Proposed Amendments to the Wastewater Systems Effluent Regulations - Discussion Document

1. Purpose

Environment and Climate Change Canada (ECCC) is proposing to amend the Wastewater Systems Effluent Regulations. The purpose of this consultation document is to inform interested parties of the key areas of the Regulations where ECCC is proposing amendments and to seek feedback. Interested parties should comment by March 5, 2022 (90 days after publication) to ensure their feedback is considered in draft proposed amendments to be published in Canada Gazette I.  

2. The Regulations and the need to amend

Effluent from wastewater systems is the largest source of pollution by volume in Canadian waters. The Wastewater Systems Effluent Regulations under the Fisheries Act were developed to protect the environment by lowering the level of harmful substances released through wastewater effluent. This reduces threats to fish, fish habitat and human health from fish consumption. The Regulations apply to systems that were designed to collect 100 m­3 or more of wastewater per day. The Regulations do not apply to any wastewater system located in the Northwest Territories, Nunavut and north of the 54th parallel in the provinces of Quebec and Newfoundland and Labrador.  

The Regulations set national baseline effluent quality standards that are achievable through secondary wastewater treatment and prohibit the discharge of effluent that is acutely lethal to rainbow trout using prescribed methods. These standards came into effect in January 2015 for most systems. The Regulations specify requirements for carrying out effluent monitoring, reporting and record keeping. ECCC has made available the data reported by owners/operators under the Regulations and a summary report on the Wastewater Annual Reports and Data webpage.

Since coming into force, the Regulations have resulted in improvements in the quality of effluent being released into Canadian waters. A number of systems have undergone upgrades to achieve secondary level treatment or equivalent. As of 2019, 79% of wastewater systems met the requirements of the Regulations.

While the majority of systems meet the requirements of the Regulations, there is still undertreated and untreated wastewater released to the environment through wastewater systems that have little or no treatment in place. Undertreated wastewater can also be released temporarily from otherwise compliant systems due to repairs, maintenance work and upgrades at treatment plants. The Regulations have provisions in place to manage these undertreated and untreated wastewater releases under specific conditions through transitional and temporary authorizations. Through several years of implementing the Regulations and based of feedback received, ECCC has identified gaps in the transitional and temporary authorization provisions and opportunities for improvement.

ECCC is proposing amendments to the transitional and temporary bypass authorization provisions of the Regulations to address comments and concerns raised as well as amendments to address implementation issues and administrative challenges. The goal of the proposed amendments is to enhance regulatory clarity, strengthen environmental protection, and improve transparency.

Further information on the status of proposed amendments can be obtained on our Consultations on Wastewater webpage.

3. Proposed areas to be amended

  1. Transitional Authorizations
  2. Temporary Bypass Authorizations
  3. Key Administrative Improvements

3.1 Transitional Authorizations

Background

While most wastewater systems in Canada were capable of achieving the effluent standards of the Regulations when they came into effect in 2015, a number of systems were unable to achieve the required level of treatment. Understanding that upgrading or constructing new wastewater treatment systems requires extensive time to plan and finance, the Regulations allowed owners/operators to apply for a transitional authorization if their system was not designed to meet the effluent limits. Owners/operators had until June 2014 to collect data and apply for a transitional authorization. Depending on the level of risk, a transitional authorization offered an extension period to the end of 2020, 2030 or 2040 to comply with the effluent limits of the Regulations. Systems posing the highest risk to the receiving environment were given less time to upgrade and comply with the effluent quality limits (2020), whereas systems with medium and low risks to the receiving environment were given more time to upgrade (2030 and 2040).

ECCC issued transitional authorizations based on the level of risk using a system of points, which considered effluent quality (carbonaceous biochemical oxygen demand (CBOD), suspended solids (SS), un-ionized ammonia, and total residual chlorine), annual average daily volume, and the sensitivity of receiving environment.

To apply for a transitional authorization, owners/operators had to:

Transitional authorization holders are required to meet site-specific effluent limits that ensure effluent quality does not get worse over time. They have to follow similar monitoring and reporting requirements as other owners/operators, and submit progress reports to ECCC every five years. ECCC issued 65 transitional authorizations.

More than 100 owners/operators did not apply for a transitional authorization even though their system(s) would likely have been eligible (see Annex I). There is no authority in the current Regulations to issue transitional authorizations after the 2014 deadline. The wastewater systems that did not apply are mostly small, rural communities that require significant upgrades to meet the limits of the Regulations. These wastewater systems represent just over 1% of total wastewater volumes released in Canada. These owners/operatorsare in long-term non-compliance with the Regulations as considerable time (5+ years) and funding is needed for upgrades to be completed. This situation does not help facilitate and support small communities in making positive steps to plan and implement upgrades. 

Proposal: new transitional authorization application process

ECCC is proposing to provide eligible owners/operators of wastewater systems another opportunity to receive a transitional authorization to the end of 2030 or 2040. This recognizes the level of effort, time, and investment that is needed to bring these systems into compliance. It would provide low to medium risk communities with the time to plan and finance upgrades to their wastewater treatment systems as originally intended under the Regulations.

The new application process is proposed to be based on the existing eligibility criteria in section 24 of the Regulations. It requires a comprehensive demonstration that the system consistently fails to meet the CBOD and/or SS effluent quality limits and that the wastewater system is not designed to meet secondary level of treatment. The new application process will continue to utilize the existing systems of points in the Regulations designed to evaluate the level of risk associated with a system. The criteria taken into consideration include the system’s daily volume, effluent quality, sensitivity of the receiving environment and if applicable, the impact of combined sewer overflow points.

The systems of points are presented in Schedule 2 and Schedule 3 of the Regulations.

Facilities will not be eligible to receive a new transitional authorization if they already have one or if they would have been eligible to receive one for a 2020 deadline.   

As noted, in order to apply for a transitional authorization, the owner/operator was required to monitor and sample effluent quality from 2012-2014. Many of the owners of eligible systems that did not apply for a transitional authorization were unaware of the Regulations and did not conduct any monitoring and sampling during that time.

ECCC has considered a number of approaches for a new transitional authorization application process such as opening a new fixed window for submitting applications or allowing a more flexible application process. The fixed approach would require systems to gather new data during a specific period after the coming into force of the amended regulations to assess eligibility and would set a new deadline in the future for applications to be submitted. A flexible approach would not specify a fixed date by which applications must be submitted but would instead allow an open/rolling application period.

Based on feedback received in early engagements, ECCC is proposing a flexible approach using an open application period (with no deadline to apply). This would enable the use of monitoring data already submitted under the Regulations (historical data) to apply for a transitional authorization where there is eligibility to do so. More than 90% of communities that would be eligible to apply for transitional authorization are already reporting data under the Regulations.

This approach closely mirrors the intent of the original application process and some applicants would use the same monitoring period as the initial application process (2012 – 2014). Allowing the use of historical data reduces sampling and monitoring burden for the application process for those owners/operators that have been meeting their monitoring and reporting obligations. These qualifying owners/operators could be issued a transitional authorization as soon as the amended regulations go into effect (e.g. as early as 2023). The application would require owners/operators to use the earliest historical data already reported under the Regulations. For continuous wastewater systems, applicants could choose a 12-month period within their first 15 months of reporting under the Regulations. For intermittent systems (e.g. lagoons), applications would select a 12-month period within their first 24 months of reporting, as most of these systems only report once per year.

This approach also provides a window of opportunity to any new systems requiring a transitional authorization in the future. For wastewater systems that are new to reporting and are eligible for a transitional authorization, they would monitor and report to ECCC for at least 12 months. Figure 1 provides an illustrative example of how owners/operators would use monitoring data to apply for a transitional authorization using the proposed monitoring period.

 

Figure 1 Illustrative examples of how a flexible application period can be used to apply for a transitional authorization. For this purpose we will assume amendments would come into force in 2023.

Figure 1. Illustrative examples of how a flexible application period can be used to apply for a transitional authorization. For this purpose we will assume amendments would come into force in 2023.

System A is system newly reporting under the Regulations after the amendments come into force. Owners/operators can sample from 2023-2025 and be issued a transitional authorization in 2025.

System B is a continuous system that has been sampling and reporting to the Department since 2016. They would use data from 2016-2017 and could be issued a transitional authorization as early as 2023. 

Long description

The illustrative example shows two timelines scenarios of how owners/operators would use monitoring data to apply for a transitional authorization using the proposed approach. This is assuming a 2023 coming into force date for the amended Regulations. 

The first timeline represents a system that has newly entered into the Regulations in 2023. Owners/operators could begin sampling right away and use monitoring data from 2023-2025 to apply for a transitional authorization. The earliest they could be issued a transitional authorization would be 2025. This transitional authorization would expire at the end of 2030 or 2040.

The second timeline represents a system with owners/operators that have been sampling under the Regulations since 2016. Using the proposed flexible application period, owners/operators would use the earliest available data, from 2016-2018, to apply to the transitional authorization. The earliest they could be issued a transitional authorization is 2023. The transitional authorization would expire at the end of 2030 or 2040. 

Revising ammonia sampling requirements in the transitional authorization application process: proposal for un-ionized ammonia

ECCC is also proposing to modify the un-ionized ammonia provisions in the transitional authorization application provisions of the Regulations (Sub-section 25(1)). Between 2012 and 2014, wastewater systems were required to sample for un-ionized ammonia and these results were required for a transitional authorization application. Since 2014, sampling for un-ionized ammonia is no longer required under the Regulations and systems are not sampling for un-ionized ammonia.

Based on analysis of historical un-ionized ammonia data in previous transitional authorization applications, exceedances of ammonia in transitional authorization applications occurred infrequently. Requiring new un-ionized ammonia sampling will increase the administrative burden for applicants and delay the transitional authorization application process. ECCC is proposing to allow flexibility for owners/operators to demonstrate that ammonia is not a risk factor through either a limited number of tests for ammonia, the use of historical data submitted federally/provincially or from indirect factors that may indicate ammonia is not an issue (never failed acute lethality, naturally low pH, etc.). 

3.2 Temporary bypass authorizations

Background

To enable owners/operators of wastewater systems to do repairs, maintenance and upgrades, the Regulations contain temporary bypass authorizations to allow wastewater systems to temporarily exceed the effluent quality standards at the final discharge point. The final discharge point is the point where effluent is released from the wastewater treatment plant before entering the environment. These activities aim to ensure the longevity of the infrastructure. Types of work include cleaning filters, repairing lagoon liners, or replacing parts that have reached end of service life such as pumps and valves.

ECCC can issue a temporary bypass authorization requested by owners/operators to bypass one or all treatment processes and the release of undertreated or untreated effluent for a specific period. The temporary bypass authorization provisions require that the request is received at least 45 days in advance and that the bypass is designed to minimize the volume of effluent and concentration of pollutants, and the effluent is released through the final discharge point. ECCC approves between 10-20 requests for temporary bypass authorizations every year.

Over the course of administering the Regulations, ECCC has observed the need for maintenance activities to be performed on sewer collection systems (i.e. the network of underground pipes and pumping stations that carry wastewater to the treatment plant). Maintenance, repairs and upgrades are essential to keep this infrastructure in good condition in the long term. Types of work include repairing or replacing aging sewer pipes, critical maintenance on pumping stations, or de-clogging sewer pipes and pumping stations. These activities may also result in releases of undertreated or untreated wastewater through overflow points in the wastewater infrastructure (non-final discharge points).

Most sewer collection systems are designed with structures to deliberately release excess flow when the system becomes overloaded to avoid breakages. Since working on this type of infrastructure often needs to be done in dry conditions, sewage is often re-routed through overflow points to isolate the section where work is being performed. Temporary measures or equipment can sometimes be used to avoid a release (by pumping sewage back into sewer or hauling it to treatment plant, for instance); however, it is not always technically or economically possible. Wastewater systems must always remain operational to prevent sewage backups into homes and businesses. In some cases, the environmental implications of alternatives (i.e., trucking wastewater to another treatment plant) may pose greater negative risks overall.

Planned releases occurring at overflow points are currently not authorized under the Regulations, and are subject to the general prohibition in subsection 36(3) of the Fisheries Act. This prohibits the deposit of deleterious substances into water frequented by fish, or to any place that may reach such water. Owners/operators are required to immediately notify ECCC of all unauthorized releases, and ensure that all reasonable measures are taken to prevent the deposit or mitigate its effects, and submit a report in writing following the event.

ECCC typically learns of these releases through the Fisheries Act notifications process, or sometimes not at all. This process generally results in a more reactive response to these types of releases.

Once ECCC enforcement officers are made aware of an alleged contravention of the pollution prevention provisions of the Fisheries Act, they take appropriate action in accordance with the Compliance and Enforcement Policy for the Habitat Protection and Pollution Prevention Provisions of the Fisheries Act. Before taking enforcement action, enforcement officers consider, on a case‑by‑case basis, any damage to the environment, any underlying factors, and any reasonable measures that may have been taken to mitigate damage and to comply with laws and regulations.

This approach tends to be more reactive and limits the ability for the department to more proactively manage these releases to minimize environmental impacts and proactively require public notification or Indigenous engagement on these releases. Some provinces authorize these types of releases, which creates regulatory inconsistency between federal and provincial regimes and a lack of regulatory mechanism to manage these releases.

Proposal

ECCC has considered a number of approaches to include temporary bypass authorizations from the non-final discharge point under the Regulations. This includes simply applying the existing provisions to these types of releases, or developing new provisions to manage these releases.

Based on feedback received in early engagement, ECCC is proposing to create new temporary bypass provisions in the Regulations for both final and non-final discharge point applications. This would allow the application of a more rigorous approach to all planned releases throughout the wastewater infrastructure. A tiered approach would set authorization conditions based on the level of potential environmental impact of the release. The existing provisions would be used as a starting point with tiers added to strengthen environmental protection and transparency, and streamline where it is relevant to do so.

The proposed tiered approach would be based on a system of points to determine the level of risk and determine the regulatory requirements for a temporary bypass authorization. A number of criteria would be taken into consideration including the flow rate of the planned bypass (which considers the duration and volume of the release), level of treatment that is applied to the effluent before release, and sensitivity of the receiving environment. The number of points would determine when a temporary bypass authorization request must be submitted to ECCC, as well as specific requirements that must be met. Table 1 and Figure 2 show an illustrative example of a proposed point-based approach. This approach is consistent with the existing point based scheme that has been used for transitional authorizations in Schedule 2 of the Regulations.

Table 1. Example of the proposed tiered approach point system

- 1 point 3 points 5 points
Rate of Flow (volume/duration) <250 m3/hour 250-2,500 m3/hour >2,500 m3/hour
Level of treatment Greater than primary treatment  Primary treatment No treatment
Receiving environment  Open marine waters/Large rivers Lake/Enclosed bay/Estuary Small rivers/Shellfish harvesting area

Level 1

14 days of notification

Streamlined process 

3-5 points 

Level 2

45 days of notification

Enhanced process 

6-10 points 

Level 3

90-120 days of notification

Detailed assessment

11-15 points 

Figure 2. shows an example of the proposed tiered authorization scheme, with associated requirements based on total number of points allocated for a given planned release.

 

Level 1

14 days of notification

Streamlined process 

  • Self-declaration bypass is designed to minimize volumes and concentrations of deleterious substances
  • Submit mitigation measures
  • Notify all nearby communities
  • Follow-up report

For Level 1, it is proposed to have a streamlined procedure with a notification period of 14 days for proposed bypasses. ECCC is proposing that owners/operators be required to submit information to ECCC on the circumstances of the planned bypass and the mitigation measures to be put in place. Owners/operators would be required to sign off that their bypass has been designed to minimize volume and concentration of pollutants. Owners/operators would be required to submit a follow-up report to ECCC to confirm the duration and volume of the release as well as the mitigation measures put in place. All nearby communities must be notified of the planned work prior to the application being submitted.  Level 1 bypasses would always be treated to at least a primary level.   

Example of a Potential Level 1 Scenario:
A medium sized community wanting to conduct a small repair must bypass the effluent (rated at 20,000 m3 per day, or approximately 800 m3 per hour), directly after the secondary treatment step, and discharge the effluent into a large river. In this instance, the community would fall under Level 1:

Total number of points allocated: 5 points (Level 1)

Given that the bypass results in a partially treated effluent into a large receiving environment at a modest flow rate, the application process would be streamlined. 

 

Level 2

45 days of notification

Enhanced process 

  • Self declaration
  • Submit mitigation measures
  • Notify all nearby communities
  • Descriptive information about wastewater system and release
  • Follow-up report
  • Long-term prevention planning for re-occurring events

For Level 2, owners/operators would be required to submit the information from Level 1 as well as be required to notify all nearby communities potentially impacted by the proposed bypass. Owners/operators must demonstrate that all nearby communities have been notified of the planned work prior to the application being submitted. Owners/operators would also be required to submit the results of notifications given in relation to the planned release from all communities, groups and the public. Owners/operators will also be expected to provide a description of the location of the proposed bypass, of the facility where the work is to be conducted as well as the receiving environment. A follow-up report would also be required as per Level 1. ECCC will require 45 days notification for any proposed bypasses in this level. ECCC is also proposing provisions to require long-term prevention plans for recurring requests at Level 2 to reduce frequency over the longer term. 

Example of a Potential Level 2 Scenario:
A small community needs to do repairs to the treatment plant and to do so, must bypass effluent (rated at 3,000m3 per day) after the primary treatment step, and discharge to a marine harbour near a shellfish harvesting area.

Total number of points allocated: 9 points (Level 2)

Given that the bypass is large volume and in a smaller receiving environment, even though it is partially treated, the process will require more enhanced review and assessment from ECCC than a Level 1 release. 

 

Level 3

90-120 days of notification

Detailed assessment

  • Self declaration
  • Alternative options analysis
  • Submit mitigation measures
  • Notify all nearby communities
  • Descriptive information about the wastewater system and release
  • Plume delineation study
  • Monitoring and sampling
  • Follow-up report
  • Long-term prevention planning

For planned releases that would end up in Level 3 of the tiered approach, ECCC is proposing that owners/operators provide ECCC with more detailed technical information related to potential impacts and mitigation measures in addition to the requirements from Level 1 and 2. This would allow for a more thorough and detailed assessment by ECCC staff to understand potential impacts of the release. ECCC proposes to include plume delineation studies, analysis of alternative options and a detailed mitigation plan to outline the actions that will be taken to minimize the impact to the receiving environment. The application period is proposed to be 90-120 days to allow sufficient time for this review.

All nearby communities must be notified of the planned work prior to the application being submitted and provide ECCC with the results of any consultations undertaken in relation to the planned release, including with Indigenous communities or groups, nearby communities and the public. ECCC will proactively engage directly with communities potentially impacted from releases that fall within this Level.

Monitoring and sampling during and after the event would be required to assess how effective mitigation measures have been at reducing adverse effects on the environment. A follow-up report would also be required.

ECCC is also proposing provisions to require long-term prevention plans when there is a request at this Level to reduce frequency and impacts over the longer term.

Example of a Potential Level 3 Scenario:
A large community needs to conduct maintenance work on the sewer system and to do so, must bypass untreated effluent (rated at 500,000m3 per day) to a lake.  

Total number of points allocated: 13 points (Level 3)

Given this releases is large, untreated, and in a potentially sensitive receiving environment, the process would require a detailed assessment of the bypass and potential impacts.

Summary

Based on available data, ECCC anticipates that most planned releases and applications would fall into the Level 1 or Level 2 categories, with very few (if any in a given year) that would end up in Level 3.

Establishing a tiered approach increases the level of environmental protection, transparency, accountability and oversight for all planned releases and clarifies the application process. It would provide ECCC with additional information to understand potential impacts of all planned releases. A tiered approach would allow ECCC to respond proactively and set conditions proportionate to the proposed bypass and associated level of risk.

3.3 Key administrative improvements

ECCC is also proposing to address various operational/administrative challenges that have arisen during the course of administering the Regulations.

Consolidated systems

Under the Regulations, owners/operators are allowed to consolidate 10+ outfalls as one “future” system. This allows owners/operators to sample and monitor at the single outfall that represents the largest environmental risk for the duration of their transitional authorization. ECCC is proposing to allow owners/operators to consolidate 2+ systems as one “future” system as long as those outfalls will become a single wastewater treatment plant. This will allow more owners/operators to use the consolidation provisions. It reduces administrative burden by focusing monitoring and reporting on the outfall with the largest volume and largest potential risk to the environment. Owners/operators could better allocate their resources to upgrade their system rather than monitoring multiple individual outfalls.

Monitoring and reporting provisions

ECCC is considering clarifying and simplify administrative provisions, including optimizing monitoring and reporting provisions for small systems holding a transitional authorization.

Under the current Regulations, systems granted a transitional authorization have the same monitoring and reporting requirements as any other systems. For example, small continuously discharging systems (releasing less than 2,500 m3 per day) are required to sample on a monthly basis and report on a quarterly basis whereas intermittent systems have to report on an annual basis. This monthly sampling frequency requires a significant level of investment in resources and finances for small communities. Harmonizing the monitoring and reporting requirements of continuously discharging systems with those of intermittent systems will help communities concentrate their efforts into upgrading their wastewater systems. ECCC is proposing that small systems granted a transitional authorization only be reporting on an annual basis, regardless if they have a continuously or intermittently discharging system.

ECCC is also reviewing other testing, monitoring and reporting provisions. This review is intended to streamline existing provisions and reduce regulatory burden.

4. Next steps

The key targets for regulatory developments are outlined below: 

5. Providing feedback

All interested parties are invited to provide feedback and perspectives on the regulatory proposal to amend the Wastewater Systems Effluent Regulations. Please submit comments in writing by March 5, 2022.

ECCC has developed a feedback form to facilitate comments. You are welcome to use this form

Comments can also be submitted by email to eu-ww@ec.gc.ca or by mail to:

Wastewater Section
Environment and Climate Change Canada
351 St. Joseph Boulevard
Gatineau QC, K1A 0H3

Annex I

Wastewater systems that may be eligible for a transitional authorization were assigned a potential transitional authorization date using the system of points in Schedule 2, and where applicable Schedule 3.

 Systems with a 2020 deadline that are likely not eligible based on the proposed approach

Province City System Name
BC Queen Charlotte VOQC outfall
NL Burin Cinema Outfall
NL Conception Bay South Pond Road Outfall
NL Marystown Bakers Cove
NL Port aux Basques Cox Ave Outfall
NL Torbay Outfall

Systems eligible and expected to receive a transitional authorization to the end of 2030 

Province City System Name
NL Bay Roberts Bay Roberts Wastewater System 2
NL Bonavista Main Lift Outfall
NL Clarenville Brook Cove
NL Cow Head Waste Water System
NL Lawn Lawn Outfall
NL Lewisporte King Street - #3017
NL Lewisporte Russhann Street - #3011
NL Marystown Drakes Road Outfall
NL Middle Arm Town of Middle Arm
NL North West River North West River Wastewater Facility
NL Parsons Pond Parsons Pond Outfall
NL Petty Harbour Maddox Cove Outfall
NL Petty Harbour Petty Harbour Outfall
NL Port Union Trinity Bay North Outfall
NL South Brook South Brook Outfall 
NL Twillingate Upper Jenkins Road
PE O'Leary Lagoon

Systems eligible and expected to receive a transitional authorization to the end of 2040 

Province City System Name
AB Beiseker Beiseker lagoon
AB Breton Village of Breton Sewer Lagoon
AB Consort Consort Lagoon Creek
AB Millet Millet Lagoon
AB Marwayne Marwayne Lagoon
AB Mundare Wastewater Lagoon
AB Stavely Stavely Lagoon
AB Wood Buffalo Conklin Sewage Lagoon
BC Lax Kw'alaams Lower Lift Station
BC Port Clements Village of Port clements Sewage Lagoon
BC Pouce Coupe Village of Pouce Coupe Sewage Treatment Lagoons
BC Prince George Danson Wastewater Treatment Plant
MB Morden City of Morden Wastewater Treatment Lagoon
MB Niverville Niverville Sewage Lagoon
MB Norway House Norway House Wastewater Lagoon
MB City of Steinbach Wastewater Treatment Lagoon
NB Baker Brook Village de Baker Brook
NB Renous Atlantic Institution Wastewater Treatment System – Correctional Service Canada
NB Edmundston Verret lagune
NB Edmundston St-Jacques 1 lagoon
NB Rivière-Verte Lagune Rivière-Verte
NL Arnolds Cove Arnolds Cove Court
NL Baie Verte Budgells Outfall
NL Baie Verte Butlers Brook Outfall
NL Baie Verte South Shore Drive Outfall
NL Bay Roberts Bay Roberts Wastewater System
NL Benoit's Cove Main St Outfall
NL Benoit's Cove Side Outfall
NL Bonavista Comminutor Outfall
NL Bonavista Red Cove
NL Botwood Airbase Botwood 1
NL Botwood Botwood 4
NL Botwood Carters Road - Botwood 3
NL Botwood Hill Road Botwood 2
NL Brigus Brigus Outfall
NL Buchans Buchans Outfall
NL Burin Main Street Outfall
NL Burnt Islands Burnt Islands Outfall
NL Carbonear Churchill Circle Outfall
NL Carbonear Crocker's Cove Outfall
NL Carbonear Fraise's Lane Outfall
NL Carbonear O'Driscoll's Lane Outfall
NL Carbonear Pike's Lane Pumphouse
NL Carbonear Powell's Brook Outfall
NL Cartwright Cartwright Outfall
NL Centreville Wareham Trinity Near STP, Trinity
NL Centreville Wareham Trinity Williams Lookout, Wareham
NL Clarenville Cormack
NL Clarenville Island View
NL Clarenville Lori Anne Outfall
NL Clarke's Beach Clarke's Beach Outfall
NL Come by Chance Town of Come by Chance Outfall
NL Comfort Cove-Newstead Comfort Cove Outfall
NL Cox's Cove Main Street Outfall
NL Cupids Town of Cupids
NL Daniel's Harbour Wastewater Outfall
NL Elliston Elliston Bay
NL Elliston Elliston Cove
NL Embree Main St. Outfall
NL Embree Nippards Lane
NL Fleur de Lys Fleur de Lys
NL Fogo Fogo Outfall
NL Fogo JoeBattsArmFlag Outfall
NL Fogo JoeBattsArmMain Outfall
NL Forteau Forteau Outfall
NL Fortune #2 - Snook's Road
NL Fortune Fortune Centennial
NL Gambo Church Street Outfall
NL Gambo Forest Outfall
NL Glovertown Calvin Saunders Outfall
NL Glovertown Harris Road Outfall
NL Glovertown Randell's Ave Outfall
NL Glovertown Stroud's Point Outfall
NL Grand Bank Outfall 1
NL Grand Bank Outfall 2
NL Grand Bank Outfall 3
NL Hants Harbour Hants Harbour Outfall
NL Harbour Breton Jon Green Outfall
NL Harbour Breton Mike Rgly Outfall
NL Harbour Grace HG Outfall #1
NL Harbour Grace HG Outfall #2
NL Harbour Grace HG Outfall #3
NL Harbour Grace HG Outfall #4
NL Harbour Grace HG Outfall #5
NL Hawkes Bay Hawkes Bay Outfall
NL Holyrood Healeys Outfall
NL Irishtown-Summerside Irishtown-Summerside Road
NL Irishtown-Summerside Irishtown-Summerside Shed
NL La Scie LaScie Outfall 1
NL La Scie LaScie Outfall 2
NL La Scie LaScie Outfall 3
NL Labrador City Drake
NL L'Anse au Clair L'Anse Outfall
NL L'Anse au Loup L'Anse au Loup Outfall
NL Lewins Cove Outfall Lewins Cove Outfall
NL Lewisporte Dildo Street Outfall
NL Lewisporte Exploits Street - #3015
NL Marys Harbour Mary's Harbour Outfall
NL Marystown Baldwins Outfall
NL Marystown Beleventure Outfall
NL Marystown Brakes Sub Outfall
NL Marystown Dock Road Outfall
NL Marystown Greenwood Outfall
NL Marystown Hollets Road Outfall
NL Marystown Reddy Sub Outfall
NL Marystown Shole Point Outfall
NL Meadows Marine Drive Outfall
NL Meadows McCarthy Outfall
NL Mings Bight Roxanne Dicks
NL Mount Moriah Mount Moriah Outfall
NL Musgrave Harbour Musgrave Harbour Outfall
NL New Wes Valley Bowness Outfall
NL New Wes Valley Hermit Cove Road
NL Normans Cove-Long Cove Normans Cove Outfall
NL Norris Point Norris Point Outfall
NL Old Perlican Town of Old Pelican
NL Paradise St. Thomas Line WW Treatment Facility
NL Placentia St Edwards Outfall
NL Placentia Woods Outfall
NL point leamington point leamington wastewater
NL Port au Choix Eastern Point Outfall
NL Port aux Basques Mouse Island Outfall
NL Port aux Basques Park Outfall
NL Port Saunders Port Saunders Outfall
NL Pouch Cove Town of Pouch Cove Outfall
NL Rocky Harbour Rocky Harbour Outfall
NL Roddickton Bide-Arm Roddickton Outfall
NL Salmon Cove Salmon Cove Outfall
NL Seal Cove - White Bay Seal Cove - White Bay Outfall
NL South River South River Outfall
NL Southern Harbour Southern Harbour
NL Spaniards Bay SB Park
NL Spaniards Bay SB Road
NL St Anthony 16 Marine Drive Ext.
NL St Anthony 6 Marine Drive
NL St Anthony American Wharf
NL St Lawrence 62 Water Street
NL St Lawrence St Lawrence Firehall
NL St. George's Town of St. George's Outfalls
NL St Lawrence Notre Dame
NL St. Paul's St. Paul's Outfall
NL Stephenville Crossing Stephenville Crossing Outfall
NL Terrenceville Terrenceville Lift Station
NL Town of Arnolds Cove Arnolds Cove Red
NL Town of Arnolds Cove Arnolds Cove Wharf
NL Triton Jim Simms Outfall
NL Triton Jims Cove Outfall
NL Triton Main Street Outfall
NL Twillingate Farmers Outfall
NL Twillingate Townhall
NL Upper Island Cove Outfall #1
NL Wabana Wabana Outfall
NL Woody Point WP Blue
NL Woody Point WP Main
ON Chesterville Chesterville Wastewater Treatment Lagoon
ON Moose Creek Moose Creek Wastewater Treatment Lagoon
ON Plantagenet Plantagenet Wastewater Treatment Lagoon
ON Porcupine Bob's Lake Sewage Lagoon
PE Georgetown Georgetown Sewage Collection and Treatment
SK Kamsack Wastewater Lagoons
SK Lemberg Town Of Lemberg
SK Moosomin Town of Moosomin
SK Norquay Town of Norquay
SK Rosetown Rosetown Lagoon

Systems that may be eligible for a transitional authorization but have not provided enough data to be assessed

Province City System Name
NL Bay de Verde Bear's Cove Outfall
NL Corner Brook Basin A
NL Corner Brook Basin B
NL Corner Brook Basin C
NL Corner Brook Basin C2
NL Corner Brook Basin D
NL Corner Brook Basin E
NL Corner Brook Basin F
NL Corner Brook Basin G
NL Corner Brook Basin I
NL Corner Brook Basin J
NL Embree Mason St. Outfall
NL Summerford Albert Wheeler's
NL Summerford Barracks Road
NL Summerford Daniel's Road
NL Summerford Lodge Hill
NL Summerford Village Cove Road West