Backgrounder: Canada and Ontario announce funding for clean water and wastewater infrastructure projects across Ontario 

Backgrounder

221 new projects approved in 86 communities

A new list of water and wastewater projects has been approved under the Canada-Ontario Clean Water and Wastewater Fund (CWWF) agreement, which is designed to improve the safety and quality of water for Canadian families, while supporting a clean economy.

The Government of Canada is providing Ontario with over $569 million under CWWF (up to 50 percent of the eligible project costs). The provincial government is providing up to $270 million (up to 25 percent of total eligible project costs). The recipients will provide the balance of funding. 

As part of the bilateral agreement with Ontario, the following 221 projects across Ontario have been approved for federal funding amounting to $19,219,318.

Location

Project Name

Federal Funding

Provincial Funding

Anticipated Start Date

Armstrong, Township of

Upgrading of perimeter Safety and Security Fencing to Wastewater Lagoon

$47,500

$23,750

June 1, 2017

Armstrong, Township of

Rehabilitation of Well # 3 located on 6th Street including New Casing and pump

$10,000

$5,000

June 1, 2017

Armstrong, Township of

Replacement of roofing on Church Road Pumping Station Building

$15,241

$7,621

June 1, 2017

Assiginack, Township of

Water and Wastewater Rehabilitation, including Pump System, Chemical Feed Systems, Instrumentation Equipment, Distribution System, Sewage System and General Building Maintenance and Equipment

$58,775

$29,388

March 1, 2017

Atikokan, Town of

Rehabilitation of Sewage Pump Station 5 located at  59 Maple Cres in the Town of Atikokan by making upgrades to Sewage Pump Station # 5

$208,237

$104,119

January 1, 2017

Baldwin, Township of

Slope Excavation, Application of Geosynthetic Clay Liner, Regrading of the Failing Berm as well as required Engineering at the Baldwin Township Exfiltrating Lagoon

$50,000

$25,000

May 15, 2017

Black River-Matheson, Township of

Upgrade Programmable Logic Controller (PLC)

$50,000

$25,000

August 1, 2017

Bruce Mines, Town of

Conduct a Study and Videography (camera) of the Town's Wastewater Collection System

$5,200

$2,600

April 1, 2017

Bruce Mines, Town of

Installation of a new Aeration System for the treatment of high levels of THMs (Trihalomethanes) at the pumping station

$25,000

$12,500

July 30, 2017

Callander, Municipality of

Sewage system optimization study, planning and design.       

$71,314

$35,657

September 20, 2016

Casey, Township of

Replacement and relocation of manhole to house the flow meter and replace the flow meter due to flooding.

$50,000

$25,000

April 1, 2016

Chapple, Township of

Upgrade to main outlet pipe from Chapple Lagoon

$50,000

$25,000

July 15, 2017

Charlton and Dack, Municipality of

Replacement and Installation of existing high lift pumps from 7.5 horsepower to 5 horsepower with variable frequency drives at 50 Agnes Street, Charlton.

$20,500

$10,250

January 4, 2017

Charlton and Dack, Municipality of

Purchase and Installation of Variable Frequency Drive control units at 50 Agnes Street, Charlton.

$20,000

$10,000

January 4, 2017

Charlton and Dack, Municipality of

Installation of a new 4 inch treated water flow meter at 50 Agnes Street, Charlton.

$3,500

$1,750

January 4, 2017

Charlton and Dack, Municipality of

Purchase and Install 2 of the 3 raw water low lift pumps at 50 Agnes Street, Charlton.

$4,000

$2,000

January 4, 2017

Charlton and Dack, Municipality of

Replacement of Blow off Valves throughout Distribution System at 50 Agnes Street, Charlton.

$2,000

$1,000

January 4, 2017

Chisholm, Township of

Replacement of a 1700mm diameter stormwater culvert on Wasing Road.

$25,000

$12,500

July 2, 2017

Chisholm, Township of

Replacement of a 2100mm diameter stormwater culvert on Maple Road.

$25,000

$12,500

July 2, 2017

Cobalt, Town of

Install a chlorine analyzer loop for proven contact time in distribution

$50,000

$25,000

December 1, 2016

Cobalt, Town of

Pumphouse Road Water Treatment Plant highlift pumps and variable frequency drive replacement

$28,500

$14,250

December 1, 2016

Cobalt, Town of

Cobalt Wetland Lagoon System Condition Assessment and Feasibility Study

$15,000

$7,500

December 1, 2016

Cobalt, Town of

Pumphouse Road Water Treatment Plant upgrades to Chart Recorder and Supervisory Control and Data Acquisition (SCADA) system

$8,000

$4,000

April 30, 2016

Cobalt, Town of

Pumphouse Road Water Treatment Plant Chlorination system replacement

$10,000

$5,000

December 1, 2016

Cobalt, Town of

Pumphouse Road Water Treatment Plant Backwash and Progress Valves replacement

$20,000

$10,000

December 1, 2016

Cochrane, Corporation of the Town of

Water Pollution Control Plant- Disinfection (Ecoli) and Preliminary Treatment (Headworks) Upgrades

$346,907

$173,454

June 1, 2017

Coleman,The Corporation of the Township of

Water Freezing Mitigation Project: Installation of three Bleeder Stations

$47,500

$23,750

January 1, 2017

Dryden, City of

Water Treatment Plant Condition Analysis/Report to determine New Build/Rehabilitation Options

$35,000

$17,500

March 31, 2017

Dryden, City of

Water Treatment Plant Multiple Turbidity Meter Upgrade

$20,000

$10,000

March 31, 2017

Dryden, City of

Multiple Structural Relining of Watermains under Canadian Pacific Railway Tracks/Yard at 5 locations

$200,000

$100,000

May 15, 2017

Dryden, City of

Structural Relining  (Cure in Place) of Sanitary Sewers at  4 locations

$212,500

$106,250

May 15, 2017

Dryden, City of

Sanitary Sewer Manhole Relining at approximately at 18 Locations

$30,000

$15,000

May 15, 2017

Dryden, City of

Replacement of 600mm Corrugated Steel Pipe (CSP) Storm Sewer Pipe on Van Horne Avenue

$50,000

$25,000

May 15, 2017

Dryden, City of

Update 2004 Land Implementation Study for the Water, Sanitary, and Storm Water Systems

$45,000

$22,500

March 31, 2017

Ear Falls, Township of

Clarifier Rehabilitation at the Ear Falls Wastewater Treatment Plant

$232,027

$116,014

February 1, 2017

East Ferris, Municipality of

Replacement and upgrading of a 20 metre stormwater culvert and rehabilitation of 4.3km of stormwater collection and conveyance system.

$50,000

$25,000

July 2, 2017

Elliot Lake, City of

Repair of waste water pumping systems that services approximately 6000 homes due to failure at 2 Scott Road, Elliot Lake, Ontario.

$198,743

$99,372

May 1, 2017

Emo, Township of

Upgrade to the Main Sewage Pumping Station - Roy Street Sewage Lift/Pumping Station, including Pumps, Piping and Controls

$87,122

$43,561

April 1, 2017

Emo, Township of

Upgrade to Existing Water Treatment Plant Raw Water Low Lift Pumps

$22,500

$11,250

April 1, 2017

Englehart, Town of

Upgrade of the main electrical system at the First Street Waterplant

$112,500

$56,250

May 1, 2017

Espanola, Town of

Infrastructure Renewal Project Phase 2 for the rehabilitation of approximately 6.7 km of  water, wastewater and stormwater infrastructure

$364,106

$182,053

April 1, 2017

Evanturel, Township of

Water Servicing Options Study

$50,000

$25,000

September 30, 2016

Fauquier-Strickland, Township of

Replace existing 8.5 HP raw water low lift pump

$8,105

$4,052

March 6, 2017

Fauquier-Strickland, Township of

Replace existing 7.5 HP high lift pump with new Variable Frequency Drive (VFD)

$18,236

$9,118

March 6, 2017

Fauquier-Strickland, Township of

Structural New Construction - Water Plant Backwash surge tank

$22,513

$11,257

February 6, 2017

Fauquier-Strickland, Township of

Water Plant Chemical Resistant Exhaust Fan equipment upgrade

$1,146

$573

February 6, 2017

Fort Frances, Town of

Replacement of water main,  sanitary sewer mains and associated service lines along  2nd Street East from Mowat Avenue to Portage Avenue

$638,506

$319,253

October 25, 2016

French River, Municipality of

Assessment of Noelville Wastewater/Stormwater Infrastructure Upgrades

$50,000

$25,000

March 1, 2017

Gillies, The Township of

Rehabilitation of Multiple Stormwater Assets within the Township including Ditch Excavation and the Upsizing of Culverts

$50,000

$25,000

May 1, 2017

Gore Bay, Town of

Replacement of 150m of Eleanor Street Watermain - From Phipps Street to Laird Street

$106,066

$53,033

April 3, 2017

Greenstone, Municipality of

Geraldton Ward Waterline Rehabilitation Phase III

$230,902

$115,451

May 1, 2017

Greenstone, Municipality of

Longlac Ward Albany Place Watermain Replacement       

$24,269

$12,134

May 1, 2017

Hearst, Town of

Replace three (3) low-lift pumps at the Hearst Water Treatment Plant with new energy efficient pumps equipped with Variable Frequency Drives

$42,895

$21,448

September 4, 2017

Hearst, Town of

Installation of Ultraviolet (UV-254) technology to monitor the efficiency of the process removing organic matter at Hearst's Water Treatment Plant

$27,500

$13,750

June 5, 2017

Hearst, Town of

Re-roofing of fifth Street Pumping Station Building

$7,500

$3,750

June 5, 2017

Hearst, Town of

Addition of Backflow Preventers at Fifth Street Sewage Pumping Station

$10,000

$5,000

June 5, 2017

Hilton Beach, Village of

Equipment Upgrades at the Water Treatment Plant for Chlorine analyzer, Turbidity meter and singer valve.

$7,500

$3,750

June 1, 2017

Hilton Beach, Village of

Blower, rotating biological contactor Pump and Lift Station Pump installation

$22,500

$11,250

May 1, 2017

Hilton Beach, Village of

Installation of new 15 horsepower Primary Well Pump

$6,100

$3,050

July 1, 2017

Hilton Beach, Village of

Upgrades to components of the Supervisory Control and Data Acquisition (SCADA) at the Wastewater Plant

$9,556

$4,778

March 1, 2017

Hornepayne, Township of

Variable Frequency Drive for 3 High Lifts at the Water Treatment Plant

$25,000

$12,500

January 1, 2017

Hornepayne, Township of

Replace 15 Main Valves Within the Water Distribution System

$100,000

$50,000

June 1, 2017

Hornepayne, Township of

Repair/Replace 20 Curb Stops Within the Water Distribution System

$32,875

$16,438

July 1, 2017

Hornepayne, Township of

Radio Communication System for Raw Water Pumping Station

$5,000

$2,500

May 1, 2017

Huron Shores, Municipality of

Storm sewer rehabilitation from the end of Phase II, east along John Street and north along Chiblow Lake Road

$50,000

$25,000

June 1, 2017

Ignace, Township of

Sewer Main upgrade, with replacement of asbestos pipe to new 200 mm Polyvinyl chloride (PVC) main and storm sewer main

$134,669

$67,335

August 21, 2017

Ignace, Township of

Sewer Main upgrade, with replacement of one sewer main approximately 170 meters long and replacement of one sewer main approximately 50 meters long

$123,484

$61,742

August 21, 2017

James, Township of

Enhance programmable logic controller (PLC) at the water treatment plant.  Located at the Elk Lake water Treatment plant, 4 First Street which serves 245 houses

$11,200

$5,600

March 1, 2017

James, Township of

Purchase new well level probe for main well for the township which serves 440 residents and 160 service connections. Located at the Elk Lake Water Treatment plant, 4 First Street.

$2,035

$1,018

March 1, 2017

James, Township of

Repair programmable logic controller (PLC) at the water treatment plant.  Located at the Elk Lake water Treatment plant, 4 First Street which serves 440 residents and 160 service connections.

$6,100

$3,050

March 1, 2017

Johnson, Township of

Upgrade the Johnson Township Water Treatment Plant

$50,000

$25,000

April 30, 2017

Kapuskasing, Town of

Upgrade to sanitary forcemain and relocation of the Mill Street forcemain

$501,015

$250,508

May 15, 2017

Kearney, Town of

Drilled well/water system at 111 Main Street.  Upgrading of water system from lake source water supply to drilled well  for human consumption/use

$7,500

$3,750

May 6, 2017

Kearney, Town of

Drilled well/water system at 163 Main Street. Upgrading of water system from lake source water supply to drilled well for human consumption/use

$7,500

$3,750

May 7, 2017

Kearney, Town of

Rehabilitate Septic System at 111 Main Street

$18,833

$9,417

June 1, 2017

Kearney, Town of

Rehabilitate Septic System at 163 Main Street

$16,166

$8,083

June 1, 2017

Kenora, City of

First Street South at Main Street South Storm Sewer Relining

$26,890

$13,445

November 1, 2017

Kenora, City of

Houghton Road Storm Sewer Relining

$196,010

$98,005

November 1, 2017

Kenora, City of

Valley Drive Sanitary Sewer Relining

$148,366

$74,183

May 1, 2017

Kenora, City of

Drewry Drive Sanitary Sewer Relining

$60,313

$30,156

May 1, 2017

Kenora, City of

Gunne Crescent Sanitary Sewer Relining

$30,957

$15,478

May 1, 2017

Kenora, City of

Seegmiller Avenue Sanitary Sewer Relining

$9,284

$4,642

May 1, 2017

Kenora, City of

Nairn Avenue Sanitary Sewer Relining

$20,713

$10,357

May 1, 2017

Kenora, City of

Heenan Place Sanitary Sewer Relining - East End

$24,332

$12,166

May 1, 2017

Kenora, City of

Heenan Place Sanitary Sewer Relining - Narin Westerly

$5,241

$2,620

May 1, 2017

Kenora, City of

Ninth Avenue South #345 to #322 Sanitary Sewer Relining

$9,982

$4,991

May 1, 2017

Kenora, City of

First Street North West Dead End Sanitary Sewer Relining

$11,230

$5,615

May 1, 2017

Kenora, City of

Ninth Street North Storm Sewer Partial Replacement

$24,750

$12,375

May 1, 2017

Killarney, Municipality of

Conduct a survey and inspection of the Sewage Collection System to develop a work plan/tender package for required upgrades/repairs.

$61,904

$30,952

May 15, 2017

Larder Lake, Township of

Raw sewage pump preplacement and soft start installation for the waste water treatment plant.

$40,981

$20,491

November 1, 2016

Larder Lake, Township of

Supervisory Control and Data Acquisition (SCADA) system replacement and enhancements for the water treatment plant

$22,500

$11,250

October 1, 2016

Latchford, Town of

Replace and reprogram computer software that runs Water Treatment Plant

$35,000

$17,500

February 1, 2017

Latchford, Town of

Electrical upgrades to lift station

$15,000

$7,500

May 1, 2017

Macdonald, Meredith and Aberdeen Additional, Township of

Rehabilitation of sanitary sewage system components including the Supervisory Control and Data Acquisition system (SCADA) and controls at two sewage lift stations, sewage pumps and valves.

$47,438

$23,719

January 1, 2017

Macdonald, Meredith and Aberdeen Additional, Township of

Rehabilitation of Drinking Water Supply and Treatment System Components

$54,697

$27,348

January 1, 2017

Machar, Township of

Replace culverts and raise the grade of Leighton Road at various locations to mitigate flooding, washouts and erosion from spring flooding and high storm events

$50,000

$25,000

April 1, 2017

Machin, Municipality of

Vermilion Bay Water Treatment Plant, 8 Bay Street, Vermilion Bay Ontario. System control and Data acquisition upgrading serving 218 services or approximately 550 people.

$67,834

$33,917

December 12, 2016

Manitouwadge, Township of

The rehabilitation of town wells #3 & #4 located at 41A Ohsweken Road

$42,500

$21,250

May 1, 2017

Marathon, Town of

Replace Clarifier Domes

$103,934

$51,967

March 1, 2017

Marathon, Town of

Purchase and Install Turbo Blower (with Programmable Logic Controller (PLC)  and Supervisory Control and Data Acquisition (SCADA) system)

$58,027

$29,014

February 1, 2017

Markstay-Warren, Municipality of

Design and construct a new Stormwater Outlet (surge capacity)

$37,500

$18,750

April 1, 2017

Markstay-Warren, Municipality of

Increasing Warren Sewage Lift Station reliability by replacing two aging 10 horsepower lift pumps

$12,500

$6,250

April 1, 2017

Matachewan, The Corporation of the Township of

Upgrades to the Matachewan Storm Water Control System located in an area covering 10 municipal streets between Calbeck Avenue and Helen Avenue

$50,000

$25,000

May 1, 2017

Mattawa, Town of

Water Treatment Plant Chlorination Analysis Improvements

$18,750

$9,375

May 1, 2017

Mattawa, Town of

Water Storage Reservoir : Upgrades to Emergency Backup Power, Supervisory Control and Data Acquisition Communication,  Corroded Piping, Valves, Access Hatches, and Access Road

$88,250

$44,125

May 1, 2017

Mattice - Val Côté, Municipality of

Repairs to low-lift water pumping station building

$8,500

$4,250

March 1, 2017

Mattice - Val Côté, Municipality of

Install Variable Frequency Drives (VFD) on water treatment plant high-lift pumps

$17,000

$8,500

March 1, 2017

Mattice - Val Côté, Municipality of

Replace one of the sanitary pumps at the Sewage pumping station

$13,500

$6,750

March 1, 2017

Mattice - Val Côté, Municipality of

Replace both sanitary pump seats at the Sewage pumping station

$11,000

$5,500

March 1, 2017

McKellar, Township of

Blackwater Bridge replacement with outflow stormdrain culvert

$50,000

$25,000

June 1, 2016

Moosonee, Town of

Water Valve Rehabilitation for Directional Flushing Program

$149,785

$74,893

July 1, 2017

Nairn and Hyman, Township of

Replacement of corroded soda ash tank system with a new poly tank and stainless feeder at the Nairn Centre Water Treatment Plant

$6,225

$3,113

April 1, 2017

Nairn and Hyman, Township of

Improve water quality at the dead end on McIntyre Street by installing flushing capacity

$5,275

$2,638

June 1, 2017

Nairn and Hyman, Township of

Replace filter media from both filters, repair under drains, install new media and replace faulty valves at the Nairn Centre Water Treatment Plant

$12,665

$6,333

January 3, 2018

Nairn and Hyman, Township of

Swab complete distribution to remove biofilm buildup on pipes and sediment in pipes in the town of Nairn Centre

$11,250

$5,625

September 1, 2017

Neebing, Municipality of

Belanger Rd Culvert Rehabilitation

$5,743

$2,872

June 1, 2017

Neebing, Municipality of

Jarvis Bay Rd Culvert Rehabilitation

$8,489

$4,244

June 1, 2017

Neebing, Municipality of

Lesnick Road Culvert Rehabilitation

$8,475

$4,237

June 1, 2017

Neebing, Municipality of

Union School Road Culvert Rehabilitation

$9,568

$4,784

June 1, 2017

Neebing, Municipality of

Larson Road Culvert Rehabilitation

$9,847

$4,924

June 1, 2017

Neebing, Municipality of

Margaret Street Culvert Rehabilitation

$6,346

$3,173

June 1, 2017

Neebing, Municipality of

Walker Road Culvert Rehabilitation

$1,532

$766

June 1, 2017

Nipigon, Township of

Upgrade to existing storm water infrastructure with a new Rain Garden to improve quality of storm water discharge.

$20,000

$10,000

June 1, 2017

Nipigon, Township of

Restoration of existing storm sewer collection system, manhole, catch basins and storm sewer pipe.

$104,648

$52,324

July 3, 2017

North Bay, City of

Extension of water and sanitary services to the Cedar Heights area.

$2,287,004

$1,143,502

April 1, 2017

Northeastern Manitoulin and the Islands, Town of

Relocation and Replacement of Membrane Programmable Logic Controller (PLC) at the Little Current Water Treatment Plant

$50,000

$21,000

May 1, 2017

Northeastern Manitoulin and the Islands, Town of

Rehabilitation of Generator and Transfer Switch at the Little Current Main Pump House

$15,000

$10,000

June 1, 2016

Northeastern Manitoulin and the Islands, Town of

Highlift Pump Rehabilitation at the Sheguiandah Water Treatment Plant

$10,498

$6,749

March 1, 2017

O'Connor, Township of

Township Wide Stormwater Culvert Replacements of Approximately 62

$50,000

$25,000

May 1, 2017

Oliver Paipoonge, Municipality of

Environmental Assessment Study and Replacement of Rosslyn Municipal Wells North and South

$50,000

$25,000

February 1, 2017

Opasatika,Township of

Interconnectivity valve replacement between clear wells

$5,000

$2,500

February 1, 2017

Opasatika,Township of

Optimize green sand filter and diffusers

$10,000

$5,000

February 1, 2017

Opasatika,Township of

Repair 7 hydrants in township to improve water distribution system effectiveness.

$25,000

$12,500

February 1, 2017

Opasatika,Township of

Repair and replace five curb valves to improve the water distribution system

$4,000

$2,000

February 1, 2017

Opasatika,Township of

Repair main sewage pump house building

$6,000

$3,000

February 1, 2017

Papineau-Cameron,Township of

Multiple Stormwater control systems Rehabilitation of structural upgrades/restoration, and replacement of multiple stormwater culverts

$50,000

$25,000

June 1, 2016

Parry Sound, Town of

Replace and upsize all watermains on Waubeek Street

$96,976

$48,488

May 1, 2017

Parry Sound, Town of

Replace failed storm sewer on Waubeek Street

$96,976

$48,488

May 1, 2017

Parry Sound, Town of

Complete replacement of failed sanitary sewer on Waubeek Street

$96,976

$48,488

May 1, 2017

Parry Sound, Town of

Complete replacement of leaking and aged sanitary forcemeain on Waubeek Street

$96,976

$48,488

May 1, 2017

Parry Sound, Town of

Replace and upsize all watermains on Prospect Street

$96,976

$48,488

May 1, 2017

Parry Sound, Town of

Replace leaking and aged storm sewer on Prospect Street

$96,976

$48,488

May 1, 2017

Parry Sound, Town of

Complete replacement of leaking and failing sanitary sewer on Prospect Street

$96,976

$48,488

May 1, 2017

Parry Sound, Town of

Complete replacement of leaking and aged sanitary forcemeain on Prospect Street

$96,976

$48,488

May 1, 2017

Petawawa, Town of

Upgrade existing watermain on Mary Street to 300mm diameter line

$273,249

$136,625

May 1, 2017

Pickle Lake, Township of

Sewage Clarifier Rehabilitation, tank rake-paddle installation (Cat Lake Road)

$44,275

$22,138

May 1, 2017

Pickle Lake, Township of

Broken hydrant replacement near 1 Koval Street and upgrading approximately 30 meters of water main to prevent future freeze-ups.

$19,074

$9,537

May 6, 2017

Plummer Additional, Township of

Plummer Road Drainage and Erosion Improvements; install 750mm x 18m stormwater culvert along 300 metres of Plummer Road

$50,000

$25,000

March 1, 2017

Powassan, The Corporation of the Municipality of

Rehabilitation - Cured-in-place pipe Relining at 250  Clark Street - community hub

$16,500

$8,250

May 1, 2017

Powassan, The Corporation of the Municipality of

New pump for Sewage Lift Station #1 at 288 Clark Street to replace old worn pump

$9,000

$4,500

April 3, 2017

Powassan, The Corporation of the Municipality of

Rehabilitation of the wastewater pipe at 74 Queens Ave

$2,500

$1,250

June 12, 2017

Powassan, The Corporation of the Municipality of

Wastewater pipe rehabilitation at 327 Edward Street

$2,500

$1,250

August 1, 2017

Powassan, The Corporation of the Municipality of

Upgrade/replacement of chlorine analyzer for water pumping station at 76 Fairview Lane

$3,000

$1,500

May 1, 2017

Powassan, The Corporation of the Municipality of

Flow Meter replacement for sewage lift station #2 at 76 HWY 534

$5,000

$2,500

June 1, 2017

Powassan, The Corporation of the Municipality of

Upgrade pump at Sewage Lift Station #2 at 76 HWY 534 which services over 1/3 of the wastewater services in the municipality

$4,000

$2,000

May 15, 2017

Rainy River, Town of

Water Line and Sanitary Sewer Line Replacement - 100-500 Atwood Avenue serving 20 residential and commercial buildings

$151,580

$75,790

July 15, 2016

Red Rock, Township of

Upgrade to Water Storage Tank Liner - Water Treatment plant

$53,911

$26,956

June 1, 2017

Redditt LSB

Connection of secondary water distribution lines from the Redditt water system to 44 local residents' homes.

$50,000

$25,000

August 21, 2017

Sables-Spanish Rivers, Township

Rehabilitation Project involving the Relining of Water Storage Tower that supports the Water Treatment System serving 500 Customers

$50,000

$25,000

May 1, 2017

Schreiber, Township of

Feasibility and detailed design for an elevated drinking water storage tank.

$98,007

$49,004

May 1, 2016

Sioux Lookout, Municipality of

Queen Street Water and Sanitary Infrastructure Restoration

$317,000

$158,500

April 1, 2017

Smooth Rock Falls, Town of

Replacement of existing 450 mm sanitary sewer at Fourth Street to Hollywood Avenue / Sixth Street intersection

$136,106

$68,053

October 28, 2016

Spanish, The Corporation of the Town of

Interior Lining Replacement at Elevated Tank

$81,464

$40,732

May 1, 2017

St. Joseph, Township of

Rehabilitation of Drinking Water Supply and Treatment System Components including well pump, high lift pumps, fire pump and analytical equipment.

$50,000

$25,000

January 1, 2017

St.-Charles, Corporation of the Municipality of

St.-Charles lagoon waste water flowmeter project.

$11,250

$5,625

May 15, 2017

Tehkummah, Township of

Supervisory Control and Data Acquisition (SCADA) System Purchase and Installation

$50,608

$25,304

May 1, 2017

Temiskaming Shores, City of

Replacement of Existing Iron Removal Filters at the McCamus Avenue Water Treatment Plant.

$344,282

$172,141

May 1, 2017

Terrace Bay, Township of

Replacement of Lakeview Dr. & Kenogami Rd. Sanitary Sewage Outfall

$166,101

$83,051

March 1, 2017

Thessalon, Town of

River Street Storm Sewer Rehabilitation

$60,000

$30,000

April 1, 2017

Thessalon, Town of

Main Street and Mill Lane Storm Sewer Installation

$50,000

$25,000

April 1, 2017

Thessalon, Town of

Feasibility Study, Hydraulic Analysis, Geotechnical Assessment and Environmental Assessment for a Water Storage Facility

$44,739

$22,370

March 1, 2017

Thorne, Local Service Board

Thorne Water Treatment Plant Capital Improvements

$50,000

$25,000

January 1, 2017

Thornloe, Village of

Upgrading of perimeter Safety and Security Fencing to Wastewater Lagoon

$12,500

$6,250

July 1, 2017

Thornloe, Village of

Upgrade of Flow Meter Installation and Construction of a Protective Insulated Building

$10,000

$5,000

July 1, 2017

Thunder Bay, City of

Drainage improvements and Low Impact Development at Birch Point and Jumbo Gardens

$163,500

$81,750

June 1, 2017

Thunder Bay, City of

Construction of a 1200mm Storm Sewer from the McIntyre River to Balmoral St and north to John St

$202,500

$101,250

June 1, 2017

Thunder Bay, City of

Extension of Catch Basins in Multiple Locations to Improve Local Drainage

$25,000

$12,500

June 1, 2017

Thunder Bay, City of

Post Assessment Repairs to Stormwater Outfalls

$12,500

$6,250

June 1, 2017

Thunder Bay, City of

Construction of a 375mm Storm Sewer on Burris Street - Margaret Street to 100 m N - to Address Local Surface Drainage Issues

$35,000

$17,500

June 1, 2017

Thunder Bay, City of

Storm Sewer Replacement on Egan Street - Algoma Street to Garrard Street

$25,000

$12,500

June 1, 2017

Thunder Bay, City of

Storm Sewer Installation on Crescent Avenue - Cox Crescent to 80 m N

$20,000

$10,000

June 1, 2017

Thunder Bay, City of

600 mm Storm Sewer Installation on Frederica Street - W Neebing to Dead End

$160,000

$80,000

June 1, 2017

Thunder Bay, City of

Conducting of Hydraulic Engineering Drainage Study in the Intercity Area

$312,500

$156,250

June 1, 2017

Thunder Bay, City of

Construction of a 300 mm Relief Storm Sewer on Prospect Avenue

$25,000

$12,500

June 1, 2017

Thunder Bay, City of

Lyon Ditch Drainage Improvements including Increased Capacity

$50,000

$25,000

June 1, 2017

Thunder Bay, City of

Construction of 1200mm Twin Relief Storm Sewer and Outfall at James Street - Neebing River to Churchill Drive

$500,000

$250,000

June 1, 2017

Thunder Bay, City of

Construction of 1500mm Stormwater Outfall  at James Street - Neebing River to Riverview Drive

$125,000

$62,500

June 1, 2017

Thunder Bay, City of

Construction of a 450-525 mm Relief Storm Sewer from McGill Crescent to the Dalhousie / McMaster St. Area

$125,000

$62,500

June 1, 2017

Thunder Bay, City of

City-Wide Stormwater Infrastructure Inventory and Condition Assessment

$125,000

$62,500

June 1, 2017

Thunder Bay, City of

First Avenue Drainage Improvements including Design and Construction of 150m of Storm Sewer

$50,000

$25,000

June 1, 2017

Thunder Bay, City of

Design of Comprehensive Surface/Stormwater Management Plan for the Solid Waste and Recycling Facility

$75,000

$37,500

June 1, 2017

Thunder Bay, City of

Construction of 300 mm Sanitary Sewer Separation on Archibald Street: Dease Street to Leith Street

$387,500

$193,750

June 1, 2017

Thunder Bay, City of

Replacement of 250 mm Sanitary Sewer on Court Street: John Street to Bay Street

$325,000

$162,500

June 1, 2017

Thunder Bay, City of

Replacement of Sanitary Sewer connections on First Avenue: Memorial Avenue to Fort William Road

$50,000

$25,000

June 1, 2017

Thunder Bay, City of

Construction of 375-450mm Stormwater Separation Sewer on Selkirk Street - Arthur Street to Cuthbertson Place and Cuthbertson Place - Selkirk St to Franklin St.

$63,250

$31,625

June 1, 2017

Thunder Bay, City of

Construction of 525 mm Sanitary Separation Sewer on Brodie Street - Neebing River to Dease Street

$360,800

$180,400

June 1, 2017

Thunder Bay, City of

Construction of 450mm Stormwater Separation Sewer on Murray Avenue - Franklin Street to Selkirk Street

$115,500

$57,750

June 1, 2017

Thunder Bay, City of

Construction of 450mm Stormwater Separation Sewer on Isabella Street - Franklin Street to Selkirk Street

$115,467

$57,733

June 1, 2017

Thunder Bay, City of

Construction of a 300mm Stormwater Separation Sewer on McGillivray Street

$22,000

$11,000

June 1, 2017

Thunder Bay, City of

Cement Mortar Lining of 150mm Cast Iron Watermains in the Hallam Street/Dewe Avenue/Dacre Street/Hodder Avenue Grid

$369,847

$178,924

June 1, 2017

Thunder Bay, City of

Replacement of Existing 150mm Cast Iron Watermain on Court Street - John Street to Bay Street

$352,500

$176,250

June 1, 2017

Thunder Bay, City of

Replacement of Existing 525 mm Ductile Iron Watermain on First Ave - Memorial Avenue to Fort William Road, and Winnipeg Avenue from First Avenue to Beverly Street

$417,500

$208,750

June 1, 2017

Thunder Bay, City of

Hilldale Rd/ Trendiak Rd Culvert Replacement Program

$50,000

$25,000

June 1, 2017

Thunder Bay, City of

Construction of Low Impact Development Stormwater Management Facilities in the McVicar Creek Basin

$14,000

$13,000

June 1, 2017

Thunder Bay, City of

Design and Construction of up to ten (10) Low Impact Development Stormwater Management Facilities

$712,500

$356,250

June 1, 2017

Thunder Bay, City of

Construct  Low Impact Development Stormwater Management Facility within George Burke Park

$50,000

$25,000

June 1, 2017

Thunder Bay, City of

Sandy Beach Road Ditch Upgrade and Deepening

$25,000

$12,500

June 1, 2017

Thunder Bay, City of

Highgate Road Drainage Improvements including Design and Construction

$75,000

$37,500

June 1, 2017

Wawa, Municipality of

Water Reservoir Rehabilitation and technical / operational rebuild (Michipicoten River Village)

$95,000

$47,500

April 1, 2017

Wawa, Municipality of

Water Reservoir Dechlorinator.  Purchase and installation of new equipment (Michipicoten River Village)

$100,000

$50,000

January 1, 2017

Wawa, Municipality of

Study  to identify actions necessary to address Trihalomethane in drinking water

$74,318

$37,159

May 1, 2017

West Nipissing, Municipality of

Relocation of shut off valve at Water Treatment Plant on Nipissing Street, Sturgeon Falls

$7,500

$3,750

February 1, 2017

West Nipissing, Municipality of

Structural upgrade to wastewater forcemain at Holditch Street extension

$150,000

$75,000

May 1, 2017

West Nipissing, Municipality of

Structural extension of water services to complete loop on Railway Street

$50,000

$25,000

May 1, 2017

West Nipissing, Municipality of

Replacement of Main Street watermains

$25,000

$12,500

May 1, 2017

West Nipissing, Municipality of

Replacement and Extension of Ramsay Street water main

$25,000

$12,500

May 1, 2017

West Nipissing, Municipality of

Structural upgrade of Sand Hill area water services

$125,000

$62,500

May 1, 2017

West Nipissing, Municipality of

Enhancement of Sabourin Road water services

$50,000

$25,000

May 1, 2017

West Nipissing, Municipality of

Extension of Bay Street water services to industrial park

$50,000

$25,000

May 1, 2017

West Nipissing, Municipality of

Upgrade of brick manholes in numerous locations throughout Sturgeon Falls

$24,375

$12,188

May 1, 2017

White River, Township of

Replacement of Waste Water Sewer Main Line (forcemain) from Ontario Street pumping station approximately.

$165,240

$82,620

June 1, 2017