Name of horizontal initiative: Impact Assessment Processes

Lead department: Impact Assessment Agency of Canada

Federal partner departments:

  • Environment and Climate Change Canada
  • Parks Canada
  • Crown-Indigenous Relations and Northern Affairs Canada
  • Fisheries and Oceans Canada
  • Health Canada
  • Public Health Agency of Canada
  • Indigenous Services Canada
  • Natural Resources Canada
  • Canada Energy Regulator
  • Canadian Nuclear Safety Commission
  • Transport Canada
  • Women and Gender Equality Canada

Start date of the horizontal initiative: August 2019

End date of the horizontal initiative: March 2028

Description of the horizontal initiative: With the coming into force of the Impact Assessment Act (IAA) in August 2019, the Impact Assessment and Regulatory Processes (IARP) Horizontal Initiative was established to monitor the progress of the Impact Assessment Agency of Canada (IAAC) and its then nine partner organizations in the implementation of the IAA and other acts. Renewed in September 2022, the initiative was streamlined to focus specifically on Impact Assessment Processes as implemented by IAAC as the initiative lead and 12 partners in their capacity as technical experts, system-owners, and lifecycle regulators. The initiative has three shared outcomes: Canada’s impact assessment processes respect the rights and culture of Indigenous Peoples, and Canada’s commitment to partner with them; Canada’s impact assessment processes foster social, economic, and environmental sustainability; and stakeholders and Indigenous groups have confidence in the transparency and certainty of Canada’s impact assessment processes.

Governance structures: In accordance with the Guide to Departments on the Management and Reporting of Horizontal Initiatives, governance committees for impact assessment were established. Chaired by IAAC, these committees provide oversight of the Impact Assessment (IA) regime, including oversight for the implementation of the horizontal initiative and associated horizontal initiative results framework.

The Deputy Minister Impact Assessment Committee (DM IA) provides oversight and strategic direction on issues and risks pertaining to the implementation of the IAA and Canadian Environmental Assessment Act, 2012 (CEAA 2012). The DM IA is supported by the Assistant Deputy Minister Impact Assessment Committee (ADM IA).

Total federal funding allocated from start to end date (dollars): $2,258,656,004

Total federal planned spending to date (dollars): $1,819,935,176

Total federal actual spending to date (dollars): $1,330,381,028

Date of last renewal of the horizontal initiative: December 2022

Total federal funding allocated at the last renewal, and source of funding (dollars): $1,245,171,076 (Budget 2023’s Refocusing Government Spending Exercise)

Additional federal funding received after the last renewal (dollars): Not applicable

Total planned spending since last renewal: $558,027,993

Total actual spending since last renewal: $467,406,618

Fiscal year of planned completion of next evaluation: 2027-28 (Impact Assessment Agency of Canada)

Performance highlights:

As presented below, some departments and agencies have identified performance highlights specific to their organization for 2024-25.

  • Impact Assessment Agency of Canada:
    • During the 2024-25 reporting period, the Impact Assessment Agency of Canada (IAAC) continued to support the timely progress of project assessments by providing guidance and expertise to proponents.
    • In June 2024, an amended Impact Assessment Act (IAA) came into force in response to the October 2023 Supreme Court of Canada (SCC) Decision. The amendments included focusing decision-making on areas of clear federal jurisdiction and enhancing collaboration with provincial and territorial partners to advance the objective of “one project, one review.”
  • Parks Canada:
    • Parks Canada (PC) participated in major projects that have potential impacts on the lands and resources it manages, including preparation for the High Frequency Rail Project. Along with Indigenous partners, PC also started co-developing a pilot approach to assess and manage cumulative effects where appropriate.
  • Crown-Indigenous Relations and Northern Affairs Canada:
    • In 2024-25, Crown-Indigenous Relations and Norther Affairs (CIRNAC) continued to provide advice and expertise on Indigenous consultation and accommodation to IAAC during the assessment of major projects and assessment-related policy development through direct requests and participation in governance structures established under the horizontal initiative. CIRNAC’s participation in the horizontal initiative continues to support the Government of Canada’s commitment to reconciliation by ensuring Indigenous Peoples’ Aboriginal and Treaty rights are meaningfully considered when the Crown contemplates or conducts activities, or decisions that might impact Aboriginal and Treaty rights.
  • Health Canada:
    • In 2024-25, Health Canada provided expertise to inform project assessments under the IAA on the following topics: contamination of country foods; health risks related to noise impacts, water quality and air quality; public health emergency management of toxic exposure events; human health risk assessment methodology; and health impact assessment methodology. Health Canada also coordinated the provision and incorporation of the Public Health Agency of Canada’s (PHAC’s) expertise on social determinants of health into project assessment documents. This expertise is reflected in finalized assessment documents published on public registries.
  • Indigenous Services Canada:
    • Land, Natural Resources and Environmental Management: Indigenous Services Canada (ISC) coordinated collaborative submissions to impact assessments, that drew on expertise from various sectors in headquarters and regions. We further improved relationships and built impact assessment awareness within ISC. We also prioritized relationship building with IAAC project teams and increased awareness of ISC’s mandate and expertise. To ensure valuable participation in impact assessments going forward, ISC proposed updates to the ISC-IAAC Memorandum of Understanding (MOU) that will support transparent processes, reciprocal expectations for information sharing, and ISC inclusion in consultation processes.
    • Indigenous Centre for Cumulative Effects (ICCE): Staff and Board members attended over 10 events throughout the year to raise the organization’s profile and work and engage audiences on cumulative effects. Eight ongoing community-based projects were funded, amounting to $1.9M, and nine new agreements were established for the coming year. ICCE has continued to build its internal governance and capacity towards long-term sustainability. Responding to findings from its recent National Needs Assessment and in line with its 2025-2028 Strategic Plan, the organization developed a new suite of programs and resources to increase capacity and knowledge for Indigenous communities related to cumulative effects, which will be rolled out in the coming year. Since its inception, ICCE has provided direct funding for multi-year community-led cumulative effects initiatives. In 2024-2025, eight ongoing projects were funded to the amount of $1.9M and nine new agreements were established for work in the coming years.
  • Natural Resources Canada:
    • Natural Resources Canada (NRCan) collaborated with IAAC, the Provinces of Newfoundland and Labrador and Nova Scotia and the Offshore Boards on the implementation of the IAA in the Atlantic offshore. This included the advancement of legislative amendments that improve the alignment of the Accord Acts with the IAA.
    • Marine Geoscience for Marine Spatial Planning (MGMSP) program highlights: two cruises on the research vessel Coriolis II for research activities, one cruise on the RSS Discovery, 1 Cruise on the CCGS Amundsen, several small vessel research expeditions, and lots of multibeam bathymetry data collection through a joint MOU with the Canadian Hydrographic Service (CHS).
    • Theme A: NRCan is legally obligated to provide scientific and technical advice, if requested, to federal assessments under the IAA, including impact, regional and strategic assessments. NRCan provided data, science, and expert advice to impact assessments to support the delivery of the IAA. NRCan’s broad scientific research mandate allows it to contribute diverse science and technical advice in project reviews, including but not limited to advice on mine waste characterization and management, groundwater and hydrogeology, geospatial and earth observation, economic and competitiveness analysis, and boreal caribou habitat. In 2024-25, NRCan provided scientific, technical expertise, and knowledge to IAAC for 30 assessment processes (i.e., impact assessments, environmental assessments, etc.) to support evidence-based decision-making for sustainable development in Canada. NRCan responded to 100% requests within the legislated timelines, providing NRCan’s diverse scientific, technical and knowledge inputs into impact assessment and environmental assessment documentation.
    • Theme C: The Open Science and Data Platform (OSDP) continued to provide open access to over 170,000 records of information (science, data and regulatory), allowing Canadians from coast-to-coast-to-coast to better understand cumulative effects and the impact of development activities in Canada, in recognition of the need to advance the implementation of the IAA and enhance regulatory efficiency, especially for major and priority projects of national interest. NRCan delivered on commitments to support the public availability of cumulative effects-relevant records: geospatial and non-geospatial data, with a release on May 15, 2024, and December 17, 2024 (two releases in 2024-2025). Both releases addressed Users’ Feedback gathered in 2024 following a broad scale user needs assessment with our diverse user community, including Indigenous groups, impact assessment practitioners, and industry proponents. A hackathon conducted in collaboration with Dalhousie University was also completed with over 100 participants who used and applied OSDP to develop use cases in the areas of environmental management, wildfire modeling and visualization, and clean energy projects. Results from usability review and testing by an external consultant were also gathered to inform future enhancements. Additionally, the OSDP project developed a Generative-Artificial Intelligence (AI) prototype to enhance discovery and access as well as usability and usership of the platform. In 2024-25, over 80,000 users accessed the platform, with 72% returning multiple times.
  • Canada Energy Regulator:
    • To advance reconciliation in 2024-25, the Canada Energy Regulator (CER) finalized the various baskets of work under the Indigenous Cultural Intelligence Framework, co-developed a UN Declaration Act Action Plan Measure 34 (Shared Priorities) Leadership Group with representatives from the CER, Natural Resources Canada, and Indigenous Caucuses of the Indigenous Advisory and Monitoring Committees (IAMCs) for the Trans Mountain Expansion (TMX) and Line 3, and advanced the development of a collaborative oversight mechanism for the Nova Gas Transmission Ltd. System. We completed early engagement and conducted supplemental Crown consultation activities with 106 Indigenous communities on two energy infrastructure projects. This engagement supports meaningful involvement in the CER’s regulatory processes, to build enduring relationships based on a recognition of rights and resolve issues early and outside of the hearing process, where possible.
    • In November 2024, the Content Management System for the Pipeline Profiles was launched – allowing for a more streamlined way of generating, reviewing, and publishing profile content and updates. This launch also included the publication of the final 11 interactive pipeline maps, data and visual updates, and new sections of pipeline. In 2024-25, the CER administered $7.6 million in grant and contribution funding to Indigenous Nations participating in adjudication processes, Crown consultations, engagement with ongoing CER policy work, and to develop capacity to enable involvement in lifecycle oversight and related Indigenous monitoring committees.
    • Phase 1 of the CER Portal project launched in 2024-25 to improve internal workflows for routine facility applications under section 214 of the CER Act, which introduced efficiencies through automation and integration of adjudicative activities related to the assessment of routine (small pipeline) applications.
  • Canadian Nuclear Safety Commission:
    • The Indigenous and Stakeholder Capacity Fund (ISCF) has allowed Indigenous Nations to employ dedicated staff, improving their ability to engage in regulatory processes and policy initiatives effectively. Eighty-six percent (86%) of survey respondents indicated that the funding increased their capacity to meaningfully participate in the CNSC regulatory process.
    • The ISCF has helped to improve Indigenous Nations’ understanding of Canadian Nuclear Safety Commission (CNSC) regulatory frameworks and processes. Ninety-five (95%) of survey respondents mentioned that they are satisfied or somewhat satisfied with the regulatory process.
    • The ISCF supports Indigenous Nations and communities to meaningfully negotiate and implement Terms of References for long-term engagement with the CNSC, with 11 TORs having been signed and another 5 being negotiated.

Contact information:

Name: Mary Kay Lamarche
Mailing Address: 160 Elgin Street, Ottawa, ON K1A 0W9, 22nd Floor
Phone: 343-998-4920
Email: MaryKay.Lamarche@iaac-aeic.gc.ca

Shared outcomes

Canada’s impact assessment processes respect the rights and culture of Indigenous Peoples, and Canada’s commitment to partner with them

Canada’s impact assessment processes foster social, economic, and environmental sustainability

Stakeholders and Indigenous groups have confidence in the transparency and certainty of Canada’s impact assessment processes

Shared outcomes

Theme

Theme A: Impact Assessment

Theme B: Partnering with Indigenous Peoples/Reconciliation

Theme C: Cumulative Effects, Open Science and Evidence

Internal services

Theme outcome(s)

Outcome 1: Proponents are held accountable for, and comply with, the conditions set out in Decision statements

Outcome 2: Scientific and evidence-based information and Indigenous knowledge related to health, social, economic, and environmental effects are generated and available

Outcome 1: Indigenous groups play a meaningful role in all or part of assessments

Outcome 2: Indigenous knowledge and input appropriately informs assessment-related decisions

Outcome 1: Government of Canada effectively considers cumulative effects in federal impact assessment processes

Outcome 2: Impact and cumulative effects assessment in Canada reflect a commitment to social, economic and environmental sustainability and respect our partnership with Indigenous Peoples

Not applicable

Impact Assessment Agency of Canada (IAAC)

$52,804,109

$18,407,112

$9,488,301

$22,487,556Footnote 1

Environment and Climate Change Canada (ECCC)

$8,392,273

Not applicable

$19,895,119

$3,383,200

Parks Canada (PC)

$1,888,018

$1,364,888

Not applicable

$332,031

Crown-Indigenous Relations and Northern Affairs Canada (CIRNAC)

Not applicable

$1,718,869

Not applicable

$225,380

Fisheries and Oceans Canada (DFO)

$7,546,762

$2,861,558

$2,125,634

$2,404,405

Health Canada (HC)

$8,398,248

$163,203

$332,733

$919,472

Public Health Agency of Canada (PHAC)

$281,897

Not applicable

Not applicable

$52,699

Indigenous Services Canada (ISC)

$3,251,755

$2,725,230

$4,478,932

$696,100

Natural Resources Canada (NRCan)

$9,054,551

Not applicable

$11,745,266

$2,084,676

Canada Energy Regulator (CER)

Not applicable

$13,048,894

$8,740,038

$2,140,939

Canadian Nuclear Safety Commission (CNSC)

Not applicable

$3,466,586

Not applicable

$445,582

Transport Canada (TC)

$3,132,934

$1,313,092

$310,999

$684,103

Women and Gender Equality Canada (WAGE)

$312,251

Not applicable

Not applicable

$53,052

Performance information

Horizontal initiative overview

Name of horizontal initiative

Total federal funding, including legacy funding, allocated since last renewal

2024-25 planned spending

2024-2025 actual spending

Horizontal initiative shared outcome(s)

2024-25 performance indicator(s)

2024-25 target(s)

Date to achieve target

2024-25 actual results

Impact Assessment Processes

$1,090,796,781

$217,130,992

$197,249,252

Canada’s impact assessment processes foster social, economic, and environmental sustainability

Percentage of projects for which reporting indicates that the vast majority* of mitigation measures set out in the Decision Statement effectively address adverse effects of the project

*Vast majority = 75% or more of mitigation measures are reported as effective

90%

March 2025

(annual target)

100%Footnote 2

Canada’s impact assessment processes respect the rights and culture of Indigenous Peoples, and Canada’s commitment to partner with them

Percentage of Indigenous groups who agree they have a productive and collaborative relationship with IAAC

70%

March 2025

(annual target)

Not availableFootnote 3

GBA Plus

Percentage of Indigenous groups who agree they have a productive and collaborative relationship with IAAC, by region*

*According to regions used by IAAC to track projects: Atlantic, Quebec, Ontario, Prairie and Northern, Pacific and Yukon

70%

March 2025

(annual target)

Not availableFootnote 4

GBA Plus

Percentage of Indigenous groups who agree they have a productive and collaborative relationship with IAAC, by Indigenous group (First Nations, Inuit, Métis)

70%

March 2025

(annual target)

Not availableFootnote 5

Stakeholders and Indigenous groups have confidence in the transparency and certainty of Canada’s impact assessment processes

Percentage of stakeholders and Indigenous groups participating in assessments who report a high level of confidence in the transparency of the assessment process

70%

March 2025

(annual target)

78%Footnote 6

GBA Plus

Percentage of stakeholders and Indigenous groups participating in assessments reporting a high level of confidence in the transparency of the assessment process, by region*

*According to regions used by IAAC to track projects: Atlantic, Quebec, Ontario, Prairie and Northern, Pacific and Yukon

70%

March 2025

(annual target)

Not availableFootnote 7

GBA Plus

Percentage of stakeholders and Indigenous groups participating in assessments reporting a high level of confidence in the transparency of the assessment process, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous

70%

March 2025

(annual target)

Indigenous group: Not availableFootnote 8

Non-Indigenous: 78%Footnote 9

Percentage of stakeholders and Indigenous groups who agree there is certainty in the assessment process

65%

March 2025

(annual target)

100%Footnote 10

GBA Plus

Percentage of stakeholders and Indigenous groups who agree there is certainty in the assessment process, by region*

*According to regions used by IAAC to track projects: Atlantic, Quebec, Ontario, Prairie and Northern, Pacific and Yukon

65%

March 2025

Not availableFootnote 11

GBA Plus

Percentage of stakeholders and Indigenous groups who agree there is certainty in the assessment process, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous

65%

March 2025

Indigenous group: Not availableFootnote 12

Non-Indigenous: 100%Footnote 13

Theme horizontal initiative activities

Theme A details

Name of theme

Total federal theme funding, including legacy funding, allocated since the last renewal

2024-25 federal theme planned spending

2024-25 federal theme actual spending

Theme outcome(s)

Theme performance indicator(s)

Theme target(s)

Date to achieve theme target

2024-25 actual results

Impact Assessment

$535,182,541

$103,423,782

$95,062,798

Proponents are held accountable for, and comply with, the conditions set out in Decision statements

Percentage of approved projects with a high level* of compliance with Decision Statement conditions

*High level of compliance = compliant with 90% or more of conditions

100%

March 2025

(annual target)

100%Footnote 14

Scientific and evidence-based information and Indigenous knowledge related to health, social, economic, and environmental effects are generated and available

Percentage of stakeholders and Indigenous groups who agree that scientific and evidence-based information and Indigenous knowledge on key health, social, economic, and environmental effects are accessible*

*Accessible is defined by: readability, clarity, conciseness, and precision

60%

March 2025

(annual target)

83%Footnote 15

GBA Plus

Percentage of stakeholders and Indigenous groups who agree that scientific and evidence-based information and Indigenous knowledge on key health, social, economic, and environmental effects are accessible*, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous

*Accessible is defined by: readability, clarity, conciseness, and precision

60%

March 2025

(annual target)

Indigenous group: Not availableFootnote 16

Non-Indigenous: 83%Footnote 17

GBA Plus

Percentage of stakeholders and Indigenous groups reporting they have the information they need to engage in the assessment process

90%

March 2025

(annual target)

78%Footnote 18

Percentage of stakeholders and Indigenous groups reporting they have the information they need to engage in the assessment process, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous

90%

March 2025

(annual target)

Indigenous group: Not availableFootnote 19

Non-Indigenous: 78%Footnote 20

Theme A horizontal initiative activities

Departments

Link to the department’s program inventory

Horizontal initiative activity (activities)

Total federal funding, including legacy funding, allocated to each horizontal initiative activity since last renewal

2024-25 planned spending for each horizontal initiative activity

2024-25 actual spending for each horizontal initiative activity

2024-25 horizontal initiative activity expected result(s)

2024-25 horizontal initiative activity performance indicator(s)

2024-25 horizontal initiative activity target(s)

Date to achieve horizontal initiative activity target

2024-25 actual results

Impact Assessment Agency of Canada

Assessment Administration, Conduct, and Monitoring

Assessment administration, conduct, and monitoring

$279,199,958

$52,804,109

$52,804,109

Assessments are conducted in a manner perceived (by stakeholders, Indigenous groups, and the public) to be fair, predictable and efficient

Percentage of stakeholders and Indigenous groups indicating that the Tailored Impact Statement Guidelines were effectively tailored to increase the efficiency and effectiveness of the project assessment

70%

March 2025

(annual target)

Not availableFootnote 21

GBA Plus

Percentage of stakeholders and Indigenous groups indicating that the Tailored Impact Statement Guidelines were effectively tailored to increase the efficiency and effectiveness of the project assessment, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous

70%

March 2025

(annual target)

Not availableFootnote 22

Stakeholders and Indigenous groups have the capacity (knowledge, skills & abilities) to engage in the assessment process

Percentage of stakeholders and Indigenous groups who agree that the Participant funding provided to them enhanced their capacity to engage in the assessment process

90%

March 2025

(annual target)

Not availableFootnote 23

GBA Plus

Percentage of stakeholders and Indigenous groups who agree that the Participant funding provided to them enhanced their capacity to engage in the assessment process, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous

90%

March 2025

(annual target)

Not availableFootnote 24

Percentage of stakeholders and Indigenous groups reporting that they have the information they need to engage in the assessment process

90%

March 2025

(annual target)

89%Footnote 25

GBA Plus

Percentage of stakeholders and Indigenous groups reporting that they have the information they need to engage in the assessment process, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous

90%

March 2025

(annual target)

Indigenous group: Not availableFootnote 26

Non-Indigenous: 89%Footnote 27

Stakeholders and Indigenous groups meaningfully participate in the assessment process

Percentage of stakeholders and Indigenous groups participating in assessment-related engagement/ consultation activities who agree they were engaged meaningfully in the process

90%

March 2025

(annual target)

100%Footnote 28

GBA Plus

Percentage of stakeholders and Indigenous groups participating in assessment-related engagement/ consultation activities who agree they were engaged meaningfully in the process, by gender

90%

March 2025

(annual target)

Not availableFootnote 29

GBA Plus

Percentage of stakeholders and Indigenous groups participating in assessment-related engagement/ consultation activities who agree they were engaged meaningfully in the process, by age

90%

March 2025

(annual target)

Not availableFootnote 30

GBA Plus

Percentage of stakeholders and Indigenous groups participating in assessment-related engagement/ consultation activities who agree they were engaged meaningfully in the process, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous

90%

March 2025

(annual target)

Indigenous group: Not availableFootnote 31

Non-Indigenous: 100%Footnote 32

Environment and Climate Change Canada

Environmental Assessment (indicator owner)

Species at Risk

Water Quality and Ecosystems Partnerships

Hydrological Services

Scientific Expertise and Advice

$49,752,193

$9,892,154Footnote 33

$8,392,273Footnote 34

Expert environmental guidance is incorporated into impact assessments

Percentage of possible environmental effects and mitigation measures that are incorporated in the final EA/IA report in accordance with ECCC advice

90%

March 2025

(annual target)

91%

Timely advice provided to support assessment processes

Percentage of requests for expertise and advice for an impact assessment process that adheres to service standards and process time limits

100%

March 2025

(annual target)

96%Footnote 35

Parks Canada

Heritage Places Conservation

Parks Canada Provides Expert Advice to Panel or IAAC led Assessments

$14,365,167

$2,243,626

$1,888,018

Natural and cultural resources in heritage places are maintained or improved

Percentage of impact assessments where Parks Canada is involved, in which Parks Canada advice is evident in impact assessment documentation, including early planning documents or Impact Assessment reports

100%

March 2027

100%Footnote 36

Fisheries and Oceans Canada

Fish and Fish Habitat Protection

Scientific Expertise and Advice

$33,320,646

$6,732,367

$4,102,534Footnote 37

Timely advice provided to support assessment processes

Percentage of requested fish and fish habitat advice for an impact assessment process that adheres to service standards and time limits

100%

March 2025

(annual target)

98%Footnote 38

Aquatic Ecosystem Science

Scientific Expertise and Advice

$7,045,736

$1,416,554

$2,780,563Footnote 39

Timely scientific information is available to inform impact assessments

Percentage of requested Science products for an impact assessment process that adheres to process time limits

100%

March 2025

(annual target)

100%Footnote 40

Fisheries Management

Scientific Expertise and Advice

$841,448

$168,290

$0Footnote 41

Timely advice with respect to socio-economic impacts fisheries is available to inform impact assessments

Percentage of socio-economic /data for an impact assessment process that adheres to process time limits

100%

March 2025

(annual target)

100%

Environmental Response

Scientific Expertise and Advice

$4,248,269

$767,876

$663,665

Timely advice and expertise on marine navigation, safety and incident management is available to inform impact assessments

Percentage of requests responded to within assessment timelines that include advice on marine navigation and incident management

100%

March 2025

(annual target)

100%

Health Canada

Health Impacts of Chemicals

Food and Nutrition

Expertise on potential health impacts

$45,132,041

$9,026,409

$8,398,248

Expert advice influenced (or informed) the impact assessment of proposed projects

Percentage of impact assessments of proposed projects influenced (or informed) by Health Canada expertise

90%

March 2025

(annual target)

100%

GBA Plus

Percentage of impact assessments of proposed projects influenced (or informed) by Health Canada expertise, by region*

* Health Canada will use the following regional structure for reporting: BC, Alberta, Saskatchewan/Manitoba, Ontario, Quebec, and Atlantic

90%

March 2025

(annual target)

BC: 100%

AB: 100%

SK/MB: Not applicableFootnote 42

ON: 100%

QC: 100%

Atlantic: 100%

Percentage of impact assessments of proposed projects with potential health impacts on Indigenous Peoples influenced (or informed) by Health Canada expertise

90%

March 2025

(annual target)

100%

GBA Plus

Percentage of impact assessments of proposed projects with potential health impacts on Indigenous Peoples influenced (or informed) by Health Canada expertise, by Indigenous group (First Nations, Inuit, Métis)

90%

March 2025

(annual target)

First Nations: 100% Inuit: 100% Métis: 100%

Timely HC expert advice is provided to the impact assessment of proposed projects

Percentage of requests for HC expertise and advice that are responded to within established timelines

100%

March 2025

(annual target)

100%

Public Health Agency of Canada

Evidence for Health promotion, and Chronic Disease and Injury Prevention

Provision of expertise and advice on potential impacts to physical and mental well-being, including social determinants of health and equity considerations

$1,427,403

$290,327

$281,897Footnote 43

Expert public health advice is incorporated into impact assessments

Percentage of impact assessments of proposed projects influenced by PHAC expertise

100%

March 2025

(annual target)

100%

Timely PHAC expert advice is provided to the impact assessments of proposed projects

Percentage of requests for expertise and advice that are responded to within established timelines

100%

March 2025

(annual target)

100%

Indigenous Services Canada

Environmental Public Health

Subject matter expertise to review/comment on impact of environmental contaminants/changes on health determinants such as country foods and First Nations diets

$2,709,224

$484,496

$358,463Footnote 44

Impact assessments are informed by analysis of potential health and environmental impacts on Indigenous communities

Percentage of impact assessment projects with potential health risks for which ISC provided input

90%

March 2025

(annual target)

100%

Percentage of requests for ISC expertise and advice that are responded to within established timelines

100%

March 2025

(annual target)

98%

Land, Natural Resource and Environmental Management

Information and advice on project impacts for Indigenous Peoples

$17,359,952

$2,893,292

$2,893,292

Advice on potential socioeconomic and environmental impacts of projects on Indigenous communities is provided to inform impact assessments within established timelines

Percentage of impact assessments for which ISC provides input within established timelines

100%

March 2025

(annual target)

100%Footnote 45

Natural Resources Canada

Provision of Federal Leadership in the Minerals and Metals Sector

Energy and Climate Change Policy

Cumulative Effects

Geoscience for Sustainable Development of Natural Resources

Green Mining Innovation

Energy Safety and Security, and Petroleum Resources

Expertise and Advice – Science, technology, and economic

‭$18,298,815‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬

$3,862,771

$2,923,870Footnote 46

Timely advice provided to support Early Planning and the Impact Assessment processes

Percentage of NRCan requests for expertise and advice that are responded to within established timelines

100%

March 2025

(annual target)

100%Footnote 47

Nòkwewashk

Supporting the Regulatory and Legislative Requirements

‭$8,698,158‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬‬

$1,739,784

$1,523,073Footnote 48

Timely advice provided to support assessment processes

Percentage of GIC decisions made within timelines prescribed by CER processes supported by NRCan advice.

100%

March 2025

(annual target)

Not applicableFootnote 49

Management and Oversight Services

Expertise and Advice – Science, technology, and economic

$1,669,872

$333,947

$315,248

Timely scientific and technical advice from NRCan’s experts represented in federal impact assessment submissions, hearings and other processes

Percentage of federal impact assessment processes requesting NRCan advice where advice is provided.

100%

March 2025

(annual target)

100%Footnote 50

Energy Safety and Security, and Petroleum Resources

Electricity Resources

Supporting the Regulatory and Legislative Requirements

$22,281,062

$4,808,886

$4,292,360Footnote 51

Legislative and regulatory development under the Canada-Nova Scotia Offshore Petroleum Resources Accord Implementation Act and the Canada-Newfoundland and Labrador Atlantic Accord Implementation Act and the Canadian Energy Regulator Act

Number of Acts and regulations amended or developed

2 Acts or regulations amended or developed

December 2025

Target met in 2024-25 when amendments to the two Accord Acts through Bill C-49 was developed, received royal assent, and were enacted through Orders in Council jointly with the provinces.

Three regulations under the Accord and CER Acts were also amended/developed and came into force:

(1) Canada Offshore Renewable Energy Regulations (December 2024)

(2) Canada-Nova Scotia Offshore Area Petroleum Operations Framework Regulations (October 2024)

(3) Canada-Newfoundland and Labrador Offshore Area Petroleum Operations Framework Regulations (October 2024)Footnote 52

Transport Canada

Aviation Safety Regulatory Framework

Marine Safety Oversight

Rail Safety Oversight

Transportation Innovation

Protecting Oceans and Waterways

Transportation Analysis

Transportation Marketplace Frameworks

Climate Change and Clean Air

Environmental Stewardship of Transportation

Departmental Engagement in Project Reviews with components related to Transport Canada’s Mandate.

$27,410,000

$5,486,088

$3,132,934Footnote 53

Transport Canada advice informs the impact assessment of a project

Percentage of impact assessments where Transport Canada is involved, in which Transport Canada advice is evident in impact assessment documentation, including early planning documents or Impact Assessment reports

100%

March 2025

(annual target)

100%

Women and Gender Equality Canada

Expertise and Outreach

Technical expertise and advice on the application of GBA Plus

$2,850,000

$472,806

$312,251Footnote 54

Timely advice on GBA Plus and issues related to gender equality provided to support Early Planning and/or Impact Assessments

Percentage of requests for WAGE expertise and advice that are responded to within established timelines

100%

March 2025

(annual target)

92%Footnote 55

Expert advice on GBA Plus and issues related to gender equality influenced (or informed) the Impact Assessments

Percentage of Impact Assessments influenced (or informed) by WAGE expertise

[GBA Plus indicator]

90%

March 2025

(annual target)

100%Footnote 56

Theme B details

Name of theme

Total federal theme funding, including legacy funding, allocated since the last renewal

2024-25 federal theme planned spending

2024-25 federal theme actual spending

Theme outcome(s)

Theme performance indicator(s)

Theme target(s)

Date to achieve theme target

2024-25 actual results

Partnering with Indigenous Peoples/Reconciliation

$258,860,039

$50,799,708

$45,069,432

Indigenous groups play a meaningful role in all or part of assessments

Percentage of Indigenous groups involved in assessments indicating they had sufficient opportunities to work in partnership/collaboratively in assessment processes

60%

March 2025

(annual target)

Not availableFootnote 57

GBA Plus

Percentage of Indigenous groups involved in assessments indicating they had sufficient opportunities to work in partnership/collaboratively in assessment processes, by age

60%

March 2025

(annual target)

Not availableFootnote 58

GBA Plus

Percentage of Indigenous groups involved in assessments indicating they had sufficient opportunities to work in partnership/collaboratively in assessment processes, by gender

60%

March 2025

(annual target)

Not availableFootnote 59

GBA Plus

Percentage of Indigenous groups involved in assessments indicating they had sufficient opportunities to work in partnership/collaboratively in assessment processes, by region*

*According to regions used by IAAC to track projects: Atlantic, Quebec, Ontario, Prairie and Northern, Pacific and Yukon

60%

March 2025

(annual target)

Not availableFootnote 60

Indigenous knowledge and input appropriately informs assessment-related decisions

Percentage of assessment reports provided to decision-makers that include how Indigenous knowledge and perspectives were considered

100%

March 2025

(annual target)

100%Footnote 61

Theme B horizontal initiative activities

Departments

Link to the department’s program inventory

Horizontal initiative activity (activities)

Total federal funding, including legacy funding, allocated to each horizontal initiative activity since the last renewal

2024-25 planned spending for each horizontal initiative activity

2024-25 actual spending for each horizontal initiative activity

2024-25 horizontal initiative activity expected result(s)

2024-25 horizontal initiative activity performance indicator(s)

2024-25 horizontal initiative activity target(s)

Date to achieve horizontal initiative activity target

2024-25 actual results

Impact Assessment Agency of Canada

Indigenous relations and engagement

Indigenous relations and engagement

$92,362,150

$18,407,112

$18,407,112

Indigenous groups and organizations are able to support the development of local and regional Indigenous impact assessment knowledge and capacity

Percentage of implicated Indigenous groups who agree they have been able to develop/increase their local and regional impact assessment knowledge and regional capacity

90%

March 2025

(annual target)

Not availableFootnote 62

GBA Plus

Percentage of implicated Indigenous groups who agree they have been able to develop/increase their local and regional impact assessment knowledge and regional capacity, by region*

*According to regions used by IAAC to track projects: Atlantic, Quebec, Ontario, Prairie and Northern, Pacific and Yukon

90%

March 2025

(annual target)

Not availableFootnote 63

GBA Plus

Percentage of implicated Indigenous groups who agree they have been able to develop/increase their local and regional impact assessment knowledge and regional capacity, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous

90%

March 2025

(annual target)

Not availableFootnote 64

Indigenous groups have resources (financial support) to provide advice/ knowledge and participate in EA/IA related processes and policy development

Percentage of funded Indigenous groups agreeing that the access to financial support enabled them to provide advice and knowledge in assessment or policy development processes

90%

March 2025 (annual target)

Not availableFootnote 65

GBA Plus

Percentage of funded Indigenous groups agreeing that the access to financial support enabled them to provide advice and knowledge in assessment or policy development processes, by region*

*According to regions used by IAAC to track projects: Atlantic, Quebec, Ontario, Prairie and Northern, Pacific and Yukon

90%

March 2025

(annual target)

Not availableFootnote 66

GBA Plus

Percentage of funded Indigenous groups agreeing that the access to financial support enabled them to provide advice and knowledge in assessment or policy development processes, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous

90%

March 2025

(annual target)

Not availableFootnote 67

Increased assessment capacity among Indigenous groups

Percentage of Indigenous Capacity Support Program partners who indicate that the eligible activities provided sufficient knowledge and skills to the Indigenous groups to enable them to engage in the assessment process

80%

March 2025

(annual target)

Not availableFootnote 68

GBA Plus

Percentage of Indigenous Capacity Support Program partners who indicate that the eligible activities provided sufficient knowledge and skills to the Indigenous groups to enable them to engage in the assessment process, by region*

*According to regions used by IAAC to track projects: Atlantic, Quebec, Ontario, Prairie and Northern, Pacific and Yukon

80%

March 2025

(annual target)

Not availableFootnote 69

GBA Plus

Percentage of Indigenous Capacity Support Program partners who indicate that the eligible activities provided sufficient knowledge and skills to the Indigenous groups to enable them to engage in the assessment process, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous

80%

March 2025

(annual target)

Not availableFootnote 70

Number of products advancing from assessment basics

Cumulative positive trend over time (sum increases over time)

March 2025

(annual target)

Not availableFootnote 71

Increased capacity to provide advice and feedback on Assessment-related policies, guidelines, tools and practices

Percentage of Indigenous groups receiving Policy Development Program funding indicating that the collaboration and engagement opportunities provided them with sufficient knowledge and skills to provide advice and feedback

75%

March 2025

(annual target)

Not availableFootnote 72

GBA Plus

Percentage of Indigenous groups receiving Policy Development Program funding indicating that the collaboration and engagement opportunities provided them with sufficient knowledge and skills to provide advice and feedback, by region*

*According to regions used by IAAC to track projects: Atlantic, Quebec, Ontario, Prairie and Northern, Pacific and Yukon

75%

March 2025

(annual target)

Not availableFootnote 73

GBA Plus

Percentage of Indigenous groups receiving Policy Development Program funding indicating that the collaboration and engagement opportunities provided them with sufficient knowledge and skills to provide advice and feedback, by Indigenous group (First Nations, Inuit, Métis), and non-Indigenous

75%

March 2025

(annual target)

Not availableFootnote 74

GBA Plus

Percentage of Indigenous groups receiving Policy Development Program funding indicating that the collaboration and engagement opportunities provided them with sufficient knowledge and skills to provide advice and feedback, by age

75%

March 2025

(annual target)

Not availableFootnote 75

GBA Plus

Percentage of Indigenous groups receiving Policy Development Program funding indicating that the collaboration and engagement opportunities provided them with sufficient knowledge and skills to provide advice and feedback, by gender

75%

March 2025

(annual target)

Not availableFootnote 76

Indigenous communities meaningfully participate in the development of policy instruments, regulations, training & guidance documents

Percentage of Indigenous groups participating in the development of policy instruments, regulations, and training and guidance documents indicating the engagement was meaningful

90%

March 2025

(annual target)

Not availableFootnote 77

GBA Plus

Percentage of Indigenous groups participating in the development of policy instruments, regulations, and training and guidance documents indicating the engagement was meaningful, by region*

*According to regions used by IAAC to track projects: Atlantic, Quebec, Ontario, Prairie and Northern, Pacific and Yukon

90%

March 2025

(annual target)

Not availableFootnote 78

GBA Plus

Percentage of Indigenous groups participating in the development of policy instruments, regulations, and training and guidance documents indicating the engagement was meaningful, by Indigenous group (First Nations, Inuit, Métis)

90%

March 2025

(annual target)

Not availableFootnote 79

GBA Plus

Percentage of Indigenous groups participating in the development of policy instruments, regulations, and training and guidance documents indicating the engagement was meaningful, by age

90%

March 2025

(annual target)

Not availableFootnote 80

GBA Plus

Percentage of Indigenous groups participating in the development of policy instruments, regulations, and training and guidance documents indicating the engagement was meaningful, by gender

90%

March 2025

(annual target)

Not availableFootnote 81

Parks Canada

Heritage Places Conservation

Indigenous Consultation within the Impact Assessment System

$6,049,824

$1,155,904

$1,364,888

Decision-making and governance at heritage places is grounded in collaborative approaches that reflect both Indigenous and western conservation values and knowledge

Percentage of impact assessments in which Parks Canada supports Indigenous consultations where Parks Canada’s mandate is implicated

100%

March 2027

100%Footnote 82

Crown-Indigenous Relations and Northern Affairs Canada

Consultation and Accommodation

Advice and expertise on Indigenous consultation and accommodation

$11,160,000

$1,718,869

$1,718,869

Increased opportunities for partnerships in impact assessments and policy development

Percentage of major projects undergoing impact assessment supported through advice

40%

March 2025

(annual target)

50.9%

Fisheries and Oceans Canada

Fish & Fish Habitat Protection

Indigenous consultation and engagement

$12,760,518

$2,578,219

$2,154,562Footnote 83

DFO participates in IA Crown consultation process as requested

Percentage of IAs for which DFO participates in Crown consultation process

100%

March 2025

(annual target)

100%

Fisheries Management

Indigenous consultation and engagement

$6,344,892

$1,279,133

$706,996Footnote 84

Evidence-based advice with respect to possible Indigenous fisheries implications available to inform impact assessments

Percentage of IAs that requested Indigenous fisheries advice and adhere to service standards

100%

March 2025

(annual target)

100%

Health Canada

Health Impacts of Chemicals

Indigenous engagement

$1,330,365

$298,073

$163,203Footnote 85

Indigenous Peoples have increased capacity to meaningfully engage on health issues in the IA process

Percentage of Indigenous groups receiving funding who indicated HC contributions funding increased their capacity to meaningfully engage on health issues in the IA process

80%

March 2028

Not applicableFootnote 86

Indigenous Services Canada

Environmental Public Health

Funding source to support First Nations communities in the development of and the undertaking of their own baseline studies and to support capacity building in advance of an assessment

$4,450,400

$783,400

$1,571,330Footnote 87

First Nations and the federal government have capacity to engage in the investigation of environmental hazards

Number of community based baseline studies conducted to support impact assessments

2 large baseline projects

March 2027

(cumulative target– 10 projects over 5 years)

10

Regional Indigenous Health Impact Assessment Coordinator support to Indigenous communities

$9,882,544

$1,647,024

$1,153,900Footnote 88

First Nations and the federal government have capacity to engage in the investigation of environmental hazards

Percentage of impact assessments in First Nations communities where community input on potential health risks were supported by a coordinator

90%

March 2027

52%

First Nations and the federal government have capacity to engage in the investigation of environmental hazards

Number of regional training workshops related to HIA

5 workshops

March 2027

1

Canada Energy Regulator

Indigenous Engagement

Company Performance

Infrastructure, Tolls, and Export Applications

Indigenous Relations and Engagement

$20,608,772

$3,608,387

$3,426,479

Input provided by Indigenous Peoples and stakeholders influences CER’s decisions and work.

Evidence that input from Indigenous Peoples and stakeholders influences CER’s decisions and work.

Narrative evidence

Not applicable

CER Indigenous Cultural Intelligence

In 2024-25, the CER focused on finalizing and implementing the various baskets of work under the Indigenous Cultural Intelligence Framework (ICIF), formally known as the Indigenous Cultural Competency Framework. The six interconnected baskets of work of the ICIF include the National Indigenous Engagement Blueprint, Indigenous Procurement Strategy, Elders-in-Residence Program, Indigenous Recruitment, Retention and Advancement Strategy (IRRAS), training and learning opportunities (TRC Call to Action #57); and Change Management Strategy. The CER exceeded the Government required target of 5% value of contracts going to Indigenous business by achieving 13.6% in 2024-25. The IRRAS, approved in the Fall of 2024, includes closely monitoring progress and working towards a better understanding impacts, which may impact Indigenous recruitment, retention and advancement; hiring packages now state the importance of Indigenous relationships in the work CER does. Furthermore, 62% of employees took part in cultural intelligence training, which included land-based learning, two-eyed seeing, and trauma- and equity-informed practices. The CER is shifting from Indigenous Cultural Competency to Indigenous Cultural Intelligence to reflect a deeper responsibility as a regulator. Competency focuses on individual learning and awareness. Intelligence goes further – it is about applying that knowledge in ways that create lasting, systemic change.

Indigenous Involvement in Oversight

The CER is actively advancing the UN Declaration Act through UN Declaration Act Action Plan Measure (APM) SP34, co-developed with NRCan and the TMX Indigenous Advisory and Monitoring Committee (TMX-IAMC). UN Declaration Act APM SP34 aims to enhance Indigenous Peoples’ participation and enable them to exercise federal regulatory authority over CER-regulated projects. In 2024-25, a UN Declaration Act APM SP34 Leadership Group was formed with representatives from the CER, NRCan, and Indigenous Caucuses of the IAMCs for TMX and Line 3. This group is leading the implementation of UN Declaration Act APM SP34 by encouraging collaboration and offering strategic guidance.

The CER has committed to developing a collaborative oversight mechanism for the Nova Gas Transmission Ltd. System. This effort supports Reconciliation and aligns with the UN Declaration Act and UN Declaration Act APM SP34. In June 2024, a co-writing committee of 17 First Nation and Métis participants, and CER staff was formed to advance conceptual work on the mechanism. Over the year, they co-developed a draft Summary Report of technical workshops held in early 2024. This report outlines Indigenous perspectives of what could form a collaborative mechanism that braids Western and Indigenous Knowledges in regulatory oversight and integrates Indigenous voices into decision-making and the stewardship of their lands.

Infrastructure, Tolls, and Export Applications

Indigenous Engagement

Regulatory Framework

Grants and Contributions financial support

$22,433,491

$6,679,212

$5,766,621Footnote 89

Indigenous groups have resources (financial support) to participate in adjudication processes, Crown consultation activities, policy dialogue, lifecycle oversight activities, Indigenous advisory committees, and research

Percentage of recipients who agree that funding enabled their participation in the activities for which funding was provided i.e. adjudication processes, Crown consultation activities, policy dialogue, lifecycle oversight activities, Indigenous advisory committees, and research.

90%

March 2025

(annual target)

100%

Infrastructure, Tolls, and Export Applications

Legal Services

Indigenous Engagement

Crown Consultation

$27,747,083

$4,372,332

$3,855,794Footnote 90

Potentially affected Indigenous Peoples are consulted through the Commission’s assessment process or CER Crown consultation activities

Percentage of communities on the Crown list that participate in Crown consultation or hearing processes or indicate that they are not going to participate

100%

March 2025

(annual target)

No results.Footnote 91

Canadian Nuclear Safety Commission

Scientific, Regulatory and Public Information

Indigenous collaboration and engagement

Indigenous Capacity

$33,160,000

$6,158,034

$3,466,586Footnote 92

Increased capacity for Indigenous Peoples to meaningfully participate in regulatory processes

Percentage of Indigenous Nations and communities and stakeholders* who indicated the funding provided increased capacity to meaningfully participate in CNSC’s regulatory process, by region (wherein “by region” means by Province/Territory)

[GBA Plus indicator]

*For the CNSC, examples of stakeholders include non-governmental organizations and members of the public

90%

March 2025

(annual target)

Manitoba: 14%

Ontario: 24%

Saskatchewan: 19%

Alberta: 19%

New Brunswick: 5%

Quebec: 5%

Total: 86%Footnote 93

Increased satisfaction of Indigenous Nations and communities and stakeholders with the CNSC’s regulatory processes and engagement activities

90% OR 10% greater than baseline

March 2028

95%Footnote 94

Number of established relationships with Indigenous Nations and communities

12

March 2025

11Footnote 95

Transport Canada

Indigenous Partnerships and Engagement

Indigenous Consultation within the Impact Assessment System

$10,570,000

$2,114,009

$1,313,092Footnote 96

Specialist or expert information or knowledge supports and informs Indigenous consultations across all phases of an impact assessment

Percentage of impact assessments in which Transport Canada supports Indigenous consultations where Transport Canada’s mandate is implicated

100%

March 2025

(annual target)

100%

Theme C details

Name of theme

Total federal theme funding, including legacy funding, allocated since the last renewal (dollars)

2024-25 federal theme planned spending

2024-25 federal theme actual spending

Theme outcome(s)

Theme performance indicator(s)

Theme target(s)

Date to achieve theme target

2024-25 actual results

Cumulative Effects, Open Science and Evidence

$294,754,201

$62,907,502

$57,117,022

Cumulative Effects Coordination and Leadership

Government of Canada effectively considers cumulative effects in federal impact assessment processes

Percentage of federal reports and decisions arising from federal impact assessment processes that explicitly speak to cumulative effects (or similar, e.g. cumulative impacts)

80%

March 2025

(annual target)

100%

Impact and cumulative effects assessment in Canada reflect a commitment to social, economic and environmental sustainability and respect our partnership with Indigenous Peoples

Percentage of Open Science and Data Platform (OSDP) users who indicate they accessed the open science and data platform to: facilitate participation in IA and/or regulatory processes; or understand and/or better manage cumulative effects; or consider Indigenous Knowledge open information

70%

March 2025

(annual target)

72%

Theme C horizontal initiative activities

Departments

Link to the department’s program inventory

Horizontal initiative activity (activities)

Total federal funding, including legacy funding, allocated to each horizontal initiative activity since the last renewal

2024-25 planned spending for each horizontal initiative activity

2024-25 actual spending for each horizontal initiative activity

2024-25 horizontal initiative activity expected result(s)

2024-25 horizontal initiative activity performance indicator(s)

2024-25 horizontal initiative activity target(s)

Date to achieve horizontal initiative activity target

2024-25 actual results

Impact Assessment Agency of Canada

Assessment, Administration, Conduct and Monitoring

Regional and strategic assessment

$48,014,222

$9,488,301

$9,488,301

Information, science and evidence are generated and inform assessment processes

Number of regional and strategic assessments underway and in planning

Always have a minimum of two assessments underway concurrently and a third in planning

March 2025

(annual target)

Regional Assessments: One is underway, and one is in the planning stage

Proportion of proponents/federal authorities/review panels indicating that regional and strategic assessments provided useful information for the conduct of designated project assessments

60%

March 2026

(annual target after 2025-26)

Not applicableFootnote 97

Environment and Climate Change Canada

Species at Risk

Regional Assessments

$78,183,406

$16,238,830Footnote 98

$13,006,692

Enhanced knowledge about environmental baselines and the prediction of impacts are provided in regional assessments to inform the consideration of cumulative effects in project impact assessments

Percentage of scientific studies, surveys, models and assessments completed per year to support the assessment of baseline conditions and manage cumulative effects to species at risk (SAR), migratory birds, and wetlands in areas identified for regional assessments

90% of planned studies (pertaining to SAR, migratory birds, or wetlands) are completed per reporting period, in each regional assessment region

March 2025

(annual target)

100%

Knowledge on cumulative effects relevant to Indigenous Peoples is incorporated into regional assessments

Percentage of Indigenous communities who access G&C capacity funding to enable contributions to the assessment of CE and identification of impacts

90% of identified Indigenous groups access capacity funding

March 2025

(annual target)

83%Footnote 99

Environmental Assessment program

Strategic Assessments

GHG assessments are conducted with a nationally consistent methodology*

*Intent is to maximize a project’s GHG emission reductions to the extent possible under the federal review process

Percentage of projects under federal review that receive SACC advice on GHG emissions.

100% of requests submitted to ECCC

March 2025

(annual target)

100%

Environmental Assessment Program

Open science and data, and Cumulative Effects Coordination

$38,752,027

$7,693,914

$6,888,427

Cumulative effects information on the OSDP informs impact assessments of designated projects

Percentage of new designated projects or regional assessments under the IAA for which the federal team indicates that information provided in a tailored OSDP presentation/email* are useful for informing their work

80%

March 2025

(annual target)

100%

Fisheries and Oceans Canada

Fish & Fish Habitat Protection

Scientific expertise and advice

$6,713,244

$1,344,386

$2,125,634Footnote 100

Fish and Fish Habitat Protection Program inputs into regional assessments as required

Percentage of requested fish and fish habitat advice for a regional assessment process that adheres to service standards

100%

March 2025

(annual target)

100%

Aquatic Ecosystems Science

Scientific expertise and advice

$6,280,957

$1,254,712

$0Footnote 101

Timely scientific information on fish and fish habitat and effectiveness of relevant management measures is available to inform regional assessments

Percentage of requested Science products for a regional assessment that adhere to process time limits

100%

March 2025 (annual target)

100%Footnote 102

Health Canada

Health Impacts of Chemicals

Expertise on human health impacts

$2,071,395

$414,279

$332,733Footnote 103

Expert advice influenced (or informed) the assessment of cumulative impacts of resource and infrastructure development

Percentage of assessments of cumulative effects influenced (or informed) by Health Canada expertise

90%

March 2025

(annual target)

100%

Indigenous Services Canada

Land, Natural Resources and Environmental Management

Support the Indigenous Centre for Cumulative Effects

$22,394,860

$4,478,932

$4,478,932

ICCE has adequate support to implement its strategic plan to build community capacity and provide access to expert knowledge around cumulative effects

Percentage of administrative and financial requests for which ISC provided support to ICCE, within appropriate service standards

100%

March 2025 (annual target)

100%

Percentage of First Nations, Inuit or Métis communities satisfied with services received through the Centre

80% of First Nations, Inuit or Métis communities and/or organizations are satisfied with the Centre’s services

March 2025

(annual target)

84%Footnote 104

Natural Resources Canada

Core Geospatial Data

Geoscience for Sustainable Development of Natural Resources Program

Information Technology Services

Regional and strategic assessment

$24,145,331

$5,002,696

$4,293,077Footnote 105

Understanding the impacts of cumulative effects assessment is enabled through publicly available information

Percentage increase of cumulative effects relevant records* made accessible to support increased understanding of cumulative effects of development

*Records could include datasets, science publications, information about development or regulatory activities, or Indigenous knowledge open information

10 percent increase per year starting in 2023

March 2028

(annual target)

11%Footnote 106

Innovative Geospatial Solutions

Geoscience for Sustainable Development of Natural Resources Program

Regional and strategic assessment

$11,693,264

$2,627,718

$2,474,671

Current and future cumulative effects and project impact assessments have access to data describing the status and trends of critical ecosystem parameters

Percentage of NRCan baseline datasets and related science made available via the Open Science and Data Platform

Five to ten percent increase per year (varying per sector) from baselines established in 2023-2024 (linear annual increase based on fixed baseline – i.e. not cumulative growth)

March 2028

(annual target)

20% Increase in datasets made available

Cumulative Effects

Sustainable Forest Management

Regional and strategic assessment

$15,124,509

$3,024,592

$2,789,466

Current and future cumulative effects and project impact assessments have access to critical forest data

Percentage of forest data and related science for cumulative effects, including updates and enhancements, made available via the OSDP

Five percent increase of forest data products per year, starting in 2023, relative to baselines to be established in 2023-2024 (linear annual increase based on fixed baseline – i.e. not cumulative growth)

March 2028

(annual target)

Cumulative Effects: 54%

Sustainable Forest Management: Signed data sharing agreements with Manitoba and Saskatchewan, 6 New/Update inventories added, (3 Quebec, 2 British Columbia, 1 Prince Edward Island) which added 135 million ha (including non-forest) and 15 million records (total inventories = 36)

Multi-Agency Ground Plot (MAGPlot) - integrated additional data from several contributors, published MAGPlot_v1.1 through Open Science and Data Platform (OSDP) and available through National Forest Inventory (NFI) Data Request.

NFI - collected data/imagery from 1200+ photo plots and 149 ground plots

OSDP additions: The Web Mapping Service (WMS+ layers in the latest version (v1.1) include all Permanent Sample Plot (PSP) programs from BC, as well as new measurement records from British Columbia non-PSP programs, Ontario Growth and Yield programs, PSP programs from Quebec and Alberta, and the Newfoundland and Labrador, updated versions of the two Common Attribute Schema for Forest Resource Inventories (CASFRI) raster products were released and two more in development.

Harmonized Forest sample plot database (version 1)

Number of measured tree records: 13,959,398 records

Harmonized forest resource inventory (version 1.1.0)

Total area of harmonized inventories (all years): 1.09 billion hectares (note this includes non-forest features), 83.3 million records.Footnote 107

Geoscience for Sustainable Development of Natural Resources

Regional and strategic assessment

$10,079,826

$2,634,659

$2,188,052Footnote 108

NRCan marine geoscience products inform Marine Spatial Planning in impact Assessments, as well as cumulative effects and project assessments in the offshore.

Percentage of marine geoscience expeditions that lead to associated data releases that inform DFO-led Marine Spatial Planning, cumulative effects assessments (e.g., RA) or project assessments in the offshore

All (100%) of marine expeditions

March 2028

(annual target)

On track for 100%, in 2024-25Footnote 109

Canada Energy Regulator

Information Technology

Integrated Open Science and Data Platform

$7,606,877

$1,393,592

$1,990,708Footnote 110

Canadians have access to environmental and socio-economic assessment data from energy project applications for knowledge, research and decision-making

Evidence that Canadians access and use information* from a new data and information product referred to as BERDI (Biophysical, Economic, Regional Data and information).

*Information and data is extracted from environmental socio-economic assessments on major pipeline project applications which could contribute to the understanding of cumulative effects

Narrative Evidence

Not applicable

During the 2024-25 fiscal year, the Biophysical, Economic, Regional Data and Information (BERDI) tool was accessed over 2700 times, underscoring its growing value as a public-facing resource for environmental and socio-economic assessment data. This level of engagement reflects strong and sustained interest from both internal and external stakeholders in using BERDI to support evidence-based decision-making and regulatory transparency.

A key milestone in BERDI’s outreach was its presentation to the Open Government Coordinators Working Group, where the team showcased the tool’s architecture and outreach strategy, reinforcing its role as a model for data transparency and accessibility within the federal open government ecosystem. Complementing these formal efforts, BERDI also drew attention from regional stakeholders, including an Environmental Assessment Analyst from the Yukon government who reached out to learn more about the database and its development methodology. This interest underscores BERDI’s relevance beyond federal regulatory processes and its potential to inform regional environmental assessments and planning.

Percentage of new datasets* added to Biophysical, Economic, Regional Data and Information (BERDI) tool

*Datasets from BERDI will be made available on the Open Science and Data Platform

80%

March 2025

(annual target)

100%Footnote 111

Energy System Information

Pipeline Information

Information Technology

Data and Information Innovation

$22,716,880

$6,999,892

$6,749,330

Canadians access and use energy information for knowledge, research and decision making.

Evidence that Canadians access and use CER energy information products and specialized expertise, including community-specific information, for knowledge, research or decision making

Narrative evidence

Not applicable

Total page views of the Pipeline Information products reached nearly 300,000 in 2024-25, a 44% increase from the prior year.

A user research study was undertaken that focused on the CER’s energy trade data, and explored how this data is being used, and what opportunities exist for improvements, such as providing clarity on data publishing rules, centralizing sources, and planning for automation to ease the reconciliation burden.

A content management system (CMS) was developed that improved the user interface and update timeliness of the popular Pipeline Profiles product. The CMS also facilitated the development of new interactive maps of the various pipelines.

The results of a 2023-24 user research study on the Provincial and Territorial Energy Profiles were translated into a prototyping phase, including user testing activities on the preliminary redesigns of the webpage. A public beta page was developed for one province and data is being collected to inform a forthcoming redesign for the full web product.

Number of system enhancements that integrate science or cumulative effects data to improve public accessibility or efficiency of the regulatory system

10% increase each year from baseline established in 2023-24

March 2025

(annual target)

5 system enhancementsFootnote 112

Transport Canada

Environmental Stewardship of Transportation

Transport Canada supports regional and strategic assessments

$1,550,000

$310,999

$310,999Footnote 113

TC knowledge informs regional or strategic assessments that intersect with the Department’s mandate.

Percentage of regional or strategic assessments that were informed by Transport Canada knowledge, where TC’s mandate is implicated

100%

March 2025

(annual target)

100%

Total spending, all themes

Theme

Total federal funding, including legacy funding, allocated since the last renewal

2024-25 total federal planned spending (dollars)

2024-25 total federal actual spending

Theme A

$535,182,541

$103,423,782

$95,062,798

Theme B

$258,860,039

$50,799,708

$45,069,432

Theme C

$294,754,201

$62,907,502

$57,117,022

Total, all themes

$1,090,796,781

$217,130,992

$197,249,252