Keeping the heat in

Natural Resources Canada's Office of Energy Efficiency offers this guide to educate on basic principles of building science and to provide guidance in home retrofit projects such as insulation and air sealing improvements.

1. Introduction

Remodeling, renovating or upgrading your home? The following information is designed to guide you in upgrading the energy performance of your home. Whether you do the work yourself or hire an expert professional contractor, you will have a good understanding of how to do the job or ensure that it is done properly.

1.1 Energy retrofits

Retrofitting is simply upgrading or renovating a house so it will keep the heat in during the heating season and keep it cooler during the summer. This means adding insulation, caulking and weatherstripping, improving or replacing windows and doors, and improving the mechanical systems including adequate ventilation. Retrofitting also means including energy efficiency measures in all your renovation and repair activities. Within the context of the Canadian climate, retrofitting makes a lot of sense.

1.1.1 Why retrofit?

1.1.2 Seek professional advice

A professional energy evaluation service is the best way to assess your home’s energy improvement potential. An energy advisor certified by Natural Resources Canada (NRCan) evaluates your home from the attic down to the foundation, including a measurement of your insulation levels and a blower door test to determine air tightness. You will receive a personalized report, including a checklist of recommended retrofits to improve overall energy efficiency, as well as an EnerGuide rating so you can compare the energy efficiency of your home with other homes. Your local utility may also offer this service or other assistance.

1.1.3 Retrofit opportunities

What is your best retrofit strategy? You will have to determine what shape your house is in and what can be done to improve it. Check the interior and exterior for signs of moisture damage and structural problems and maintenance and repair needs. Consider renovation opportunities, the level and condition of insulation, air leakage paths, and the age and condition of mechanical systems.

Although each house is unique, here are some typical retrofit opportunities:

Visit the Energy efficiency for homes section of the Government of Canada website for more information.

1.2 Before you get started

Every homeowner should read the following for relevant background information about the science behind retrofit techniques and materials as well as for important health and safety information:

Read other sections as required for specific details. Improving energy efficiency is an ongoing process, accomplished bit by bit as you work on your house over the years.

Where more details could be helpful (for example, information about heating systems and health concerns), we refer to the various sections of our website.

1.2.1 Measuring up

NRCan uses metric measurements and values and provides the imperial equivalent in parentheses, for example, RSI 3.5 (R-20). Some measurements are provided as expressions; for example, a 38 x 89 millimetre (mm) stud is commonly known as a 2 x 4. In these cases, the metric unit of measurement is not indicated because the imperial expressions are those used by the housing industry.

1.2.2 House as a system

Experts at NRCan have gained a great deal of experience with retrofit work over the last five decades. One of the most important lessons is that a house works as a system. Each part is related to all others and making a change in one place causes an effect elsewhere. Section 2, “How your house works”, discusses this in detail.

1.2.3 Codes and standards

Each province or territory and most municipalities have jurisdiction over their respective building codes. Follow local codes; check with your municipal office and building inspector (and utility, if applicable) for requirements and permits.

1.2.4 Recommended techniques

Please note, certain techniques are described as recommended. This means that building scientists and professional contractors believe this approach is the best current practice to follow when retrofitting a house.

1.2.5 Safety warning

Safety warnings indicate that a technique or material requires particular attention or treatment. In these instances, you must take appropriate precautions to protect the health and safety of workers and occupants. With all materials, be sure to read and follow the manufacturer’s recommendations and instructions.

1.2.6 Technical notes

Technical notes offer useful information or advice about a particular technique or procedure. This information is designed to help you ensure that the job is done properly.

1.2.7 Be aware of your responsibility

You and the companies that you select are responsible for verifying the quality and safety of the products and services used whether a building permit is required or not. All products and services must meet relevant building codes and standards.

1.3 Doing the work

Should you decide to do all or part of the renovations yourself, do not forget about health and safety. Be careful when working with tools and products, and follow the manufacturer’s safety information and directions. Wear appropriate protective equipment and clothing. You should also take steps to protect the rest of the house from dust, debris and contaminants that could pose a problem for others.

Find out about the necessary precautions to take before working in areas that contain vermin, droppings, mould, lead, asbestos, vermiculite and other hazardous products. Part 1.4, Health and safety considerations, describes some general health and safety considerations.

1.3.1 Hiring a contractor

If you decide to hire a contractor, ask for quotes in writing and insist on a written contract before you start any work. Contractors are responsible for complying with local by-laws and relevant provincial, territorial and/or federal legislation and guidelines. Ask your contractor questions about the materials to be installed, such as:

You are far more likely to have excellent results if you choose a contractor carefully and take an active interest in the work. The more you know the better. This is especially important if you are hiring a contractor to undertake general renovations and want to include energy efficiency as part of the retrofit. Visit the Renovating for energy efficiency article on the Government of Canada website for more information.

1.4 Health and safety considerations

With proper precautions, retrofitting should pose little to no threat to the health and safety of the occupants or to those doing the work. Though most building materials and renovation work can be potentially hazardous, risk factors should be low if materials are handled with care and work is performed with safety in mind. Always read and follow the manufacturer’s recommendations for safety procedures when working with various materials.

Safety reminders for each type of retrofit job are noted in the sections that follow. This section provides general construction safety tips and guidelines. Figure 1-1 shows some examples of protective gear namely a hard hat, respirator mask, work boots, gloves, coveralls and safety goggles.

 
Long description below

Figure 1-1 Protective clothing and safety equipment

Long description

Illustration of a hard hat, respirator mask, work boots, gloves, coveralls and safety goggles.

General construction safety tips

1.4.1 Asbestos and vermiculite insulation

An older home may contain insulation that is wholly or partly asbestos (usually white or greyish-white in colour) and may be in a powder or semifibrous form. If you find asbestos, check with your local or regional health authority to determine if you should consult a professional qualified to work with asbestos.

Some vermiculite insulation may contain asbestos fibres. From the 1920s to 1990, a vermiculite ore produced by the Libby Mine in Montana, USA, may have contained amphibole asbestos. It was sold in Canada as Zonolite® Attic Insulation and possibly as other brands.

Not all vermiculite insulation produced before 1990 contains asbestos fibres. However, to be safe in the absence of evidence to the contrary, it is reasonable to assume that if your home has older vermiculite insulation, it may contain some asbestos.

If vermiculite is contained in walls or attic spaces and is not disturbed, it poses very little risk to occupant health. However, if it is exposed or disturbed as it might be during a renovation, it can cause health risks. Asbestos inhalation is associated with asbestosis, lung cancer and mesothelioma.

If you find vermiculite insulation in your home, do not disturb it. Refer to Health and safety considerations for energy-efficient renovations for more information.

1.4.2 Mould

If you suspect mould growth in your home, it must be thoroughly removed, the affected areas cleaned and disinfected, and contaminated materials properly disposed of. To control and reduce the potential for mould growth, control sources of moisture, maintain indoor humidity at recommended levels (see Part 2.4, Control of moisture flow), and remedy water infiltration and leakage.

For detailed information, refer to Guide to addressing moisture and mould indoors.

1.4.3 Radon

Radon is a radioactive gas that is colourless, odourless and tasteless. Radon is produced by the breakdown of uranium, a naturally occurring material found in soil, rocks and groundwater. When radon is released from the ground into the air, it is diluted to low concentrations and is not a concern. However, in enclosed spaces, like houses, it can sometimes accumulate to high levels, which can be a health risk. The only way to know if radon is present in your home is to perform a radon test.

For more information on testing your home for radon and reducing radon levels in your home, refer to Health and safety considerations for energy-efficient renovations.

1.4.4 Protecting yourself and your family

Many materials give off particles, fibres or vapours during installation that can be harmful to the installer and anyone in the immediate area. Even natural materials such as sawdust and plaster dust can be harmful. Often, the hazard is not from the primary material, but from binders, solvents, stabilizers or other additives.

To retrofit safely and effectively, maintain a clean work area, separate it from the rest of the house and follow the guidelines below:

1.4.5 Insulation and other particulate materials

Fibrous insulation materials such as glass fibre and mineral wool can easily irritate the skin, eyes and respiratory system. Disposable lightweight coveralls or loose, thick clothing with long sleeves and tight cuffs will help minimize skin irritations. Gloves and special barrier creams that protect the skin when working with fibrous materials are available from safety supply houses and some building supply stores.

Wear goggles when there is any possibility of insulation dust coming in contact with the eyes. Eyes can easily become irritated or inflamed by brittle fibres, and permanent damage can result. Wear a hard hat to prevent head injuries, bumps and cuts (watch out for exposed roofing nails in the attic) and to protect your hair from insulation particles.

Avoid breathing insulation, wood and plastic dusts. Wear a well-designed, snug-fitting half-mask respirator with a particulate filter when handling glass fibre, mineral wool and cellulose fibre insulation.

If opening existing attics, wall cavities or ceilings, be especially cautious. Wear a well-fitted mask with replacement cartridges to avoid inhaling dust, pollens, mould spores and debris associated with bats, mice and other vermin. A half-mask respirator with a high efficiency particulate arrester (HEPA) filter cartridge is recommended. These are available through safety supply houses. Buy a supply of filters rated for the material you will be using and change the filters according to the manufacturer’s instructions.

Plastic insulations

Rigid polystyrene insulation is essentially an inert material, but it can shed particles, so use a face mask when cutting board stock. However, note that polyurethane insulations give off harmful vapours when being cut or sprayed in place. The vapour causes skin and eye irritation and breathing difficulties, even at low levels of exposure, so ventilate well.

When applying the spray-in-place material, contractors take special safety precautions and use respirators. If you plan to have spray plastic foam insulation installed inside your home, make sure you provide additional ventilation until the material has cured. Curing time is generally between 24 and 48 hours.

Caulking

Sealants and caulking materials have widely different chemical compositions. Most sealants use solvents to keep the material pliable until it is installed. Once applied, the solvents evaporate and release fumes as the material sets or cures. These fumes can cause respiratory irritation or other allergic reactions. Make sure the work area is well ventilated and provide additional ventilation to the home during the curing period, which can vary from days to weeks.

1.4.6 Lead-based paint

Older homes, especially those built before 1950, were often painted with lead-based paint. Exercise caution when working with windows, doors, trim work, wood siding or porches of older homes. For additional information, refer to the Lead-based paint article on the Government of Canada website.

1.4.7 Cleanup

A wet/dry vacuum cleaner (such as a Shop-Vac®) with a HEPA filter is the preferred type of machine to use to clean up fibres and dust. Attach an extension hose to the exhaust port of the vacuum cleaner to discharge it to the outside to ensure that any particles travelling through the filter are not recirculated in the household air.

1.4.8 Retrofitting for the hypersensitive

You or a member of your family may have hypersensitivities to certain building materials. People with allergies, asthma or chemical sensitivities might be more susceptive. Seek professional advice concerning building materials you intend to use in your home if you believe there may be any related health issues.

Technical note:

Do not use a household vacuum cleaner especially when removing drywall dust. Drywall dust can damage the vacuum motor as well as furnace fan motors and may void their warranties.

If you can only sweep up the material, wet it first to prevent particles from becoming airborne. Vacuum your clothing to avoid spreading dust and insulation material around the house. Wash work clothes separately from other clothing.

1.4.9 Aging in place

Aging in place is being able to maintain your lifestyle in your existing home as your needs change with age. This often requires making modifications to your home to ensure you maintain your comfort, safety, and independence. These modifications can range from simple adjustments such as adding railings, grab bars, more lighting, and replacing fixtures and appliances with more convenient products, to major renovations such as widening doorways, adding a main floor bedroom, or installing an accessible bathtub or shower. When undertaking any renovation, you should consider implementing aging-in-place modifications for future needs.

1.4.10 Home resiliency to weather events

Resiliency of a home is another aspect to consider when performing renovations. As extreme weather events related to climate change (storms, wildfires, extreme heat and floods) are becoming more frequent and intense, the resiliency of a home becomes an increasingly important subject. When performing retrofits, consider measures that can reduce the impacts associated with these extreme weather events, while also considering backup power generation for when electrical power is lost.

Many resiliency measures can be implemented as you make your home more comfortable and energy efficient. Here are a few tips how:

You can find more information on the web and discuss resiliency measures with your contractor.

2. How your house works

Understanding how your house works before starting a retrofit will help ensure that the job meets your expectations and that you will not be causing new issues while resolving old ones. This section explains how building science principles can help you control the flow of heat, air and moisture / humidity, and why you must consider these factors together. From your bedroom to your basement, the heating and cooling system plays an important part of improving the comfort of your home, reducing your energy bills and helping reduce harmful greenhouse gases (GHGs).

2.1 The basics of house performance

We expect our homes to be sturdy and durable, provide shelter, and keep us warm and comfortable. Some factors working together to meet these needs include the building envelope, the mechanical system and us, the occupants. This section is mainly about improving the performance of the building envelope.

2.1.1 The building envelope

The building envelope is the shell of the house, comprising the basement or crawl space walls and floor (that is, the foundation), the above-grade walls, the roof, and the windows and doors. The envelope separates our indoor environment from the weather outside. To maintain our indoor environment, the envelope must control the flow of heat, air and moisture from the inside to the outdoors.

2.1.2 The envelope and heat flow

Heat will move wherever there is a difference in temperature. Many people believe that because hot air rises, most heat loss will be through the ceiling. This is not necessarily so. As shown in Figure 2-1, heat moves in any direction – up, down or sideways – as long as it is moving from a warm spot to a colder one.

Long description below

Figure 2-1 Heat moves out of a house in all directions

Long description

Cutaway of a house showing arrows going up, down, left and right from the centre.

2.1.3 How does heat flow?

Heat flows in three distinct ways as illustrated in Figure 2-2. In a wall, for example, heat can move in one, two or three ways at the same time.

Long description below

Figure 2-2 Heat can move by conduction, convection and radiation

Long description

Illustration of a hand near a hot frying pan on a stove showing conduction, a cutaway of an exterior wall with arrows moving in a circular motion within the wall cavity showing convection, and an illustration of a hand near a hot light bulb showing radiation.

In most houses, radiation accounts for less than 10 percent of heat loss and most of that loss will be associated with windows. Conduction and convection are the main causes of heat loss; convection is the main culprit when the house is leaky.

2.1.4 The envelope and airflow

Uncontrolled airflow (that is, leakage) through the envelope can be the major source of heat loss and can lead to other problems. Since warm air can carry large amounts of water vapour, airflow is also the main means by which moisture is carried into the envelope.

Under winter conditions, inside air is forced out through the building envelope, carrying heat and moisture, while incoming replacement air brings drafts and dry winter air. For air to move from one side of the building envelope to the other, there must be holes in the envelope and a difference in air pressure between the inside and outside. The difference in air pressure can result from any combination of wind, a temperature difference creating a stack effect in the home, and combustion appliances or exhaust fans. The causes of airflow through the building envelope are demonstrated in Figure 2-3.

Long description below

Figure 2-3 Causes of airflow through the building envelope

Long description

Wind effect is represented by a cutaway of a house with arrows showing wind passing over the house and some wind travelling through the house. Stack effect is represented by a cutaway of a house with arrows showing wind entering the first floor and then moving up and out through the attic and roof. Combustion and ventilation effect is represented by a cutaway of a house with a number of arrows entering from the exterior from all directions and leaving through the chimney and kitchen and bathroom ventilation.

2.1.5 The envelope and moisture

Water, in all of its states, is the major cause of damage to a building and affects its durability. Moisture can cause concrete to crumble, wood to rot and paint to peel; it can also damage plaster, ruin carpets and encourage mould growth. Moisture can appear as a solid (ice), a liquid (water) or a gas (water vapour). It can originate from the outside of a building as surface runoff, ground water, ice, snow, rain or fog. It can also originate from the inside as water vapour produced by the occupants and their activities like washing, cleaning and cooking, and direct sources like houseplants, aquariums and humidifiers. Moisture can also come from plumbing leaks, open sumps and damp or leaky foundations.

In its different forms, moisture can move through the envelope in a number of ways:

Far more moisture can be carried by airflow through a small hole in the envelope than by diffusion through a much larger area in the building materials, as illustrated in Figure 2-4.

Long description below

Figure 2-4 Moisture entry from holes in the building envelope

Long description

Illustration of a wall corner with several small drops on one wall and a large water drop coming out of a hole on the other. – One small air leak can let in 100 times more moisture than diffusion will for the same area.

2.1.6 Condensation

Water vapour becomes a problem when it condenses into liquid water. This happens at the point of 100 percent relative humidity (known as the dew point), which is when the air cannot hold any more water vapour. Warm air can contain far more water vapour than cold air.

Condensation on windows is a typical example. When air contacts a cold window, the air loses heat. The air can then no longer hold all the water vapour and some condenses out onto the surface of the window. If the window is extremely cold, the condensation will appear as frost. Condensation is more likely to occur in humid areas such as the kitchen, bathroom and some basements and crawl spaces.

2.1.7 House as a system

A house operates as a system. All the elements of a house, the environment, envelope, mechanical systems and occupant activities affect each other, and the result affects the performance of the house as a whole. The secret to avoiding problems is in understanding these relationships.

For example, reducing air leakage provides more comfort to the occupants and protects the envelope from moisture damage, but it also increases humidity levels inside the house since less water vapour can escape. This can mean an increase of condensation on windows. If a house is tightened to this degree, it will now need more ventilation. The lesson here is that a change to one component of the house can have an immediate effect on another component. Many small changes over time can also affect the balance of the system.

Before beginning any retrofit work, it is a good idea to review what is involved and to understand which other aspects of the house may be affected. For major retrofit projects, you may have to anticipate the need for changes to the heating system or house ventilation and include these changes in the work plan. When undertaking smaller projects that are spread out over time, monitor your house carefully after each project to assess the impact of the changes.

For example, watch for signs of higher relative humidity, such as condensation on windows, stale air and lingering odours. At some point, you will probably have to make adjustments to the heating system and house ventilation to keep the system working properly and efficiently.

2.2 Control of heat flow

Insulation wraps the house in a layer of material that slows the rate of heat loss to the outdoors. Still air does not conduct heat well and is a relatively good insulator. In large empty spaces such as wall cavities, heat can be lost across the air space by convection and radiation. Insulation divides the air space into many small pockets of still air, inhibiting heat transfer by convection. At the same time, the insulation material reduces radiation across the space.

2.2.1 How is insulation rated?

To rate insulation, its resistance to heat flow is measured, and products are labelled with both an RSI value (Résistance Système International) and an R-value. The R-value is the imperial measurement, and the RSI value is the metric measurement of thermal resistance.

Use the following equation to convert an R-value (imperial) to RSI (metric).

Conversion of an R-value to RSI

R-value/5.678 = RSI

Example: 20/5.678 = RSI 3.52

The higher the resistance value, the slower the rate of heat transfer through the insulating material. One brand of insulation may be thicker or thinner than another, but if they both have the same RSI value, they will control heat flow equally well. Section 3, “Materials,” describes insulation materials and their RSI values.

Follow these common guidelines where you install insulation:

  • Ensure that the insulation fills the space completely and evenly. Blank spots or corners allow convection currents to occur, sometimes letting heat bypass the insulation completely.
  • Minimize thermal bridging. A thermal bridge is any solid material that connects the warm side of the envelope to the cold side (for example, a stud in wall). Figure 2-5 illustrates this phenomenon. When insulation such as foam board is installed on one side of the thermal bridge, it acts like a roadblock, reducing heat flow.
  • Loose-fill insulation must be installed by your contractor at the proper thickness and blown in at the proper density. This is especially important for wall and cathedral or flat roof applications.
Long description below

Figure 2-5 Thermal bridging and convection currents in the wall cavity

Long description

Cutaway of a wall with arrows travelling from the outside in through the insulation and up through loose-fitting insulation. – Wood studs create a thermal bridge and gaps in the insulation allow convection currents.

2.2.2 Nominal RSI values and effective RSI values

The nominal RSI is the insulating value for the insulation itself (for example, RSI 3.52 batt [R-20] as purchased). The effective insulation value accounts for all the other building components and what portion of the structure they represent.

For example, wall studs and top and bottom plates will reduce the effective insulation value of an insulated wall; while sheathing, drywall and the exterior finish can increase a wall’s thermal resistance. Figure 2-6 illustrates that RSI 3.52 (R-20) batt insulation in a 2 x 6 wall yields an effective insulation value of only 2.99 (R-17).

Long description below

Figure 2-6 Nominal versus effective RSI (R) values

Long description

Cutaway of a wall showing four two by six wall studs with R.S.I. 1.16 or R-6.6, and three batts of insulation with R.S.I. 3.52 or R-20 between these studs, but with an effective insulation value of only R.S.I. 2.99 or R-16.98 for the whole wall unit.

How much insulation?

You must install at least the minimum levels according to local building codes, but you can exceed these values where it is practical and economical. Table 2-1 provides a guideline for how much insulation to install based on climate zones and Figure 2-7 shows a map of climate zones and their associated criteria. How the house is built will determine how much you can practically add, and how much insulation is already there will help you decide how much you can economically add. If you are doing other renovations, this may make it worthwhile to add higher insulation levels.

Long description below

Figure 2-7 Heating degree-day zones

Long description

Heating degree-days (HDD) are a measure of heating demand based on the difference between the average daily outdoor temperature and 18°C (65°F). Cumulative totals for the month or heating season are used to estimate heating energy needs. Each zone represents an area that experiences a similar number of heating degree-days.

Table 2-1 Recommended minimum insulation values
House component Metric (RSI) or imperial (R) Nominal insulating value
Zone 4
<3000 HDD
Zone 5
3000 to 3999 HDD
Zone 6
4000 to 4999 HDD
Zone 7a
5000 to 5999 HDD
Zone 7b
6000 to 6999 HDD
Zone 8
>7000 HDD
Walls RSI 3.9 4.8 4.8 7.1 7.1 7.1
R 22.0 27.0 27.0 40.0 40.0 40.0
Basement Walls RSI 3.3 4.2 4.2 5.3 5.3 5.3
R 19.0 24.0 24.0 30.0 30.0 30.0
Roof or Ceiling RSI 7.9 9.7 10.6 14.1 14.1 14.1
R 45.0 55.0 60.0 80.0 80.0 80.0
Floor (over unheated spaces) RSI 6.2 7.1 7.1 8.8 8.8 8.8
R 35.0 40.0 40.0 50.0 50.0 50.0

2.3 Control of airflow

Controlling airflow protects building materials from moisture damage, improves comfort and makes for a cleaner, healthier, safer and quieter home. Controlling airflow prevents uncontrolled air leakage through the building envelope, provides for fresh air supply and the exhaust of stale air, and provides draft and combustion air for fuel-burning appliances.

2.3.1 Air leakage control — weather barriers, air barriers and vapour barriers

Insulation must trap still air to be effective. Insulation must be protected from wind blowing through from the outside and from air escaping from the inside of the home.

Typically, the air barrier (sometimes referred to as a wind barrier or weather barrier) is under the exterior wall finish or cladding (wood or vinyl siding, brick veneer, stucco, etc.). Its primary roles are to shield the wall components from the weather (rain, wind, etc.) while also providing an escape route to the exterior for any water vapour that has penetrated the wall cavity. When rain leaks past the cladding or internal water vapour permeates through the air barrier, there should be a space or gap at the base of the wall where the moisture can escape. This space, called the drainage plane, allows moisture to drain down and away.

An air barrier blocks airflow through the building envelope. It reduces heat loss by preventing air from passing in and out through the envelope and protects the insulation and structure from moisture damage. The air barrier, when located on the exterior, may also act as part of the drainage plane. Standard building materials, such as exterior sheathing, building paper and house wrap, act as the air barrier. Figure 2-8 shows different configurations for weather, air and vapour barriers.

Long description below

Figure 2-8 Different configurations of weather barrier, air barrier and vapour barrier

Long description

Cutaways of two walls. The first shows an exterior air barrier which acts as weather and air barrier on the exterior side, and a vapour barrier on the interior side. The second shows weather barrier on the exterior side and a combined vapour and air barrier on the interior side. An arrow representing wind is bouncing off the exterior portion of the exterior wall in both cases

The vapour barrier resists the diffusion of water vapour from the inside to the outside of the building envelope. It protects the insulation and structure from moisture damage that can be caused if water vapour moves into and condenses in the envelope assembly. In some applications, the vapour barrier also acts as the air barrier by reducing heat loss as it prevents air from passing in and out through the envelope (that is, an air and vapour barrier).

A number of building materials resist vapour diffusion well enough to be used as a vapour barrier. These include polyethylene sheeting, smart retarders, oil-based and special vapour barrier paints, some insulation materials, exterior-grade plywood and oriented strand board (OSB).

New houses typically have an air barrier on the outside and a vapour barrier on the inside of the exterior walls. The ceiling typically has only a single air and vapour barrier, as an exterior air barrier is normally impractical due to air sealing constraints caused by the roofing and ceiling structures.

One material can work as both an air barrier and a vapour barrier, provided it meets the requirements of both types of barriers and is properly installed. Polyethylene sheets and foil-backed gypsum drywall can combine these functions. To avoid confusion of terms, when a material is doing both jobs it is called an air and vapour barrier.

Long description below

Figure 2-9 The air barrier is a system that joins several building components

Long description

Cutaways of the external walls of a one storey home with a basement: circle-dotted lines around the exterior walls and window openings represent the air barrier; dashed lines up the interior above-ground and basement walls represent the vapour barrier; and circle and dashed lines along the upper wall and ceiling represent the air and vapour barrier.

Because the house envelope is made up of many components, it is impossible for any one material to surround the house completely and form the air barrier (see Figure 2-9). The air barrier is actually a continuous system made up of many parts that are sealed to each other with caulking, tape, gaskets and weatherstripping. Typical components of the air barrier system include the following:

2.3.2 How tight should an air barrier system be?

The air barrier must be continuous and well sealed. But if the air barrier is too tight, how will fresh air get into the house?

First, most older houses are so loosely built that, even after extensive air-leakage control work, enough air will still come in to provide ventilation. Second, the air barrier is just the first step in the control of airflow.

The other essential steps include providing air for ventilation and air for combustion in a controlled manner. These steps may be necessary in houses where extensive retrofit work has already been done.

Read Section 9, “Operating your house,” for essential information about ensuring proper ventilation and adequate combustion air for your home.

Safety warning:

Every home that has a combustion appliance should have carbon monoxide detectors. The local building code may require it. Typically, the requirement is to have one detector located near the furnace or appliance and one detector in each bedroom area to ensure that the alarm can be heard. Be sure to follow the installation and operation instructions. Check with your building or fire department for more information.

2.4 Control of moisture flow

Control of moisture in all its forms is critical in making homes durable and comfortable. Building components and practices such as flashings, roofing and waterproofing the basement protect the home from liquid water. It is equally important to control the movement of water vapour to provide added protection for the house structure and help maintain indoor humidity at a comfortable level.

Controlling moisture involves construction techniques that keep moisture away from the structure, producing less moisture and exhausting the excess.

2.4.1 Sources of moisture in the home

Even houses that are apparently dry, with no leaks in the basement or roof, can have moisture problems. Where does all the moisture come from?

Examples of moisture sources:

Table 2-2 Moisture added to the house through various household activities (per week assuming four occupants)
Activity Moisture produced (L)
Cooking – three meals daily 6.3
Bathing – 0.2 L per shower (a bath is 0.05 L) 2.4
Clothes washing 1.8
Floor mopping per 9.3 m² (100 sq. ft) 1.3
Normal respiration and skin evaporation from occupants 38.0
Total moisture production per week 49.8

Despite all this water produced each day, the majority of older and even newer, poorly air sealed houses have dry air in winter to the point that homeowners may have humidifiers installed. Why?

Cold outdoor air cannot carry much water vapour. Since warm moist air rises (warm air is more buoyant than cold air), it creates a negative pressure below that can draw in cold air. In poorly air sealed homes, uncontrolled airflow brings colder, drier air indoors and forces the warm, moist air out through openings in the upper walls and attic. As the moist air escapes through openings in the upper walls and attic, a drying effect is achieved throughout the house.

With regards to the warm moist air that is escaping, it can condense within the walls and attic as liquid or, if it is cold enough, as frost as illustrated in Figure 2-10. This can reduce the effectiveness of insulation, cause mould and structural damage.

Long description below

Figure 2-10 Water vapour condenses into liquid water or frost when it reaches the dew point

Long description

Cutaway of an exterior wall with a high temperature thermometer on the indoor side and a low-temperature thermometer and snowflakes on the outdoor side. There is an arrow pointing from inside outward and both small and large water droplets in the centre of the wall cavity.

2.4.2 How much humidity?

Humidity levels above 20 percent help prevent dry, sore throats and should make the air feel warmer and more comfortable. Moist air will also eliminate static electricity in the house and help to protect plants and preserve your furniture.

On the other hand, higher humidity levels can cause frosting and fogging of windows, staining of walls and ceilings, peeling paint, mould growth and odours. Condensation on windows or static electricity can provide good indications of the relative humidity levels. However, a humidity sensor or humidistat can monitor or adjust humidity levels more accurately.

Having too low or high humidity levels in your home can expose the occupants to different health risks. See Figure 2-11 for potential risks associated with different humidity levels. Maintaining a humidity level between 30-50% (lower humidity in the winter and higher in the summer) limits the exposure to humidity related health risks.

Long description below

Figure 2-11 Sterling Chart

Long description

The graph above establishes that high and low percentages of humidity pose health high risks for homeowners. According to the data shown, the optimal humidity range that diminishes health risks would be between 30-50 % Relative Humidity (RH).

See Table 9-1, Maximum indoor relative humidity levels, for more details on relative humidity levels and their effect on windows.

2.4.3 Keeping the structure dry

Here are four strategies that are used to keep the structure dry:

  • Exterior weather and moisture protection: This strategy requires building paper, siding, flashing, gutters and other construction techniques (for example, a drainage plane) to shed water and repel wind-driven rain. It also involves below-grade measures such as proper drainage, grade slope and water proofing to protect the foundation from groundwater leaks or from moisture movement by capillary action. These techniques are shown in Figure 2-12.
  • Reducing moisture at the source: This involves producing less moisture in the first place, exhausting moist air and bringing in drier air. (For solutions to moisture problems, see section 9, “Operating your house.”)
  • Preventing moist indoor air from getting into the envelope: This requires a vapour barrier to reduce moisture movement by diffusion and an air barrier to prevent moisture movement by air leakage.
    As a general rule, the vapour barrier should be on the warm side of the insulation. In some cases, however, the vapour barrier can be located within the wall or ceiling assembly, following the one-third, two-thirds rule (1/3 – 2/3 rule). This rule requires that at least two thirds of the insulation value of the wall is on the cold side of the vapour barrier (see Figure 2-13). Because this ratio should be adjusted for houses with high interior humidity (that is, levels exceeding 50 percent, such as those with indoor pools or open spa-pools) or for homes in extremely cold climates (that is, northern Canada), consult with your local building authority.
  • Letting the envelope dry (through) to the outside: This final strategy allows the house to deal with seasonal fluctuations in humidity and to release any moisture that does penetrate the envelope from the interior or exterior. Drying to the outside is promoted by layering materials most resistant to vapour diffusion on the warm side of the envelope and the least resistant (such as building paper) on the outside.
Long description below

Figure 2-12 The building envelope must shed water from the roof to the footings

Long description

Illustration showing a home’s drainage plane. Rain is hitting the roof and collecting in an eaves trough. A downspout runs down the exterior wall and away from the house. A vertical dotted line extends below the ground in line with the house, and water is drained away from the footing of the basement.

Long description below

Figure 2-13 Up to one third of the insulating value can be installed on the warm side of the vapour barrier

Long description

Cutaway of an exterior facing wall with two-thirds of the total batt insulation next to the exterior wall and one-third of the batt insulation on the interior side. The two sections are separated by a vapour barrier.

Some wall systems work well with a relatively impermeable insulated sheathing because the interior wall-cavity temperatures are kept high. As a precaution, when retrofitting a wall, always install code-compliant RSI levels of insulated sheathing and ensure that the interior surfaces are vapour resistant.

Some siding applications have an air space or drainage plane immediately behind the exterior finish to promote drying out of materials that have been soaked by rain, wind or solar-driven dampness. This drainage plane also provides an escape route for any moisture that has penetrated the wall cavity from the indoors. If installing insulated siding, keep a drainage space behind the insulation even though a small amount of the insulation value of the siding will be lost.

2.5 Older homes

Older homes are part of our architectural heritage and require special consideration when retrofitting. Maintaining the durability of the structure is especially important. Some houses that were built before 1950 incorporated unusual construction details and materials that make it necessary to improvise and adapt standard retrofit methods.

Remain sensitive to the heritage aspect, design, materials and particular features of the house when retrofitting. Some houses may even have special heritage designation that may limit what can be changed. The retrofit will need to minimize changes to the building’s appearance and emphasize repair, rather than replacement, of building components. In any event, it is advisable to consult with your local building authorities about planned upgrades.

In some cases, you may want to consult with an architect or a building conservator with knowledge of heritage house conservation and in others, an engineer, before undertaking work that may compromise the structure. Refer to the Renovating for energy efficiency section of our website.

3. Materials: insulation, house wrap barriers and weatherstripping

Whether for your attic or your basement, choosing the right materials and installing them properly ensures the finished job lives up to your expectations. This section describes the types of insulations, house wrap materials (air barriers and vapour barriers) as well as details about weatherstripping windows and doors.

Embodied carbon

Embodied carbon, sometimes referred to as embodied energy, are the green house gas (GHG) emissions associated with building materials during their entire life cycle. This life cycle includes resource extraction, manufacturing, transportation, installation and construction process, maintenance, and eventual demolition and end of life recycling or disposal of the material. Just as improving the energy performance and efficiency of a home can reduce emissions from heating, cooling and ventilation systems, selecting materials with low embodied carbon emission factors is an important step in reducing the overall carbon footprint of a home. You can consider embodied carbon when selecting building materials and practices in planning energy efficient retrofits. For example, plant based materials (for example, wood, straw, hemp, cellulose) typically have lower embodied carbon factors than synthetic and mineral-based products, which may require considerable energy to manufacture. You can ask your contractor, an energy advisor or check the web about embodied carbon when planning a renovation.

3.1 Insulation

To be effective, insulation must resist heat flow, fill the space completely and evenly, be durable, and for some locations, withstand exposure to heat or moisture. Different materials may be used at different locations in the house envelope depending on the space available, ease of access and other installation requirements.

In addition, consider the following:

For proper application, material handling, safety equipment and protective clothing requirements, follow the manufacturer’s instructions (see Part 1.4, Health and safety considerations). Figure 3-1 shows various Insulating materials and safety equipment.

Long description below

Figure 3-1 Insulating materials and safety equipment

Long description

Illustration of a hard hat, work light, dust-particle mask, overalls, goggles, fire extinguisher, first aid kit, tubes of caulking as well as batts and rigid board insulation, and foam plastic pipe-wrap insulation.

3.1.1 Do your research

Once you have selected a product, get the facts about it and find out about proper installation techniques. Compare the advantages, limitations and intended use of different products.

Materials (or their packaging) may be marked indicating that they comply with Canadian product standards. If they do not, they may have an evaluation number issued by the Canadian Construction Materials Centre. Your local municipal office can tell you if certain products are acceptable for use in your municipality.

Manufacturers and suppliers are responsible for making sure that the products they sell comply with Canadian legislation. If you are concerned about the safety of a particular product, find out if it is prohibited or regulated under the Canada Consumer Product Safety Act and Canadian Environmental Protection Act (the Acts), and other relevant federal, provincial or territorial legislation, or municipal bylaws.

Ask for a Safety Data Sheet (SDS) that lists the hazardous ingredients, safety information and emergency measures related to specific products (SDS replaces the previous Material Safety Data Sheet [MSDS]). An SDS is required for certain industrial and chemical products used in the workplace like paint, caulking, spray foam insulation and cleaners. An SDS is not required for manufactured items (for example, insulation) or consumer products, but it may be available from the manufacturer or supplier.

For example, as of the date of publication, two types of insulation products are prohibited and one other is regulated under the Acts as follows:

Prohibited

Regulated

For more information about the Acts and for clarification on these requirements, visit Meeting Canada Consumer Product Safety Act requirements and Understanding the Canadian Environmental Protection Act. Visit Renovating for energy efficiency for information on Health and safety considerations for energy-efficient renovations.

3.1.2 Cost of materials

Generally, the cost per RSI value is lower for loose fill or batt type materials than for rigid board or foam type insulations. However, the price of the basic material is just one aspect. High material costs may be offset by lower installation costs or the installer’s preference for a particular insulation technique.

3.1.3 Thermal performance: How effective is that material?

Thermal resistance values (RSI and R) are listed in Table 3-1. This table also provides average design specifications because values for different manufacturer’s products of the same class may vary.

3.1.4 If it sounds too good to be true . . .

Some manufacturers may claim that an insulation product offers remarkable insulating value. Any product that is promoted as offering a long-term thermal resistance exceeding RSI 1.14/25 mm (R-6.5/in.) may be making a claim that is not substantiated by industry-recognized tests to specific accepted standards. Also, be alert to any manufacturer’s thermal performance claims that are based on building envelope systems (for example, whole wall or ceiling configurations) that are not identical to those configurations or conditions in which the product is being considered for use.

3.1.5 Summary of insulation types

This section explains the following insulation types:

Batt or blanket insulation

Glass fibre and mineral fibre (slag or rock wool) batt or blanket insulation is relatively easy to install in accessible spaces such as exposed wall cavities and some attics. This type of insulation does not settle, it conforms to slight surface irregularities, and it can be cut to fit. To gain the maximum insulating benefit, batts and blankets should completely fill the space they are fitted into and neither be compressed nor have gaps (especially avoid compressing the edges).

Some products are available in non-combustible form. Check with the manufacturer to verify that the products are non-combustible. Safety equipment and protective clothing are required during installation.

Technical note:

Glass and mineral fibre insulations are typically poor air sealing products. Sometimes these products are stuffed into cracks and gaps (at the header in the basement or around a window) in an attempt to block air leakage. This practice is not effective. Always air seal by using appropriate materials and techniques.

Loose-fill insulation

Loose-fill insulation is suitable for walls and floors and excellent in attics and enclosed spaces, such as roofs, where the space between the joists may be irregular or cluttered with obstacles. You can use it to top up existing insulation in attics and accessible enclosed wall cavities and to fill in cracks and small or uneven spaces. It is not appropriate for below-grade application. Use safety equipment and wear protective clothing during installation. Consider hiring a trained and manufacturer-licensed technician to perform the installation.

Safety warning:

Never allow insulation materials to come into contact with a chimney or a combustion vent, an exposed recessed lighting fixture or an old knob and tube wiring because these can pose a fire hazard. See Part 1.4, Health and safety considerations.

Loose-fill insulation may be poured or blown into cavities. Pouring will generally require more material than blowing to achieve a specified RSI value. Check the manufacturer’s information on the quantity of material required to provide a specified RSI value.

Most loose-fill materials installed in walls will settle after installation, creating gaps at the top of the cavities. There are different installation approaches for each type of material to lessen this effect.

Loose-fill insulation options include cellulose fibre, glass fibre and mineral fibre described as follows.

i) Cellulose fibre

Cellulose fibre is made from shredded newsprint treated with chemicals that resist fire and fungal growth and inhibit corrosion. Because of its small particle size, it can fill any gaps around obstructions such as nails or electrical wires that are within cavities. However, blowing cellulose fibre can create a lot of dust. Be sure to make allowance for settling.

Cellulose fibre offers limited additional air sealing when blown into cavities that already have insulation. However, it will provide increased air sealing when blown into empty and restricted cavities at dense-pack levels, typically around 56 kilograms per cubic metre (kg/m³) (3.5 pounds per cubic foot [lb./cu. ft.]).

To reduce settling, some companies offer a wet-spray installation technique for their products for open wall cavities that may require a fabric net. Drying time varies for the different types and brands of product.

ii) Glass fibre

Loose-fill glass fibre is a similar material to glass fibre batts, but chopped up for blowing or pouring applications. Hand-poured glass fibre works best in open horizontal surfaces such as attics. Blown glass fibre can be used in both horizontal and vertical applications.

At conventional application pressure, it may be difficult to install in cavities that are partially blocked by nails, framing, electrical wiring, etc. At dense-pack levels (that is, around 40 kg/m3 [2.5 lb./cu. ft.]), higher RSI (R) values are achieved and can better fill cavities that have restrictions. For walls, application density is usually two to two-and-a-half times the manufacturer’s recommended rate of application for horizontal surfaces. This higher density ensures better overall application and performance.

Some products are classified as non-combustible. Check the manufacturer’s specifications for verification.

iii) Mineral fibre (mineral wool or rock wool)

Loose-fill mineral fibre is treated with oil and binders to suppress dust, maintain shape and ease the blowing process. It is similar to glass fibre in appearance and texture. Mineral fibre is suitable for accessible attics and inaccessible areas such as wood-frame walls, roofs or floors. For walls, the density of application is usually two to two-and-a-half times the manufacturer’s recommended rate of application for horizontal surfaces.

Mineral fibre may be acceptable for insulating around masonry chimneys as it will not support combustion. However, check with your local building inspector to learn what is accepted.

Rigid board insulation

Rigid board insulation (insulating boards) is currently manufactured from mineral fibre or foam plastic materials. These materials have a high insulating value per unit thickness although the cost per RSI value is greater than that for loose-fill or batt or blanket insulations.

Insulating boards are lightweight and easy to cut and handle. Fitting them into irregular spaces, however, can be a tedious process. Some boards are available with special coverings (for example, a fire-resistant material) and their own system of attachment. Some board materials can be ordered pre-cut to specific sizes for an additional cost.

When installed on interior surfaces, all plastic-based rigid board insulation must be covered with a fire-resistant material – typically 13 mm (1/2 in.) drywall – that is mechanically fastened to the building structure. Plastic boards must be protected from prolonged exposure to sunlight, solvents and some sealants. Be sure to ask your supplier for a compatible sealant.

Rigid board insulation options include expanded polystyrene, extruded polystyrene, mineral fibre rigid board and polyurethane and polyisocyanurate plastic boards described as follows.

i) Expanded polystyrene

Expanded polystyrene (EPS), often called bead board, is made by using pressurized steam to expand and form polystyrene beads into rigid foam plastic boards. High and low-density products are manufactured using steam as the blowing agent. High-density board is more moisture resistant and can be used on the exterior of foundation walls in dry, sandy soils.

ii) Extruded polystyrene

Extruded polystyrene (XPS) is a foam plastic board with fine, closed cells containing a mixture of air and non-ozone depleting refrigerant gases. If joints are sealed properly, it can perform as an air barrier and, at certain thicknesses, may perform as a vapour barrier. Low permeability means that it does not absorb or pass on moisture, making it suitable for below-grade applications.

iii) Mineral fibre rigid board

Mineral fibre insulation, when compressed and held together with a combustible binder, forms semi-rigid board stock. The fibres are aligned vertically so that any water that penetrates the surface will run down, making it suitable as a drainage layer. High-density, semi-rigid mineral fibre board for residential use is designed for below-grade exterior applications.

iv) Polyurethane and polyisocyanurate boards

Long description below

Figure 3-2 Foil-faced foam board acts as an air vapour barrier

Long description

Cutaway of a wall showing the multiple layers of an exterior-facing wall with snowflakes indicating the outdoors. The cutaway section has four wall studs with batts of insulation filling the three cavities. The batts form the layer closest to the exterior. The next layer is a foil-faced foam board, foil facing the interior, and with spacers creating an air gap between it and the interior wall finish.

Polyurethane and polyisocyanurate plastic boards are made of closed cells containing non-ozone depleting refrigerant gases instead of air. They usually come double-faced with foil (as shown in Figure 3-2) or are sometimes bonded with an interior or exterior finishing material. These products must be protected from prolonged exposure to sunlight and water. If the seams are well sealed, they can act as an air and vapour barrier. Use is generally limited to areas where a high RSI is desired and space is limited. The RSI value of some polyisocyanurate products tends to drop in cold temperatures so it should be used as an interior insulation layer unless a cold temperature rating is given.

Spray-foam insulation

Spray-foam insulation is a mixture of plastic resin (for example, soy-based resins or resins made from recycled plastic) and a catalyst, that are prepared and applied on the job site. Spray kits for this type of insulation are available to the consumer, but employing a certified installer who is trained in the application of the specific product will ensure the best results. The liquid foam is sprayed directly onto the building surface or poured into enclosed cavities with a pump-driven applicator. The foam expands in place and sets in seconds.

There are two types of foam: low density and high density. When installed on interior surfaces, all plastic-based foam insulation must be covered with a fire-resistant material – typically 13 mm (1/2 in.) drywall – that is mechanically fastened to the building. All foam plastics must be protected from prolonged exposure to sunlight.

Options for spray-foam insulation include closed-cell polyurethane foam and open-cell polyurethane foam described as follows.

i) Closed-cell polyurethane foam

Closed-cell polyurethane foam (also called high-density or two-pound foam) is sprayed onto surfaces in layers not more than 50 mm (2 in.) thick at each pass (if greater thicknesses are desired), where it hardens in seconds. A 24 hour curing and off-gassing period is required before occupancy can resume. The foam can expand 28 to 35 times its initial volume and should not be used in enclosed cavities.

This product can be used as an air barrier. When applied to a thickness of 50 mm (2 in.), it can sometimes act as a vapour barrier. It can be used below grade and it bonds well to clean cement and masonry where it also makes a good moisture barrier. Though high-density foam is a premium, hard textured, multi-task product, it is not generally used to completely fill cavities due to its high cost.

Technical note:

Freshly applied closed-cell spray polyurethane foam can have an RSI value as high as 2.0. However, due to the loss of the foam’s blowing gases over the immediate and long term, its RSI value should be limited to only 0.90 as shown in Table 3-1. This is because the design RSI value is based on a long-term thermal resistance (LTTR) test that accounts for the deterioration of the insulation over time. The LTTR value is determined by measuring the thermal resistance of a closed-cell foam insulation over 5 years under laboratory conditions. It is best practice to use the LTTR as the design value when calculating the amount of insulation required.

ii) Open-cell polyurethane foam

Open-cell polyurethane foam (also known as low-density or half-pound foam) is made from a combination of isocyanurate resins and catalysts, resulting in an open-celled, spongy semiflexible material. With a very high expansion rate – up to 100 times its initial volume – and its lower comparative cost, this product is more effective than closed-cell foam for filling larger cavities. It can be used as an air barrier but not a vapour barrier.

Cementitious foam insulation

Recently introduced into Canada, cementitious foam insulation is a non-plastic based non-combustible material with a soft chalky texture. When poured or injected into cavities by a trained installer, it has the consistency of shaving cream and may require some drying out time. This insulation can be used as an air barrier but not a vapour barrier.

Reflective bubble foil insulations and radiant barriers

Reflective bubble foil insulation is essentially a plastic bubble wrap sheet with a reflective foil layer and belongs to a class of insulation products known as radiant foils. Reflective bubble foil insulations – and other radiant barrier products like paints and sheeting – are noted for their ability to reflect unwanted solar radiation in hot climates, when applied properly.

However, all of Canada is considered a cold climate, so these products do not perform as promoted. Though they are often marketed as offering very high insulating values, there is no specific standard for radiant insulation products, so be wary of posted testimonials and manufacturers’ thermal performance claims.

Research has shown that the insulation value of reflective bubble foil insulations and radiant barriers can vary from RSI 0 (R-0) to RSI 0.62 (R-3.5) per thickness of material. The effective insulating value depends on the number of adjacent dead air spaces, layers of foil and where they are installed.

If the foil is laminated to rigid foam insulation, the total insulating value is obtained by adding the RSI of the foam insulation to the RSI of the dead air space and the foil. If there is no air space or clear bubble layer, the RSI value of the film is zero.

3.2 Insulation values table

Table 3-1 lists the thermal resistance ranges and the accepted design specification values or averages of insulation materials, including older and less common materials that you may find in a house.

Table 3-1 Insulation Values
Material Ranges RSI/25.4 mm (R/in.) Design spec or average
RSI/25.4 mm (R/in.)
Polyurethane closed-cell spray foam 0.92 to 1.14 (R-5.2 to 6.5) 1.06 (R-6)
Polyurethane board 0.97 to 1.2 (R-5.5 to 6.8) 1.06 (R-6)
Extruded polystyrene board (XPS) 0.88 (R-5) 0.88 (R-5)
Polyisocyanurate spray foam 0.85 to 1.46 (R-4.8 to 8.3) 0.88 (R-5)
High-density glass fibre board 0.63 to 0.88 (R-3.6 to 5) 0.7 (R-4)
Expanded polystyrene board – Type I (EPS) 0.67 (R-3.8) 0.67 (R-3.8)
Expanded polystyrene board – Type Il (EPS) 0.7 to 0.77 (R-4 to 4.4) 0.7 (R-4)
Glass fibre roof board 0.67 (R-3.8) 0.67 (R-3.8)
Cementitious foam 0.69 (R-3.9) 0.69 (R-3.9)
Cotton fibre batt 0.67 (R-3.8) 0.67 (R-3.8)
Cork 0.65 to 0.67 (R-3.7 to 3.8) 0.65 (R-3.7)
Polyurethane open-cell spray foam 0.63 to 0.67 (R-3.6 to 3.8) 0.63 (R-3.6)
Polyurethane open-cell foam, poured 0.7 (R-4) 0.7 (R-4)
Cellulose fibre, wet sprayed 0.53 to 0.67 (R-3 to 3.8) 0.63 (R-3.6)
Cellulose fibre, blown, settled thickness 0.53 to 0.67 (R-3 to 3.8) 0.63 (R-3.6)
Mineral fibre batt 0.53 to 0.7 (R-3 to 4) 0.6 (R-3.4)
Wood fibre 0.58 (R-3.3) 0.58 (R-3.3)
Mineral fibre, loose fill, poured 0.44 to 0.65 (R-2.5 to 3.7) 0.58 (R-3.3)
Glass fibre batt 0.55 to 0.76 (R-3.1 to 4.3) 0.56 (R-3.2)
Glass fibre, loose fill, poured 0.39 to 0.65 (R-2.2 to 3.7) 0.53 (R-3)
Mineral fibre, loose fill, blown 0.51 to 0.56 (R-3 to 3.8) 0.53 (R-3)
Glass fibre, loose fill, blown 0.48 to 0.63 (R-2.7 to 3.6) 0.51 (R-2.9)
Fibreboard (beaverboard) 0.41 (R-2.3) 0.41 (R-2.3)
Mineral aggregate board (Insulbrick) 0.41 to 0.7 (R-2.3 to 4) 0.46 (R-2.6)
Wood shavings 0.18 to 0.53 (R-1 to 3) 0.42 (R-2.4)
Vermiculite* 0.37 to 0.41 (R-2.1 to 2.3) 0.38 (R-2.2)
Compressed straw board 0.35 (R-2.0) 0.35 (R-2.0)
Eel grass (seaweed) batt 0.53 (R-3) 0.53 (R-3)
Cedar logs 0.18 (R-1) 0.18 (R-1)
Softwood logs (other than cedar) 0.18 to 0.25 (R-1 to 1.4) 0.22 (R-1.25)
Hardwood logs 0.12 (R-0.7) 0.22 (R-1.25)
Straw bale 0.23 to 0.28 (R-1.3 to 1.6) 0.26 (R-1.45)
Radiant foil insulation See Reflective bubble foil insulations and radiant barriers in Part 3.1

* See the vermiculite health and safety warning in Part 1.4, Health and safety considerations.

3.3 Air barrier materials

The main purpose of an air barrier system is to protect the building structure and the insulation from moisture damage. It must resist air movement; be continuous, completely surrounding the envelope of the house; be properly supported by rigid surfaces on both the interior and exterior (to prevent movement in high winds); and be strong and durable. Attention to detail during installation is critical for good performance.

Various materials throughout the envelope act as an air barrier. Large-surface building materials such as drywall, baseboards or structural members and windows and doorframes are incorporated into the air barrier by sealing them to the adjoining materials. Caulking, tapes and gaskets are used for joints between materials that do not move, and weatherstripping, for joints that do move.

3.3.1 Choosing an air barrier material

If the material that you are considering using offers resistance to airflow and is strong and durable, consider the following installation factors:

Sheet materials

i) House wrap (typically made from a spun polyolefin plastic)

ii) Polyethylene sheeting

Technical note:

If the sheeting will be exposed to sunlight over an extended period during renovations, use a UV-stabilized polyethylene.

iii) Polyamide sheeting

iv) Rigid materials

Most solid building components including drywall, plaster, plywood, glass, wood, rigid foam insulation and poured concrete (not concrete blocks) will act as air barriers. Seal all seams between these materials with the appropriate caulking, weatherstripping, tape or gasket. For example, caulking can be used between the baseboard and a wall as well as between the baseboard and the floor, linking the air sealing qualities of three building components.

3.3.2 Sealants

Caulking seals joints between building components. Most joints move because of changes in moisture and temperature in the building. Some materials can seal a larger joint and accommodate more joint movement than others. Choose carefully because there is wide variation among the same type of products produced under different brands. If possible, always select the premium product for long-term durability. Choosing the proper product and paying attention to the quality of application are crucial.

All sealants will require extra ventilation of the house after application to let the material cure. Typical curing time will be two or three days for interior applications. For application directions, see Part 4.2, Caulking and other air sealing materials.

Materials labelled “for exterior use only” may not be suitable for indoor applications because they may contain volatiles that may be hazardous in a confined space if inhaled over an extended period. Read the manufacturer’s literature carefully.

The following factors limit the effectiveness of caulking:

Table 3-2 lists caulks and sealants available at most building supply stores. It is designed to help you select the best product for each application. If possible, always select a premium product for long-term durability.

Technical note:

Be mindful when using caulks and sealants. Urethane foams are impossible to remove once cured, other products are flammable. Read manufacturers’ literature and take proper precautions during installations (see Part 1.4, Health and safety considerations).

Table 3-2 Air barrier caulking and sealants
Type Bonds to Application Maximum joint Comments
Acoustical sealant
  • metal, concrete, gypsum board and polyethylene
  • use only where sandwiched between two materials (not exposed to the exterior)
  • staples required when sealing joints in polyethylene
  • can be reapplied over itself
  • 16 mm (5/8 in.)
  • accepts 10% joint movement
  • good durability: 20 years
  • non-hardening
  • not paintable
Butyl rubber caulk (synthetic rubber sealant)
  • most surfaces but particularly suited to metal and masonry
  • generally used on exterior
  • ventilation required during application and curing (up to three days)
  • difficult to smooth
  • 13 mm (1/2 in.)
  • accepts 12.5 to 25% joint movement
  • low to moderate durability: 5 to 10 years
  • available in a variety of colours
  • paintable after curing
Silicone sealant caulk
  • most non-porous surfaces like ceramic tile, glass and some plastics
  • primers may be required on wood, steel or anodized aluminum
  • avoid bare concrete, masonry and steel
  • cannot be used over existing silicone
  • interior and exterior grades
  • ventilation required during application
  • easy to smooth
  • flexible, watertight seal when cured
  • 25 mm (1 in.) with backer rod
  • accepts 12 to 50% joint movement
  • excellent for large moving joints
  • good durability: 20+ years
  • available with fungicide for wet locations and in a high-temperature type for use around chimneys/vents
  • available in colours and clear
  • most types not paintable
  • paintable types less durable
Polysulphide caulk (synthetic rubber sealant)
  • stone, masonry and concrete surfaces when used with a special primer
  • may attack some plastics
  • generally used on exterior
  • can be used below grade
  • ventilation required while curing
  • moderately easy to smooth
  • flexible upon curing
  • 25 mm (1 in.) with backer rod
  • accepts 12 to 25% joint movement
  • very good durability: 25+ years
  • available in several colours
  • paintable
Polyurethane caulk (urethane)
  • most surfaces
  • preferred choice of window and door installers
  • exterior use only
  • ventilation required while curing
  • long curing time
  • can be hard to smooth
  • flexible upon curing
  • can be reapplied over itself
  • 25 mm (1 in.) with backer rod
  • very stretchable: up to 50% joint movement
  • very good durability: 25+ years
  • limited colours
  • paintable
Acrylic latex caulk
  • aluminum, concrete, fiber cement, masonry, vinyl, wood
  • avoid steel
  • interior and exterior use
  • ventilation required when curing
  • easy to smooth
  • 10 mm (3/8 in.)
  • accepts 7 to 10% joint movement
  • low to moderate durability (varies by brand): 5 to 25 years
  • water cleanup
  • comes in colours
  • paintable
Acrylic latex with silicone caulk
  • aluminum, concrete, fiber cement, masonry, vinyl, wood
  • avoid steel
  • interior and exterior use
  • ventilation required when curing
  • easy to smooth
  • can be reapplied over itself
  • 13 mm (1/2 in.)
  • accepts 12.5 to 25% joint movement
  • very good durability: 30+ years
  • water cleanup
  • paintable
Elastomeric latex sealant
  • most surfaces
  • interior (some brands only) and exterior use
  • ventilation required when curing
  • flexible upon curing
  • moderately easy to smooth
  • can be reapplied over itself
  • 25 mm (1 in.) with backer rod
  • accepts 50% joint movement
  • very good durability: 30+ years
  • water cleanup limited colours
  • paintable
Urethane foam sealant (low, medium and high expansion types)
  • most surfaces except Teflon, polyethylene or silicone plastics
  • interior and exterior use
  • use only low expansion type around window and doorframes or risk bowing
  • can be used below grade
  • ventilation required during installation
  • can be reapplied over previous foam
  • protect from sunlight
  • check the can for expansion rates and sizes of cracks that can be filled
  • very good for filling larger joints and cavities like header/joist intersections, around indoor and outdoor plumbing and vent openings, and wiring holes
  • good durability: 10 to 20 years
  • available in individual aerosol spray cans and dispensing systems with spray nozzles
  • hard consistency when cured
  • use gloves and a drop cloth: impossible to remove residue after curing
  • use acetone to clean up uncured foam
  • paintable
Latex foam sealant
  • most surfaces
  • interior and exterior use
  • must be covered for exterior use due to open-cell structure
  • not for use below grade
  • ventilation required during installation
  • extremely flammable during application: read precautions on the product label
  • can be applied in successive layers
  • difficult to smooth
  • will not over expand – reaches 75% of size upon application
  • recommended around window and door frames, but requires a vapour barrier
  • good durability: 10 to 20 years
  • cleans up with water
  • soft, spongy consistency when cured
  • paintable
High-temperature stove or muffler cements and non-combustible sealants
  • most materials
  • typically used in conjunction with other materials for sealing around masonry or factory-built chimneys
  • interior and exterior use
  • for use in high temperature applications
  • easy to smooth
  • no joint movement
  • very good durability
  • compatible with high-temperature silicone sealant
  • check product for certified performance rating for high-temperature use
  • available at heating equipment supply stores

3.3.3 Gaskets

Gaskets are used to seal joints where caulking may not be appropriate. Figure 3-3 shows a gasket used to seal electrical outlets and Figure 3-4 shows a typical foam backer rod. Table 3-3 describes the most common types of gasket materials and where each type works best.

Long description below

Figure 3-3 Electrical outlet gasket

Long description

Illustration of a disassembled electrical outlet covering, with a screw, the faceplate, a gasket directly behind the faceplate, and the exposed outlet behind the gasket. An outlet plug with the insulating gasket affixed is visible in the foreground.

Long description below

Figure 3-4 Foam backer rod

Long description

Illustration of a coiled foam backer rod

Table 3-3 Gaskets
Type Application Installation Comments
Sill plate gasket (polyethylene foam strips) installed between the foundation and sill plate during construction or where existing house walls meet staple to hold it temporarily in place
cuts easily with a knife
available in 152 and 203 mm (6 and 8 in.) widths on 24 m (79 ft.) rolls
Foam backer rod (closed-cell compressible foam rope) excellent for filling gaps before caulking ensure caulking will fill the gap (see product specifications for maximum joint width) available in diameters of 6 to 50 mm (1/4 to 2 in.)
Electrical outlet and lighting fixture gaskets (pre-cut) designed to fit behind the cover plates of electrical receptacles, switches and lighting mounts electrical outlet gaskets are more effective when caulked and should be used in conjunction with child-safety plugs to reduce air leakage through electrical sockets place the centre cut-out piece of foam gasket over the end of the electrical plug or child safety plug to ensure a proper seal
Neoprene and elastomeric gaskets excellent for sealing joints and penetrations where movement is to be expected such as plumbing stacks best slipped over piping, if possible
very difficult to seal if it must be cut to fit around piping
flexible and very durable

3.3.4 Weatherstripping

Weatherstripping is used to block air leakage around doors and the operable parts of windows. Weatherstripping comes in a variety of shapes: flat strip, tube or V (that is, V-strips), and can be designed to work under compression or by sliding along the joint. To be effective, the product must close the gap and not allow air to pass. Some products get hard – and less effective – in cold weather when you need them the most.

When choosing weatherstripping, consider the size of the gap to be sealed and the durability, ease of installation and finished appearance of the product. Look for products that are flexible and that spring back to their original shape quickly and easily. Avoid products that make it difficult to operate the window or door. When replacing weatherstripping, bring a sample of the old material to the store with you to ensure that you purchase the correct product.

A wide range of products is available in most building supply stores, including complete sealing kits. For the best quality weatherstripping, contact window and door manufacturers or installers.

Table 3-4 lists the major types of products and Figure 3-5 illustrates them.

Long description below

Figure 3-5 Types of weatherstripping

Long description

Nine illustrations of weatherstripping options including the following types: closed-cell foam, ribbed, tubular, spring vinyl, spring metal, magnetic strip, door sweep, full threshold, and spring loaded.

Table 3-4 Weatherstripping - Compression strips
Category Application Installation Comments
Closed-cell foam (with or without vinyl covering)
  • use where there is a pressure stress: along the bottom of vertical sliding windows, around attic hatches or on hinged windows and doors
  • adhesive-backed
  • easy to install
  • available in rolls
  • available as a high-performance compressible polyurethane strip with its own carrier
  • good for irregular surfaces
  • vinyl may crack over time
Ribbed closed-cell rubber as above
  • adhesive-backed
  • available in rolls
  • very durable
  • easy to install
  • good for irregular surfaces
  • less appropriate for long or varied gaps
Tubular stripping material as above
  • has its own attachment or an attachment strip
  • installed with nails, staples or screws
  • rubber more durable than plastic
  • noticeable when installed
  • check for suitability of use in cold weather
Table 3-5 Weatherstripping - Tension strips
Category Application Installation Comments
Spring vinyl
  • use in the same applications as compression strips
  • also in sliding joints for double-hung windows and doors
  • adhesive-backed
  • easy to install
  • use small-format V-strip for narrow gaps such as tight-fitting double-hung windows
  • use large format for wide gaps
  • good durability
  • polypropylene type should be chosen instead of other plastics
Spring metal
  • generally used for doors
  • most effective under light compression
  • installed using small tacks
  • metal can permanently deform
  • potential to ice-up
Table 3-6 Weatherstripping - Combination types
Category Application Installation Comments
Spring-loaded, self adjusting
  • spring mechanism adapts to long unequal distances from the weatherstrip to the door or window
  • effective for doors and hinged windows
  • installed with screws through an attachment strip
  • can be used in conjunction with V- strips
  • cannot adjust to small irregularities
  • limited colours
  • highly visible
Magnetic-strip systems
  • magnetic strips on the frame and on the door/window provide the seal
  • effective for doors and hinged windows
  • ensure a clean, smooth surface for installation of self-stick products
  • good durability
  • highly noticeable when installed
  • limited colours
  • for doors: works best on modern steel doors
  • may not provide good seal in cold conditions because of condensation and frost formation (plastic casing may stiffen and split)
Table 3-7 Weatherstripping - Door bottoms, sweeps and thresholds
Category Application Installation Comments
Door sweeps (attach to the door)
  • vinyl, pile, silicone or rubber sweep
  • screwed with a metal or plastic attachment strip
  • easier to install than a threshold
  • effective with low-pile carpet or no carpet
  • height variable attachment
  • some models have replacement seals available
  • more durable than thresholds, but often provide a less effective seal
  • some vinyl types are very flexible and more durable
Door bottoms
  • combination strips of vinyl, pile or compressible rubber
  • attachment strip fits over the door bottom
  • requires a clearance of 8 to 13 mm (1/3 to 1/2 in.) under the door
  • more durable than thresholds, but often provide a less effective seal
Thresholds (attach to the floor or door frame beneath the door)
  • a vinyl rubber or combination metal/vinyl or rubber strip attached to the threshold
  • requires clearance below the door, see the manufacturer’s instructions
  • can become damaged by traffic and weathering
  • some models have replacement seals available
  • provides an excellent seal
  • less durable than door sweeps, but a more effective seal
Table 3-8 Weatherstripping - Other air barrier materials
Category Application Installation Comments
Duct tape
  • approved foil and flexible plastic duct tapes can be used to seal seams of heating duct to reduce air leakage
  • do not use on heating equipment vents or chimneys
  • may require removal of paper backing to expose the adhesive
  • clean surfaces before applying
  • do not use common vinyl or cloth-backed duct tapes because the adhesive fails over time
  • use especially where ducts pass through unheated areas
Sheathing tape (that is, red technical tape)
  • used to seal the seams of house wrap, wind barrier material and polyethylene air barrier material
  • try to place tape joints between building materials to help further secure it, if possible
  • very sticky adhesive
  • do not apply temporarily to finished surfaces because the adhesive may remain on the surface after the tape is removed
Electrical box air barriers
  • placed around electrical outlet and switch boxes before installation
  • equipped with a flange for sealing to the main air barrier
  • also act as a vapour barrier
  • seal the wiring hole with an appropriate sealant
Mastic putty
  • hole filler
  • usually applied around pipes and cabling on exterior walls
  • sticks or ribbons of putty are softened and pushed around pipes or cables on existing walls or furnace plenum
  • poor adhesion when the product dries out
  • do not use below grade or where subject to wetting
Mastic latex sealant
  • seals joints on heating, cooling and ventilation ducts
  • apply to cleaned joints with a brush or a cotton glove with non-latex liner (then discard!)
  • easy cleanup
  • good bond
  • not noticeable
  • water-based type has low to no fumes
Pot light covers (recessed light covers)
  • seals pot light fixtures to the top of the ceiling
  • installed from above with screws
  • some come with sealants on gaskets
  • designed for high temperatures

3.4 Vapour barrier materials

The vapour barrier is an important component of the house envelope because it protects the structure and insulation from moisture damage. The vapour barrier must resist the flow of water vapour from the interior, be durable and be located on the warm side of the insulation. In some cases it may be part of the insulation or air barrier. It should be easy to install and appropriate for other work being done on the home.

Install the vapour barrier to protect the entire surface areas of insulated walls, ceilings and floors. Give special attention to all penetrations, joints and junctions (for example, light fixtures, wall plugs, switches and window frames) and areas that receive high humidity such as bathrooms and kitchens. Figure 3-6 illustrates an open electrical box, placed in a poly-pan vapour barrier box, encircled by a caulking to be attached to a vapour barrier.

Long description below

Figure 3-6 Sealing an electrical box

Long description

Illustration of an open electrical box, placed in a poly-pan vapour barrier box, encircled by a caulking to be attached to a vapour barrier.

Usually located on the warm side of the insulation, the vapour barrier can also be installed part way into the wall, provided that no more than one third of the insulating value of the wall is on the warm side of the vapour barrier. For information about the 1/3 – 2/3 rule, see Part 2.4, Control of moisture flow.

This amount of insulating value should be reduced to one quarter or less in very cold climates or in buildings with high moisture sources such as swimming pools. Like an air barrier, the vapour barrier can be made of various materials, including existing building components such as plywood, OSB, paint or vinyl wallpaper. In most older homes, the layers of oil-based primer and paint can function as an adequate vapour barrier for walls and ceilings.

Vapour barrier performance

The effectiveness of a vapour barrier (also known as a vapour diffusion retarder) is measured in terms of its permeability (perm) rating. The lower the perm rating, the more effective the moisture barrier will be. Materials considered to be effective vapour barriers include polyethylene, aluminum foil, polamide film (smart barrier), oil-based and latex vapour barrier paints (varying by type and thickness, some types and thickness of insulation and even some vinyl wallpapers).

4. Comprehensive air leakage control in your home

Air leakage control is the single most important retrofit activity, and it should be considered first in any upgrade strategy for your house. Air leakage control is essential. Every time you insulate, install or upgrade the air barrier system, ensure that moisture does not enter the insulation or building envelope. Comprehensive air leakage control is the systematic identification and sealing of as many air leakage paths as possible with weatherstripping and caulking and by applying gaskets and tapes. Did you know that your windows, doors, cracks in the walls, interior trim and even light fixtures in the ceiling are potential leakages areas?

Contracting the work

Homeowners can usually do a relatively effective air sealing job if they have the time and patience and are conscientious about air sealing in areas that can be difficult and uncomfortable to work in (for example, the attic). However, professional air sealers can usually do a much better job because of their experience in locating and sealing leaks.

Contractors may use a depressurizing fan door (sometimes called a blower door) with smoke pencils to locate air leaks and use specialty caulking and sealants. The infrared scanner, used in conjunction with a blower door test, is also a powerful tool to locate air leaks and missing insulation.

Many air sealing companies also offer testing and assessment of ventilation and combustion air requirements, including testing for backdrafting of combustion gases.

Effect on a house as a whole

As the envelope is tightened, household humidity levels rise and can create condensation and moisture problems. Additionally, as less fresh air is circulated through the house, less air becomes available for combustion appliances. Therefore, an important part of comprehensive air leakage control is attention to controllable whole-house ventilation and combustion-air supply. Refer to Part 9.4, Ventilation and combustion air, for ways to control the ventilation in your home.

Proper ventilation ensures healthier indoor air quality which includes controlling the humidity in the home. For more information on indoor relative humidity, refer to Part 2.4.2, How much humidity?, and Figure 2-11, Sterling Chart.

Each house will respond to comprehensive air sealing in its own unique way, so monitoring is important. Older houses may require remedial measures before air sealing.

For example, moisture can accumulate in the walls over time, resulting in mould buildup. This situation may require cleanup and replacement of the affected materials and installation of an improved air and vapour barrier. The best way to avoid problems is to understand how they occur and to take steps to control humidity and ventilation.

Furnaces, water heaters, fireplaces, woodstoves and any other fuel-burning appliances require air for combustion and for exhausting the products of combustion out of the house. If there is not enough air, the chimney or flue could spill dangerous gases into the house.

Humidity, ventilation and combustion air are discussed in more detail in Section 9, “Operating your house.”

4.1 Finding leakage areas

Air leaks occur where there is a hole in the building envelope and a pressure difference. In winter, the house tends to operate like a chimney due to the stack effect, where air enters the house at lower levels and exits at the upper levels and ceiling.

4.1.1 How to locate air leaks

Identifying the specific leakage areas requires a little detective work. For optimal results, hire an air sealing contractor or professional energy advisor. However, you can also do it yourself, as described below.

Long description below

Figure 4-1 Do-it-yourself leak detector

Long description

Illustration of a hand holding two burning incense sticks next to an electrical outlet with smoke drifting away from the outlet.

Make yourself a leak detector (see Figure 4-1) – all you need are burning incense sticks. Hold two or three together for more smoke and easier detection. Powerful leaks will cause the smoke to dissipate and the tips of the incense to glow. Slower leaks will cause the smoke to trail away or move toward the leak.

On a cold day, check for drafts in all suspected areas. It is easier to locate air leaks on a windy day. Check for possible leaks on the interior walls and features, such as electrical outlets and switches, because there may be a direct route through partition walls or along floor joists to the outside that should be sealed.

You can perform a rudimentary fan test by closing all windows and doors and turning on all the exhaust appliances in the house, such as bathroom and kitchen fans, clothes dryers (on cool cycle) and any portable fan placed in a window (if you can seal around it). However, before starting, turn off any fuel-fired space and water heaters to prevent backdrafting of combustion gases. You can now go around the house with your leak detector and identify and mark the air leakage locations that should be sealed.

4.1.2 Checklist of air leakage areas

A few areas deserve special attention (illustrated in Figure 4-2) but do not limit your detective work to just these places.

Long description below

Figure 4-2 Typical leakage areas

Long description

Cutaway of one-storey house with sloped roof and basement showing 13 numbered key locations to check for leaks, including an attic hatch, ceiling penetrations into the attic, doors, exhaust vent, mail slot, sill and header, service entry, floor drain, foundation cracks, electrical outlets, windows, chimney, and penetrations from attic to roof.

Inside the main living areas, check the following:

Inside the attic, check the following (you may have to move aside existing insulation):

Inside the basement, check the following:

Safety warning:

See Part 1.4, Health and safety considerations, for a warning about asbestos and vermiculite insulation.

4.2 Caulking and other air sealing materials

Long description below

Figure 4-3 Sealing air and vapour barrier seams

Long description

Cutaway of a wall showing the five steps to installing polyethylene and vapour barriers: 1) First sheet placed over a solid member. 2) Bead of acoustical caulking. 3) Second sheet pressed into the head. 4) Staples through the bead. 5) Wallboard or batten attached for mechanical support.

Air seal cracks and penetrations on the inside surface of exterior walls, ceilings or floors to prevent air from escaping into the walls and roof.

On the exterior, caulk cracks that will allow water and insect entry. If you are painting the house, try not to plug the joints in the siding and use a permeable paint or stain. The outside of the walls must be able to dispel moisture. For these same reasons, do not paint stucco; special sealers are available for stucco.

4.2.1 Caulking basics

Buy a good quality caulking gun that easily fits your hand to avoid strain. The gun should have a pressure release lever. A thumb release is convenient since it permits one-hand operation, as are a nozzle cutter and tube piercer.

Choose the right sealant for the job. People often have a bad experience when they first try caulking because they purchase a low quality or inappropriate caulk and/or caulking gun. Choose premium caulks for durability. Practice running and smoothing beads before starting on the actual See Figures 4-3 and 4-4 for guidelines for applying caulking.

See Part 3.3, Air barrier materials, for a guide to the different types of caulking.

Safety warning:

Use non-combustible caulking around heat sources (chimney, light fixtures, fan motors, etc.). Silicone or polysulphide sealants usually work well. Special high-temperature silicones are available for flue pipes. Check the product labels.

Long description below

Figure 4-4 How to lay a bead of caulking

Long description

Illustration of a tube of caulking, with caulking being applied to a small gap where a vertical and a horizontal surface meet. An arrow indicates the direction of application. Hold the caulking gun approximately perpendicular to the line of travel. Cut the nozzle squarely. Force the caulk into the crack.

4.2.2 Other sealing materials and applications

Other materials are used to provide an air barrier at different locations in the house, including specialty gaskets and tapes, as well as sheet materials such as polyethylene, spun-bonded olefin, rigid insulation, drywall, plywood, Oriented Strand Board (OSB) and sheet metal. Installation techniques are critical when using sheet materials as an air barrier. Seal all edges, seams and penetrations in the sheets.

4.2.3 Air and vapour barriers

It is often possible to install a new air and vapour barrier by using sealed drywall as the air barrier and layers of paint or sheet polyethylene as the vapour barrier. Alternatively, sealed sheet polyethylene installed on the warm side of the insulation can provide both an air barrier and a vapour barrier. Proper installation is critical (see Figure 4-3).

4.2.4 Refinishing the interior

If an attic retrofit is part of interior renovations, consider removing the ceiling and installing a new sheet-polyethylene or sealed drywall air barrier on the underside of the ceiling joists. Although sealing the air barrier on the ceiling to the one on the wall should pose no difficulties, maintaining continuity at interior partitions will require some ingenuity and detailed work.

Where partition walls run perpendicular to the ceiling joists, maintain continuity by working from above, using connecting strips of polyethylene or extruded polystyrene.

Where partition walls run parallel to the ceiling joists, install blocking and nailing strips to provide support for the new ceiling materials.

4.2.5 Tips on sealing some of the leakiest areas

Electrical outlets

If you notice a draft through any wall electrical outlet, seal it. Inside wall outlets can also be leaky and need to be sealed. Turn off the power to the outlet by turning off the circuit breaker or removing the fuse. Check to make sure the power is disconnected by turning on a lamp.

You will obtain a better seal if you caulk the gasket before installation. Additionally, there are special approved foam pads that fit between the cover plate and receptacles. As well, you can place child safety plugs in seldom-used outlets. Look for the foam pads that come with a gasket that fits on the safety plug (see Figure 3-3 in Section 3).

If you are installing an electrical outlet during a renovation, place it in a special plastic box available from building supply stores, for an optimal seal. Caulk the penetration for the wire, and seal the new air and vapour barrier to the edge of the box.

Trim areas

Seal areas of air leakage around all baseboards, mouldings and window and door casings. In some cases, this can be done easily by sealing all the joints with a flexible caulk that is clear, paintable or of a matching colour. A more effective solution is to carefully remove the trim and seal behind it. Insulate wide cracks with a foam backer rod and seal them with caulking, the appropriate type of polyurethane foam or other suitable material (see Figure 4-5). If you remove baseboards, you might also be able to caulk between the wall finish and the bottom wall plates, and between the plates and the floor.

Glass panes (glazings)

The seal between glass and its wood frame should be tight. Check the glazing carefully and be certain that all the seals are intact, with no cracks or missing sections. If not, repair them with glazing compound that lasts longer and stays semi-soft and usable longer than putty. Remove the old putty and apply the new materials with a putty knife. Press it firmly into the space for a good seal and then paint, allowing the paint to just touch the glass.

Long description below

Figure 4-5 Sealing behind window or door trim

Long description

Cutaway of a properly air sealed window or door trim. The large crack behind the trim is filled with foam backer rod sealed with caulking.

Long description below

Figure 4-6 Sealing an unused open fire place

Long description

Cutaway of a fireplace indicating the damper at the base of the chimney, the combustion air supply and damper connected by a vent in the floor of the fireplace to the exterior, and an insulated board in front of the fireplace opening that can serve as a plug.

Fireplaces

Close the chimney damper when a fireplace is not in use. Take a flashlight and make sure the damper fully closes. If it does not, have it repaired by a certified chimney specialist. However, even with the damper closed, a great deal of heat may still escape up the chimney. You can install tight fitting glass doors but be aware that most are not very tight or effective. The door frame should be tightly sealed to the fireplace with non-combustible caulk, and the frame should include a combustion air gate or damper. The air gate permits entry of combustion air from the outside to supply the fire, but when not being used, the air gate should be closed. Ask for door kits at your wood-burning appliance dealer or local building-supply outlet.

Seal an unused or seasonally used fireplace by putting an airtight plug of some sort in the chimney or across the fireplace opening. This can be made from board material that is cloth-covered and provides a good seal at the edges (see Figure 4-6).

Check for air leaks where the chimney meets the wall (remove the trim if necessary). Caulk this joint with a high-temperature caulking.

Chimney

Chimneys pose particular challenges for air-sealing and insulating.

Long description below

Figure 4-7 Cutaway view of a well-sealed attic hatch

Long description

There is sealant between the casing and the ceiling drywall. A hook with an eyebolt ensures that the hatch is held firmly against the weatherstripping.

Attic hatch

Seal the attic hatch exactly as you would seal an exterior door. Caulk around the frame and between the casing and the ceiling drywall. Weatherstrip along the edges of the casing or the access panel itself. Finally, install hooks with eyebolts or some sort of latch mechanism to hold the hatch firmly against the weatherstripping (see Figure 4-7). The hatch itself should be insulated.

Safety warning:

Fire safety is a real concern when air-sealing and insulating. Refer to Part 5.1.2, Fire and other hazards in attics, for methods of dealing with this area.

Windows that are never opened

Seal windows that are not needed for ventilation or as a possible emergency escape route with caulking rather than weatherstripping. Use special strippable caulk that can be removed when you want to operate the window again.

5. Roofs and attics

Relatively easy access has made the attic a favourite starting point to insulate for many homeowners, despite the fact that most other areas, such as basements and uninsulated walls, lose more heat than the typical attic. Even if an attic is already insulated, there may still be an opportunity to improve the energy efficiency and soundness of the house through air sealing and ventilation. Air leaks via the chimneys, vents, plumbing pipes and electrical boxes in the attic can account for substantial heat loss and can lead to a variety of moisture-related problems.

The importance of air sealing cannot be overstated. If you are upgrading your attic, read this entire section for helpful tips and other relevant information. Figure 5-1 displays four different types of attics.

Long description below

Figure 5-1 Types of attics

Long description

Four illustrations, including one-and-a-half storey house with knee walls and small attic space, a truss attic where the framing forms a w-pattern throughout, an accessible attic which is unfinished and more open, and a cathedral/flat roof/mansard attic which has large interior walls and ceilings and little attic space.

5.1 General considerations for all attics

Regardless of the type of attic or ceiling your house has, there are a number of things to examine before beginning work. A thorough inspection of the following features will help you to develop your retrofit strategy.

Accessibility

Most houses with accessible attics have an interior ceiling hatch, although exterior roof or wall-mounted entries are not uncommon. A hatch should be large enough to allow you to bring in materials. If not, or if there is no access, you may be able to cut a hole in the ceiling in an inconspicuous place such as a closet. Exterior entries, for example in a gable end represent one less opening that will have to be air sealed, which offers ready access to firefighters in the event of a fire.

Check the roof space for obstructions and ease of movement. Vertical clearances of less than 1 m (39 in.) will not allow you to move freely. Attics or roofs without a working space are covered later in this chapter, in Part 5.4, Cramped attics, cathedral ceilings and flat roofs. Figure 5-2 illustrates a more worker-friendly attic space.

Long description below

Figure 5-2 Placing boards on the joints creates a working platform that evenly distributes the weight

Long description

Illustration of a person working in an accessible, unfinished attic, wearing proper safety equipment including gloves, overalls, boots, a dust mask, goggles and a hard hat. The person is kneeling on boards laid across the joists, while holding an unopened bale of batt insulation, and has tools such as a hammer, staple gun, tape measure, and utility knife laid out on the side.

Assessments

In addition to checking for structural problems, check the condition of the roof framing, sheathing, finish and the soffit and fascia for signs of moisture problems such as leaks, stains, mould, flaking or rot. Uncorrected moisture problems will reduce the effectiveness of insulation and can lead to structural damage such as wood rot or split rafters. Mould or rot are sure signs of advanced condensation problems. Identify the cause and correct it before adding insulation.

Moisture can come from the outside due to failure of the roof or flashing. Typical problem areas include poor flashing at a hip, valley or the chimney and ice dam leaks. Pay particular attention to water marks on the underside of the sheathing or along rafters.

Moisture can also come from inside the house, carried into the attic as water vapour by air leakage. Typical problem areas occur around bathroom and kitchen vents that penetrate the ceiling, around plumbing stacks and chimney chases and at wiring penetrations and pot lights. A tell-tale sign of air leakage is the discolouration of insulation, so do not hesitate to look under existing insulation to locate air leaks.

Check the attic during or just after a cold snap for condensation buildup, which will appear as frost in cold climates. Some frost buildup is to be expected, but if it is particularly heavy buildup (10 mm [3/8 in.] or more), look to make sure ventilation is present and not blocked with insulation. Checking the attic during or just after a rainstorm will help determine whether moisture problems are generated by interior or exterior sources.

Examine the existing insulation for type, condition (dry, wet, compact, etc.), average depth and coverage. If it has been damaged or contaminated by mould or vermin, remove it. However, do not disturb vermiculite insulation (see Part 1.4, Health and safety considerations).

If the insulation is wet, do not cover it until the source of moisture is removed and the insulation is dry. If the insulation is dry, it will probably be all right to leave it in place. Generally, there is no problem in using two types of insulation. Check the depth of the insulation to determine its insulating value. Compare this with the recommended insulation values in Part 2.2, Control of heat flow.

Make sure that the insulation is distributed evenly and that there is full depth coverage, especially around the perimeter of the attic above the wall plates. Uninsulated areas will cause a cold spot where the wall and ceiling meet, which can lead to moisture and mould problems.

Existing air and vapour barriers

Houses should have a vapour barrier on the warm side of the insulation. In older homes, the vapour barrier might have been provided by wax paper, kraft paper-backed batts or layers of paint. Newer houses usually have a polyethylene sheet vapour barrier, but overall, very few houses have an effective air barrier.

If there is an air barrier, locate it and determine its condition. Remember, an air barrier must be continuous; holes or tears must be repaired, and penetrations sealed. Do not hesitate to pull back existing insulation where leakage sites might be found and seal these areas. However, do not disturb vermiculite insulation as previously warned.

Increased insulation means a colder attic, which in turn means that any vapour escaping into the attic can condense before it can be vented. It is essential to air seal the attic to prevent moist indoor air from getting in.

If there is no air and vapour barrier, concentrate on comprehensive air sealing. Create an effective air barrier by using caulking, gaskets and weatherstripping to seal the joints between building components. Do not rely on batt, blown-in or poured insulation to reduce the need for proper air sealing.

Structural considerations

When undertaking attic or roof renovations, consider upgrading the roof structure for future photovoltaics or solar hot water panels. Keep in mind that adding an additional layer of shingles to the existing layer will result in an additional load on the roof structure. It is typically recommended to remove existing shingles when installing new ones.

5.1.2 Fire and other hazards in attics

Safety warning:

Certain areas in the attic can pose serious fire and health hazards. Before air sealing and insulating an attic, ensure you or your contractor address the following health and safety concerns.

Masonry chimneys

Check the chimney and surrounding framing for signs of charring, soot deposits, crumbling masonry or mortar, or evidence that the chimney lining is deteriorating. Do not insulate it if the chimney is suspect. Have a chimney specialist repair, seal and insulate it at the same time.

Commonly a gap exists where a masonry chimney passes through the attic. To air seal this area, first install sheet metal flashing to bridge this gap and then seal all the joints with a non-combustible sealant (ensure the product is rated for this application). To prevent insulation, especially blown-in insulation, from coming into contact with the chimney, construct a barrier 75 mm (3 in.) from the face of the masonry chimney and a minimum 75 mm (3 in.) higher than the top of the insulation, as shown in Figure 5-3.

Long description below

Figure 5-3 Keep combustibles away from a masonry chimney

Long description

Cutaway of a masonry chimney as it passes through a ceiling and attic. A 75 millimetre or 3-inch air space is created around the chimney by a non-combustible barrier extending 75 millimetres or 3 inches above the attic insulation. This barrier rests on non-combustible flashing sealed to the chimney masonry and to the top side of the attic joists by high-temperature caulking. An air and vapour barrier covers the floor of the attic space and is sealed to the joists with acoustical sealant.

Metal chimneys

Factory-built metal chimneys should be kept from contacting insulation by a minimum 75 mm (3 in.) unless otherwise specified by manufacturer or local authorities. Install a non-flammable radiation shield that maintains a 75-mm (3-in.) air space between the chimney and insulation. To reduce air leakage, first air seal the fire stop to the air and vapour barrier with non-combustible sealant. The top of the radiation shield should also be a minimum of 75 mm (3 in.) higher than the level of existing or new insulation to be added. To prevent insulation from falling behind the shield, attach a clamp-type storm collar without sealant at the top of the radiation shield, as shown in Figure 5-4.

Long description below

Figure 5-4 Keep combustibles away from an insulated metal chimney

Long description

Cutaway of a metal chimney as it passes through a ceiling and attic. A radiation barrier creates a 75 millimetre or 3-inch air space around the chimney and extends 75 millimetres or 3 inches above the attic insulation, maintaining the distance from combustible materials. The top of the barrier is a storm collar clamped, not sealed, to the chimney. Above the ceiling, the air and vapour barrier is wrapped around the drywall to contact the firestop sealant. From the ceiling side of the floor below the attic, a firestop is installed and sealed with high-temperature caulking. A collar-like ceiling trim plate is attached below the firestop.

Electrical installations

Work safely around electrical wiring (turn off the power). Consult with an electrical contractor if questionable wiring or corroded electrical connections are present.

Recessed lighting

Standard interior recessed lights are difficult to air seal effectively and can become a fire hazard if covered with insulation. Replace with approved airtight recessed fixtures or covers that can be installed safely under insulation. Keep insulation away from a recessed light fixture as shown in Figure 5-5.

Long description below

Figure 5-5 Keep insulation away from a recessed light fixture by creating a barrier

Long description

Cutaway of a ceiling. Around the light fixture a 12.5 millimetre or half-inch plywood box lined with a fire-resistant material such as drywall or sheet metal provides airspace around the fixture. All joints and edges of the box are caulked to minimize air leakage. To determine the minimum box volume, allow 800 cubic centimetres per watt of the fixture. For example, a 150-watt the fixture would require a 120,000 cubic centimetre box. Centre the fixture if possible, and keep it a minimum of 12.5 millimetres or half an inch from the sides and top. Above the fixture, leave a minimum 12.5 millimetres or half an inch, but 150 millimetres or 6 inches is preferred.

As an alternative to traditional recessed or pot lights consider light-emitting diode (LED) flush or flat mount fixtures for better energy efficiency. This also offers the opportunity to better seal and insulate the existing cavity. Ensure that fixture installation instructions are followed.

Animal droppings

If you find a significant amount of animal droppings and vermin in the attic, do not disturb them because they can harbour easily airborne moulds, parasite eggs and bacteria that can cause severe illness. See Part 1.4, Health and safety considerations, for more information.

5.1.3 Air sealing

Seal the following areas:

  • Around the plumbing stack and any other pipes. For plastic plumbing stacks that move up and down due to thermal expansion, use a flexible gasket or a polyethylene sleeve sealed to a plywood collar (see Figure 5-6).
  • Around wires or ceiling light fixtures that penetrate the attic floor and partition and exterior wall top plates (see Figure 5-7 and Figure 5-8). See Part 5.1.2, Fire and other hazards in attics, on how to deal with recessed lights.
  • Around ducting that enters the attic from inside the house. Seal duct joints with aluminum duct tape or paint or mastic. Seal the gaps where ducts penetrate the ceiling. The ducts should stay below the insulation or should be wrapped with insulation and be protected from being crushed. Exhaust fans should always discharge to the outside but not directly below the soffit vents.
  • At the junction of the ceiling and interior wall partitions, pull back the insulation to locate and caulk cracks along interior walls (see Figure 4-4).
  • At the top of interior and exterior walls, check to see if all wall cavities are blocked from the attic (usually by a top plate). Block any open spaces in the exposed cavity with a piece of rigid board insulation and caulking. If the top plate is cracked or poorly fitted, use caulking and polyethylene to create a tight seal (see Figure 5-7).
  • Around attic hatches (see Figure 4-7).
  • Around the chimney. Building codes require that air spaces between chimneys and floor or ceiling assemblies through which they pass be sealed with a non-combustible fire stop (see Figure 5-3 and Figure 5-4).
  • Along the edge of shared walls. There is often a gap between the party wall (such as the shared wall between units in duplexes, triplexes and row houses) and the edge of the attic floor. Ensure that this gap is well sealed. If you suspect that air is leaking up and out of a party wall made of concrete blocks, hire a contractor to seal the blocks.
Long description below

Figure 5-6 Sealing the plumbing stack

Long description

Illustration of a sealed plumbing stack tube as it passes through a ceiling and attic. A heavy polyethylene strip which is overlapped, caulked with acoustical sealant, and stapled to the space between attic joists, is secured with a pipe clamp around the plumbing stack.

Long description below

Figure 5-7 Sealing an electrical box (Note: See Figure 5-5 for the special case of recessed lighting electrical boxes)

Long description

Illustration of a sealed electrical box in an attic space. A heavy polyethylene sheet which is caulked with acoustical sealant and stapled to the ceiling encases the electrical box. An electrical wire leads away from the electrical box and down through a hole into an interior wall. Holes around electrical wires are filled with caulking or foam sealant, and caulking seals gaps along the top of the interior walls.

Long description below

Figure 5-8 Sealing a light fixture on the ceiling

Long description

Illustration of a spherical light fixture being attached to a ceiling and sealed with a non-adhesive caulking, or a gasket approved by the Canadian Standards Association.

5.1.4 Ventilation

Attic ventilation serves a number of purposes. It reduces summer heat buildup, prolonging the life of roofing and reduces air conditioner loads. After air sealing, attic ventilation is your second line of defence against the water vapour that may have found its way into the attic. It ensures a colder, well-vented attic space less prone to the formation of ice dams at the eaves.

Make sure that existing attic vents are working properly and not blocked by insulation, debris or other materials. You may have to locate roof or soffit vents from outside if they are not clearly visible from inside the attic.

Houses with peaked roofs and accessible attics are the easiest to vent by using the ratio of 1 to 300. This ratio refers to unobstructed vent area to the insulated ceiling area. The vent area must be increased if vents are covered with screening (to keep out insects, etc.) and with baffles (to keep out rain and snow), which reduce the clear area of the vents. Ideally, locate vents to allow for good cross ventilation from end to end and from top to bottom. However, although important, vents will not prevent condensation and will not solve the problems created by air leakage.

Although an airtight ceiling will significantly reduce the likelihood of moisture in the attic, building codes still require minimum attic ventilation.

Do not automatically increase ventilation. Also, do not use electric exhaust fans for attic ventilation as these can draw more air than can be supplied through the soffit vents. This will actually pull house air into the attic, resulting in greater heat loss and moisture accumulation. They are also prone to failure, noise production and increased energy use. Wind-driven, revolving roof vents do not create suction and are no more effective than other types of capped vents.

The location of vents is as important as their number and type. Often, a mixture of types and locations will work best. The following Parts detail the best approach depending on your attic type.

5.2 Easily accessible attics

After you have inspected the attic and carried out any remedial work, focus first on air and moisture control.

5.2.1 Air and moisture control

There are five options for installing an air barrier system in an unfinished attic:

The first option is the most practical, since installing a polyethylene air and vapour barrier in an existing attic is fraught with obstructions and requires painstaking attention to detail. On the other hand, spray foam offers air sealing and an initial layer of high quality insulation that can be topped up to the desired RSI (R) level.

If the attic retrofit is being completed in conjunction with interior renovations, the easiest approach is to install a new, single air and vapour barrier on the underside of the ceiling joists.

5.2.2 Concentrate on air sealing

It is a good idea to paint the room side of the ceiling with two coats of oil-based paint or apply a single coat of latex vapour barrier paint to inhibit vapour movement. Ordinary latex paint is not a suitable vapour barrier.

See Section 4, “Comprehensive air leakage control,” for detailed information on sealing all air leaks into the attic.

Install polyethylene over top of the joists

If the attic is relatively unobstructed with chimneys, plumbing stacks or structural members, consider installing polyethylene directly over the ceiling joists. This method involves the least number of seams and requires less caulking and stapling than other methods. It also leaves existing insulation in place. However, seal all obvious air leakage paths before laying down the polyethylene. This method is illustrated in Figure 5-9.

Long description below

Figure 5-9 Installation of polyethylene sheets over attic joists

Long description

Cutaway of the layers in an attic space with polyethylene air barrier over attic joists. An arrow travelling from outdoors through a vent in the roof overhang and into the attic space indicates air flow. There is a layer of rigid foam board on the attic floor at the eaves to maintain ventilation space. A polyethylene sheet is attached to the top of attic joists by caulking and staples. Insulation is both between the attic joists and on top of the polyethylene sheet.

To avoid trapping moisture between the plastic and the ceiling, which might lead to possible wood rot or other moisture-related problems, install a minimum of twice the insulating value over top of the air vapour barrier (such as applying the one-third, two-thirds rule). For example, if the joist height is 89 mm (3 1/2 in.) and contains RSI 2.1 (R-12), install at least RSI 4.2 (R-24) over top of the polyethylene.

The main difficulty with this technique involves sealing the barrier to the wall top plate, especially at the eaves where there is little room to manoeuvre. This area must be well sealed. Spray foam or rigid board insulation can help bridge the gap in this area. Cut rigid board to fit between the ceiling joists and to extend from the exterior wall top plate toward the attic. A second piece of rigid insulation, installed vertically, joins the polyethylene to the horizontal rigid board. Carefully caulk any joints or seams between materials. Expanding two-part spray foam kits (or the service of a spray foam company) are also very good for sealing areas around joists and boards.

Install polyethylene between the joists

Where obstructions, such as a truss roof, make the previous method too difficult, install a polyethylene air barrier or low-permeable foam insulation board between the joists. However, note that this is a lengthy and painstaking process.

Remove existing insulation from the area you are working on and set it to one side. Cut foam boards to fit snugly between the trusses. Caulk all edges, gaps and joints, see Figures 5-10 and 5-13. Obstructions, such as electrical wires, will require cuts in the barrier; seal these carefully to make the barrier continuous. Another option though less effective, is to cut the polyethylene strips about 200 mm (8 in.) wider than the joist spacing. Lay a bead of caulking on the side of the joists along their length and install the polyethylene using staples, installed through the caulk every 75 mm (3 in.).

Long description below

Figure 5-10 Foam board laid between the joists and caulked as an air and vapour barrier

Long description

Cutaway of the space between attic joists with a layer of foam board placed between the joists and attached to the attic floor with caulking. A layer of batt insulation is placed on top of the foam board.

Spray foam between the joists

Spray foam contractors can install closed-cell foam between the joists to air seal and add insulation at the same time to the ceiling. All existing insulation and dust must be removed first to allow for a good bond. A minimum of 50 mm (2 in.) is needed; top up with other insulation afterwards.

Spray foam under the roof

This approach involves installing closed-cell spray foam directly under the roof surface, right down to the junction of the ceiling and exterior walls. This eliminates roof venting and creates what is called a hot roof, where the attic space becomes part of the conditioned (heated and cooled) house space. This process may be suitable for some attics, but do not proceed without approval from your building inspector, and then only use a certified spray foam contractor who is familiar with the process.

5.2.3 Installing insulation

Common materials for use in accessible attics are batt or blanket types or loose-fill insulation. If there are obstructions above the joists, such as with a truss roof, it may be easiest to put batt insulation into the joist spaces and then use loose-fill insulation to create a complete blanket of insulation above the joists and around all obstructions. Loose-fill insulation is also good by itself, especially in irregular or obstructed spaces.

Batt or blanket insulation

Fit batt insulation into place between the ceiling joists snugly, without compression. If the joist space is not the standard 406 or 610 mm (16 or 24-in.), cut the batts to fit the space or use loose-fill insulation

Additional installation tips:

Long description below

Figure 5-11 Baffles can be used to maintain airflow through the soffit vents

Long description

Cutaway of baffles between attic roof joists with arrows indicating air movement traveling from the exterior, through a vent in the ceiling overhang, and over the baffles.

Long description below

Figure 5-12 Fitting insulation around cross bracing

Long description

Cutaway of cut batt insulation inserted between the cross bracing in the attic joists.

Long description below

Figure 5-13 The top layer of insulation runs perpendicular to the bottom layer

Long description

Illustration of layers of batts of insulation between and above attic joists. Batts on top of joists are perpendicular to batts between joists. A polyethylene sheet is laid under both layers of insulation and attached to the top of attic joists by caulking and staples.

Loose-fill insulation
Long description below

Figure 5-14 Installing loose-fill insulation

Long description

Illustration of a person installing loose-fill insulation. The installer is wearing safety equipment, including goggles, a dust mask, a hard hat, overalls, gloves, and work boots. The person placed a marker on the truss uprights to indicate the final depth of the insulation to be achieved.

5.2.4 Ventilation

Ideally, 50 percent of the attic ventilation openings should be continuous soffit vents, and the other 50 percent gable, ridge or roof vents. Figure 5-15 shows various types of vents. Any of them are adequate when used in conjunction with soffit vents. Ridge vents are preferable where practical, but must be equipped with baffles to deflect wind blowing up the roof and to prevent the penetration of water and snow. Occasionally, a house will only have soffit vents. In this case, install gable end, ridge or roof vents to take advantage of cross ventilation.

Long description below

Figure 5-15 Roof venting

Long description

Illustration of a slanted roof that highlights different types of ventilation, including soffit vents, gable end vent, ridge vent, and a roof vent.

5.3 Houses with half storeys

Houses with 1 ½ or 2 ½ storeys have attics with several small parts that may make access, air sealing and insulating very difficult. If you cannot get into these spaces, you may have to hire a contractor. If the space is accessible, the following section gives some guidelines on how to do the work yourself.

5.3.1 Air and vapour control

Where you have access to the attic space, follow the directions for the control of air and vapour flows as outlined in Part 5.2, Easily accessible attics.

Houses with half storeys have one major source of air leakage that must not be overlooked: through the ceiling joists immediately beneath the knee walls (see Figure 5-16). This critical air leakage area must be sealed flush with the back of the knee wall finish. This can be done by cutting and fitting foam board that will fill that ceiling joist opening and seal it into place with caulking or spray foam.

Long description below

Figure 5-16 Rigid insulation can be nailed over the studs of the knee-wall section

Long description

Cutaway of one side of a slanted roof showing the attic rafter vent at the eaves and a vent space halfway up the roof, foam board is installed on the knee walls and to the ceiling and caulked at the top and base.

Another option may be to dense-pack loose-fill insulation between the floorboards and the ceiling below while ensuring that an air barrier is installed.

5.3.2 Ventilation

Ventilate the attic spaces above and beside the top storey separately by using gable vents. Position the vents to prevent wind from blowing through the insulation.

A second option is to use gable vents or a ridge vent for the area above the attic ceiling and soffit vents in the side areas. This is a good option if the house already has working soffit vents (see Figure 5-17). A ventilation space in the rafter section will permit airflow between the insulated areas.

Otherwise, you will have to install rafter vents in the section along the rafters to ensure adequate ventilation (see Figure 5-17 and Figure 5-18). These vents must be on the cold side of the space, while the warm side can be filled with insulation that can be added to the sloping ceiling portion unless other arrangements are made in the renovation process.

Long description below

Figure 5-17 Ventilation occurs between sections through attic rafter vents installed in the rafter section. (Note: See Figure 5-11 for baffle detail.)

Long description

Cutaway of a slanted roof with triangular vents at opposite ends of the peak and at opposite ends of the base of the overhang. Arrows indicating air flow travel through the vents up the interior of the roof along baffles.

Long description below

Figure 5-18 Each section has its own cross ventilation

Long description

Cutaway of a roof with triangular vents at opposite ends of the peak, and at opposite ends of the base of the overhang. Arrows travel through the vents and indicate airflow.

5.3.3 Insulation

Spray foam and rigid foam insulation can be used, but batts are less expensive and easier to handle in confined spaces (see Figure 5-19). If there are any electrical outlets (use care to avoid shocks – and also take this opportunity to upgrade wiring in this area) or pipes in the knee wall, keep them on the warm side of the air and vapour barrier and insulation, and seal the air and vapour barrier around them.

Long description below

Figure 5-19 The wall and floor sections of a half storey are being insulated and secured

Long description

Cutaway of one side of a slanted roof and the exterior showing a half-storey space with insulated walls, a floor with batts of insulation between the joists, and further batts laid perpendicularly on top.

Dormer windows

Many 1 ½ or 2 ½ storey houses have dormer windows. The walls of the dormer may be insulated with batts, as described for the knee wall. Dormers typically include a lot of framing members that limit the amount of insulation that can be added. Besides air sealing, consider dense-pack blown-in insulation and also the addition of rigid board insulation and drywall to reduce thermal bridging.

Floorboards

Some houses will have the attic floored over, even when it is not used as living space. You can insulate it by lifting the floorboards and treating it as you would an unfinished attic, though some or all of the boards may have to be replaced to maintain the ceiling stiffness.

Also, a contractor can fill the subfloor space completely by blowing in dense-pack loose-fill insulation through access holes. Air leaks, such as around plumbing stacks and open eave spaces, should be sealed first. With the contractor, ensure that the space is filled completely and at the right density. Alternatively, spray foam can be used to air seal and insulate this space if accessible.

Safety warning:

Before insulating, check for wiring (replace damaged or frayed wiring), recessed light fixtures or other sources of heat that may be concealed beneath the floorboards. All heat sources must be protected from the insulation or removed entirely.

You will not likely be able to achieve the minimum manufacturer’s recommended levels for attic insulation by filling this space alone. If possible, add some insulation on top of the floorboards to keep them warm and to reduce thermal bridging through the joists and floorboards.

5.4 Cramped attics, cathedral ceilings and flat roofs

This section discusses methods for insulating difficult areas.

5.4.1 Cramped attics

There are three options for insulating an attic that is too cramped to work in:

The last two options can also be done together. The first and last methods may apply where there is inadequate headroom.

There will likely be no way of installing a new sheet-material air barrier. If one does not already exist, it should still be acceptable to install insulation if there is no evidence of moisture problems, if humidity levels in the house are reasonable and if any air leaks through the ceiling into the attic are sealed. You can achieve added protection by painting the ceiling below the attic with latex vapour barrier paint (ask paint suppliers or manufacturers) or two coats of oil-based paint.

Ensure that the contractor prevents insulation from entering the eaves and blocking the ventilation. If there are any recessed light fixtures, chimneys or other sources of heat in the attic, make sure precautions are taken to avoid creating a fire hazard.

Ventilating cramped attics can be difficult because of the difficulty of creating an adequate airflow. Where the roof extends past the exterior walls, it may be possible to use soffit vents in combination with roof vents or built-up ridge vents.

Many houses with cramped attic spaces lack eaves. In such cases, approach ventilation with caution. The best approach is to carefully seal the ceiling below the attic from inside the house and then insulate without installing additional vents.

If possible, check the roof space for moisture problems during or just after a cold snap in mid-winter. Some frost is to be expected, but if the buildup is especially heavy, you will have to vent the space, thoroughly seal all air leaks and reduce humidity levels in the house.

Check with local building authorities to determine which procedures are permitted in your area.

5.4.2 Cathedral ceilings and flat roofs

A house (or any portion of a house) with a flat roof, cathedral ceiling or some other attic-less construction is difficult and will require the services of a qualified contractor. All renovation options involve some risk of either moisture problems or thermal bridging that can reduce the effectiveness of the insulation. Before proceeding with the work, make sure that any material added will not exceed the load capacity of the existing structure.

The main problem with these roofs is the limited space for insulation and ventilation (see Figure 5-20). If there is already some insulation in the joist space, trying to add more may not be beneficial. However, if you decide it is worth your while to increase insulation levels, there are a number of options. One option is to install rigid board insulation directly under existing ceiling and cover with a new finish such as drywall. Before proceeding discuss with a contractor or building official on how to locate and install a new vapour barrier. A technique involving blown insulation is discussed below.

Long description below

Figure 5-20 Flat roof

Long description

Cutaway of flat roof showing arrows indicating air flow traveling up through the soffit vent of the roof overhang, over the insulation, and exiting a capped pipe on the roof.

Part 5.6, Renovations and repair, discusses both interior and exterior retrofits, including the addition of a new roof. The existing space between the ceiling and roof can be dense-packed with cellulose or glass fibre loose-fill insulation by a contractor. Densities are typically between 56 to 72 kg/m³ (3 ½ to 4 ½ lb./cu. ft.). The contractor should calculate and confirm the density for each roof cavity.

The dense-packed approach eliminates roof ventilation, so it is generally not recommended (check with local building authorities first). However, the high density of the insulation, combined with comprehensive air sealing, should reduce airflow sufficiently to avoid condensation problems.

Take extra care to make sure that air leaks into the ceiling are sealed from below. This is difficult because wiring and plumbing usually puncture the ceiling in a number of places. Moreover, the partition walls may not be completely blocked off at the top, allowing large amounts of air to flow through the interior walls into the ceiling.

Where the interior walls are completely open to the ceiling, there is no easy solution unless you are prepared to have your interior walls blown full of insulation and sealed along all trim, outlets and other penetrations.

5.5 Ice dams

Ice dams are large masses of ice that collect typically on the lower edge of a roof and in the gutters (see Figure 5-21). As melting snow (or rain) runs down the roof, it meets this ice mass and backs up, sometimes under the shingles and then leaking into the attic.

Long description below

Figure 5-21 Ice dams

Long description

Cutaway of a slanted roof covered in snow with an ice dam at the base. There is a thin ice slab beneath the snow and water is running down the underside of the sheathing, trapping water below. This forms ice on the interior of the eaves and icicles on the exterior.

Ice damming usually occurs when there is a significant amount of snow on the roof. The snow itself, especially when deep, can act as an insulator. If the attic temperature is above freezing, it warms the roof sheathing, which melts the layer of snow that is in direct contact with the roof. Melt water runs down the roof until it meets the overhang.

If the air and the overhang are below freezing, the water freezes on the roof and starts the ice dam. In addition, southerly exposed dark wall siding heated by the sun can cause warm convection currents to enter the eave and roof area above it, causing ice damming.

5.5.1 Roof type and ice dams

Uninsulated attics usually do not have ice dams because the heat coming through the attic tends to melt snow as it lands and prevents much accumulation. A well-sealed and insulated attic results in a cool roof and generally will also not have ice dams. Complicated roofs with many valleys, dormers or large overhangs are more prone to ice damming as they tend to have more thermal bridging and air leakage.

5.5.2 Locating areas prone to ice dams

One way to find areas prone to ice dams is to look at the roof after the first heavy frost in fall or light snow. Note where the snow melts first and find out what is under that spot. One common sight in such conditions is a horizontal melt line across the roof of a 1 ½ storey house, where the short knee wall meets the ceiling. Other places would be beneath a roof-ducted exhaust fan, plumbing vent, under a skylight and above a leaky attic access hatch. The best prevention for ice damming is to seal all attic air leaks and insulate thoroughly.

Dark wall finishes can absorb solar heat and cause warm convection wall currents that may be to blame for ice dams. Sealing the associated soffit vents may help reduce the problem. However, other venting may still be required to ensure that the roof space is properly vented.

5.5.3 Dealing with restricted attic space

Many attics, including those under low-sloped roofs, do not have enough space for adequate insulation at the edge of the attic floor. If a baffle is required at the edges of the attic floor to keep a ventilation opening between the insulation and the roof sheathing above, there may only be about 100 mm (4 in.) of space left for insulation. Since it is not possible to put as much insulation there, this may result in the snow melting just above the overhang and promoting ice damming.

Try to put the best insulation possible at that edge to reduce heat loss. Spray foam is ideal as it air seals as well as insulates. Cut pieces of extruded polystyrene will help as well. Install a piece of extruded polystyrene 25 mm (1 in.) from the sheathing to maintain the ventilation air space and then fill between this foam board and the attic floor with insulation (see Figure 5-22).

Long description below

Figure 5-22 Creating ventilation space with rigid insulation

Long description

Illustration showing how wood blocks act as spacers between the rigid insulation and the sheathing of the slanted roof. The insulation is flush with the rafters and extends down to bottom of the attic joists.

5.5.4 Cathedral ceilings

Ice dams on roofs with cathedral ceilings are more difficult to resolve as they are harder to access. The same principles apply to preventing ice dams – stopping house air leaks, upgrading insulation, possibly improving roof ventilation. Ice dam issues on cathedral-type roofs are usually best dealt with by contracting an insulator with dense-pack insulation experience or when re-roofing.

5.5.5 Installing a new roof

When re-roofing, remove the roof finish and the sheathing, air seal and fill the cavities with insulation and then install the new roofing materials, including an ice-shield membrane. A well-sealed roof will need little to no ventilation. If you are uncertain about whether or not the sealing can be done effectively, leave a ventilation channel under the sheathing from the soffit to the peak. Sometimes insulation can be added to the ceiling inside, although this approach will not stop the air leakage.

An alternative measure to prevent ice dams is to make the roof impermeable by using a self-sealing membrane under the shingles. Building codes require such membranes on the lower part of the roof in new houses. These membranes do not stop ice dams, but they prevent the water from leaking through the roof sheathing and into the house. Ice damming can still occur and possibly damage shingles and gutters.

5.5.6 Quick fixes and their limitations

There are many popular, quicker solutions but they have drawbacks:

For certain older houses with complicated roofs, it may be impossible to completely eliminate ice dams without resorting to several different techniques.

The preferred solution for most houses is to keep house heat out of the attic by air sealing and insulating.

5.6 Renovations and repair

Renovations or repairs provide an opportunity to ensure a well-insulated attic ceiling and walls with an effective air and vapour barrier.

A popular renovation activity is to convert an existing unfinished attic into a new living space. Depending on the depth of the rafter space, it may be difficult to install as much insulation as is recommended. If you choose to finish your attic, check for local code requirements and then consider the following steps:

Long description below

Figure 5-23 Collar beams or collar ties provide additional support

Long description

Illustration showing two joists meeting at an angle with a third nailed to each, forming a triangle.

5.6.1 Dropped ceiling

Long description below

Figure 5-24 Extending the rafters provides space for insulation and ventilation

Long description

Cutaway of ceiling rafters which have been extended with wood underneath to create a deeper cavity filled with thick insulation.

Where headroom is sufficient, constructing a dropped ceiling to hold insulation is an excellent way of thermally upgrading a cathedral ceiling or flat roof, especially when planned as part of a renovation. The following are several options:

Although it is not necessary to remove the interior finish and expose the rafters and tops of the walls when constructing a new ceiling, it is a good idea. This will allow you to perform air sealing, check the state of the insulation and verify if there is a vapour barrier.

5.6.2 Adding a new roof

Insulation can also be added on top of an existing ceiling or roof. This option is most suitable for cathedral ceilings and flat roofs when major exterior alterations, such as a new roof, are required. Air sealing, installing new insulation, sheathing, roofing surface and replacing eavestroughs, soffits and fascia plus disposal will cost several thousand dollars. You will almost certainly need the services of a qualified contractor.

One method involves installing rigid board insulation on top of the existing roof (see Figure 5-25). The higher RSI value of rigid insulation means a smaller increase in the roof thickness, although several layers of insulation may be needed to meet the desired RSI level.

Long description below

Figure 5-25 A new insulated roof can be built over the old roof

Long description

Cutaway of a slanted roof and the top of an exterior wall. Blocking insulation is shown at the joint between the wall and the original roof and is sealed with caulking on the inside face of the exterior wall. Two layers of rigid insulation are placed over the existing roof finish. Boards are placed across the new insulation, perpendicular to the rafters, and the new roof sheathing and finish are attached.

Sheet polyethylene or an elastomer membrane is first placed on the existing roof to provide the air and vapour barrier, following the 1/3 – 2/3 rule. Alternatively, a layer of closed-cell spray foam or low-permeability rigid board can be installed with the joints taped to prevent air leakage. This step is not necessary if an air barrier is already in place.

It is important to insulate (such as, block) and air seal the spaces between the joists along the perimeter of the roof. This prevents heated air from escaping around the insulation. Line up the edges of the blocking material with the inside finish of the exterior wall and thoroughly caulk all seams. Another approach is to hire a spray foam contractor familiar with air sealing to block these critical areas.

Another method is to build up the existing roof or to frame a new roof and fill it with batt insulation or loose-fill insulation, which is blown in. Ensure that the air and vapour barrier is tightly sealed. The new space or roof frame may add to the structural loading of the entire assembly, so this must be done following local code requirements.

This approach is best done with new trusses or by installing cross members (called purlins) that span the length of the roof. Once the purlins are in place, the new rafters are installed, followed by the proper installation of the insulation to avoid air movement and thermal bridging. Leave enough clear space above the insulation and above the new roof rafter to allow for ventilation.

6. Basement insulation: floors, walls and crawl spaces

Basements can account for about 25 percent of a home’s total heat loss. This is due to the large, uninsulated surface area both above and below grade level. Contrary to popular opinion, earth is a poor insulator. There is also a lot of air leakage through basement windows and penetrations (including cracks in these areas) and at the top of the foundation wall (sill area and rim joist). See Figure 6-1.

Many basements have little or no insulation, so this means there is much potential for improvement. Insulating can often be tied in with other repairs or renovation work such as waterproofing, radon remediation or finishing the basement.

Long description below

Figure 6-1 Heat loss in a basement

Long description

Cutaway of a one-storey house with peaked roof, a basement and crawl space under part of the house. Arrows travel down from the first floor through the basement out into the ground and to the exterior.

Types of basement construction

The most common type of construction is the full foundation basement, with mainly below grade foundation walls supporting the house structure (see Figure 6-2). Many houses have been built with partial depth foundation walls that create a crawl space under the house. Some older homes, cottages or mobile homes are built up on posts and piers, leaving the space below the house open or walled off. Other houses are built on a slab-on-grade where there is no basement or crawl space at all. Consider obtaining expert advice before proceeding on remediation.

Long description below

Figure 6-2 Common foundation types

Long description

Four cutaways of exterior walls transitioning to the foundation. The rubble foundation consists of irregularly sized stones or rocks supporting a brick wall. The brick foundation is built of the same bricks as the exterior wall. A poured concrete foundation consists of a solid concrete wall and floor with a drainage system at the footings. The block foundation consists of rows of concrete blocks with a drainage system at the footings.

i) Concrete foundations

Poured or concrete block foundations have been built since the 1920s, usually with parging, waterproofing and drain tiles on the exterior. However, anything more than 20 years old may need some repair. This type of foundation can be insulated from the outside or inside if no serious water or structural problems exist.

ii) New houses or new foundations under older houses

If the house is new or it has been raised to accommodate a new basement, allow about a year of drying out time before insulating or renovating. As concrete contains large amounts of moisture, it is best to let it dry before insulating and finishing unless the renovation method to be used can handle this entrained moisture.

iii) Older rubble, brick or stone foundations

Older foundations are often uneven and can vary in depth and thickness. These foundations were rarely damp-proofed; some have an interior drainage path and all have a high mortar content, which can absorb water from the soil. They are best insulated from the outside, but some interior insulating is possible. Always obtain expert advice before proceeding on remediation.

iv) Other types of foundations

Some newer homes and additions are built with preserved wood foundations. They are damp-proofed and are generally fully insulated.

Basement assessment

Before planning the job, assess the status of your basement. Here are some of the problems to look for:

i) Water leaks

Major water leaks, such as persistent leaks and flooding in the spring and when it rains, must be corrected. Often the solution requires excavating, damp-proofing or waterproofing the basement, adding a drainage system and insulating from the exterior.

Minor water leaks can sometimes be corrected by directing water away from the foundation by sloping the grade, aiming downspouts away from the house and patching the foundation on the interior.

Correct any problems with sump pumps or sewer backup before beginning the insulation job.

ii) Dampness

Symptoms of dampness on foundations and finishes include staining or mould growth, blistering and peeling paint, efflorescence (a whitish mineral deposit on the surface), spalling (deterioration of the surface) as well as a musty smell. Minor dampness may be corrected from the interior; more serious problems should be corrected from the outside. Condensation can also form on the foundation walls in the summer when the air is very humid and the foundation is cool.

Checking for dampness

Dry foundation walls, slabs and earth floors help to limit the potential to mould growth, musty odours and water damage. If the foundation walls and floors appear dry yet the space seems damp, this might indicate that moisture is wicking through the foundations and evaporating faster than it can accumulate. A simple test can reveal if this may be the case.

To conduct the test for any moisture release, cut a sheet of plastic about 1 m (40 in.) square and tape it to the concrete walls and slab. For earth floors, hold down the edges with sand or sticks. After a day or two, check the plastic. If condensation formed on the top of the plastic, this indicates high interior moisture levels. (See Part 2.4, Control of moisture flow and Part 9.4, Ventilation and combustion air).

Carefully remove the plastic and note any condensation on the bottom of the plastic or a colour difference from wetting of the concrete or soil. Condensation formed under the plastic indicates moisture movement from the ground into the home as well as the possibility of radon emissions.

Any subsequent renovation or addition will require remediation (for example interior or exterior concrete sealing or waterproofing, subfloor membranes) to deal with damp conditions or adding a moisture barrier as described for crawl spaces in Part 6.3.

iii) Cracks

If the basement has an active crack (such as one that gets bigger or smaller), seek professional help to determine if the situation requires structural repairs.

iv) Radon

Radon may be present in all homes, with and without humidity and moisture problems (see Part 1.4, Health and safety considerations, for more information).

Insulate inside or outside?

Insulating on the outside is best, but it is often necessary to insulate from the inside for economical and practical reasons. Sometimes a combination of approaches is required. Examine the advantages of each approach carefully.

i) Insulating inside

This may involve installing rigid insulation board and drywall, a wood-frame wall and insulation or other combinations of insulation. Your choice of method will depend on a number of factors, including whether there are moisture issues, the need to account for moisture and air/vapour barriers, how you plan to use the space and, finally, cost.

Advantages of inside insulation

Disadvantages of inside insulation

Technical note:

Some authorities have expressed concern about the possibility of frost action and structural damage when foundations are insulated from the inside. The concern is that frost will penetrate deeper down the outside of the foundation wall. Research has found that this is not a problem.

Under some circumstances, such as in soils that are particularly frost-susceptible in extreme climates, there could be a problem caused by some construction techniques. Check with your local building authorities or find out if your neighbours have experienced any difficulties with frost action on their foundation.

ii) Insulating outside

This involves excavating around the foundation, waterproofing and installing insulation, as per Figure 6-3. Flashing must be attached to keep water from getting behind the insulation and a protective covering installed on exposed Parts of insulation.

Long description below

Figure 6-3 Steps for exterior insulation

Long description

Cutaway of a foundation shown from the exterior.

  1. The foundation has been excavated to the footing.
  2. Waterproofing covers the foundation from grade level to the footings and runs under the drain.
  3. Insulation has been placed over the waterproofing, covering the basement wall down to the footings.
  4. A drainage system covered with backfill is at the base of the foundation.
  5. A protective coating topped by flashing covers the insulation and extends a short distance below grade.

Advantages of outside insulation

Disadvantages of outside insulation

6.1 Insulating the basement from the outside

Further to the previous introduction, assess the following before beginning work:

6.1.1 Special safety considerations

Refer to Part 1.4, Health and safety considerations, for general advice on safe working procedures.

Safety warning:

In particular, follow safe trenching practices to avoid accidental burial and trench collapse. Protect the trench from running water and the elements, and ensure that people and animals cannot fall in. Some soils are not stable and may require bracing to prevent collapse. If you are doing this yourself, consult local building authorities for advice on proper shoring and trenching practices.

For every underground service that enters your home (for example gas, electricity, telephone, water and sewage), find out where each is located before you begin digging. Utilities provide this service at no cost.

How to insulate outside the basement

The work may require several weeks of effort. Plan for extra time if you need to excavate, repair cracks, waterproof the exterior foundation walls and install a drainage system.

Insulating the outside of the basement includes the following steps:

i) Dig the trench

The excavation should ideally go down to the footings but never below. The trench should be wide enough to work in. It is a big job, so do not make it even bigger with an oversize trench. Digging may be done by hand or using appropriate machinery. The excavated dirt can be stored on a tarp or sheet of polyethylene at least 600 mm (24 in.) away from the excavation.

In some cases it may only be practical to install insulation to a minimum of 600 mm (24 in.) below grade, especially when the foundation walls and drainage system are in good condition. This will reduce the excavating required while still offering substantial thermal protection, and can be coupled with further interior insulating. An optional horizontal rigid insulation skirt can also be added to reduce heat loss to the surface, which can mitigate frost-related problems (see Figure 6-4).

Long description below

Figure 6-4 Exterior basement insulation

Long description

Cutaways of two poured concrete foundations and the lower section of the exterior walls above them. The first cutaway represents the minimum depth that rigid insulation must extend below grade. There is rigid insulation, covered with protective coating and flashing, placed on the basement wall. The insulation starts above ground level down to a minimum depth of 600 mm (24 in.) below grade. At the base of the insulation, there is an optional extension of insulation measuring 600 mm (24 in.) resting on a sand bed. This insulation slope horizontally and slightly downwards away from the house. There is a concrete footing at the base of the foundation with a drain tile and gravel directly in front of it. The second cutaway shows insulation, protected as described previously, reaching the full depth of the foundation wall to just above the footing. A slab of insulation 600 mm (24 in.) wide abuts it and slopes horizontally and slightly downwards away from the house, just above the drain. A sand bed, if required, lies beneath the drainage system.

ii) Prepare the surface and site

First clean the surface of the foundation with a wire brush and scraper or use a pressure-washer if you can easily remove the water. Inspect and repair any major holes, cracks or damage and then seal all penetrations. Smooth or replace deteriorated surfaces and old parging with an appropriate type of new parging. Allow repairs to dry.

Check the condition of the drainage tiles and repair as needed. Install a drainage system if one does not exist but only if it can be done properly (such as one that can drain to an appropriate discharge). It is best to do this task after completing work on the foundation wall. Consult a drainage systems expert before proceeding.

Have a contractor apply waterproofing material from grade level down to and over the top of the footings, and then seal all penetrations and overlaps. Sheet materials, sprays and roll-on compounds are available. Follow all manufacturers’ directions.

Many homeowners choose to install a dimple membrane on their foundations. The dimpled structure of this membrane creates air gaps that form drainage paths. Note that some dimple membranes are not waterproof and need an additional waterproofing material. Check with a manufacturer or contractor which product or combination of products is best suited for your application as well as for proper installation.

iii) Apply the insulation

Three types of insulation are used on the exterior of basement walls: rigid mineral wool boards, high-density polystyrene (Type IV) and polyurethane/polyisocyanurate boards. (See Part 4.2, Caulking and other air sealing materials, for more information.)

Type IV polystyrene board is the material most commonly used in exterior below-grade applications (see Figure 6-3 and Figure 6-4).

Insulation with drainage capability (see Figure 6-5), such as mineral wool board, must be used only if:

Long description below

Figure 6-5 Draining-type insulations must be installed vertically all the way down to the footings

Long description

Cutaway of an exterior concrete block foundation wall, including the footings and the excavated ground around the house. Rigid drainage-type insulation is attached vertically to the wall and extends from the top of the wall to where it meets the footings. There is a drainage tile along the footings at the base of the foundation, surrounded by gravel. – A drain tile is essential.

Measure and cut the insulation to the desired height (generally from the top of the footings to the exterior wall flashing). Start installing the insulation at one corner, overlapping at the corners and keep the insulation sheets as tight to the wall as possible (see Figure 6-6).

Technical note:

Some experts suggest using two layers of insulation with overlapping joints. The insulation is held in place at the top edge by the flashing and by using corrosion-resistant fasteners and washers. The below-grade portion of the insulation will be held in place by the backfill, but may require some fasteners to hold it in place during the process.

Long description below

Figure 6-6 The insulation should overlap at corners

Long description

Illustration of two sections of rigid insulation board overlapping at an exterior corner of a poured concrete foundation wall.

It may be convenient (although more expensive) to purchase a special interlocking system of grooved polystyrene boards with steel channels. These should be used in the above-grade portion only to a depth of 300 mm (12 in.). There are also special clips and fasteners for applying the rigid board to the wall; check building-supply stores.

Apply parging to rubble and brick foundations to smooth the wall after all repairs have been completed. The type and flexibility of the insulation will determine the smoothness of the parging required. The correct parging material will also act as a sacrificial surface material to help protect the mortar in the foundation wall. Waterproof the parging, insulate and then proceed as noted above.

iv) Apply the flashing

Flashing helps keep the insulation in place, prevents water from getting behind it and provides a clean, neat junction. There are two major considerations: the location of the flashing, which defines how far up the wall the insulation extends, and the type of flashing used (see Figure 6-7).

Long description below

Figure 6-7 Types of flashing for a foundation – First floor transition

Long description

Cutaways of three concrete foundations and the lower section of the exterior walls above. With a J channel, the foundation is faced with rigid board insulation which extends above the ground and is capped by an upside-down J-shaped flashing and sealed with caulking where it meets the bottom of the exterior wall. The Z flashing is nailed in place behind the siding, and slopes down and out to cover the basement insulation. The wood flashing is nailed at an angle to the header joist at the base of the exterior wall. This joint is sealed with caulking and the flashing slopes out and down to cover the top of the basement insulation.

If the siding can be partially removed or pried up, use standard Z-flashing inserted at least 50 mm (2 in.) behind the siding and building paper (such as behind the drainage plane). If you cannot insert flashing behind the siding (such as with brick), then either a metal J-channel must be installed prior to the insulation or a wood flashing installed after the insulation.

Flashing should accommodate the width of the insulation and protective coat. Wood flashing should be sloped with an overhang of at least 20 mm (¾ in.) and have a drip edge on the underside.

For wood flashing or a J-channel, seal the joint between the flashing and the house with a suitable caulking.

For brick siding, keep the weep holes open that allow water to escape from behind the brick.

Ideally, carry the insulation up past the header area by at least 150 mm (6 in.) as shown in Figure 6-8. This often cannot be done because of practical or aesthetic reasons. If the insulation is carried up only to the header area or lower, then air seal and insulate the header area from the interior. This is described later in this Section.

Long description below

Figure 6-8 Insulating the header area from the exterior

Long description

Cutaway of a poured concrete foundation where it meets the exterior wall. The foundation is faced with rigid insulation that extends up the exterior wall, covering the header joist area. A protective covering, extending at least 100 millimetres or 4 inches below grade, covers the insulation. The insulation is capped with flashing that is sealed where it meets the exterior wall. Siding or stucco matching the existing exterior wall begins at 200 millimetres or 8 inches above grade and covers the protective covering.

v) Protect the exterior by covering the exposed insulation

Protect the insulation from sunlight and physical damage with a covering applied from the top of the insulation to at least 100 mm (4 in.) below settled ground level as per Figure 6-9. Covering the insulation to 300 mm (12 in.) below ground level may be preferable

Covering options include the following:

Long description below

Figure 6-9 Exterior protection should extend below grade

Long description

Cutaway of a poured concrete foundation where it meets the exterior wall. Rigid insulation, mechanically fastened in place, extends from the top of the concrete wall to below grade. The insulation is covered by a protective covering and capped by a J channel flashing.

vi) Refill the excavation

First, cover the drain tiles (such as the perforated plastic pipe) with 150 mm (6 in.) of clean gravel – 4 mm [1/8 in.]) or larger – and a strip of filter fabric. If drainage insulation is used, the gravel should extend at least 100 mm (4 in.) up the side of the insulation.

Backfill the excavated area in stages by removing large objects from the backfill and then compacting or tamping the ground. In poor draining soils such as expansive clay, it would be better to bring in free-draining backfill. When the excavation is filled, make sure the ground slopes away from the house. Usually a slope of 10 percent (such as 200 mm [8 in.] for the first 2 m [6 ft.]) is provided to allow for settling. This will encourage drainage away from the insulation, as will the addition of eavestroughs and downspouts that direct excess surface water away from the foundation by at least 2 m (6 ft.).

Cover the filled excavation with any type of surface – patio stones, grass or a garden. Some additional settling may take place, so it is better to wait before undertaking any expensive treatments such as paving.

vii) Complete the finishing details

Windows can usually be finished by wrapping the insulation around the foundation to meet the window frame. Apply lath and parging on top of the insulation to the edge of the window frame. Caulk the joint between the frame and parging, and inspect it periodically to make sure it is still sealed. Sills should slope away from windows, as shown in Figure 6-10.

Long description below

Figure 6-10 The sill should slope away from the window

Long description

Cutaway of a poured concrete foundation wall containing a window. The exterior above-ground wall is faced with siding capped with Z flashing. The foundation wall and window openings are insulated with rigid board covered by a protective covering, and joints are sealed with caulking. The exterior downward-sloping windowsill has insulation sealed to the window frame and extending out to cover the top of the insulation on the basement wall below the window.

Doors should be outlined with a J-channel or equivalent flashing. You may have to extend the doorsill to protect the flashing beneath the door.

Seal penetrations through the insulation and covering to prevent wind, water and vermin entry. Some penetrations (gas lines, electrical conduits) should be sealed with a compatible and flexible sealant.

viii) Insulate the exterior joist header area

If the exterior insulation does not extend above the header area by at least 150 mm (6 in.), air seal and insulate the header area from inside the basement. (See Part 6.2, Insulating the basement from the inside.)

6.1.2 Complications

Where part of the basement wall encloses a cold cellar or unheated garage, apply the insulation inside the basement, against the cold cellar or garage walls, treating them like exterior basement walls. Weatherstrip and insulate the doorway from the basement. Finally, insulate the ceiling of the cold cellar or garage. (See Part 6.4, Open foundations, for information about exposed floors.)

Extend the outside insulation around the rest of the basement by at least 600 mm (24 in.) beyond the inside wall junction to minimize heat loss at these points. (For information about insulating a cold cellar, see Part 6.2, Insulating the basement from the inside).

If a concrete porch is butted against a basement wall, a paved driveway or some other obstruction, the insulation should switch to the inside around these obstacles. Allow at least 600 mm (24 in.), as illustrated in Figure 6-11, of overlap to provide continuous coverage and reduce the heat loss through the thermal bridge.

Long description below

Figure 6-11 Overlapping foundation insulation at places where insulation cannot be put on the exterior

Long description

Two cutaways of house foundations as viewed from above. The first, a rectangle with a square inside, indicates a home with an unheated garage. Rigid insulation faces the exterior of the foundation in the heated section with an overlap on two sides of the unheated section. Rigid insulation faces the interior of the foundation where heated and unheated sections share foundation walls. The second, a rectangle with a box attached, indicates a home with slab for front entrance steps. Rigid insulation faces the exterior walls up to the slab. Rigid insulation faces the interior of the foundation behind the slab and overlaps both sides of the stair slab.

6.2 Insulating the basement from the inside

Since basement type and condition will influence how you insulate, be sure to also consider the following factors:

Consult your local building authorities to be sure that your proposed project will meet code requirements. Also, some regions have particular problems such as frost heave due to expansive clay soils, which you should consider before beginning work.

Common types of insulation used as interior basement insulation include batt or blanket, glass fibre loose fill, polyurethane spray and rigid plastic board.

Closed cell polyurethane spray foam, which should be applied only by a certified installer, is a high-quality insulating method for all types of walls, including uneven ones. Closed cell spray foam can also help control dampness on basement walls.

Rigid plastic board insulation generally has a higher RSI value per millimetre than batt insulation and requires less basement space and a thinner supporting framework. (See Part 3.1, Insulation, for more information.)

Safety warning:

When working inside basements, refer to Part 1.4, Health and safety considerations, and follow those guidelines. In addition, because powder-activated concrete fastening tools are often used in basement renovations, carefully follow usage directions.

6.2.1 How to insulate inside the basement using only rigid board insulation

This method works best if the basement wall is even and vertical (such as poured concrete or concrete block) as the board material is fairly rigid. Secure rigid and moisture impermeable insulation panels to the concrete using mechanically attached fastening strips and then protect the assembly by attaching 12.7 mm (½in.) gypsum drywall to the fastening strips (see Figure 6-12 for details). Electrical outlets and switches will typically be surface-run.

Long description below

Figure 6-12 Insulating with rigid insulation from the interior

Long description

Cutaway of a poured concrete foundation as it joins the above-ground wall, focusing on three steps to installing rigid insulation including:

  1. air sealing the old walls including header and ceiling,
  2. installing the insulation from the floor into the ceiling, including the header area and
  3. finishing the interior basement wall.
Preparation

After checking the wall and making any necessary repairs, air seal all leakage paths such as at the sill and around penetrations. This important step provides the primary air barrier system.

As the insulation board is acting as a moisture barrier, use medium- to high-density foam board with good moisture resistance properties such as extruded polystyrene and Type IV expanded polystyrene. Foil-faced insulation board may deteriorate in contact with cement and mortar, so check with the manufacturer before using.

Installation

The insulation can be sealed to the foundation by applying foam-compatible adhesive around the perimeter of the foam board before fastening it to the wall. If any mould were to develop behind the insulation, it would be contained. Air sealing the foam board to the wall creates an air and moisture barrier somewhat equivalent to spray foam.

As mechanical fasteners are essential to secure the gypsum board to the wall, use wooden fastening strips on top of the insulation. Alternatively, insulation can be held in place with special wood or metal fastening strips that fit within grooves or notches factory-cut in the insulation panels. In either case, screw or nail the drywall to the strip that has been secured to the concrete with corrosion-resistant concrete fasteners.

Install a minimum of RSI 2.1 (R-12) unless local building codes require more. Consider installing insulation in overlapping layers to minimize heat loss through any fastening strips. Fit the insulation snugly to eliminate air circulation at the edges and use foam caulking and technical tape to seal all joints and interParts.

Finishing

Insulate and seal the joist area (unless the joists are embedded in concrete). See Part 6.2.6, Joist header space for more information. Protect the entire wall with 12.7 mm (1/2-in.) gypsum board or equivalent fire protection. This includes the joist space if a new ceiling is not installed.

6.2.2 How to frame and insulate inside the basement

There are three common methods for insulating the interior of a basement incorporating a frame wall. Each method should be assessed on basic principles of practicality: the ability to do the work yourself, the cost of materials and labour if contracted out, and the expected outcome (for example will it be a finished basement or just storage space?).

The three current approaches are

Preparation

After checking the wall and making any necessary repairs, air seal all leakage paths such as at the sill and around penetrations. This important step provides the primary air barrier system.

For information about materials and techniques, see Section 3, “Materials,” and Section 4, “Comprehensive air leakage control.”

Technical note:

Use dry lumber for the framing. If the lumber is not dry, allow the framing to dry for at least two weeks before adding insulation and covering the wall with the air and vapour barrier. Temporary bracing may be tacked on to the framing to keep the wet studs from twisting as they dry.

6.2.3 Frame wall with single or double layer of batt insulation

To protect the insulation, framing and wall finish from possible water damage, cover the basement walls with house wrap. Plastic was once the material of choice, but in some cases where air and moisture entered the insulated wall, condensation formed on the plastic and caused wetting and mould issues within the wall.

Safety warning:

Do not use asphalt building paper (tar paper) inside of the house because it can release toxic vapours.

By using house wrap, moisture (not excessive and not leakage) that penetrates the new wall will dry out either into the interior of the house or to the top of the foundations that are above grade. The building paper should start at or just above the grade line and extend down to the basement floor and under the bottom plate of the frame wall. Mechanically support it with strapping such as 1 x 3 lumber (see Figure 6-13).

Long description below

Figure 6-13 Framed wall with batt insulation

Long description

Cutaway of a basement wall with interior batt insulation. A dotted line indicates grade level. A moisture barrier, mechanically affixed with one by three horizontal strapping, extends from the beneath the bottom plate of the new framing to grade level. The bottom plate sits on sill gasket that covers the extension of the moisture barrier on to the floor. Four vertical framing studs rest on the bottom plate, and the stud spaces are filled with batt insulation and covered by the wall finish.

House wrap must be installed correctly to allow inward breathing/diffusion. The installation direction can vary by product; therefore it is recommended to consult the manufacturer’s product guide for proper installation.

Framing

The next step is to install a frame wall. You can use one of two approaches:

Allow enough room for a firm fit without compressing the insulation.

The second approach takes up more interior room but provides more insulation, less thermal bridging through the studs and better moisture protection. The bottom plate should sit on top of the extension of the house wrap and on a continuous impermeable membrane such as a sill gasket (see Figure 6-14).

Long description below

Figure 6-14 Double layer batt insulation in a framed wall

Long description

Cutaway detail of the interior of a concrete block foundation, showing the framing and insulation at the base of the interior wall. The foundation is covered by a moisture barrier which extends down to and along the floor under the bottom plate of the new wood-frame wall. The framing is spaced away from the foundation so a layer of batt insulation can be laid horizontally behind it. An additional layer of batt insulation is installed vertically between the studs. 1) Horizontally between the foundation wall and the studs walls. 2) Vertically insulation between the studs. 3) Impermeable gasket under the bottom plate.

Next, fasten the top plate to the bottom of the joists. Where the wall runs parallel to the joists you will have to build in a nailing support for the top plate (the approach you use will depend upon your particular house, Figure 6-15 shows one approach). Now is the time to square up the walls.

Long description below

Figure 6-15 Top plate detail where the joists run parallel to the wall

Long description

Cutaway of a concrete foundation where it meets the exterior wall. Wood blocking is nailed in place between the rim joist and the next interior joist. A moisture barrier extends to grade level on the interior basement wall. Dotted lines indicate where the framing for the finished basement wall can be attached to the wood blocking.

If your home is in an area of expansive clay soils, you may have to include a 25 mm (1 in.) gap between the top plate and the bottom of the floor joists to allow for vertical movement of the basement slab/floor. Talk with your local building authorities about how to best handle this situation.

Next, install the studs 600 mm (24 in.) on centre (such as measured from the centre of one stud to the centre of the next). Confirm that this spacing will offer structural support for your finishing needs. Make sure that the studs are perfectly vertical and accurately spaced so that the insulation will fit snugly and the finish can be installed without problems. Measure each stud separately. Extra framing is needed around doors in the foundation, but window openings only need a single stud, as the wall is non-load bearing.

If all alignments are perfectly level and square and there are no obstructions, you may be able to build the wall on the floor, tilt it into place, shim the bottom plate and secure the wall frame in place. Then install any required wiring and plumbing rough-ins.

Insulating

If you left a space behind the frame for batt insulation, you can now add the insulation between the studs and the wall in a horizontal layer. The insulation must be tight against the foundation wall. Next, fill the frame wall with a vertical layer of batt insulation fitting it snugly between the studs. Install insulation at the back of the wall allowing no gaps, air spaces or over-compression. Alternatively, if using fibreglass blown-in insulation, fill all cavities to the manufacturer’s recommended density and RSI level.

Finishing

Install a vapour barrier over the studs and insulation. In basements that have proven to be dry, a polyethylene vapour barrier is suitable. However, if you have any doubts or there is a risk of dampness in the basement, there are two alternate methods that may be better suited.

The first alternate method is to use polyamide sheeting, a breathable membrane also known as Nylon-6 vapour retarder film or smart barrier. When installed on the warm side of an exterior wall, smart barrier has a water vapour permeance that changes with the conditions within the wall. If the relative humidity in the wall cavity increases, the smart barrier will allow the wall to dry out toward the interior unlike other sheet-type vapour barriers. If you are using smart barrier, carefully follow manufacturer’s directions and installation requirements, though its application is similar to polyethylene sheet with a few important exceptions.

Leave enough of either the polyethylene or smart barrier at the top to connect to the air barrier in the joist header space. Seal all edges, seams and penetrations with acoustical sealant or other approved materials. All joints should overlap over a stud and be sealed with a continuous bead of sealant that is run between the layers of material at the lapped joints. Staple the barrier to the stud through the bead of sealant (see detail in Figure 4-3).

The second alternate method is to use an air and vapour barrier system known as the airtight drywall approach (ADA). The ADA method uses rigid materials, typically drywall, very carefully and thoroughly sealed to the framing and all other component connections by using adhesive-backed foam tape and flexible caulking.

Attention to detail is critical. The ADA method works only if it is completely sealed and tied into the air and vapour barrier system in the rest of the house. The following is a non-inclusive list of ADA sealing considerations:

Long description below

Figure 6-16 Sealed plumbing penetrations

Long description

Illustration of three plumbing lines as they exit a wall. A rectangular sheet of drywall or plywood, attached to wood blocking, bridges between two wall studs. The pipes pass through this board, and gasket material, and the gaps where they penetrate are caulked. Caulking rings the gasket where it will attach to the air-vapour barrier.

6.2.4 Frame wall with batt insulation and rigid board insulation

This method involves gluing rigid board insulation to the foundation wall and then covering it with a frame wall incorporating batt insulation. The result is higher insulation values with less loss of interior space, a very good reduction of thermal bridging and no need for an additional moisture barrier. It works best if the basement wall is even and vertical (such as poured concrete or concrete block) as the board is fairly rigid. Use only moisture-resistant board insulation such as extruded polystyrene or Type IV expanded polystyrene.

Preparation

Follow the preparations required in Part 6.2.1, How to insulate inside the basement using only rigid board insulation.

Installation

Using rigid board insulation with at least RSI 1.76 (R-10), secure and seal it to the foundation by applying foam-compatible adhesive around the perimeter of the foam board before fastening it to the wall. If any mould were to develop behind the insulation it would be contained. Air sealing the foam board to the wall creates an air and moisture barrier somewhat equivalent to spray foam. Special mechanical fasteners can be used if you have any sensitivity to the glue. Install the insulation snugly to eliminate air circulation at the edges. Use urethane foam sealant and technical tape to seal all joints and interParts of the foam board.

Next, install the wood-frame wall directly in contact with the rigid board insulation. Follow the techniques detailed in Part 6.2.3, Frame wall with single or double layer of batt insulation.

Adding additional insulation

The frame wall can now be roughed in for any wiring and plumbing and insulated as noted previously in Part 6.2.3, Frame wall with single or double layer of batt insulation. For details on treating the joist area, see Part 6.2.6, Joist header space.

Finishing

Do not use a polyethylene air and vapour barrier with this approach, as there is a risk of creating a double vapour barrier with the foam board. Instead, use either the smart barrier or the ADA method.

If you are using smart barrier, leave enough of the film at the top to connect to the air barrier in the joist space.

If you are using the ADA method, pay strict attention to proper air and vapour sealing, including a layer of vapour barrier paint. Any exposed foam insulation may require fire protection as per code requirements.

6.2.5 Frame wall with batt insulation and spray foam backing

This is becoming a popular hybrid method of insulating. It involves building a frame wall 25 to 50 mm (1 to 2 in.) away from the foundation and then having a professional spray-foam contractor install about 50 mm (2 in.) of medium or high density polyurethane foam against the wall. The spray foam fills and bonds directly to the framing members and the wall, offering high insulation value (about RSI 0.98 [R-5.6/in.]) while reducing thermal bridging and providing a moisture barrier. The frame wall is then filled with insulation.

The primary limitation of this approach is higher cost, although its use reduces the need for additional materials and labour (see Figure 6-17).

Long description below

Figure 6-17 Top view of a framed wall with batt insulation and spray foam

Long description

Overhead cutaway of a concrete foundation and the interior basement wall. A layer of spray foam which acts as a thermal break is applied to the inner surface of the foundation behind and partially embedding the wall studs. The studs are thus spaced away from the foundation wall, and batt insulation fills the remaining stud cavities. A smart retarder or airtight drywall approach is placed over the studs and batt insulation, and the wall is covered with the interior finish.

Preparation

Discuss with the spray foam contactor on site what should be done before starting the spraying. Major issues such as active structural cracks and frequent and major water leaks must be addressed first.

Install the wood frame wall at a distance from the foundation as directed by the contractor, including both sides of the corner studs. Follow the framing techniques discussed in Part 6.2.3, Frame wall with single or double layer of batt insulation.

Adding additional insulation

Once the contractor has installed the foam, the frame wall can be roughed in for wiring and plumbing and insulated. Again, a polyethylene vapour barrier is not recommended.

For details on treating the joist area, see Part 6.2.6, Joist header space. For finishing, see the previous frame wall method in Part 6.2.3, Frame wall with single or double layer of batt insulation.

6.2.6 Joist header space

The joist header space is also called the rim joist space, foundation header space or simply the joist space. This is the area where the floor joists intersect and are supported by the foundation walls in both basements and crawl spaces. Put simply, it is the area where the house structure rests on the foundation. This area is prone to air leakage and is seldom properly insulated, resulting in unwanted drafts, dust and pollen entry and vermin access. Concrete block foundations can be prone to additional leakage paths through the center holes of the blocks. Ensure that the tops of concrete block foundations are properly sealed as well as any other penetrations into the blocks.

There are three major joint configurations, each with implications on how best to air seal and insulate:

Long description below

Figure 6-18 Reducing air leakage in the joist header area

Long description

Three cutaways of types of floor joists.

  1. Floor joists on a sill plate - A sill plate runs flat along the top of the concrete foundation. A rim joist and floor joists are built on top of the sill plate and the subfloor sits on top of the joists. All edges and joints between the foundation wall, sill plate, joists and floor are sealed with caulking.
  2. Floor joists partially cast-in - The rim and floor joists are partially cast into the top of the concrete foundation and the subfloor sits on top of the joists, creating a gap between the sub-floor and the concrete wall. This gap is filled with expanding foam. Caulking is applied around joists and along the concrete wall and subfloor edges.
  3. Floor joists fully cast-in - Floor joists are fully cast-in, with the subfloor resting directly on top of the concrete foundation wall. All edges and joints between the concrete wall, the joists and the subfloor are sealed with caulking.
Long description below

Figure 6-19 Insulating the joist header area

Long description

Three cutaways of types of floor joist installations.

  1. Floor joists on a sill plate - Floor joists rest on a sill plate on top of a concrete foundation wall. The floor joists are covered by the subfloor. Batt insulation fills the space between the subfloor, the foundation wall and the joists, and is covered by rigid insulation, 25 millimetres or 1 inch thick and cut to fit tightly between the subfloor and concrete wall. Drywall, flush with the interior, covers the rigid insulation. All edges and joints between the subfloor, joists, drywall and foundation are sealed with caulking.
  2. Floor joists partially cast-in - Floor joists are partially cast into the concrete wall, creating a gap between the concrete wall and the subfloor above. Batt insulation fills this gap and a layer is placed over the concrete wall to the depth of the joists. Rigid insulation, 25 millimetres or 1 inch thick and cut to fit tightly, covers the batt insulation facing into the basement interior. Two by four blocking runs along the base of the joists to support the insulation layers and drywall finish. All edges and joints between the subfloor, joists, drywall and foundation are sealed with caulking.
  3. Floor joists are fully cast-in - The subfloor rests directly on top of the concrete foundation. Rigid insulation 25 millimetres or 1 inch thick and cut to fit tightly runs along the top of the concrete wall between the joists. Drywall covers the rigid insulation. All edges and joints between the subfloor, joists, insulation, drywall and foundation are sealed with caulking.

If it is not possible to extend the exterior foundation insulation to cover the full header joist area, the space will have to be insulated and sealed from the inside.

If the foundation walls are insulated from the interior, the air and vapour barrier must be continuous for the wall and header space.

Figure 6-19 shows how to air seal and insulate three common types of joist header spaces.

For fully-embedded joists, do not exceed a maximum of 25 mm (1 in.) of foam board insulation as the concrete below the floor may make the floor above uncomfortably cold and prone to damage.

For all the approaches illustrated in Figure 6-18 and Figure 6-19, building codes may mandate levels of insulation, so check with your local authorities as to the recommended levels and practices.

Polyurethane spray foam installed by a certified contractor offers excellent air sealing and insulation of this space. However, the foam must be covered with fire-resistant material if it is not covered by the basement ceiling.

6.2.7 Complications

The following issues can complicate the process of installing insulation:

Wall space interrupted by pipes, ducts or an electrical panel
Basement wall interrupted by a window

6.2.8 Rubble and irregular basement and crawl space walls

An irregular basement is usually made of stone or rubble and is rarely waterproofed on the outside (see Figure 6-20). While an exterior retrofit is always recommended, it may be possible to insulate on the inside if there are no water or moisture problems.

First, cover the interior wall with cement-based parging to smooth the surface and to protect the existing mortar. Then build a frame wall, add a maximum of RSI 2.1 (R-12) batt insulation and finish as previously described in Part 6.2.3, Frame wall with single or double layer of batt insulation.

In general, do not go with higher insulation values as there is a risk that the wall may be subjected to damaging freeze-thaw cycles. Check with your local building authorities for more information on how to deal with this potential problem.

Closed-cell spray polyurethane foam has been used successfully to reduce dampness problems for rubble walls while offering some thermal protection value. Do not exceed RSI 2.1 (R-12). This product must be installed by a certified installer and be covered by an appropriate fire-resistant material.

For very wet basements prone to flooding and high moisture problems, it may be best not to insulate the basement walls. Instead, consult your building authorities and an experienced general contractor about the potential to treat the floor joist space as an exposed and insulated floor.

Additional modifications will be needed to take care of the plumbing and heating system.

6.2.9 Part of the basement is a cold cellar or an unheated garage

Apply the insulation to the cold cellar or garage wall separating the heated basement from the unheated space, as if it were an external wall. Weatherstrip and insulate the doorway from the basement. Insulate the ceiling as described in Part 6.4, Open foundations, and overlap the insulation as in Figure 6-11.

If you insulate your cold cellar, check on the winter temperature so you can make adjustments to prevent freezing. If the room is still too warm or the floor above is cold, you may want to insulate the ceiling of the cold room (see Part 6.4, Open foundations).

6.2.10 Basement pony walls

A pony wall consists of a short wood frame wall sitting on top of a conventional concrete foundation. In this case, the wood frame Part is insulated between the studs, and the concrete Part is insulated on the interior (assuming there are no moisture problems). The insulation on the concrete is extended up about 200 mm (8 in.) to overlap with the frame Part. A ledge is created at this point (see Figure 6-20). To avoid a ledge, install a frame wall from floor to ceiling and fill the cavity with insulation.

Long description below

Figure 6-20 Insulating a pony wall is a two-step process that creates a small ledge

Long description

Cutaway of a low concrete foundation wall with a short wood-frame wall resting on top, supporting an exterior wall and main floor. The header area and wood-frame basement wall are insulated and sealed. Framing on the interior of the concrete foundation wall extends upward to overlap the wood-frame wall, creating a ledge where they meet. The concrete wall portion is insulated and sealed.

This method will offer higher thermal performance but creates a deep window frame.

6.2.11 Overhangs

Seal and insulate floors that overhang the foundation. It is usually possible to remove the finish underneath the overhang and air seal the space between the joists above the foundation with polyurethane foam or with caulked, low-permeability rigid insulation. Insulate the joist space with batt or blanket insulation and add an air barrier before re-installing the finish as shown in Figure 6-21.

Long description below

Figure 6-21 Overhangs should be air sealed before they are insulated

Long description

Cutaway of concrete foundation with floor joists on a sill plate and an overhang that is filled with batt insulation. The batt insulation is faced with rigid insulation on the interior, covered with drywall, and all edges and joints are sealed with caulking.

In some cases, a layer of rigid board insulation with protective outer finish can be applied to the underside of the overhang, to reduce thermal bridging through the floor joists, but the joist space should still be air sealed and insulated. Alternatively, a contractor can spray foam into the cavities or blow in dense-pack fibre insulation though holes drilled to the underside.

If the cavity can be made air tight, a method to create a warmer floor above an overhang can include a small air gap between the top of the insulation and the bottom of the flooring as shown in Figure 6-21. This will allow convection currents to form in this space which will warm the floor. However, as this air space decreases the amount of insulation in the joist spaces, there will be additional heat loss associated with this method of construction. To reduce this heat loss, add rigid insulation to the bottom of the overhang as previously noted.

6.2.12 Basement floors

As most heat is lost through the upper part of the foundation walls, basement floor slabs are seldom insulated. For improved comfort, moisture control and radon reduction, apply a moisture barrier to the floor or seal the floor to prevent moisture accumulation between the insulation and the slab. Alternatively, you may install a floor drainage system under the new floor.

If you are installing or replacing a concrete slab floor, this offers an excellent opportunity to have in-floor heating installed or to have it made radiant-ready. Radiant-ready is where insulation and heating lines are installed before pouring the new slab, allowing for future use of radiant heat (including solar-generated) in this area. Consult a heating contractor with experience in hydronic in-floor heating.

6.2.13 Uninhabited basements and crawl spaces

Medium- and high-density polyurethane foams are sometimes used in basements and crawl spaces walls that have poured concrete, concrete block, brick or rubble walls and are not intended to be living space. In these cases, spray foam is installed directly on the foundation wall and then sprayed with a non-flammable covering to meet local code requirements.

6.3 Crawl spaces

A crawl space can be insulated in two ways:

As a general rule, treat heated crawl spaces as short – sometimes very short – basements and renovate them as described earlier in this chapter.

Fix any water leaks and remove sources of water infiltration as noted in Part 2.4, Control of moisture flow.

Remember, as with a basement, never vent a clothes dryer into a crawl space.

Insulating the walls is recommended to avoid having to insulate and protect all plumbing pipes and heating distribution systems. Walls can be insulated externally to reduce the internal moisture problems that can develop in damp crawl spaces and to keep the soil below the footings warm. It is also usually easier to insulate the walls than the ceiling above, especially in tight crawl spaces or where joist spacing is uneven. Walls tend to require fewer materials than ceilings.

If there is no moisture barrier on the crawl space floor, add one. The minimum barrier should be 0.10 mm (4 mil) clear or opaque polyethylene overlapped, caulked and taped at the seams. Although more difficult to find, white opaque polyethylene brightens the space, shows areas of leakage or vermin entry more readily, and hides moisture or mould that may be on the other side of the plastic.

Mechanically fasten the moisture barrier to the walls and all obstructions that it cannot go over such as floor support posts. It should also be sealed to any moisture barrier added to the walls. To prevent the plastic from billowing, as may happen occasionally, hold it down with a few old boards or some smooth scrap material. If there is likely to be any traffic, protect the polyethylene with a length of plastic floor mat. Do not use sand or gravel.

6.3.1 How to insulate a heated crawl space

From the outside
  • Insulate the outside wall exactly as described previously for the outside basement wall (see Figure 6-22 and Part 6.1, Insulating the basement from the outside).
  • If outside obstructions (for example a porch or paved driveway) make it impossible to completely encircle the crawl space from outside the house, then insulate the inside portion of the wall at those points. Overlap interior and exterior insulation coverage by at least 600 mm (24 in.) See Figure 6-11.
  • If the crawl space does not open into a full basement, it should have some form of ventilation. In general, do not use vents that open to the exterior, as there is a risk of condensation increasing during the summer. Instead, try to incorporate the crawl space with a whole-house ventilation approach or consider using a dehumidifier. Any existing vents should be sealed permanently if you are performing a full renovation where the space will be heated.
  • If the foundation footings are above the frost line, insulate on the outside of the crawl space walls. By insulating on the outside, the walls will be kept warmer, avoiding the possibility of frost heave. Shallow footings can be kept warmer by placing a layer of horizontal insulation sloping away from the foundation.
Long description below

Figure 6-22 Insulating outside the crawl space is similar to insulating a full basement

Long description

Cutaway of a low concrete crawl space foundation, showing floor joists on a sill plate and an exterior above-ground wall. The exterior foundation wall is covered by rigid insulation and insulation protection extending from footings to above the floor joists. This insulation is capped with flashing where it meets the exterior wall finish. From the interior, the crawl space walls and floor are covered by a moisture barrier, fastened mechanically to the top of the concrete wall. Joints between the sill plate, joists, concrete walls and subfloor are sealed with caulking.

From the inside

6.3.2 How to insulate a partially heated crawl space

It is possible to insulate between and under the joists, and create an unheated crawl space. However, this can lead to problems of freezing pipes, frozen ground and possible rot at the joist ends. For these reasons, use floor insulation only when combined with foundation-wall insulation to create a partially heated crawl spaceas per Figure 6-23.

Long description below

Figure 6-23 Insulation on the walls and in the floor creates a partially heated crawl space

Long description

Cutaway of a low concrete crawl-space foundation, floor joists on a sill and an exterior wall. Batt insulation runs between floor joists. The exterior wall of the crawl space is covered by rigid insulation and insulation protection. The rigid insulation extends from the footings to above the floor joists and is capped with flashing. From the interior, the walls and floor are covered by a moisture barrier, fastened mechanically to the top of the wall. The joints at the sill plate and rim joist are caulked.

Insulation board added under the floor joists reduces thermal bridging and increases the insulation level of the floor. Similar to Section 6.2.11, Overhangs, if the cavity can be made air tight, a warmer floor can be created by leaving an air space between the top of the insulation and the bottom of the flooring. This method will decrease the insulation value in the joist space, but this will be offset when adding rigid insulation underneath. Check with your local building code if a protective covering is required for the exposed layer of insulation board.

Points of general importance

6.4 Open foundations

Some older homes, cottages and modular/mobile homes have open foundations and exposed floors. They should be insulated between the joists in the same way as crawl spaces, with the vapour barrier placed above the insulation (always on the warm side) instead of below. There should be a good air seal and the insulation should be protected from the wind, insects and animals. It may be possible to build an insulated skirt around the foundation to create a heated crawl space.

For modular/mobile homes, the floor may contain a bagged system of insulation. It is critical to seal any perforations or openings in the system. Pay special attention to sealing the bag around the water service line, the sewer connection, gas or oil service and the combustion air inlet for the furnace.

If the joist space is already covered, consider having the floor space blown with dense-pack fibre insulation so that there is no air space between the insulation and the floor above. Alternatively, medium- or high-density foam can be used as the vapour barrier, air barrier and primary insulation layer.

In all cases, do not vent the clothes dryer into the floor space.

6.5 Concrete slab on grade

Insulation is applied to houses with slab-on-grade foundations exactly as you would insulate the outside of a full basement (see Part 6.1, Insulating the basement from the outside). If the foundation is on frost-susceptible soils, install a layer of impermeable insulation horizontally in the soil at a slope ratio of 1:5 for at least 1 m (3 ft.) as per Figure 6-24. For more specific information, consult your local building authority.

Long description below

Figure 6-24 Sloped rigid insulation buried in the soil provides frost protection to the slab-on-grade

Long description

Cutaway of a slab-on-grade and an exterior wall footings. Rigid insulation overlaps the base of the above-ground exterior wall and extends to the base of the footings. The insulation is capped with flashing and covered by protection which extends below grade. At the base of the footings a slab of rigid insulation extends out from the wall insulation and slopes down and away from the wall.

A dry concrete slab helps to limit the potential to prevent mould, water damage and musty odours. A simple method to check if a new or existing slab of concrete is dry or if it is releasing moisture into the home was described in the beginning of this chapter in Checking for dampness. Even though a slab may appear dry, it is still best to preform this test.

7. Insulating walls: insulating, renovating and building additions

Walls can account for about 20 percent of heat loss in houses. In addition to heat loss through the walls, there are many cracks and penetrations that allow uncontrolled air leakage into and out of the house. If you are planning to renovate the inside or the outside of your home, this section will provide information about the types of walls within a home as well as how to get the most out of your home improvements.

Types of wall construction

There are three main types of wall construction used in Canadian houses.

i) Solid walls

Solid walls – built of brick, stone, concrete block, log or wood plank – do not have a cavity that can be insulated. The only option is to add insulation to the exterior or to the interior. Many solid walls, including double brick and wood plank walls (see Figure 7-1 and Figure 7-2), have a small cavity, generally less than 25 mm (1 in.), which is a drainage plane that collects and drains water out of the wall. Never insulate these cavities or plug their drain holes.

Long description below

Figure 7-1 Double brick construction

Long description

Cutaway of brick interior and exterior walls, held together with brick ties and separated by an air space. The interior face is covered by a layer of strapping, then a lath and plaster finish.

Long description below

Figure 7-2 Wood plank construction

Long description

Cutaway of a wood plank exterior wall with horizontal planks one on top of the other. Diagonal strapping covers the exterior face of plank wall and a layer of tar paper lies between it and the exterior finish. On the interior, lath and plaster covers the planks.

ii) Concrete block

Concrete-block walls usually have hollow cores that allow air circulation within, increasing convective heat losses. Insulating the cores offers minimal thermal resistance since the block’s internal webs and mortar will continue to act as thermal bridges. Instead, seal all possible air leakage routes into the block wall and ensure that the top course of blocks is capped (see Figure 7-3). Where block walls form the party walls between housing units, air leakage often occurs in the space between the block wall and the interior finish. Make sure the space is fully air sealed.

Long description below

Figure 7-3 Concrete block construction, a party wall with an open wall

Long description

Cutaway of two units, A and B, that share a concrete block wall. The block wall is capped and filled. The open spaces between the interior stud-frame walls of each unit and the common wall are sealed at the top with caulking.

iii) Frame walls

Frame walls have a cavity that may be insulated. Different construction techniques determine the size of the cavity and ease of access from either the interior or exterior. The wall construction also affects details that can interfere with the insulation, including top and bottom plates, fire stops, blocking, plumbing, wiring and heating ducts, as shown in Figure 7-4. A frame house with a brick veneer usually has a 25 to 50 mm (1 to 2 in.) air space between the bricks and the frame wall as part of the drainage plane. Do not insulate this space. Furthermore, insulating over the surface of an exterior wall that includes a drainage plane air space will simply not be very effective. It is better to add the insulation directly to the exterior of the frame wall and then incorporate the appropriate air barrier, drainage plane and siding, unless the specific product and its installation directions account for these requirements. The larger cavity in the frame wall can be insulated.

Long description below

Figure 7-4 Potential blockages in the wall, including wires, pipes, blocking, windows and doors

Long description

Illustration of an exterior facing wall with a window. The stud framing is exposed, showing wiring and wood blocking, and the wall is partially covered by exterior siding.

Opportunities for upgrading

Using dense-pack insulation techniques, empty cavity and some partially insulated cavity frame walls can be insulated from the top and bottom or from the interior or exterior. Insulating should include air sealing as described in Section 4, “Comprehensive air leakage control.”

Walls can be insulated as part of a major repair job or renovation. Interior work includes wall repairs, electrical wiring upgrades, insulation and vapour barrier installation, drywall and finishing. On the exterior, insulating can be combined with re-siding.

Address any moisture or structural problems before insulating. Indications of problems include staining, mould growth, rot, cracks on the inside and exterior wall finishes, and windows and doors that do not operate properly because they are out of square.

It is important to consider both vapour barriers and air barriers, especially when adding insulation to the interior or exterior of an existing wall. The vapour barrier must be on the warm third of the finished wall (see Figure 2-13 for more details). Also consider the location and condition of old vapour barriers, which could be as simple as plaster walls with several coats of paint that may need to be removed or perforated.

7.1 Blown-in insulation

Today, professional insulation contractors can blow in loose-fill insulation or inject approved foam insulation into even partially insulated wood-frame wall cavities. Using dense-pack techniques, cellulose, glass fibre and approved foams will compress existing batt insulation and fill all the remaining voids while also offering good air sealing values. Since the stud space is likely only about 89 to 102 mm (3 ½ to 4 in.) thick, thermal resistance gains may be limited, especially if the wall already contains some insulation. However, next to adding either interior or exterior insulation, good results can be had. Before proceeding, try looking behind electrical outlets – with the power off – to find out what already exists in the walls.

To insulate, small holes must be drilled into each stud space. In most cases, one to five holes must be drilled per storey, including those above and blow windows and doors. A long tube is inserted through each hole into the cavity from the top or the bottom of the stud space. The hose is then withdrawn in stages to allow the space to be filled to the proper density.

To help choose the right product for your job, review the characteristics of blown-in and foamed-in insulations as outlined in Section 3, “Materials.”

Choose your insulation product and installation method carefully. Consult closely with a contractor with a proven track record to obtain the best results. Stipulate the manufacturer’s recommended densities for the material in the contract with the installer. The contractor will need to verify the amount and density of the application and then you and the contractor should agree on the number of bags or containers to be used.

Only a small variation from this target is acceptable as too little will leave voids and/or settling gaps in the walls. If too much is used, some of the insulation may be escaping from the wall into the floor space or some other area where it is not needed. Too high a density can cause walls to bulge. Also verify with the contractor exactly how the holes will be sealed, patched and finished.

Installing the insulation

There are three ways to install the insulation:

i) From the inside

Small holes of 15 to 50 mm (⅝ to 2 in.) are drilled through the inside wall finish and the insulation is blown or injected directly into the wall. The holes must then be completely plugged and sealed.

If you must replace or re-cover the interior finish, it should be possible to

ii) From the outside

Most types of exterior siding can be drilled, lifted or removed to access the stud wall behind. In some cases, brick siding can have single bricks temporarily removed leaving sufficient space to repair holes in the sheathing. Ideally, two stud spaces can be filled from one brick space, though each stud space may require two or more holes with this method. Do not insulate the drainage cavity between the brick veneer and the stud walls. Make sure the installer patches the holes section by section rather than leaving them all until the end to avoid water entry if a storm occurs.

iii) From the basement/attic

This can be the easiest approach if access can be gained and if the cavity is open from top to bottom such as with balloon frame construction. All stud spaces need to be filled, but there should be allowance for windows and doors, fire stops, cross braces and other obstructions in the wall cavity. The contractor will check to see if the wall should be filled from the top, bottom or both, depending on obstructions (see Figure 7-4). After the wall is filled, ensure that the access holes are tightly sealed.

7.2 Renovating the interior

If your plans involve extensive renovation, you have two options: you can rebuild the existing wall or build a new wall on the inside of an existing one.

7.2.1 Rebuild the existing wall

Remove the existing wall board or plaster from a wood frame wall, add or upgrade the existing wall cavity insulation and then install the vapour barrier, new drywall and finish. Better yet, reduce thermal bridging by upgrading the stud cavity and adding 50 mm x 50 mm (2 in. x 2 in.), 50 mm x 76 mm (2 in. x 3 in.) or even 50 mm x 89 mm (2 in. x 4 in.) horizontal strapping, and fill the space with insulation.

Add a vapour barrier on the warm side of the wall within the first third of the thermal resistance value of the overall wall insulation. See the 1/3 – 2/3 rule in Part 2.4, Control of moisture flow and Figure 7-5.

Long description below

Figure 7-5 Retrofitting the existing wall and applying the two thirds rule

Long description

Illustration of a wood-frame exterior above-grade wall showing the steps for insulating from the interior which include: 1) insulating the old wall, 2) extending the electrical boxes, 3) installing or repairing air barrier, 4) adding perpendicular strapping, 5) horizontal insulation between the strapping, 6) the option of extending the insulation past the partition walls, and 7) applying the new vapour barrier.

Alternatively, after filling the cavity with insulation, screw or nail the rigid foam board directly to the exposed studs. Foam board materials, with their high RSI (R) value, use less interior space and provide a thermal break. Depending on the type and thickness of the foam board used, either seal the foam board to act as a vapour barrier or install an approved vapour barrier (see Section 3, “Materials”).

If you are considering having spray-foam professionally installed, there are two basic techniques – one that uses low-density spray foam and the other, high-density spray foam.

For low-density applications, you can choose to remove any existing wall cavity insulation and fill the cavity or better yet, strap the wall and then fill the full, deeper space. The low-density foam will act as an air barrier, but you will have to install an additional vapour barrier before covering the wall with drywall and finishing.

For high-density spray foam, first strap the wall to create a deeper cavity. Then spray a continuous layer of foam (minimum 50 mm [2 in.]) against the exterior sheathing and also cover the framing members. Fill the rest of the cavity with your choice of insulation (for example, low-density spray foam, glass, mineral or cellulose fibre). Since the high-density spray foam acts as a vapour barrier, the wall does not need a polyethylene vapour barrier. Instead, before finishing the wall, install a smart barrier or use the ADA method as described in Part 6.2.3, Frame wall with single or double layer of batt insulation.

7.2.2 Build a new wall on the inside of an existing one

With both wood frame and masonry walls, you can build a new insulated wall onto the existing one. The new frame wall can be installed any distance from the old wall as long as all cavities are filled with insulation (see Figure 7-6). If you ensure that a new, well-sealed vapour barrier is installed, there is no need to remove or damage any existing vapour barrier.

Long description below

Figure 7-6 Building a new wall on the interior of an existing wall

Long description

Cutaway of a new interior facing wall built in front of an existing exterior wall. The new wall framing is attached to the old wall. The window frame is extended to meet the new frame. Batt insulation completely fills the spaces between the vertical studs. A continuous air and vapour barrier covers the wall is sealed with caulking at the top, bottom and any overlaps, and covered with drywall. Alternately, an airtight drywall approach or A.D.A. finish is used.

In both options noted above, follow the relevant part of the instructions for insulating a basement from the inside. This includes sealing air leaks, framing the new wall, framing around window and door openings, insulating (ideally in two layers so there are no gaps), installing an air and vapour barrier, and applying the new finish. For more details, see Part 6.2, Insulating the basement from the inside.

Additional points

  • When installing the air and vapour barrier, cover the entire wall area, including window and door openings (see Figure 7-5). (Later, this will be cut with a large X – from corner to corner – and the flaps sealed to the frame.) Make sure the air and vapour barrier is well sealed at all joints, openings and penetrations.
  • Though it may be difficult, plan for the insulation to extend behind any obstructions (for example, pipes, electrical boxes and heating ducts), so that these are on the warm side of the insulation. New and existing electrical boxes need to be moved into the new wall and installed in poly pans that are sealed to the new air and vapour barrier. Plumbing pipes should be moved into the new wall or carefully insulated only from behind to prevent freezing and bursting. Any air duct joints must be air sealed with approved sealants.
  • If you are rebuilding the existing wall, seal all cracks around door or window frames with non-expanding polyurethane foam sealant as per Figure 7-7 or stuff the gap with insulation or backer rod and caulk. If installing a new wall, it is usually not necessary to install extra framing around windows and doors, as the new wall is non-load bearing.
  • Consider extending the insulation past junctions at partition walls (see Figure 7-5). To do this, remove the drywall on the partition wall back one stud space and cut back the partition wall enough to extend the insulation and seal the air and vapour barrier through the partition wall.
  • As a fast option to increase the wall RSI value while reducing thermal bridging, install at least RSI 0.88 to 1.76 (R-5 to 10) rigid board insulation directly to the wall finish and cover it with drywall. You will still need to ensure the vapour barrier is sealed and will have to reposition such things as electrical switches and plugs. Seriously consider having insulation blown or injected into the wall cavities at the same time.
Long description below

Figure 7-7 Low expansion foam insulation can seal gaps around window and door frames

Long description

Low expansion foam insulation can seal gaps around window and door frames. – Illustration of a canister spraying low-expansion foam insulation in gaps between a window frame and an insulated exterior wall.

7.3 Renovating the exterior

It is always best to remove the existing siding and perform any upgrades to the structure, wiring, plumbing, cavity insulation and the vapour and air barrier before installing additional insulation under new siding (see Figure 7-8). However, rigid board or batt or blanket insulation can be applied on top of old siding.

Points to keep in mind:

Long description below

Figure 7-8 Adding insulation to the exterior

Long description

Illustration of a corner of a one storey home with horizontal siding, a slanted roof and a window in one wall. The walls are framed out with new studs, and studs extend the window openings. The space between the studs is filled with rigid insulation over the existing wall. The insulation and new siding are separated by a layer of building paper or house wrap.

Long description below

Figure 7-9 The box beam can overlap at corners

Long description

Cutaway of an exterior corner of a home with insulation and new studs installed on top of the existing siding. A box beam attached to the base of the above-ground exterior wall supports the new framing. The box beam is shown extending out at a corner to create an overlap with the box beam of the other wall. A weather or air barrier covers the original wall. The new framing is supported by the box beam and is spaced out from the existing wall to allow for a horizontally-installed layer of insulation. A second layer of batt insulation is placed vertically between the studs.

Rigid board insulation

Batt/blanket insulation

  • Build a wooden framework on top of the entire outside wall to hold the insulation and support the new siding (see Figure 7-10). Ensure the air and vapour barriers are properly installed.
  • Alternatively, a lightweight frame wall (such as a Larsen truss) can be hung from the rafters or supported on a bottom plate out from the old wall. This would allow two layers of snugly installed batt type insulation, one horizontally behind the frame, the other vertically between the studs. Using this method, RSI 3.5 (R-20) or higher can be installed.
Long description below

Figure 7-10 Trusses can be hung from the rafters and nailed to the existing wall

Long description

Cutaway of the top of an exterior wall and a slanted roof, Trusses are attached to the rafters of the roof overhang, as well as the existing wall. Vertical batt insulation is placed between the trusses.

7.4 Miscellaneous spaces: attached garages and more

Heat moves in all directions, so walls and floors must be insulated where they separate a heated space from an unheated space. This is commonly found with bonus rooms, which is where a living space is created above an attached garage.

Attached unheated garage

The walls, ceiling and door adjoining the house must be insulated and air sealed to reduce heat loss and prevent garage fumes from entering the house. Refer to Part 7.1, Blown-in insulation, and Part 7.2, Renovating the interior, for instructions on wall insulation if the garage is above ground, or Section 6, “Basement insulation,” if it is below ground level.

If the garage ceiling is open and the joists are visible, proceed as outlined for open foundations (see Part 6.4, Open foundations). It is best to remove an existing garage ceiling finish to air seal and insulate it properly.

Where a finished ceiling exists in the garage, a contractor may be able to blow dense-pack insulation into the space between it and the floor above. All holes cut in the ceiling should be carefully re-sealed to prevent any garage fumes from leaking into the rooms above, and all house ducts must be sealed with an approved sealant.

Safety warning:

Never run heating supply and return ducts from the house into a garage because this is dangerous and violates all building codes. See Section 9, “Operating your house.”

Many contractors recommend the use of professionally installed spray foam against the bottom of the floor above if there is no ceiling finish as this space is notoriously difficult to air seal. This can create a vapour barrier, an air barrier and a good initial insulating layer. Fill any remaining space with additional insulation. Any exposed spray foam will have to be covered with either drywall or approved fire-rated overspray.

If there is a ceiling finish that you do not want to remove, you can nail rigid board insulation and drywall to it as long as the surface is fairly even. Before adding the rigid board insulation, seal all potential leakage paths to prevent air from bypassing the insulation. This is especially important along any junction of the ceiling and walls where you may have to seal the cavity and spaces within the surrounding walls that typically leak into the ceiling. Seal this area with spray foam or with sections of impermeable rigid board insulation caulked between the joists (see Figure 7-11).

Long description below

Figure 7-11 Air seal and insulate between an unheated garage and the house

Long description

Illustration of a two storey home with an unfinished garage below a room of the house. The rear wall is a shared wall with the home so there is insulation between the framing studs. The ceiling of the garage forms the floor of the room above. The garage ceiling has a layer of rigid insulation sealed between the joists and covered by a layer batt insulation. Drywall covers this ceiling.

7.5 Additions and new construction

Renovating often involves some new construction such as the addition of a room or wing. New construction provides an opportunity to install a continuous air and vapour barrier and high levels of insulation in an efficient and cost-effective way.

Figure 7-12 shows a typical cross-section of new construction from the roof to the footings. Note how both the insulation and air barrier run continuously without breaks or thermal bridging.

Renovations also allow for current or future allowances of renewable energy and other energy-efficient features into your home such as solar water heating, passive solar heating, radiant-ready in-floor heating and photovoltaic power generation and an electric vehicle charging station.

It is important to consider these renovations well in advance. For instance, ensure your roof structure can support any additional weight or wind uplift loads for any roof-mounted system, and any addition of future conduits, water piping or electrical circuits for future systems.

Attic

High levels of insulation, a continuous air and vapour barrier and ventilation are the features of an energy-efficient attic. Roof trusses are available that allow high insulation levels above the top plate of the outer walls. These include raised heel trusses for flat ceilings, scissor trusses for cathedral ceilings and parallel chord trusses for flat roofs.

Walls

The section in the illustration at the right shows a 2 x 6 wall with insulating sheathing. Other wall systems include interior cross strapping, double-wall systems and the use of trusses. These systems allow the continuous air and vapour barrier part way in the wall. Note the recessed headers that allow room for the continuous air and vapour barrier and extra insulation.

Windows

High-performance ENERGY STAR® windows are used where possible. All windows are sealed to the air barrier.

Foundation

The foundation has full-depth insulation – in this example, on the exterior. Proper damp proofing, a drainage system and a sloped grade help ensure a dry basement.

Mechanical systems

Space heating and cooling systems are smaller for well-insulated and air-sealed homes. High-efficiency space and water heating equipment can use directly connected combustion air and avoid using household air to operate.

Long description below

Figure 7-12 Exterior wall cross-section

Long description

Cutaway of an exterior wall of a typical new one-storey house with insulated attic, cathedral ceiling and a full-depth concrete foundation. There is a window in the wall on the main floor. All walls, including the attic sloped ceiling, are insulated with a combination of batt and rigid insulation, have continuous vapour and/or moisture barriers and caulking along edges and joints. Regarding the attic, high levels of insulation, a continuous air and vapour barrier and ventilation are the features of an energy-efficient attic. Roof trusses are available that allow high insulation levels above the top plate of the outer walls. These include raised heel trusses for flat ceilings and parallel chord trusses for flat roofs. Regarding the walls, the section in the illustration at the right shows a two by six wall with insulating sheathing. Other wall systems include interior cross strapping, double-wall systems and the use of trusses. These systems allow the continuous air and vapour barrier part way in the wall. Note the recessed headers that allow room for the continuous air and vapour barrier and extra insulation. Regarding the windows, high performance ENERGY STAR® windows are used where possible. Most windows face south. All windows are sealed to the air barrier. Regarding the foundation, the foundation has full-depth insulation on the on the exterior in this example. Proper damp proofing, a drainage system and a sloped grade help ensure a dry basement. Regarding the mechanical systems, space heating and cooling systems are smaller for well-insulated and air-sealed homes. High-efficiency space and water heating equipment can use directly connected combustion air and avoid using household air to operate.

8. Upgrading windows and exterior doors

Windows, doors, and skylights can account for up to 35 percent of total house heat loss. This chapter discusses upgrade or replacement options for windows and doors to save energy.

8.1 Windows

There are a number of options for upgrading the energy efficiency of your windows. Windows can be repaired by servicing hardware such as latches, cranks and locks or retrofitted with caulking and weatherstripping or adding glazing and storm windows. At times the best choice is total window and frame replacement with new ENERGY STAR® certified windows or high-performance inserts. If the frames are still in good condition, inserts (such as new sash and glazing units) can be a good option, especially for homes with heritage status.

8.1.1 Window types

Residential windows and skylights come in two basic types: operable and non-operable (or “fixed”). While non-operable windows may be more airtight, operable windows (including casement, awning, hopper, tilt, turn, and slider) allow for ventilation or emergency escape routes. There are also operable skylights that open like “awning-style” windows but are designed to be installed on an angle. See Figure 8-1 for illustrations of these windows.

Long description below

Figure 8-1 Types of windows

Long description

Illustration of various windows with different styles and functionalities such as awning, casement, horizontal slider single and double, tilt and turn, hopper, vertical slider (single and double – hung), skylight (flat-glazed) and skylight (dome).

Figures 8-2 and 8-3 illustrate two different styles of windows and their various components.

Long description below

Figure 8-2 Casement window showing parts and hardware

Long description

Illustration of a casement window in open position, showing the window frame, sash, glazing and hinges and other hardware. Hinges, casement cranks, handles, locks, latch plates, sash balances, etc. that are used to operate and lock the window.

Long description below

Figure 8-3 Double-hung window showing parts and air-leakage paths

Long description

Cutaway showing the elements of a double-hung window and its location in the rough framing of an insulated wall. Window elements include the drip cap or flash, exterior casing, window frame, the upper and lower sashes, shim spaces. The exterior sheathing and interior drywall are also indicated. Arrows show the air-leakage paths through gaps at the rough framing at the header, sill and around the window frame, the shim spaces, sashes and window trim.

8.1.2 Material options

Windows and skylights for use in houses and low-rise buildings are commonly manufactured from a variety of materials, including aluminum, fiberglass, vinyl and wood, or a combination of these materials. While aluminum conducts heat more than non-metals, the overall energy efficiency of the window or skylight is more dependent on the actual design of the product. This is reflected in the energy-performance rating which takes into account the entire window assembly (see Part 8.1.4, Rating Information).

8.1.3 Glazing

Glazing is the generic term for the transparent material, usually glass, in a window, door or skylight. Ordinary glass is called annealed glass. Glass can also be tempered (heat-strengthened) or laminated (to make it more shatter-resistant and better withstand adverse weather conditions). Glazing options include the following:

i) Glazing layers

A single-glazed product has one pane of glass. A double-glazed product has two panes; a triple-glazed three; and a quad-glazed four. More glazing layers reduce outdoor noise from entering the house. One of the panes in a triple-glazed product may be substituted for a thin layer of suspended polyester film to reduce the overall weight.

ii) Low-E coatings

Low emissivity or low-E coatings have a fine, factory installed transparent coating of metal applied to one or several glazing surfaces to reduce heat loss in the winter and heat gain in the summer. Low-E coatings can reduce heat loss in the winter and heat gain in the summer by up to 50%. This is beneficial as it helps to maintain a comfortable room temperature year round, reduces the load on a home’s heating, ventilating and air-conditioning (HVAC) system and saves on energy bills.

Low-E coatings can come in passive or solar control options. Passive low-E coatings have a high Solar Heat Gain Coefficient (SHGC) and are designed to harness the sun’s energy to supplement the home’s heating system. Alternatively, solar control low-E coatings have a lower SHGC that can reduce the load on a home’s air conditioning system (see Part 8.1.4.ii Solar Heat Gain Coefficient (SHGC) for more information).

An after-market product to consider in improving energy efficiency is low-E films, which can be applied to existing glazed units.

iii) Gas fill

The space(s) between glazings in double-, triple-, and quad-glazed windows are filled with an odourless, colourless, harmless inert gas, such as argon or krypton, to reduce heat transfer through the glass.

iv) Insulated spacers

Traditional aluminum-box spacers between glazings contribute to heat loss and condensation problems along the edges. Spacers designed with thermal breaks that use better insulating materials such as foam, plastic or composites reduce edge heat loss.

v) Optimal glazing spacing

The size of spacing between each glazing affects the insulation value of a window. If the space is too narrow, conduction through the air space is significant. If too wide, convection currents will start to form when still air begins to rise as it is heated on the warm interior side and falls as it is cooled on the cold exterior side of the window resulting in unwanted heat transfer (loss). The best spacing to minimize convection losses is 12 to 16 mm (1/2 to 5/8 in.).

8.1.4 Rating information

Windows and skylights are tested using standard sample sizes to fairly rank their overall energy performance. The energy performance and terminology that are most often used in Canada to describe the windows, doors and skylights are provided in this section. This information will help start the conversation with your windows supplier who can help determine the appropriate window specifications for your needs.

i) U-factor

The U-factor measures the rate of heat loss of a window assembly and is an inverse of the RSI or R-value. The lower the U-factor, the greater the resistance to heat loss (unlike the RSI or R-value for which the greater number, the better the resistance to heat loss). Overall U-factor includes centre-of-glass, edge of glass and frame U-factors. Better performing double-glazed windows can have U-factors of 1.2 W/m2∙K or lower and triple-glazed windows can have U-factors as low as 0.8 W/m2∙K.

ii) Solar Heat Gain Coefficient (SHGC)

A fraction between 0 and 1 indicating the amount of the sun’s heat that can pass through the product (solar gain). The lower a window’s SHGC, the less solar heat it transmits, and this reduces the load on the home’s cooling system. The higher a window’s SGHC, the more solar energy is allowed (and trapped) in the house and this reduces the load on the home’s heating system.

Ultimately selecting the appropriate SHGC depends on the climate (length of the heating season vs. the cooling season), the ability of a home to regulate temperature (HVAC system, air-tightness of a home, passive heat elements that absorb residual heat), available shading (such as overhangs above windows) and orientation of the windows and doors.

As a rule of thumb, a SHGC of between 0.3-0.4 is optimal for homes that were substantially renovated for energy efficiency or new homes in Canada.

High SHGC (greater than 0.4) will allow more solar heat gains into the home and is normally suitable in the following instances:

Discuss with your window and door supplier the role of solar heat gain in your home.

iii) Energy Rating (ER)

This unitless number reflects the balance between heat transfer (U-factor) and solar gain. Higher numbers indicate a slower heat transfer without significantly reducing the amount of solar gain.

iv) Visible Transmittance (VT)

The percentage or fraction of visible light that can pass through the glazing. The higher the number, the greater the amount of visible light that can pass through.

v) Centre-of-Glass U-factor

Often called “centre-of-glass ratings,” these values make the product appear more energy-efficient than it really is, because other parts of the window/glazing assembly are not included, only the glass portion is considered.

8.1.5 Replacing glazing, sashes and windows

Properly installed energy-efficient windows make homes more comfortable by reducing drafts and increasing the temperature of the interior side of the window, reducing condensation. Energy-efficient windows will have many of the following features:

If your inspection has revealed serious problems with a window’s glazing, sash or the entire unit, your best option will be to replace all or part of the window.

For example, if the glazing is only a single pane of glass or is in poor condition, you can buy a new sealed glazing window insert. If the frame is in poor condition, it may be time to replace the unit.

8.1.6 Taking stock

Check each window for signs of damage: rot, mold and/or staining on or around the window, the condition of the glass, putty and paint, weatherstripping and the operation and condition of the hardware. Some windows may need only minor air sealing work, while others require major upgrading or even replacement. Check for air leakage around the frame and at all movable joints. Combine a visual inspection with a test using a leak detector as described in Section 2, “How your house works.”

8.1.7 Condensation problems

Interior surface condensation and frosting are common complaints. Sometimes the problem is light fogging on some windows; at other times, there may be persistent and heavy frost covering the glass. Many homeowners buy new windows only to find that the problem becomes worse because the old, leaky windows actually helped to reduce humidity. The new windows seal the house more tightly, causing a rise in humidity. Some solutions are to reduce humidity levels in the house and improve the house ventilation.

Alternatively, you can increase the surface temperature of the window by installing more efficient windows, such as ENERGY STAR® certified windows. In more extreme climates, homes may have more problems with edges of the glazing fogging up and freezing. Triple-glazed windows help reduce this problem while offering better performance overall.

When condensation forms between panes on non-sealed glazing units or storm windows, moist house air has leaked past the inner pane and condensed on the outer pane. Even dry houses can suffer from this type of condensation problem. This problem is common on second storeys where there is more air being pushed out the window because of the stack effect. The solution is to weatherstrip the inner sash to prevent air leakage; make sure that the weep holes on the storm windows, which allow water to escape, are open to the outside.

If condensation occurs inside a sealed double-glazed unit, due to the seal being broken, the problem is best corrected by replacing the glazing unit. Check to see if the window is still under warranty. Although some specialty companies can refurbish sealed glazing units that have failed, this is considered a temporary fix that will not offer the same original energy efficiency.

For more information on moisture and condensation, see Part 2.4, Control of moisture flow, and Section 4, “Comprehensive air leakage control,” and Part 9.4, Ventilation and combustion air.

8.1.8 Interior caulking

Window air leakage can be reduced by applying a continuous bead of caulk around the window trim where it meets the wall, at the mitred joints of the trim, and between the trim and the frame (see Figure 8-4). Make sure the caulk is intended for indoor use (do not use exterior caulking indoors), can be painted and is of good quality. For more information about caulking products, see Part 3.3, Air barrier materials.

Long description below

Figure 8-4 Where to caulk the joints of a fixed window

Long description

Cutaway of an exterior wall with a double-glazed fixed window, the edges and joints between the window frame, sill and all trim are sealed with caulking.

If a window is particularly leaky and the trim can be easily removed and re-installed, remove the trim, add insulation, and seal the gap before reapplying the trim. If the gap is small, 6 mm (¼ in.) or less, insulating the gap followed by caulking may suffice. Larger gaps may require either a backer rod with caulking or low-expansion foam (see Figure 8-5).

Long description below

Figure 8-5 How to seal behind the window trim

Long description

Cutaway of an interior-view detail of an exterior wall showing the rough framing and the corner of the window. A canister of low-expansion foam insulation injects sealant into the gap between the rough framing and the window frame, behind the window trim. The wall containing the window is finished with drywall.

To further reduce air leakage, apply a layer of red technical tape to cover the joint between the wall and window frame. Ensure that the tape will be hidden by the trim as it cannot be painted and red adhesive may remain after excess tape is removed.

8.1.9 Exterior caulking

Exterior caulking is the last and weakest defense against rain entering a wall from the outside. The best defense against window and door wall leakage includes the following two items:

Caulking on the outside of a window should be done only after interior sealing is complete. If the exterior is caulked first, it can trap warm, moist air in the wall, which over time, can damage the wall.

8.1.10 Weatherstripping

Weatherstripping is used to create a seal between the frame and door or window sash to block rain and dust and to minimize air leakage. There are four different types of seals: compression, brush, sweep and magnetic. Other than fixed windows, the most airtight windows are typically those with compression or magnetic seals. These are generally found on casement, awning, hopper and tilt-turn-style windows and most operable skylights. Look for and question the quality of the hardware and weatherstripping when selecting windows and doors. If the windows do not have to be opened and do not serve as emergency exits, they can be locked and caulked. Where storm windows are installed, seal the inside window more tightly than the outside window to reduce condensation problems.

Technical note

Building codes require that every bedroom have at least one window that opens from the inside to allow escape in case of emergency. Be mindful of this requirement before deciding to seal shut certain windows.

Many types of weatherstripping are available. Table 3-4 lists some of the more common varieties of weatherstripping, though it is certainly not an exhaustive list. Try to visit a window and door supplier that stocks a wide variety of original manufacturer products. For newer windows with built-in weatherstripping that has lost its effectiveness over time, pry out a sample and take it to the window manufacturer or supplier for replacement with the same type. Cheaper products are usually less durable and less effective, so do not choose merely on the basis of cost.

Preparation and installation are important and typically involve the following steps:

i) Double-hung and single-hung windows

Double-hung and single-hung windows should be weatherstripped on the sides, top and bottom of the moving sash, as shown in Figure 8-6. Caulk air leaks around the fixed portion of the window.

Long description below

Figure 8-6 Where to weatherstrip a single hung window

Long description

Cutaway of an interior view of a window with V-strip weatherstripping along all edges of the sash where it meets the frame. The area where the upper and lower sashes meet is also weatherstripped.

Sides

The thin plastic V-type weatherstripping is a good choice. Open the window and slip the stripping up the crack between the sash and the frame, with the mouth of the V facing the exterior. It need only extend to 25 mm (1 in.) above the top of the closed window. You can do a better job if you first remove the stop and the bottom sash.

Top

Weatherstrip the space where the two sashes meet by removing the lower sash and applying V-type weatherstripping to the upper window from the inside.

Bottom

Apply V-type or compression-type neoprene rubber to the windowsill where the closed window will sit or to the bottom of the moving window sash itself.

ii) Sliding windows

Sliding windows with sashes typically use brush weatherstripping that will require removing the sash and pulling the old weatherstripping out of its slot (see Figure 8-7). Cut the new material to the length required and snap or slide it into the slot. Tack, staple, or glue each end of the brush material to ensure that the weatherstripping stays in place before reinstalling the sash.

Long description below

Figure 8-7 Brush weatherstripping on a sliding window

Long description

Cutaway of an interior view of a double-glazed sliding window with brush-type weatherstripping. Weatherstripping is installed on the bottom and faces of the sliding portion of the sash where it contacts the frame. An arrow indicates the sideways direction of sash movement.

Sashless sliders – panes of glass not encased in a frame – are inefficient. At the very least they should be supplemented with interior storm windows. Better yet, replace them with energy-efficient units.

iii) Swing-type (hinged) windows

Swing-type (hinged) windows are treated like doors. Apply weatherstripping to the frame so it meets the edge of the sash or place it on the stop where it will meet the face of the sash (see Figure 8-8). The force of a closed window against the weatherstripping makes a pressure seal. Hinged windows usually require a combination of V-strip and compression-type weatherstripping. Hinges and locking hardware may complicate the job. Sometimes, more than one weatherstrip will therefore be needed in those areas.

Long description below

Figure 8-8 Compression and sweep weatherstripping on a casement window

Long description

Cutaway of an interior view of a double-glazed casement window with sweep-type weatherstripping on the base of the sash and compression-type weatherstripping where the casement meets the frame. An arrow indicates the outward movement of the sash.

8.1.11 Storm window systems

Single-glazed windows lose about 10 to 20 times as much heat as the same area of a properly insulated wall. Storm windows or double-glazed sealed units will reduce the heat loss by almost half. Storm windows can be installed on the inside or the outside, can be permanent or seasonal, and can be made to order.

Exterior storm window systems

Exterior storm windows were once very common and continue to serve a useful role in many applications. They are usually constructed of a wood or metal frame, with glass or an acrylic sheet as glazing.

Exterior storm windows can be either seasonal (installed in the fall and removed in the spring) or permanent. Seasonal storm windows should be inspected each year before installation to ensure that the glazing, putty and weatherstripping are in good condition. A drawback of seasonal units is the labour involved in installing and removing them each year, as well as the need for storage. Permanent exterior storm windows are usually equipped with a built-in screen and a sliding sash.

When you use exterior storm windows, the main interior window must be air sealed more tightly than the storm window to prevent moist household air from entering the space between the windows and being trapped, where it can condense and cause deterioration of the sash and frame.

Interior storm window systems

Interior storm windows are generally attached directly to the window frame, which helps reduce air leakage around the window. To minimize condensation and air leakage, interior storm windows should be sealed tightly so that no warm air gets between the storm unit and the original window after installation.

Interior storm windows are lighter and more accessible than seasonal exterior storm windows especially on upper floors. A disadvantage is that blinds or other window treatments may have to be repositioned to accommodate the storm window.

Interior storm windows are typically used in the winter only and are stored for the rest of the year. However, in an air-conditioned house, they can also help keep heat out and cool air in during the hot summer months.

There are two common interior storm window system options – heat-shrink film with double-sided tape and clear rigid acrylic sheets with magnetic seals.

i) Heat-shrink film with double-sided tape

These inexpensive, temporary, do-it-yourself kits are sold at most hardware and building supply stores and include instructions for installation. With this system, two-sided tape attaches the film to the window trim, after which the film is heated with a hair dryer to shrink it tightly across the window. In most cases, the film can be used only once.

Although this system provides an excellent seal and good visibility, the two-sided tape can lift paint when it is removed. As well, once this system is installed, the window cannot be opened without removing or puncturing the film.

Points to keep in mind:

ii) Clear rigid acrylic sheets with magnetic seals

This seasonal system is more durable than plastic film but more expensive; plus, it may require the services of a contractor.

To install a magnetic seal system, a metal strip is fastened to the window trim using double-sided tape (this strip can be painted to match the frame). A magnetic molding is then secured to the acrylic sheet and the sheet is pressed into place on the metal strip.

When the acrylic sheets are not in use, they must be stored in a flat or vertical position (not slanted) and in a cool place protected from exposure to sunlight and excessive heat. The rigid glazing is easier to clean and has a more finished appearance than shrink film.

Some plastic supply stores sell these systems (and the appropriate cleaning products) and can cut the sheets to the size required. As well, some firms specialize in manufacturing and installing these systems.

Specialty products

There are two products that are most suitable for areas that have very high solar gains that make the room too hot: applied window films and multi-layered polyester films. Films are usually professionally applied with some precautions.

Applied window films are usually made from a clear or tinted polyester substrate with a scratch-resistant coating on one side and an adhesive with a protective liner on the other. Multi-layered polyester films are black on one side and silver on the other. The film is permanently attached to the window by removing the liner and pressing it firmly on the glass.

Window films with a solar-control coating reduce solar gain and help protect carpeting, draperies, furniture, and wood from fading. They should not be used on all windows as they offer very little increased insulation and greatly cut down on solar gain, which could lead to higher energy bills during the heating season. There is also a small risk of glass breakage due to increased thermal stress and the use of these films may void the warranty issued by the original window manufacturer.

Curtains and blinds can help reduce radiant heat loss from windows during the heating season and reduce solar gain during the summer. Shutters, shades, awnings, and trees can also reduce solar gains during the summer. Close window coverings during the day and open windows at night for ventilation.

During the heating season, insulated drapes offer somewhat more benefit than non-insulated drapes and blinds. However, as curtains and blinds are not airtight, they may cause window condensation problems in the winter.

8.1.12 Skylights

Skylights can come in a flat glazed design, a dome lens design, or a tubular design, and should have a low curb (the part that holds the glass at the roof line to reduce heat loss through the frame). Skylights commonly suffer from water leakage and condensation around the frame and curb or tunnel. For operable skylights, ensure that hardware is working, and all seals are in good order. Keep rain out by repairing exterior seals and flashings. Curbs and interior tunnels around the skylight must be well insulated and air sealed to reduce condensation. Reduce summer overheating with light-reflective glazing and blinds.

Do not open a skylight (or upper storey window) in hot weather if the house air temperature is cooler than the outside air as this can cause reverse stack effect. Opening the skylight draws hot air into the house especially when air conditioning is being used as the cooler air leaks out of the lower level of the home thereby drawing hot air through the open skylight or window. Reverse stack effect negates the effectiveness of air conditioning or natural cooling.

8.2 Doors

Doors come in two operable styles: swinging (hinged) and sliding. Doors can either be solid or have glazing in the door, beside the door (sidelight) or above the door (transom). Doors can be made from a solid material, such as wood, or have an insulated core that is covered with a metal, fiberglass, or wood shell. Insulated core doors are more thermally resistant than solid material doors and doors that include glazing. See Figure 8-9 for components of a door system and Figure 8-10 for types of patio doors.

Long description below

Figure 8-9 Components of an entry door system

Long description

Illustration of an entry door system that highlights different components such as sill, door slab, doorlite, sidelite, transom, hinge set, door frame, lock set, latch set, foam core, and sill sweep.

Long description below

Figure 8-10 Types of patio doors

Long description

Illustration of various types of patio doors such as swinging (hinged) patio or garden door, French door, and sliding patio door.

Poor installation, years of hard use, shifting foundations and seasonal warping can often force hinged doors and sliding glass patio doors to become out of square with their frames. If doors do not fit snugly, fix or replace the door, frame, hardware, gaskets and weatherstripping. The same techniques for preparing windows (as explained in Part 8.1, “Windows”) apply to all doors including any needed repairs or adjustments, surface preparation and cleaning for the weatherstripping. Technical specifications such as glazing and rating information covered in Part 8.1, Windows apply to doors as well.

8.2.1 Weatherstripping the doors

Weatherstrip the top and sides of the door frame as illustrated in Figure 8-11, image A and Figure 8-11, image B. The easiest and most effective weatherstripping for a door frame is a good quality V-shaped vinyl type (see Figure 8-11, image B), which makes contact with the edge of the door and provides a good seal even when the door warps from season to season.

Long description below

Figure 8-11 Methods of weatherstripping a door

Long description

Three cutaways of a door inside its frame showing different methods of weatherstripping to create a seal. A) The first shows weatherstripping applied to the interior face of the door where it meets the frame. B) The second shows V-type weatherstripping applied where the edge of the door meets the frame and C) The third shows weatherstripping along the bottom of the door where it contacts the threshold.

For increased protection, attach weatherstripping to the stop so that it presses against the face of the door as shown in Figure 8-11, image A. There are also many types of combination metal and foam or rubber weatherstripping that are screwed to the stop. They should be adjusted regularly to conform to the changing warp of the door.

Apply weatherstripping to either the door sill (see the threshold in Figure 8-11, image C) or to the door itself. Although this can be a difficult area to seal well, it is worthwhile doing because this is often a source of major drafts. Use durable material that can withstand traffic and is flexible enough to conform to changes in the door caused by fluctuations in humidity and temperature. The weatherstripping should also be easy to replace. A good seal can usually be obtained with gasketed door-bottom weatherstripping that attaches to the door, or with full or partial threshold weatherstripping that is attached to the door sill.

When the weatherstripping is applied to the door itself, a very durable material is necessary. The most effective choice is the combination type, which is simply tacked or screwed along the bottom inside surface of the door. There should be slots that allow for some adjustment of the weatherstripping.
There is a wide variety of door weatherstripping on the market, including kits that include weatherstripping and threshold or door bottom seals. Some products come with replacement seals. Look for high-quality, durable products.

For sliding patio doors, replace weatherstripping and hardware when worn. Replace poor condition sliding patio doors with ENERGY STAR® certified units. In the interim, older patio sliding doors not used in winter can be sealed with removable sealant or covered with heat-shrink film.

8.3 Contracting the work

Air sealing and repairing windows and doors can become part of the work of an air sealing contractor (see Section 3, “Materials”). If you are having only some of the windows or doors replaced, ask the contractor to check and replace defective weatherstripping on the remaining units.
When getting estimates, make sure the contractor has experience in the type of work you want done. Ask the contractor if the company offers a third-party warranty on products and services.
Have a knowledgeable professional install windows, doors, and skylights according to the manufacturer's instructions. Typically, installations of windows and doors by a professional contractor ensure that the product’s warranty will be covered.
A poorly installed product may not operate properly and could cause cold drafts even though the product itself is energy efficient. Poor installation may also allow water to leak into the home, leading to costly damages.

Here are some installation criteria:

When replacing existing windows or doors, there are two types of installation: insert and complete tear out.

An insert retrofit involves installing a new window or door into the frame of the existing window or door that is being replaced. However, an insert should be done only if the existing frame has not deteriorated and is properly sealed and insulated. An insert is usually less expensive and minimizes the disturbance to the surrounding wall and trim. Skylights are typically not retrofitted with inserts.

A complete tear out involves removing the old window, door or skylight, including the frame. A tear out allows the installer to make an airtight insulated seal between the product and the rough opening. The original door opening, or window glass area is usually retained or enlarged. For certified window installations refer to the Window Wise program.

Helpful information on energy-efficient windows, doors and skylights can be found on the Government of Canada website.

9. Operating your house: thermostats, water heaters, furnaces and other heating/cooling systems

Like any system, your house will run only as efficiently as you operate and maintain it. Operating it efficiently will maximize your retrofit gains and can actually improve your home's heating, cooling and ventilation performance and overall durability. Even more important, you will create a healthier, more comfortable living environment. As part of your house as a system, a well-tuned and efficiently operating heating, ventilating and air-conditioning (HVAC) system can significantly reduce your annual energy bill.

9.1 Operating and maintaining the heating, ventilating and air-conditioning system

Follow the manufacturer’s recommended maintenance procedures for cleaning and servicing heating and cooling equipment. Oil-fired furnaces and boilers require annual cleaning and tuning. Natural gas and propane furnaces and boilers and ground-source heat pumps should be serviced at least every two years. If your home has solid fuel burning equipment (for example, wood stove or fireplace), have the equipment and chimney inspected annually and cleaned as often as necessary.

9.1.1 Homeowner maintenance

Although a qualified service technician should perform annual maintenance and efficiency tune-ups, homeowners can do some of the work.

Safety warning:

Building codes now require that every home with a combustion appliance or attached garage must have a carbon monoxide (CO) detector, one located near the furnace or appliance or one within 5 m (15 ft.) of each bedroom door. Typically, the requirement is to have one detector located near the furnace or appliance and one detector in each bedroom area to ensure that the alarm can be heard. Be sure to follow the installation and operation instructions. Check with your building or fire department for more information.

For a forced-air system, keep return-air grilles and warm-air vents clean and free of obstructions, and change or clean filters every three months or as they become loaded. Vacuum the radiators of electric or hydronic baseboard systems each autumn to prevent dust buildup. If the heating fins are bent, gently straighten them with a plastic comb to improve their efficiency.

Hydronic systems perform best when radiators are relatively free of air bubbles and operating at correct pressures. This means bleeding radiators regularly unless the system has an automatic bleeding capability. Automatically achieve further savings with an outdoor reset control that adjusts the operating temperature of the circulating water according to outdoor temperatures.

9.1.2 Thermostats

Except for some hydronic systems and heat pumps with slow response times, you can save energy by turning down your thermostat, and the best way to do this is to install a programmable setback thermostat. A basic programmable thermostat will provide a clock timer and allow at least two setback and reset periods a day.

For example, a temperature reduction could be programmed to start before bedtime and end before you get up in the morning. The second setback can reduce the temperature when everyone is away during the day and end just before you arrive in the evening.

A drop of 1°C (2°F) over an eight-hour period can save about 2 percent on your heating energy consumption. If you are away from home for more than three or four hours, it is worthwhile to turn down the temperature. In general, it is best not to reduce the temperature lower than 17°C (63°F), as there is a risk of moisture build-up in the exterior walls. If you want to reduce your temperature further, such as when you are away for extended periods of time (a week or longer), you must keep humidity levels low (see Part 2.4, Control of moisture flow).

Measure the relative humidity throughout the house with a hygrometer to ensure low levels exist, and if not, reduce the humidity by controlling moisture sources or by adding an ENERGY STAR® certified dehumidifier.

Smart thermostats are also available that allow you to control home heating and cooling remotely through your smartphone, computer or tablet. They may also provide home energy use information for tracking and management.

A subset of smart thermostats are adaptive thermostats. They can monitor weather, occupancy or proximity to a home and establish an accurate schedule. They will adapt heating and cooling to suit your needs and provide even greater savings over programmable thermostats.

9.1.3 Sizing and balancing an HVAC system

A newly retrofitted house will have reduced heat loss and will need a smaller heating and cooling system than before the retrofit. This means that any fuel-fired heating equipment may now be oversized – a condition that can cause larger temperature fluctuations and inefficient short cycling, especially for mid-efficiency furnaces and boilers. High-efficiency furnaces and boilers are less affected efficiency-wise, but temperature fluctuations will still affect comfort for occupants, and the equipment will suffer more wear and tear.

When a mid-efficiency furnace or boiler operates less often, the chimney can get colder between firings, increasing the potential for down drafting and possible condensation and damage to the chimney. If your retrofit measures are extensive and you are concerned about this, have the system checked by a qualified heating-system technician.

If the short cycling problem cannot be controlled or comfort becomes an issue, consider replacing the furnace with a high efficiency 2-stage, 3-stage or fully modulating unit. Modulating boilers are also available with outdoor reset controls that further improve a boilers energy efficiency by reducing the boiler water supply temperature. Staged and modulating furnaces and boilers have the advantage of being able to run very efficiently at lower firing rates especially in the spring and fall as well as during less intense cold periods of winter. For example, in milder weather, a 2-stage furnace may fire at 60% and 100% of its rated capacity, a 3-stage furnace might fire at 60%, 75% and 100% and a modulating unit may fire at any point from 60% to 100%. This greater control allows the unit to provide consistent lower heating output levels over a longer time, instead of an intermittent higher heating output level over a shorter time. This results in increased occupant comfort while allowing the equipment to run efficiently without short cycling (such as in its peak efficiency band).

In addition, while the unit is operating at steadier and lower capacity, more air passes through the air filter which leads to better indoor air quality.

A persistent problem for almost all new, existing and renovated homes is the need to have the heat distribution system balanced. Undersized ductwork, leaking ducts, inadequate or poorly placed return air grilles and ducts can mean occupant discomfort and higher heating bills. Improved insulation and air sealing may make some previously hard-to-heat rooms easier to heat, while others may overheat.

Simple rebalancing of the system by either adjusting the dampers in a ducted system or adjusting valves in a hot water system may help. Otherwise, find a competent contractor to upgrade or balance your system. Be warned, duct cleaning alone will not resolve balancing issues and generally has little effect on the HVAC system and indoor air quality. For more information on duct work and duct balancing see Part 9.3.1, Balancing an air conditioning system.

Be warned, duct cleaning alone will not resolve balancing issues and generally has little effect on the HVAC system and indoor air quality.

9.1.4 Motor Selection

When selecting a furnace, a boiler, a heat or energy recovery ventilator (HRV or ERV), the types of fan or pump motor(s) in these pieces of equipment will have an impact on the overall efficiency of the unit. The two main types of motors available on the market today are permanent split capacitor (PSC) and direct current brushless motors (commonly referred to as ECM for electronically commutated motor).

PSC motors typically operate at 60% to 65% efficiency at peak capacity and become less efficient when they are programmed to run at lower speeds. They tend to start and stop abruptly and have limited speed change options with little associated energy savings. They can also get very hot which is a major disadvantage if using the furnace for cooling or air conditioning.

Alternatively, ECMs can be programmed to run with a much greater range of speeds, can start and run quietly even when increasing or decreasing speed, and their efficiency stays high (near 80%) even if their speed is reduced. In addition, ECMs operate much cooler and have other features like ability to meet the airflow required even when dust filters and dirty air conditioning coils cause restrictions.

It is worth noting that while ECM motors can overcome resistance in the duct system such as dirty filter or restrictive ductwork, they consume more power to do so. Good duct design, wise filter selection and regular cleaning and filter changes all contribute to an efficient heating and cooling system.

9.1.5 Air distribution ducts

To improve comfort, safety and system balancing, seal all plenums and supply and return ducts with aluminum foil duct tape, approved flexible plastic tape or water-based mastic. Heating ducts running through unheated or cool basements and crawl spaces should be insulated. Cut RSI 2.1 (R-12) or more of batt or blanket insulation to size or use specially designed foil-faced fibreglass blanket insulation designed for this purpose. Wrap the insulation around the ducts and secure with string, zip ties or approved tape (see Figure 9-1). Do not use standard vinyl type duct tape for duct sealing or securing insulation around ducts as the adhesive dries out over time and the tape falls off.

Long description below

Figure 9-1 Taping an air duct

Long description

Illustration of a person wearing work clothes, a hard hat, goggles, and gloves, taping the seam of an air duct in the ceiling of the basement. Batt insulation is wrapped around the duct work.

Do not seal or wrap the ducts within 1.8 m (6 ft.) of a wood-fired furnace unless you use a special, approved non-combustible tape, mastic, or insulation.

Another option is to seal ducts from the interior using a blown-in plastic polymer that seals all joints, gaps and holes typically 10 mm (3/8 in.) or smaller. This process is done by a qualified technician using specialized equipment. The technician will temporarily seal off sections of the duct work to exclude the furnace and air conditioner, and plug the existing supply registers and return grilles. The blown-in sealant will collect and bond to the edges of the duct where air is leaking, ultimately sealing the gaps.

For houses with hydronic systems, place foil-covered insulation board between radiators and exterior walls to reflect heat back into the room. Metallic supply and return lines can be insulated with minimum RSI 0.7 (R-4) approved insulation. Insulated jackets are available for some types of boilers and may offer some efficiency gains for equipment installed in cold parts of the house.

9.1.6 Open hearth fireplaces

Open hearth gas- or wood-fired fireplaces are basically decorative; the heat supplied will not make up for the losses due to house air drawn up the chimney. Consequently, most fireplaces are unable to provide any net heat gain. Fireplace accessories such as tightly fitted glass doors only offer nominal improvements on efficiency. The hearth industry has a variety of efficient direct vent zero-clearance fireplaces and inserts: gas, propane, pellet and wood units that also look great and eliminate standby losses. Refer to Part 4.2.5, Tips on sealing some of the leakiest areas - Fireplaces and Figure 4-6 for tips on how to reduce air leakage from an unused fireplace.

9.2 Domestic hot water

Domestic water heaters (DWHs) consume on average about 20 percent of a home’s energy – about the same as all the lights and appliances combined. Next to space heating, the water heater is the largest energy user in most homes. In comparison, in a substantially renovated or new energy efficient home the DWH load can be greater than the space heating load.

9.2.1 Replacing your fuel-fired DWH system

The best energy performance option is to replace the existing system with a new high-efficiency system, including tank-type, instantaneous or combination space and water heating models. Compare carefully for your best selection. Match the size of the heater to your needs: bigger tank-type units are typically less efficient than smaller units, especially if your hot water demand is low. Use sizing charts available from the manufacturer or retailer. If considering the installation of an on-demand water heater, wait times for hot water delivery at the fixture will likely increase. Discuss with your plumber how to reduce the wait time and any resulting wasted water.

There are more energy-efficient options now available, including ENERGY STAR® certified DWH units and solar hot water heating systems. Find the most energy-efficient model for your needs.

Energy saving tips for DWH systems

Here are some ways to save on hot water bills:

9.3 Cooling systems

Although Keeping the Heat In publication is about keeping your home warm and comfortable, air conditioning is becoming more common across Canada and is briefly discussed here.

Retrofitting also reduces the amount of energy needed to cool your home in the summer. Air conditioning lowers both air temperature and, very importantly, humidity levels. Air conditioning is a good example of where oversizing is clearly detrimental to comfort, cost of operation and equipment performance. An oversized system will lower house temperature too quickly without removing excess humidity. The result is a house that is cool and damp, which in turn can promote mold growth and musty odors. Higher indoor temperatures (for example, 26°C/79°F) with reduced humidity levels are more comfortable and allow for more energy savings.

Air conditioners should be serviced and maintained regularly. They become inefficient when the inside coil is dirty, when the airways on the outdoor condenser unit are blocked and when the refrigerant level runs low. You can do some simple maintenance yourself.

For example, clean or change the air filter, keep the outside condenser free from obstructions such as plants and leaves. In addition, a service contractor should periodically maintain your unit. Check your owner’s manual for information on maintenance.

9.3.1. Balancing an air conditioning system

In a multi-story home, it is not uncommon to experience hotter temperatures on the upper levels during the cooling season. This is because the upper walls and ceilings are typically exposed to more solar heat gains which is further aggravated by the fact that warm air rises. In addition, the ducting for most central heating and cooling systems is designed primarily to satisfy the heating requirements and is controlled by one thermostat located on the main floor. This means that when the air temperature near the thermostat meets the desired thermostat setting, the second floor will still be too warm, and the basement will likely be too cold. It is possible to make some manual adjustments with dampers located in the ductwork to help even out the temperatures throughout the house (if not installed, dampers can be added in many cases by a heating/cooling technician).

You can try to partially close some of the dampers in the basement and on the main floor and leave the dampers fully open on the upper levels. The intent is to create a balanced air distribution system for summer cooling and a different balanced system for winter heating by just adjusting the dampers. If no dampers are installed or can be accessed, individual registers can also be adjusted but they are less effective than controlling the air in the ducts. Placing thermometers on the different levels can assist with the manual adjustments as it will take some trial and error before possibly finding a balance that works best. If you find your attempts to balance the system are ineffective, it may be because the ductwork is too leaky. In this case, closing the dampers may just cause more leakage rather than sending the air to the intended room.

Balancing a system won’t always work if there is insufficient return air ducting or inadequate supply ducts. In these cases, a separate ductless mini-split air conditioner on the upper floors can help to resolve the problem (installing a higher capacity or more efficient air conditioner will in most cases not resolve the problem and can actually make it worse). Alternatively, in some homes a large duct can be installed from the basement to the upper floor as a means to help return hot stale air trapped in the upper portion of the house down into the basement where it is connected to the main return ductwork to the furnace. Finding a suitable location for the duct can be a challenge and, in some cases, an inline fan may be required to help draw the hot air down and into the furnace.

In every case when balancing a system, mark the position of any dampers before making adjustments, and then mark the best positions for both summer and winter. Be careful not to restrict air supply back to the furnace as this can result in freezing the air conditioning coil (not harmful to the coil) located in the furnace plenum (chamber typically just above the furnace) or cause the furnace to shut down in the heating season by triggering the furnace’s high heat limit switch. Do not hesitate to discuss your concerns with your heating and cooling maintenance technician.

There might be other solutions for balancing a system such as adding a separate heating or cooling system per floor. You can discuss options that can work in your home with an HVAC professional.

9.3.2. Portable air conditioners

If you are considering getting a portable air conditioner (PAC) to help cool a small area of your home, choose wisely as these units are in general not very efficient because the entire unit is indoors. First, avoid single-hose PACs as they are least effective. As single hose units draw warm air from the room and exhaust the heat outdoors, they create a negative pressure that causes more hot humid outdoor air to leak into the home. This results in the air conditioner operating for extended periods of time while trying to meet the desired temperature. This means more power consumption, higher energy bills and prolonged operating noise. A better alternative is a dual-hose PAC that can cool space quickly without exhausting indoor air outdoors. Dual-hose PACs have an additional hose that draws in air from the outside. This air passes through the compressor and the air conditioner’s coil capturing the heat and exhausts it out the other hose to the outside. This results in no negative pressure indoors and increased overall cooling capability.

9.4 Ventilation and combustion air

People need fresh ventilation air to control indoor air quality, and fuel-fired space and water heating systems need combustion air to burn properly. Yet, most Canadian homes have too much excess air due to poorly sealed building envelope. In fact, typically about 25 percent of heat loss can be due to air leakage.

For most older homes, comprehensive air leakage control will lower heating bills without reducing the air supply enough to cause problems. Air leakage does not make for good ventilation.

A better approach is to install a ventilation system that is capable of changing the total household air once every three hours, plus providing separate combustion air for fuel-burning appliances.

Take a systematic look at the moisture balance and ventilation needs of your house. This involves listing moisture sources, symptoms of problems and ventilation requirements. Figure 9-2 lists some common sources of moisture. Retrofits will affect the house, so if the house already shows signs of excessive condensation, find and reduce the moisture sources. If this cannot be done, any retrofit that makes the house more airtight will have to include a mechanical ventilation system.

Long description below

Figure 9-2 Sources of moisture in the home

Long description

Cutaway of a one storey home with peaked roof and basement, indicating seven sources of moisture including: shower or bath, plants, cooking, drying clothes, foundation leaks, drying firewood, and hot water appliances.

Some systems exhaust stale air, some exhaust stale and supply fresh air and some are balanced to do both. The addition of balanced ventilation with heat recovery has a long list of benefits including ability to control the rate of ventilation, maximizing air tightening and increased home durability. Furthermore, improved indoor air quality from controlled ventilation has proven positive health effects.

9.4.1 Is your house susceptible to indoor air quality problems?

Be aware of potential problems, the symptoms to look for and some of the possible solutions. The following circumstances can make a house more susceptible:

9.4.2 Some signs of indoor air quality and moisture problems

The following symptoms indicate that your house may have air quality or moisture problems:

9.4.3 Solutions to moisture problems

If the problem is high humidity or condensation, the first step is to reduce the amount of water vapour in the air:

Table 9-1 shows the maximum levels of indoor relative humidity at 21ºC (70ºF) at which there will be no condensation on conventional double-glazed or energy-efficient windows at various outside temperatures.

Table 9-1 Maximum indoor relative humidity levels
Outdoor temperature Maximum indoor relative humidity
Older generation
double-glazed
low-E
Double-glazed Double-glazed low-E Triple-glazed low-E
0°C (32°F) 50% 58% 70% 81%
-10°C (14°F) 34% 44% 59% 74%
-20°C (-4°F) 24% 34% 50% 67%
-30°C (-22°F) 15% 25% 42% 60%
-40°C (-31°F) 10% 18% 35% 54%

It can be difficult to accurately measure and maintain the recommended humidity levels. One simple approach is to let your windows become your indicator. If excessive condensation appears on the interior surface of double-glazed windows (except those in the kitchen and bathroom), you have too much moisture in the air. Alternatively, you can also use a hygrometer to monitor humidity levels.

Occasional condensation does not pose a problem. Excessive condensation or frosting is an indication that you should reduce moisture production or increase ventilation. Refer to the Health and safety considerations for energy-efficient renovations of our website.

Finally, if you are replacing your space heating and DWH systems with high-efficiency sealed combustion equipment, this may affect indoor air quality. Combustion air from outside directly connected to equipment helps reduce spillage and uncontrolled combustion air from entering the home. However, using outdoor air as part of the combustion process reduces air changes in the home and may cause humidity levels to rise.

9.4.4 Increasing ventilation

If you still have too much condensation even after reducing moisture production, or if indoor air quality is poor, you will have to increase the rate of ventilation or air change.

Ventilation systems work under two main categories: balanced and unbalanced. Unbalanced is most common where exhaust fans are used and replacement air comes from air leakage. This can result in reduced house pressures and limited success in ventilating the house properly. Balanced ventilation incorporates a system where exhausted air is replaced with a dedicated source of incoming air. This helps keep house pressures close to neutral and helps to ventilate the house more evenly.

Ventilation can be increased by:

Long description below

Figure 9-3 Ventilating a house with a heat recovery ventilator

Long description

Cutaway of a one-storey house with peaked roof and basement showing the ventilation and heating system. Arrows indicated air flow into, through and out of the system as well as around and out of the house. Heat recovery ventilators: 1) Collect and exhaust stale, moist air. 2) Supply and distribute fresh air. 3) Use a heat exchanger to recover some of the heat (and moisture for ERV) from the outgoing air. 4) condensate to drain (if provided).

Long description below

Figure 9-4 Heat recovery ventilator

Long description

Cutway of heat recovery ventilator shown: 1) Outdoor air intake. 2) Exhaust air outlet. 3) Stale air from house. 4) Fresh air to house. 5) Circulation fans. 6) Heat exchanger core. 7) Condensate drain. 8) Controls and power wiring. 9) Filters.

A somewhat effective ventilation technique involves having a contractor install a fresh-air duct with a damper to the return-air plenum of a forced-air system (see Figure 9-5). The forced air system should be interlocked to appropriate exhaust fans to avoid pressurizing the house and pushing moisture into the building envelope. Outdoor air is drawn in by the suction of the furnace fan, mixed with house air and preheated by the furnace. Typically, the inlet should be located on the return air duct a minimum of 3 m (10 ft.) from the furnace inlet. The contractor should ensure that the cold ventilation air does not adversely affect the furnace in any way.

Long description below

Figure 9-5 Fresh-air duct to the cold-air return

Long description

Cutaway of a basement, its exterior wall, and a forced-air furnace with ductwork. A fresh-air duct penetrates the basement wall from the exterior and is connected to the return-air plenum of the furnace. Dotted lines indicate the distance of the fresh air inlet to the furnace inlet on the return air duct. Arrows indicate the direction of air flow through the ducts and furnace.

Open the damper in the outdoor-air duct just enough to prevent window condensation. It will have to be adjusted periodically through the seasons. Alternatively, a motorized damper with a humidistat control can open the damper only when the house becomes too humid.

Some ventilation systems are designed with a central exhaust fan with several ducts pulling air from the kitchen and bathrooms. Better yet, incorporate a heat recovery ventilator that typically recovers 70 to 80 percent of the heat from the exhaust air and transfers the heat to the incoming air. Central ventilation systems should be designed, specified and installed by a professional.

9.4.5 Heat recovery ventilators and energy recovery ventilators

An energy-efficient HRV or ERV is one of the best ways to ventilate a home and to control indoor air quality. HRVs and ERVs are connected to an existing forced-air distribution system or a dedicated ductwork system in a balanced manner. It is important for HRV or ERV supply and exhaust air flows to be balanced to maximize performance and not affect the house pressure. Look for models with electronically commutated motors (ECM) to reduce power consumption. In addition, HRVs and ERVs are often available with a range of controls including programmable units to meet homeowner’s specific needs.

An HRV saves on energy costs compared to conventional ventilation systems because it recovers heat from exhausted air. The HRV exhausts stale air and passes it through a heat exchanger. The exchanger transfers the heat to the fresh incoming air before it exhausts the stale air to the outside (see Figure 9-3 and Figure 9-4).

Similarly to an HRV, an ERV recovers heat from exhausted air, but it also allows for the moisture to be transferred between the air streams. An ERV is recommended where cooling load is high, where the interior moisture loads are very low, or where it is operating in a very dry climate (for example, northern Canada).

During the cooling season, ERVs help control excess moisture in your home by allowing it to pass through the core. For example, in hot humid regions some of the moisture in the outdoor supply air is transferred through the core to the outgoing exhaust air. Because less energy is required to lower the temperature of dry air compared to moist air, an ERV can reduce the load on your air conditioner.

On the other hand, if the amount of moisture produced in your home is limited during the heating season, ERVs can help recover some of the moisture that would be exhausted to the outdoors by a regular HRV. This helps you maintain a humidity level within your home, minimizing static electricity, sore throats and other discomforts caused by air that is too dry. Also note that this dryness could be caused by over-ventilation, which might indicate that the ventilation system is oversized or needs to be slowed down.

HRVs and ERVs must be installed, balanced and commissioned properly by a certified technician. Historically, many HRVs and ERVs were not installed or maintained properly, so if you are unsure of how your unit is set up or performing, contact a certified professional (ideally trained for your make and model). Like all HVAC equipment, once properly set up, HRVs and ERVs must be serviced regularly. The homeowner should be able to perform routine maintenance as this typically only requires cleaning filters and the core, and checking components as noted in the service manual for the unit. Visit the Heat and energy recovery ventilators section of our website for more helpful tips.

9.4.6 Combustion air

Long description below

Figure 9-6 Many appliances compete for household air resulting in backdrafting of combustion gases

Long description

Cutaway of a one-storey house with peaked roof and basement showing appliances and air movement. Arrows indicate air flow out of the home through the attic vents, dryer vent, stove fan exhaust, bathroom fan, plumbing stack and fireplace. Air is shown being drawn in through the chimney, causing back-puffing at the furnace.

All fuel-burning appliances require air for combustion and for diluting and exhausting the products of combustion out of the house. If the air supplied to the house is less than the amount of air exhausted, a negative pressure is created that can produce backdrafts of combustion gases (see Figure 9-6). For example, a powerful kitchen fan or a roaring open fireplace exhausts air from the house creating a negative pressure that can pull combustion gases back into the house through chimneys or vents.

Signs of combustion air problems include:

The first line of defence is to replace spillage-susceptible space heating and DWH equipment with direct vent or sealed combustion appliances (Figure 9-7). Alternatively, select electric heating systems with heat pump technology.

Long description below

Figure 9-7 Direct-venting for heating and domestic hot water equipment

Long description

Two illustrations show a furnace and a domestic water heater. Arrows indicate the exterior combustion air intakes and direct venting of combustion gases to the exterior. Domestic hot water shows: 1) fresh air supply. 2) direct-vent. 3) cold water in. 4) hot water out.

Conventional open fireplaces can be a wonderful feature of a home, but they are also responsible for leaking heated air to the outside and are prone to backdrafting. At the end of their burn cycles, when the wood burns to coals, heat output is reduced and large quantities of carbon monoxide are emitted. At this point fireplaces are more vulnerable to backdrafting. Minimize this problem by installing tight-fitting glass doors and consider opening a nearby window slightly when you operate the fireplace or install a designated combustion air supply.

Safety warning:

Always install CO detectors in a home that has combustion appliances (fireplace, wood stove, fuel-burning furnace or water heater) or an attached garage. Properly installed, these detectors will help protect occupants from asphyxiation caused by a venting failure or malfunction of combustion appliances or automobile fumes leaking into the home from an attached garage. Never operate a vehicle in an enclosed space. Always open the garage door before starting a car inside.

Regularly replace batteries in CO and smoke detectors. These devices have limited life spans and must be replaced regularly. Check the manufacturer’s literature for this information.

9.5 More ways to save energy

Explore the Energy efficiency renovations section of our website to access a wealth of additional tips on saving energy in your home and to learn more about how an EnerGuide home evaluation can help you make informed decisions when operating, renovating or purchasing a home.