Impact Assessment Agency of Canada's 2023–24 Departmental results report: Horizontal initiatives
General information
Name of horizontal initiative: Impact Assessment Processes
Lead department: Impact Assessment Agency of Canada (IAAC)
Federal partner departments:
- Environment and Climate Change Canada (ECCC)
- Parks Canada (PC)
- Crown-Indigenous Relations and Northern Affairs Canada (CIRNAC)
- Fisheries and Oceans Canada (DFO)
- Health Canada (HC)
- Public Health Agency of Canada (PHAC)
- Indigenous Services Canada (ISC)
- Natural Resources Canada (NRCan)
- Canada Energy Regulator (CER)
- Canadian Nuclear Safety Commission (CNSC)
- Transport Canada (TC)
- Women and Gender Equality Canada (WAGE)
Start date of the horizontal initiative: August 2019
End date of the horizontal initiative: March 2028
Description of the horizontal initiative: With the coming into force of the Impact Assessment Act (IAA) in August 2019, the Impact Assessment and Regulatory Processes Horizontal Initiative was established to monitor the progress of the Impact Assessment Agency of Canada and its then nine partner organizations in the implementation of the IAA and other acts. Renewed in September 2022, the initiative was streamlined to focus specifically on Impact Assessment Processes as implemented by the Agency as the initiative lead and 12 partners in their capacity as technical experts, system-owners, and lifecycle regulators. The initiative has three shared outcomes: Canada’s impact assessment processes respect the rights and culture of Indigenous Peoples, and Canada’s commitment to partner with them; Canada’s impact assessment processes foster social, economic, and environmental sustainability; and stakeholders and Indigenous groups have confidence in the transparency and certainty of Canada’s impact assessment processes.
Governance structures: With the coming into force of the IAA in August 2019, and in accordance with the Guide to Departments on the Management and Reporting of Horizontal Initiatives, governance committees for impact assessment were established. Chaired by IAAC, these committees provide oversight of the Impact Assessment (IA) regime, including oversight for the implementation of the horizontal initiative and associated horizontal initiative results framework.
The Deputy Minister Impact Assessment Committee (DM IA) provides oversight and strategic direction on issues and risks pertaining to the implementation of the IAA and Canadian Environmental Assessment Act, 2012 (CEAA 2012). The DM IA is supported by the Assistant Deputy Minister Impact Assessment Committee (ADM IA).
Total federal funding allocated from start to end date (dollars): $2,258,656,004
Total federal planned spending to date (dollars): $1,571,491,185
Total federal actual spending to date (dollars): $1,097,222,581
Date of last renewal of the horizontal initiative: December 2022
Total federal funding allocated at the last renewal, and source of funding (dollars): $1,245,171,076 (Budget 2023’s Refocusing Government Spending Exercise)
Additional federal funding received after the last renewal (dollars): Not applicable
Total planned spending since last renewal: $309,584,002
Total actual spending since last renewal: $234,248,171
Fiscal year of planned completion of next evaluation: 2026–27 (Impact Assessment Agency of Canada)
Performance highlights:
As presented below, some departments and agencies have identified performance highlights specific to their organization for 2023–24.
- Canada Energy Regulator:
- In 2023–24, the CER developed the Indigenous Cultural Intelligence and Change Management Framework which is the cornerstone for individual and organization-wide transformative change and for supporting the CER in building strong relationships with Indigenous Peoples. Its components include a national Indigenous engagement blueprint, Indigenous procurement strategy, Indigenous recruitment, retention, and advancement strategy, and Elders-in-Residence program. Crown consultation highlights included for the first time since 2015, the Governor-in-Council decision on a major infrastructure application with supplemental Crown consultation was completed on time, without any extensions to legislative timelines. The Governor-in-Council approved the project and determined that the duty to consult was adequately met and there were no legal challenges to the decision. Throughout the year, the CER continued to digitize historical records of business value to enhance access to baseline socio-economic and environmental data. The CER has built a Geographic information System-based method to support the Abandonment Cost Estimate calculation to reduce processing time and human error. This standardizes the calculation method and enhances the transparency of the data used for estimations.
- Canadian Nuclear Safety Commission:
- In 2023–24, through the Indigenous and Stakeholder Capacity Fund (ISCF), 64 initiatives supporting 30 individual recipients were awarded over multiple years. 100% of survey respondents were satisfied with the timeliness with which their application was processed and 88% of survey respondents mentioned that the funding they received for the project/activity they applied for helped them better understand the CNSC’s role as Canada’s nuclear regulator and regulatory processes.
- Crown-Indigenous Relations and Northern Affairs Canada:
- CIRNAC will continue to provide advice and expertise on Indigenous consultation and accommodation to IAAC, and other internal and external stakeholders, during pre-planning of projects, the assessment of major projects and assessment-related policy development to ensure that Indigenous Peoples’ Aboriginal and Treaty rights are taken into consideration when the Crown contemplates activities, conduct, or decisions that might impact Aboriginal and Treaty rights.
- Health Canada:
- In 2023–24, Health Canada provided expertise to inform project assessments under the Impact Assessment Act on the following topics: contamination of country foods; health risks related to noise impacts, water quality and air quality; public health emergency management of toxic exposure events; human health risk assessment methodology; and health impact assessment methodology. Health Canada also coordinated the provision and incorporation of the Public Health Agency of Canada’s expertise on social determinants of health into project assessment documents. This expertise is reflected in finalized assessment documents published on public registries.
- Impact Assessment Agency of Canada:
- During the 2023–24 reporting period, the Impact Assessment Agency of Canada (IAAC) continued to support the timely progress of project impact assessments by providing guidance and expertise to proponents. This support was maintained during the Interim Statement period.
- Following the Supreme Court of Canada (SCC) Decision on the Impact Assessment Act in November 2023, IAAC swiftly implemented the interim measures. These measures included providing opinions on whether there is a clear federal jurisdiction to support the assessment of projects currently in the system; collaborating with willing proponents on gathering the information required to support the assessments; and exploring opportunities to maximize collaboration with provinces to take full advantage of provincial assessment of factors that they are examining and focus federal assessments on potential adverse effects in areas of federal jurisdiction.
- Natural Resources Canada:
- The Open Science and Data Platform (OSDP) provided open access to over 170,000 records, allowing Canadians to better understand cumulative effects, the impact of major development projects nationwide and to advance the implementation of the Impact Assessment Act, enhancing regulatory efficiency, especially for clean growth projects.
- Completed content collections and story map project “Overview of cumulative effects research at NRCan” and onboarded onto the OSDP 60 new NRCan geospatial datasets and 242 from other federal departments and over 3,500 new publications from NRCan, ECCC, HC, DFO, TC and CNSC and regulatory registry records.
- Enhanced OSDP application and geospatial technology, such as the catalogue and dissemination applications. Advanced the delivery of a standard-oriented, cloud agnostic, next generation NRCan Viewer based on open-source technology (GeoView) and automated the process that connects with P/T portals to synchronize data weekly, using AI for translation to support both official languages.
- Delivered on commitments to support the public-availability of cumulative effects-relevant records: geospatial and non-geospatial data, with two (2) main releases during fiscal years 2023–2023 and 2023–2024.
- Harmonized forest inventory product for pan-Canadian forest analysis, now has multiple products available for download through OSDP/Open Canada. These include leading genus and tree-type products. Harmonized forest sample plot database now contains over 40K ground samples across almost every province and territory and is published on OSDP.
- Responded to 100% of IAAC requests for economic expertise and advice within established timelines.
- For the Environmental Impact Assessment Services (EIAS) of the Geological Survey of Canada (GSC), all 30 Environmental Assessments (EA) requests were responded in a timely manner.
- The Marine Geoscience for Marine Spatial Planning program released an updated Surficial Geology Map for the Scotian Shelf generated strong stakeholder interest and 5 requests for related data products.
- Responded to and led on IAA related amendments to the Accord Acts. Collaborated with IAAC, NL and NS and the Offshore Boards on implementation of the IAA in the Atlantic offshore.
- Parks Canada:
- Parks Canada provided early strategic direction to minimize project impacts to lands and waters administered by Parks Canada, and to archeological resources on federal lands. Parks Canada also contributed to meaningful consultations discussions.
Contact information:
Name: Mary Kay Lamarche
Mailing Address: 160 Elgin Street, Ottawa, ON K1A 0W9, 22nd Floor
Phone: 343–998–4920
Email: MaryKay.Lamarche@iaac-aeic.gc.ca
Shared outcomes
Canada’s impact assessment processes respect the rights and culture of Indigenous Peoples, and Canada’s commitment to partner with them
Canada’s impact assessment processes foster social, economic, and environmental sustainability
Stakeholders and Indigenous groups have confidence in the transparency and certainty of Canada’s impact assessment processes
Theme |
Theme A: Impact Assessment |
Theme B: Partnering with Indigenous Peoples/Reconciliation |
Theme C: Cumulative Effects, Open Science and Evidence |
Internal services |
|---|---|---|---|---|
Theme outcome(s) |
Outcome 1: Proponents are held accountable for, and comply with, the conditions set out in Decision statements Outcome 2: Scientific and evidence-based information and Indigenous knowledge related to health, social, economic, and environmental effects are generated and available |
Outcome 1: Indigenous groups play a meaningful role in all or part of assessments Outcome 2: Indigenous knowledge and input appropriately informs assessment-related decisions |
Outcome 1: Government of Canada effectively considers cumulative effects in federal impact assessment processes Outcome 2: Impact and cumulative effects assessment in Canada reflect a commitment to social, economic and environmental sustainability and respect our partnership with Indigenous Peoples |
Not applicable |
Impact Assessment Agency of Canada (IAAC) |
$47,818,826 |
$22,586,937 |
$5,243,085 |
$16,723,288 |
Environment and Climate Change Canada (ECCC) |
$7,528,801 |
Not applicable |
$21,387,756 |
$34,406,254 |
Parks Canada (PC) |
$1,396,215 |
$960,516 |
Not applicable |
$229,635 |
Crown-Indigenous Relations and Northern Affairs Canada (CIRNAC) |
Not applicable |
$2,891,390 |
Not applicable |
$225,361 |
Fisheries and Oceans Canada (DFO) |
$5,166,057 |
$2,385,320 |
$2,049,084 |
$3,912,359 |
Health Canada (HC) |
$8,495,290 |
$142,045 |
$354,308 |
$673,377 |
Public Health Agency of Canada (PHAC) |
$276,698 |
Not applicable |
Not applicable |
$31,420 |
Indigenous Services Canada (ISC) |
$3,196,256 |
$1,469,776 |
$4,478,932 |
$696,100 |
Natural Resources Canada (NRCan) |
$6,388,956 |
Not applicable |
$11,046,663 |
$1,791,401 |
Canada Energy Regulator (CER) |
Not applicable |
$9,457,358 |
$8,497,698 |
$549,937 |
Canadian Nuclear Safety Commission (CNSC) |
Not applicable |
$3,098,503 |
Not applicable |
$261,492 |
Transport Canada (TC) |
$2,590,274 |
$1,199,092 |
$297,072 |
$1,205,785 |
Women and Gender Equality Canada (WAGE) |
$250,677 |
Not applicable |
Not applicable |
$53,349 |
Performance information
Name of horizontal initiative |
Total federal funding, including legacy funding, allocated since last renewal |
2023–24 planned spending |
2023–2024 actual spending |
Horizontal initiative shared outcome(s) |
2023–24 performance indicator(s) |
2023–24 target(s) |
Date to achieve target |
2023–24 actual results |
|---|---|---|---|---|---|---|---|---|
Impact Assessment Processes |
$1,090,796,781 |
$201,477,584 |
$177,068,653 |
Canada’s impact assessment processes foster social, economic, and environmental sustainability |
Percentage of projects for which reporting indicates that the vast majority* of mitigation measures set out in the Decision Statement effectively address adverse effects of the project *Vast majority = 75% or more of mitigation measures are reported as effective |
90% |
March 2025 (annual target) |
100%Footnote 1 |
Canada’s impact assessment processes respect the rights and culture of Indigenous Peoples, and Canada’s commitment to partner with them |
Percentage of Indigenous groups who agree they have a productive and collaborative relationship with IAAC |
70% |
March 2025 (annual target) |
Not availableFootnote 2 |
||||
GBA Plus |
Percentage of Indigenous groups who agree they have a productive and collaborative relationship with IAAC, by region* *According to regions used by IAAC to track projects: Atlantic, Quebec, Ontario, Prairie and Northern, Pacific and Yukon |
70% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 3 |
||||
GBA Plus |
Percentage of Indigenous groups who agree they have a productive and collaborative relationship with IAAC, by Indigenous group (First Nations, Inuit, Métis) |
70% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 4 |
||||
Stakeholders and Indigenous groups have confidence in the transparency and certainty of Canada’s impact assessment processes |
Percentage of stakeholders and Indigenous groups participating in assessments who report a high level of confidence in the transparency of the assessment process |
70% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
100%Footnote 5 |
||||
GBA Plus |
Percentage of stakeholders and Indigenous groups participating in assessments reporting a high level of confidence in the transparency of the assessment process, by region* *According to regions used by IAAC to track projects: Atlantic, Quebec, Ontario, Prairie and Northern, Pacific and Yukon |
70% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
ATL: not applicable; QC: Not available; ON: 100%; PNR: Not applicable; PYR: Not availableFootnote 6 |
||||
GBA Plus |
Percentage of stakeholders and Indigenous groups participating in assessments reporting a high level of confidence in the transparency of the assessment process, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous |
70% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 7 |
||||
Percentage of stakeholders and Indigenous groups who agree there is certainty in the assessment process |
65% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 8 |
|||||
GBA Plus |
Percentage of stakeholders and Indigenous groups who agree there is certainty in the assessment process, by region* *According to regions used by IAAC to track projects: Atlantic, Quebec, Ontario, Prairie and Northern, Pacific and Yukon |
65% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 |
ATL: not applicable; QC: not available; ON: not available; PNR: not applicable; PYR: not applicableFootnote 9 |
||||
GBA Plus |
Percentage of stakeholders and Indigenous groups who agree there is certainty in the assessment process, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous |
65% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 |
Not availableFootnote 10 |
Theme horizontal initiative activities
Name of theme |
Total federal theme funding, including legacy funding, allocated since the last renewal |
2023–24 federal theme planned spending |
2023–24 federal theme actual spending |
Theme outcome(s) |
Theme performance indicator(s) |
Theme target(s) |
Date to achieve theme target |
2023–24 actual results |
|---|---|---|---|---|---|---|---|---|
Impact Assessment |
$535,182,541 |
$87,421,290 |
$75,757,256 |
Proponents are held accountable for, and comply with, the conditions set out in Decision statements |
Percentage of approved projects with a high level* of compliance with Decision Statement conditions *High level of compliance = compliant with 90% or more of conditions |
100% |
March 2025 (annual target) |
100%Footnote 11 |
Scientific and evidence-based information and Indigenous knowledge related to health, social, economic, and environmental effects are generated and available |
Percentage of stakeholders and Indigenous groups who agree that scientific and evidence-based information and Indigenous knowledge on key health, social, economic, and environmental effects are accessible* *Accessible is defined by: readability, clarity, conciseness, and precision |
60% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
99%Footnote 12 |
||||
GBA Plus |
Percentage of stakeholders and Indigenous groups who agree that scientific and evidence-based information and Indigenous knowledge on key health, social, economic, and environmental effects are accessible*, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous *Accessible is defined by: readability, clarity, conciseness, and precision |
60% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 13 |
||||
GBA Plus |
Percentage of stakeholders and Indigenous groups reporting they have the information they need to engage in the assessment process |
90% |
March 2025 (annual target) |
94%Footnote 14 |
||||
Percentage of stakeholders and Indigenous groups reporting they have the information they need to engage in the assessment process, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous |
90% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
94%Footnote 15 |
Departments |
Link to the department’s program inventory |
Horizontal initiative activity (activities) |
Total federal funding, including legacy funding, allocated to each horizontal initiative activity since last renewal |
2023–24 planned spending for each horizontal initiative activity |
2023–24 actual spending for each horizontal initiative activity |
2023–24 horizontal initiative activity expected result(s) |
2023–24 horizontal initiative activity performance indicator(s) |
2023–24 horizontal initiative activity target(s) |
Date to achieve horizontal initiative activity target |
2023–24 actual results |
|---|---|---|---|---|---|---|---|---|---|---|
Impact Assessment Agency of Canada |
Assessment Administration, Conduct, and Monitoring |
Assessment administration, conduct, and monitoring |
$279,199,958 |
$47,854,212 |
$47,818,826 |
Assessments are conducted in a manner perceived (by stakeholders, Indigenous groups, and the public) to be fair, predictable and efficient |
Percentage of stakeholders and Indigenous groups indicating that the Tailored Impact Statement Guidelines were effectively tailored to increase the efficiency and effectiveness of the project assessment |
70% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 16 |
GBA Plus |
Percentage of stakeholders and Indigenous groups indicating that the Tailored Impact Statement Guidelines were effectively tailored to increase the efficiency and effectiveness of the project assessment, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous |
70% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 17 |
||||||
Stakeholders and Indigenous groups have the capacity (knowledge, skills & abilities) to engage in the assessment process |
Percentage of stakeholders and Indigenous groups who agree that the Participant funding provided to them enhanced their capacity to engage in the assessment process |
90% |
March 2025 (annual target) |
Not availableFootnote 18 |
||||||
GBA Plus |
Percentage of stakeholders and Indigenous groups who agree that the Participant funding provided to them enhanced their capacity to engage in the assessment process, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous |
90% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 19 |
||||||
Percentage of stakeholders and Indigenous groups reporting that they have the information they need to engage in the assessment process |
90% |
March 2025 (annual target) |
94%Footnote 20 |
|||||||
GBA Plus |
Percentage of stakeholders and Indigenous groups reporting that they have the information they need to engage in the assessment process, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous |
90% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 21 |
||||||
Stakeholders and Indigenous groups meaningfully participate in the assessment process |
Percentage of stakeholders and Indigenous groups participating in assessment-related engagement/ consultation activities who agree they were engaged meaningfully in the process |
90% |
March 2025 (annual target) |
89%Footnote 22 |
||||||
GBA Plus |
Percentage of stakeholders and Indigenous groups participating in assessment-related engagement/ consultation activities who agree they were engaged meaningfully in the process, by gender |
90% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 23 |
||||||
GBA Plus |
Percentage of stakeholders and Indigenous groups participating in assessment-related engagement/ consultation activities who agree they were engaged meaningfully in the process, by age |
90% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 24 |
||||||
GBA Plus |
Percentage of stakeholders and Indigenous groups participating in assessment-related engagement/ consultation activities who agree they were engaged meaningfully in the process, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous |
90% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 25 |
||||||
Environment and Climate Change Canada |
Environmental Assessment (indicator owner) Species at Risk Water Quality and Ecosystems Partnerships Hydrological Services |
Scientific Expertise and Advice |
$49,752,193 |
$10,274,126 |
$7,528,801 |
Expert environmental guidance is incorporated into impact assessments |
Percentage of possible environmental effects and mitigation measures that are incorporated in the final EA/IA report in accordance with ECCC advice |
90% |
March 2025 (annual target) |
73%Footnote 26 |
Timely advice provided to support assessment processes |
Percentage of requests for expertise and advice for an impact assessment process that adheres to service standards and process time limits |
100% |
March 2025 (annual target) |
93%Footnote 27 |
||||||
Parks Canada |
Heritage Places Conservation |
Parks Canada Provides Expert Advice to Panel or IAAC led Assessments |
$14,365,167 |
$1,251,242 |
$1,396,215 |
Natural and cultural resources in heritage places are maintained or improved |
Percentage of impact assessments where Parks Canada is involved, in which Parks Canada advice is evident in impact assessment documentation, including early planning documents or Impact Assessment reports |
100% |
March 2027 |
100%Footnote 28 |
Fisheries and Oceans Canada |
Fish and Fish Habitat Protection |
Scientific Expertise and Advice |
$33,320,646 |
$5,969,971 |
$3,355,291 |
Timely advice provided to support assessment processes |
Percentage of requested fish and fish habitat advice for an impact assessment process that adheres to service standards and time limits |
100% |
March 2025 (annual target) |
97%Footnote 29 |
Aquatic Ecosystem Science |
Scientific Expertise and Advice |
$7,045,736 |
$1,260,103 |
$1,270,114 |
Timely scientific information is available to inform impact assessments |
Percentage of requested Science products for an impact assessment process that adheres to process time limits |
100% |
March 2025 (annual target) |
100% |
|
Fisheries Management |
Scientific Expertise and Advice |
$841,448 |
$168,290 |
$60,018 |
Timely advice with respect to socio-economic impacts fisheries is available to inform impact assessments |
Percentage of socio-economic /data for an impact assessment process that adheres to process time limits |
100% |
March 2025 (annual target) |
100% |
|
Environmental Response |
Scientific Expertise and Advice |
$4,248,269 |
$767,867 |
$480,634 |
Timely advice and expertise on marine navigation, safety and incident management is available to inform impact assessments |
Percentage of requests responded to within assessment timelines that include advice on marine navigation and incident management |
100% |
March 2025 (annual target) |
100% |
|
Health Canada |
Health Impacts of Chemicals Food and Nutrition |
Expertise on potential health impacts |
$45,132,041 |
$9,026,408 |
$8,495,290 |
Expert advice influenced (or informed) the impact assessment of proposed projects |
Percentage of impact assessments of proposed projects influenced (or informed) by Health Canada expertise |
90% |
March 2025 (annual target) |
100% |
GBA Plus |
Percentage of impact assessments of proposed projects influenced (or informed) by Health Canada expertise, by region* * Health Canada will use the following regional structure for reporting: BC, Alberta, Saskatchewan/Manitoba, Ontario, Quebec, and Atlantic |
90% |
March 2025 (annual target) |
BC: 100% Alberta: 100% Saskatchewan/Manitoba: N/A Ontario: 100% Quebec: 100% Atlantic: 100%Footnote 30 |
||||||
Percentage of impact assessments of proposed projects with potential health impacts on Indigenous Peoples influenced (or informed) by Health Canada expertise |
90% |
March 2025 (annual target) |
100% |
|||||||
GBA Plus |
Percentage of impact assessments of proposed projects with potential health impacts on Indigenous Peoples influenced (or informed) by Health Canada expertise, by Indigenous group (First Nations, Inuit, Métis) |
90% |
March 2025 (annual target) |
First Nations: 100% Inuit: 100% Métis: 100% |
||||||
Timely HC expert advice is provided to the impact assessment of proposed projects |
Percentage of requests for HC expertise and advice that are responded to within established timelines |
100% |
March 2025 (annual target) |
100% |
||||||
Public Health Agency of Canada |
Evidence for Health promotion, and Chronic Disease and Injury Prevention |
Provision of expertise and advice on potential impacts to physical and mental well-being, including social determinants of health and equity considerations |
$1,427,403 |
$273,473 |
$276,698Footnote 31 |
Expert public health advice is incorporated into impact assessments |
Percentage of impact assessments of proposed projects influenced by PHAC expertise |
Targets will be determined based on first year performance. The objective will be to maintain or exceed previous years’ results |
March 2025 (annual target) |
100% |
Timely PHAC expert advice is provided to the impact assessments of proposed projects |
Percentage of requests for expertise and advice that are responded to within established timelines |
100% |
March 2025 (annual target) |
100% |
||||||
Indigenous Services Canada |
Environmental Public Health |
Subject matter expertise to review/comment on impact of environmental contaminants/changes on health determinants such as country foods and First Nations diets |
$2,709,224 |
$474,496 |
$303,664Footnote 32 |
Impact assessments are informed by analysis of potential health and environmental impacts on Indigenous communities |
Percentage of impact assessment projects with potential health risks for which ISC provided input |
90% |
March 2025 (annual target) |
100% |
Percentage of requests for ISC expertise and advice that are responded to within established timelines |
100% |
March 2025 (annual target) |
100% |
|||||||
Land, Natural Resource and Environmental Management |
Information and advice on project impacts for Indigenous Peoples |
$17,359,952 |
$2,892,592 |
$2,892,592 |
Advice on potential socioeconomic and environmental impacts of projects on Indigenous communities is provided to inform impact assessments within established timelines |
Percentage of impact assessments for which ISC provides input within established timelines |
100% |
March 2025 (annual target) |
39 Submissions to IAAC on 28 projects.Footnote 33 |
|
Natural Resources Canada |
Provision of Federal Leadership in the Minerals and Metals Sector Energy and Climate Change Policy Cumulative Effects Geoscience for Sustainable Development of Natural Resources Green Mining Innovation Energy Safety and Security, and Petroleum Resources |
Expertise and Advice – Science, technology, and economic |
$18,298,815 |
$3,005,609 |
$2,712,813 |
Timely advice provided to support Early Planning and the Impact Assessment processes |
Percentage of NRCan requests for expertise and advice that are responded to within established timelines |
100% |
March 2025 (annual target) |
100% (31 assessments)Footnote 34 |
Nòkwewashk |
Supporting the Regulatory and Legislative Requirements |
$8,698,158 |
$1,754,185 |
$1,397,519 |
Timely advice provided to support assessment processes |
Percentage of GIC decisions made within timelines prescribed by CER processes supported by NRCan advice. |
100% |
March 2025 (annual target) |
100%Footnote 35 |
|
Management and Oversight Services |
Expertise and Advice – Science, technology, and economic |
$1,669,872 |
$336,766 |
$147,677 |
Timely scientific and technical advice from NRCan’s experts represented in federal impact assessment submissions, hearings and other processes |
Percentage of federal impact assessment processes requesting NRCan advice where advice is provided. |
100% |
March 2025 (annual target) |
100% (31 assessments)Footnote 36 |
|
Energy Safety and Security, and Petroleum Resources Electricity Resources |
Supporting the Regulatory and Legislative Requirements |
$22,281,062 |
$6,596,052 |
$2,130,947Footnote 37 |
Legislative and regulatory development under the Canada-Nova Scotia Offshore Petroleum Resources Accord Implementation Act and the Canada-Newfoundland and Labrador Atlantic Accord Implementation Act and the Canadian Energy Regulator Act |
Number of Acts and regulations amended or developed |
2 Acts or regulations amended or developed |
December 2025 |
Target met in 2022–23 with 9 regulations developedFootnote 38 |
|
Transport Canada |
Aviation Safety Regulatory Framework Marine Safety Oversight Rail Safety Oversight Transportation Innovation Protecting Oceans and Waterways Transportation Analysis Transportation Marketplace Frameworks Climate Change and Clean Air Environmental Stewardship of Transportation |
Departmental Engagement in Project Reviews with components related to Transport Canada’s Mandate. |
$27,410,000 |
$5,317,218 |
$2,590,273Footnote 39 |
Transport Canada advice informs the impact assessment of a project |
Percentage of impact assessments where Transport Canada is involved, in which Transport Canada advice is evident in impact assessment documentation, including early planning documents or Impact Assessment reports |
100% |
March 2025 (annual target) |
100%Footnote 40 |
Women and Gender Equality Canada |
Expertise and Outreach |
Technical expertise and advice on the application of GBA Plus |
$2,850,000 |
$472,806 |
$250,677Footnote 41 |
Timely advice on GBA Plus and issues related to gender equality provided to support Early Planning and/or Impact Assessments |
Percentage of requests for WAGE expertise and advice that are responded to within established timelines |
100% |
March 2025 (annual target) |
100% |
Expert advice on GBA Plus and issues related to gender equality influenced (or informed) the Impact Assessments |
Percentage of Impact Assessments influenced (or informed) by WAGE expertise [GBA Plus indicator] |
90% |
March 2025 (annual target) |
100%Footnote 42 |
Name of theme |
Total federal theme funding, including legacy funding, allocated since the last renewal |
2023–24 federal theme planned spending |
2023–24 federal theme actual spending |
Theme outcome(s) |
Theme performance indicator(s) |
Theme target(s) |
Date to achieve theme target |
2023–24 actual results |
|---|---|---|---|---|---|---|---|---|
Partnering with Indigenous Peoples/Reconciliation |
$258,860,039 |
$49,041,305 |
$44,005,795 |
Indigenous groups play a meaningful role in all or part of assessments |
Percentage of Indigenous groups involved in assessments indicating they had sufficient opportunities to work in partnership/collaboratively in assessment processes |
60% |
March 2025 (annual target) |
Not availableFootnote 43 |
GBA Plus |
Percentage of Indigenous groups involved in assessments indicating they had sufficient opportunities to work in partnership/collaboratively in assessment processes, by age |
60% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 44 |
||||
GBA Plus |
Percentage of Indigenous groups involved in assessments indicating they had sufficient opportunities to work in partnership/collaboratively in assessment processes, by gender |
60% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 45 |
||||
GBA Plus |
Percentage of Indigenous groups involved in assessments indicating they had sufficient opportunities to work in partnership/collaboratively in assessment processes, by region* *According to regions used by IAAC to track projects: Atlantic, Quebec, Ontario, Prairie and Northern, Pacific and Yukon |
60% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 46 |
||||
Indigenous knowledge and input appropriately informs assessment-related decisions |
Percentage of assessment reports provided to decision-makers that include how Indigenous knowledge and perspectives were considered |
100% |
March 2025 (annual target) |
Not availableFootnote 47 |
Departments |
Link to the department’s program inventory |
Horizontal initiative activity (activities) |
Total federal funding, including legacy funding, allocated to each horizontal initiative activity since the last renewal |
2023–24 planned spending for each horizontal initiative activity |
2023–24 actual spending for each horizontal initiative activity |
2034–24 horizontal initiative activity expected result(s) |
2023–24 horizontal initiative activity performance indicator(s) |
2023–24 horizontal initiative activity target(s) |
Date to achieve horizontal initiative activity target |
2023–24 actual results |
|---|---|---|---|---|---|---|---|---|---|---|
Impact Assessment Agency of Canada |
Indigenous relations and engagement |
Indigenous relations and engagement |
$92,362,150 |
$18,558,305 |
$22,586,937Footnote 48 |
Indigenous groups and organizations are able to support the development of local and regional Indigenous impact assessment knowledge and capacity |
Percentage of implicated Indigenous groups who agree they have been able to develop/increase their local and regional impact assessment knowledge and regional capacity |
90% |
March 2025 (annual target) |
Not availableFootnote 49 |
GBA Plus |
Percentage of implicated Indigenous groups who agree they have been able to develop/increase their local and regional impact assessment knowledge and regional capacity, by region* *According to regions used by IAAC to track projects: Atlantic, Quebec, Ontario, Prairie and Northern, Pacific and Yukon |
90% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 50 |
||||||
GBA Plus |
Percentage of implicated Indigenous groups who agree they have been able to develop/increase their local and regional impact assessment knowledge and regional capacity, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous |
90% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 51 |
||||||
Indigenous groups have resources (financial support) to provide advice/ knowledge and participate in EA/IA related processes and policy development |
Percentage of funded Indigenous groups agreeing that the access to financial support enabled them to provide advice and knowledge in assessment or policy development processes |
90% |
March 2025 (annual target) |
Not availableFootnote 52 |
||||||
GBA Plus |
Percentage of funded Indigenous groups agreeing that the access to financial support enabled them to provide advice and knowledge in assessment or policy development processes, by region* *According to regions used by IAAC to track projects: Atlantic, Quebec, Ontario, Prairie and Northern, Pacific and Yukon |
90% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 53 |
||||||
GBA Plus |
Percentage of funded Indigenous groups agreeing that the access to financial support enabled them to provide advice and knowledge in assessment or policy development processes, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous |
90% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 54 |
||||||
Increased assessment capacity among Indigenous groups |
Percentage of Indigenous Capacity Support Program partners who indicate that the eligible activities provided sufficient knowledge and skills to the Indigenous groups to enable them to engage in the assessment process |
80% |
March 2025 (annual target) |
Not availableFootnote 55 |
||||||
GBA Plus |
Percentage of Indigenous Capacity Support Program partners who indicate that the eligible activities provided sufficient knowledge and skills to the Indigenous groups to enable them to engage in the assessment process, by region* *According to regions used by IAAC to track projects: Atlantic, Quebec, Ontario, Prairie and Northern, Pacific and Yukon |
80% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 56 |
||||||
GBA Plus |
Percentage of Indigenous Capacity Support Program partners who indicate that the eligible activities provided sufficient knowledge and skills to the Indigenous groups to enable them to engage in the assessment process, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous |
80% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 57 |
||||||
Number of products advancing from assessment basics |
Cumulative positive trend over time (sum increases over time) |
March 2025 (annual target) |
Not availableFootnote 58 |
|||||||
Increased capacity to provide advice and feedback on Assessment-related policies, guidelines, tools and practices |
Percentage of Indigenous groups receiving Policy Development Program funding indicating that the collaboration and engagement opportunities provided them with sufficient knowledge and skills to provide advice and feedback |
75% |
March 2025 (annual target) |
Not availableFootnote 59 |
||||||
GBA Plus |
Percentage of Indigenous groups receiving Policy Development Program funding indicating that the collaboration and engagement opportunities provided them with sufficient knowledge and skills to provide advice and feedback, by region* *According to regions used by IAAC to track projects: Atlantic, Quebec, Ontario, Prairie and Northern, Pacific and Yukon |
75% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 60 |
||||||
GBA Plus |
Percentage of Indigenous groups receiving Policy Development Program funding indicating that the collaboration and engagement opportunities provided them with sufficient knowledge and skills to provide advice and feedback, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous |
75% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 61 |
||||||
GBA Plus |
Percentage of Indigenous groups receiving Policy Development Program funding indicating that the collaboration and engagement opportunities provided them with sufficient knowledge and skills to provide advice and feedback, by age |
75% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 62 |
||||||
GBA Plus |
Percentage of Indigenous groups receiving Policy Development Program funding indicating that the collaboration and engagement opportunities provided them with sufficient knowledge and skills to provide advice and feedback, by gender |
75% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 63 |
||||||
Indigenous communities meaningfully participate in the development of policy instruments, regulations, training & guidance documents |
Percentage of Indigenous groups participating in the development of policy instruments, regulations, and training and guidance documents indicating the engagement was meaningful |
90% |
March 2025 (annual target) |
Not availableFootnote 64 |
||||||
GBA Plus |
Percentage of Indigenous groups participating in the development of policy instruments, regulations, and training and guidance documents indicating the engagement was meaningful, by region* *According to regions used by IAAC to track projects: Atlantic, Quebec, Ontario, Prairie and Northern, Pacific and Yukon |
90% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 65 |
||||||
GBA Plus |
Percentage of Indigenous groups participating in the development of policy instruments, regulations, and training and guidance documents indicating the engagement was meaningful, by Indigenous group (First Nations, Inuit, Métis) |
90% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 66 |
||||||
GBA Plus |
Percentage of Indigenous groups participating in the development of policy instruments, regulations, and training and guidance documents indicating the engagement was meaningful, by age |
90% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 67 |
||||||
GBA Plus |
Percentage of Indigenous groups participating in the development of policy instruments, regulations, and training and guidance documents indicating the engagement was meaningful, by gender |
90% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2025 (annual target) |
Not availableFootnote 68 |
||||||
Parks Canada |
Heritage Places Conservation |
Indigenous Consultation within the Impact Assessment System |
$6,049,824 |
$1,078,640 |
$960,516 |
Decision-making and governance at heritage places is grounded in collaborative approaches that reflect both Indigenous and western conservation values and knowledge |
Percentage of impact assessments in which Parks Canada supports Indigenous consultations where Parks Canada’s mandate is implicated |
100% |
March 2027 |
100%Footnote 69 |
Crown-Indigenous Relations and Northern Affairs Canada |
Consultation and Accommodation |
Advice and expertise on Indigenous consultation and accommodation |
$11,160,000 |
$2,891,390 |
$2,891,390 |
Increased opportunities for partnerships in impact assessments and policy development |
Percentage of major projects undergoing impact assessment supported through advice |
40% |
March 2025 (annual target) |
47.4% |
Fisheries and Oceans Canada |
Fish & Fish Habitat Protection |
Indigenous consultation and engagement |
$12,760,518 |
$2,309,318 |
$1,638,855 |
DFO participates in IA Crown consultation process as requested |
Percentage of IAs for which DFO participates in Crown consultation process |
100% |
March 2025 (annual target) |
100% |
Fisheries Management |
Indigenous consultation and engagement |
$6,344,892 |
$1,144,215 |
$746,465 |
Evidence-based advice with respect to possible Indigenous fisheries implications available to inform impact assessments |
Percentage of IAs that requested Indigenous fisheries advice and adhere to service standards |
100% |
March 2025 (annual target) |
100% |
|
Health Canada |
Health Impacts of Chemicals |
Indigenous engagement |
$1,330,365 |
$138,073 |
$142,045 |
Indigenous Peoples have increased capacity to meaningfully engage on health issues in the IA process |
Percentage of Indigenous groups receiving funding who indicated HC contributions funding increased their capacity to meaningfully engage on health issues in the IA process |
80% |
March 2028 |
Not applicableFootnote 70 |
Indigenous Services Canada |
Environmental Public Health |
Funding source to support First Nations communities in the development of and the undertaking of their own baseline studies and to support capacity building in advance of an assessment |
$4,450,400 |
$783,400 |
$711,000Footnote 71 |
First Nations and the federal government have capacity to engage in the investigation of environmental hazards |
Number of community based baseline studies conducted to support impact assessments |
2 large baseline projects |
March 2027 (cumulative target– 10 projects over 5 years) |
|
Regional Indigenous Health Impact Assessment Coordinator support to Indigenous communities |
$9,882,544 |
$1,646,724 |
$758,776Footnote 73 |
First Nations and the federal government have capacity to engage in the investigation of environmental hazards |
Percentage of impact assessments in First Nations communities where community input on potential health risks were supported by a coordinator |
90% |
March 2027 |
|||
First Nations and the federal government have capacity to engage in the investigation of environmental hazards |
Number of regional training workshops related to HIA |
5 workshops |
March 2027 |
|||||||
Canada Energy Regulator |
Indigenous Engagement Company Performance Infrastructure, Tolls, and Export Applications |
Indigenous Relations and Engagement |
$20,608,772 |
$4,346,480 |
$3,793,352Footnote 76 |
Input provided by Indigenous Peoples and stakeholders influences CER’s decisions and work. |
Evidence that input from Indigenous Peoples and stakeholders influences CER’s decisions and work. |
Narrative evidence |
Not applicable |
In 2023–24 the Indigenous Relations and Reconciliation Business Unit (IRRBU) continued support for the Energy Supply and Data Team’s data project with the Saskatchewan First Nations Centre of Excellence (the Centre). CER and the Centre developed a Memorandum of Understanding in 2022–23, that led to the co-development of energy information, which included stories featuring Indigenous perspectives and scenarios. This led to an opportunity for CER to feature the partnership at the Annual General Meeting of the Centre. The CER continued to work with Indigenous communities to co-develop a mechanism aimed at increasing Indigenous involvement in the CER’s compliance and oversight activities for the NGTL System. In 2023–24, the CER published a report that was co-written by Indigenous participants and CER staff summarizing what was discussed during the leadership meetings that took place in 2022–23. Over the last year, the CER also met with technical staff from participating Indigenous communities to define the governance, structure, and approach for the collaborative mechanism. A summary report, co-written with Indigenous participants, will be released in fall 2024 and will guide the drafting of the terms of reference and the implementation of this initiative. |
Infrastructure, Tolls, and Export Applications Indigenous Engagement Regulatory Framework |
Grants and Contributions financial support |
$22,433,491 |
$4,335,867 |
$1,061,005Footnote 77 |
Indigenous groups have resources (financial support) to participate in adjudication processes, Crown consultation activities, policy dialogue, lifecycle oversight activities, Indigenous advisory committees, and research |
Percentage of recipients who agree that funding enabled their participation in the activities for which funding was provided i.e. adjudication processes, Crown consultation activities, policy dialogue, lifecycle oversight activities, Indigenous advisory committees, and research. |
90% |
March 2025 (annual target) |
96% |
|
Infrastructure, Tolls, and Export Applications Legal Services Indigenous Engagement |
Crown Consultation |
$27,747,083 |
$4,839,517 |
$4,603,001 |
Potentially affected Indigenous Peoples are consulted through the Commission’s assessment process or CER Crown consultation activities |
Percentage of communities on the Crown list that participate in Crown consultation or hearing processes or indicate that they are not going to participate |
100% |
March 2025 (annual target) |
100% |
|
Canadian Nuclear Safety Commission |
Scientific, Regulatory and Public Information |
Indigenous collaboration and engagement Indigenous Capacity |
$33,160,000 |
$4,928,079 |
$3,098,503Footnote 78 |
Increased capacity for Indigenous Peoples to meaningfully participate in regulatory processes |
Percentage of Indigenous Nations and communities and stakeholders* who indicated the funding provided increased capacity to meaningfully participate in CNSC’s regulatory process, by region (wherein “by region” means by Province/Territory) [GBA Plus indicator] *For the CNSC, examples of stakeholders include non-governmental organizations and members of the public |
90% |
March 2025 (annual target) |
99% |
Increased satisfaction of Indigenous Nations and communities and stakeholders with the CNSC’s regulatory processes and engagement activities |
90% OR 10% greater than baseline |
March 2028 |
66%Footnote 79 |
|||||||
Number of established relationships with Indigenous Nations and communities |
12 |
March 2025 |
||||||||
Transport Canada |
Indigenous Partnerships and Engagement |
Indigenous Consultation within the Impact Assessment System |
$10,570,000 |
$2,041,297 |
$1,199,091Footnote 81 |
Specialist or expert information or knowledge supports and informs Indigenous consultations across all phases of an impact assessment |
Percentage of impact assessments in which Transport Canada supports Indigenous consultations where Transport Canada’s mandate is implicated |
100% |
March 2025 (annual target) |
100%Footnote 82 |
Name of theme |
Total federal theme funding, including legacy funding, allocated since the last renewal (dollars) |
2023–24 federal theme planned spending |
2023–24 federal theme actual spending |
Theme outcome(s) |
Theme performance indicator(s) |
Theme target(s) |
Date to achieve theme target |
2023–24 actual results |
|---|---|---|---|---|---|---|---|---|
Cumulative Effects, Open Science and Evidence |
$294,754,201 |
$38,459,139 |
$30,952,097 |
Cumulative Effects Coordination and Leadership Government of Canada effectively considers cumulative effects in federal impact assessment processes |
Percentage of federal reports and decisions arising from federal impact assessment processes that explicitly speak to cumulative effects (or similar, e.g. cumulative impacts) |
80% |
March 2025 (annual target) |
88% |
Impact and cumulative effects assessment in Canada reflect a commitment to social, economic and environmental sustainability and respect our partnership with Indigenous Peoples |
Percentage of Open Science and Data Platform (OSDP) users who indicate they accessed the open science and data platform to: facilitate participation in IA and/or regulatory processes; or understand and/or better manage cumulative effects; or consider Indigenous Knowledge open information |
70% |
March 2025 (annual target) |
74%Footnote 83 |
Departments |
Link to the department’s program inventory |
Horizontal initiative activity (activities) |
Total federal funding, including legacy funding, allocated to each horizontal initiative activity since the last renewal |
2023–24 planned spending for each horizontal initiative activity |
2023–24 actual spending for each horizontal initiative activity |
2023–24 horizontal initiative activity expected result(s) |
2023–24 horizontal initiative activity performance indicator(s) |
2023–24 horizontal initiative activity target(s) |
Date to achieve horizontal initiative activity target |
2023–24 actual results |
|---|---|---|---|---|---|---|---|---|---|---|
Impact Assessment Agency of Canada |
Assessment, Administration, Conduct and Monitoring |
Regional and strategic assessment |
$48,014,222 |
$9,461,618 |
$5,243,085Footnote 84 |
Information, science and evidence are generated and inform assessment processes |
Number of regional and strategic assessments underway and in planning |
Always have a minimum of two assessments underway concurrently and a third in planning |
March 2025 (annual target) |
Regional Assessments: Two are underway, and two are in the planning stage.Footnote 85 |
Proportion of proponents/federal authorities/review panels indicating that regional and strategic assessments provided useful information for the conduct of designated project assessments |
60% (To be confirmed once input is received when baseline is set in 2023–24) |
March 2026 (annual target after 2025–26) |
Not availableFootnote 86 |
|||||||
Environment and Climate Change Canada |
Species at Risk |
Regional Assessments |
$78,183,406 |
$16,781,149 |
$12,665,774 |
Enhanced knowledge about environmental baselines and the prediction of impacts are provided in regional assessments to inform the consideration of cumulative effects in project impact assessments |
Percentage of scientific studies, surveys, models and assessments completed per year to support the assessment of baseline conditions and manage cumulative effects to species at risk (SAR), migratory birds, and wetlands in areas identified for regional assessments |
90% of planned studies (pertaining to SAR, migratory birds, or wetlands) are completed per reporting period, in each regional assessment region |
March 2025 (annual target) |
100% |
Knowledge on cumulative effects relevant to Indigenous Peoples is incorporated into regional assessments |
Percentage of Indigenous communities who access G&C capacity funding to enable contributions to the assessment of CE and identification of impacts |
90% of identified Indigenous groups access capacity funding |
March 2025 (annual target) |
100% |
||||||
Environmental Assessment program |
Strategic Assessments |
GHG assessments are conducted with a nationally consistent methodology* *Intent is to maximize a project’s GHG emission reductions to the extent possible under the federal review process |
Percentage of projects under federal review that receive SACC advice on GHG emissions. |
100% of requests submitted to ECCC |
March 2025 (annual target) |
100% |
||||
Environmental Assessment Program |
Open science and data, and Cumulative Effects Coordination |
$38,752,027 |
$7,919,270 |
$8,721,983 |
Cumulative effects information on the OSDP informs impact assessments of designated projects |
Percentage of new designated projects or regional assessments under the IAA for which the federal team indicates that information provided in a tailored OSDP presentation/email* are useful for informing their work |
80% |
March 2025 (annual target) |
55%Footnote 87 |
|
Fisheries and Oceans Canada |
Fish & Fish Habitat Protection |
Scientific expertise and advice |
$6,713,244 |
$1,222,524 |
$892,269 |
Fish and Fish Habitat Protection Program inputs into regional assessments as required |
Percentage of requested fish and fish habitat advice for a regional assessment process that adheres to service standards |
100% |
March 2025 (annual target) |
100% |
Aquatic Ecosystems Science |
Scientific expertise and advice |
$6,280,957 |
$1,191,286 |
$1,156,815 |
Timely scientific information on fish and fish habitat and effectiveness of relevant management measures is available to inform regional assessments |
Percentage of requested Science products for a regional assessment that adhere to process time limits |
100% |
March 2025 (annual target) |
100% |
|
Health Canada |
Health Impacts of Chemicals |
Expertise on human health impacts |
$2,071,395 |
$414,279 |
$354,308Footnote 88 |
Expert advice influenced (or informed) the assessment of cumulative impacts of resource and infrastructure development |
Percentage of assessments of cumulative effects influenced (or informed) by Health Canada expertise |
90% |
March 2025 (annual target) |
100% |
Indigenous Services Canada |
Land, Natural Resources and Environmental Management |
Support the Indigenous Centre for Cumulative Effects |
$22,394,860 |
$4,478,932 |
$4,478,932 |
ICCE has adequate support to implement its strategic plan to build community capacity and provide access to expert knowledge around cumulative effects |
Percentage of administrative and financial requests for which ISC provided support to ICCE, within appropriate service standards |
100% |
March 2025 (annual target) |
100%Footnote 89 |
Percentage of First Nations, Inuit or Métis communities satisfied with services received through the Centre |
80% of First Nations, Inuit or Métis communities and/or organizations are satisfied with the Centre’s services |
March 2025 (annual target) |
100% |
|||||||
Natural Resources Canada |
Core Geospatial Data Geoscience for Sustainable Development of Natural Resources Program Information Technology Services |
Regional and strategic assessment |
$24,145,331 |
$5,028,172 |
$4,468,542 |
Understanding the impacts of cumulative effects assessment is enabled through publicly available information |
Percentage increase of cumulative effects relevant records* made accessible to support increased understanding of cumulative effects of development *Records could include datasets, science publications, information about development or regulatory activities, or Indigenous knowledge open information |
10 percent increase per year starting in 2023 |
March 2028 (annual target) |
151,132 recordsFootnote 90 |
Innovative Geospatial Solutions Geoscience for Sustainable Development of Natural Resources Program |
Regional and strategic assessment |
$11,693,264 |
$1,694,334 |
$1,739,891 |
Current and future cumulative effects and project impact assessments have access to data describing the status and trends of critical ecosystem parameters |
Percentage of NRCan baseline datasets and related science made available via the Open Science and Data Platform |
Five to ten percent increase per year (varying per sector) from baselines established in 2023–2024 (linear annual increase based on fixed baseline – i.e. not cumulative growth) |
March 2028 (annual target) |
Phase 2 maintained a 5% to 10% increase in datasets made available year over year |
|
Cumulative Effects Sustainable Forest Management |
Regional and strategic assessment |
$15,124,509 |
$2,962,054 |
$2,762,366 |
Current and future cumulative effects and project impact assessments have access to critical forest data |
Percentage of forest data and related science for cumulative effects, including updates and enhancements, made available via the OSDP |
Five percent increase of forest data products per year, starting in 2023, relative to baselines to be established in 2023–2024 (linear annual increase based on fixed baseline – i.e. not cumulative growth) |
March 2028 (annual target) |
44%Footnote 91 |
|
Geoscience for Sustainable Development of Natural Resources |
Regional and strategic assessment |
$10,079,826 |
$2,377,351 |
$2,075,864 |
NRCan marine geoscience products inform Marine Spatial Planning in impact Assessments, as well as cumulative effects and project assessments in the offshore. |
Percentage of marine geoscience expeditions that lead to associated data releases that inform DFO-led Marine Spatial Planning, cumulative effects assessments (e.g., RA) or project assessments in the offshore |
All (100%) of marine expeditions |
March 2028 (annual target) |
On track for 100%. In 2023–24, 9 marine geoscience expeditions collected data and samples. Also, 19 scientific and technical products, including maps, data sets and preliminary results from the new expeditions were released.Footnote 92 |
|
Canada Energy Regulator |
Information Technology |
Integrated Open Science and Data Platform |
$7,606,877 |
$1,540,258 |
$495,644Footnote 93 |
Canadians have access to environmental and socio-economic assessment data from energy project applications for knowledge, research and decision-making |
Evidence that Canadians access and use information* from a new data and information product referred to as BERDI (Biophysical, Economic, Regional Data and information). *Information and data is extracted from environmental socio-economic assessments on major pipeline project applications which could contribute to the understanding of cumulative effects |
Narrative Evidence |
Not applicable |
The CER demonstrated BERDI to British Columbia lower mainland municipalities and followed up with additional information as they were very interested in learning more about BERDI. We also presented BERDI to the Canadian Open Data Society (a national collective of open data supporters who strive to promote and support relevant initiatives across the country). The BERDI team was recognized at the Government of Canada’s Digital Government Community Awards for Excellence in Data and Information Stewardship. This award acknowledges the commitment and outstanding contributions to advancing the Government of Canada’s digital ambition. |
Percentage of new datasets* added to Biophysical, Economic, Regional Data and Information (BERDI) tool *Datasets from BERDI will be made available on the Open Science and Data Platform |
80% |
March 2025 (annual target) |
100% |
|||||||
Energy System Information Pipeline Information Information Technology |
Data and Information Innovation |
$22,716,880 |
$7,791,259 |
$8,002,054 |
Canadians access and use energy information for knowledge, research and decision making. |
Evidence that Canadians access and use CER energy information products and specialized expertise, including community-specific information, for knowledge, research or decision making |
Narrative evidence |
Not applicable |
A user research study that explored the experience of website visitors to a top-visited product, the Provincial and Territorial Energy Profiles. The results, 143 survey responses and 8 interviews, identified top areas for improvement. A user research study that explored success factors for one of our longest-running publication series, Market Snapshots. Capturing 7 survey responses, 3 interviews and many search queries, revealed insights and new opportunities for audience appeal. For the 2023–24 fiscal year, there were approximately 5,800 pipeline information dataset downloads via the Open Government portal and web traffic was 199,079 for pipeline information products on the CER’s external website. |
|
Number of system enhancements that integrate science or cumulative effects data to improve public accessibility or efficiency of the regulatory system |
10% increase each year from baseline established in 2023–24 |
March 2025 (annual target) |
||||||||
Transport Canada |
Environmental Stewardship of Transportation |
Transport Canada supports regional and strategic assessments |
$1,550,000 |
$297,072 |
$297,072 |
TC knowledge informs regional or strategic assessments that intersect with the Department’s mandate. |
Percentage of regional or strategic assessments that were informed by Transport Canada knowledge, where TC’s mandate is implicated |
100% |
March 2025 (annual target) |
100%Footnote 95 |
Theme |
Total federal funding, including legacy funding, allocated since the last renewal |
2023–24 total federal planned spending (dollars) |
2023–24 total federal actual spending |
|---|---|---|---|
Theme A |
$535,182,541 |
$97,695,416 |
$83,108,050 |
Theme B |
$258,860,039 |
$49,041,305 |
$44,190,937 |
Theme C |
$294,754,201 |
$63,159,558 |
$53,354,598 |
Total, all themes |
$1,090,796,781 |
$209,896,278 |
$180,653,584 |