Public Services and Procurement Canada
2023 to 2024 Annual report on the Access to Information Act
Information contained in this publication or product may be used and reproduced, in part or in whole, and by any means, for personal or public non-commercial purposes, without charge or further permission, unless otherwise specified, provided that you do the following:
- exercise due diligence in ensuring the accuracy of the materials reproduced
- indicate both the complete title of the materials reproduced, as well as the author organization
- indicate that the reproduction is a copy of an official work published by the Government of Canada and that the reproduction has not been produced in affiliation with, or with the endorsement of, the Government of Canada
Commercial reproduction and distribution is prohibited, except with written permission from Public Services and Procurement Canada (PSPC). For more information, please consult Contact Government of Canada Publications.
The official symbols of the Government of Canada, including the Canada wordmark and flag symbol, may not be reproduced, whether for commercial or non-commercial purposes.
© His Majesty the King in Right of Canada, represented by the Minister of Public Services and Procurement, 2024.
Aussi disponible en français.
ISSN 2817-5662
On this page
- Introduction
- Purpose of the act
- About Public Services and Procurement Canada
- Organizational structure
- Proactive publication
- Delegation of authority
- Performance for 2023 to 2024
- Training and awareness
- Policies, guidelines and procedures
- Proactive publication under part 2 of the Access to Information Act
- Initiatives and projects to improve access to information
- Summary of key issues and actions taken on complaints
- Appeal to the Federal Court of Canada
- Fees
- Monitoring compliance
- Annex A: Delegation of authorities chart for the Access to Information Act and its regulations
- Annex B: Statistical report on the Access to Information Act
- Annex C: Supplemental statistical report on the Access to Information Act and the Privacy Act
Introduction
Public Services and Procurement Canada is pleased to present to parliament its annual report on the administration of the Access to Information Act. This report describes the activities that support compliance with the act for the fiscal year commencing April 1, 2023, and ending March 31, 2024.
Section 94 of the Access to Information Act and section 20 of the Service Fees Act require that the head of every federal government institution submit an annual report to parliament on the administration of the Access to Information Act during the fiscal year.
Purpose of the act
The purpose of the Access to Information Act is to enhance the accountability and transparency of federal institutions in order to promote an open and democratic society and to enable public debate on the conduct of those institutions. In furtherance of that purpose, Part 1 extends the present laws of Canada to provide a right of access to information in records under the control of a government institution in accordance with the principles that government information should be available to the public, that necessary exceptions to the right of access should be limited and specific, and that decisions on the disclosure of government information should be reviewed independently of government; and Part 2 sets out requirements for the proactive publication of information.
About Public Services and Procurement Canada
Public Services and Procurement Canada, formerly Public Works and Government Services Canada, derives its mandate from the Department of Public Works and Government Services Act of 1996, which established the department as a common service provider. As such, the department plays an important role in the daily operations of the Government of Canada as a key provider of services for federal departments and agencies. The department supports them in the achievement of their mandated objectives in 5 service categories:
- buying and selling
- pay, pension and benefits
- property and buildings
- security, corporate and information services
- Translation Bureau
PSPC provides services across Canada through its headquarters in the National Capital Region, 5 regional offices, as well as offices in Europe (Geilenkirchen, Germany) and the United States (Washington, DC).
Organizational structure
The Access to Information and Privacy (ATIP) Directorate is responsible for the administration of the Access to Information Act and the Privacy Act within PSPC. The ATIP senior director acts as the department’s ATIP coordinator. The directorate is overseen by the director general of the Corporate Secretariat and Accessibility Sector, who is also the department’s chief privacy officer.
In the 2023 to 2024 fiscal year, 40.814 full-time equivalent (FTE) employees and 2.130 FTEs casual employees administered the Access to Information Act with the support of 4.658 consultants, for a total complement of 47.602 FTEs.
Access to Information and Privacy reporting structure at Public Services and Procurement Canada

Text version
This organizational chart displays a hierarchy beginning with the ATIP coordinator of PSPC at the top. Directly below the ATIP coordinator are 5 divisions who report to the coordinator:
- the administration team carries out administrative functions for the ATIP Directorate and ensures the maintenance of ATIP software
- the operations team processes requests received under the Access to Information Act and the Privacy Act, and liaises with the offices of the information and privacy commissioners to resolve complaints
- the privacy management team advises and supports the department in the management of privacy risk, ensuring compliance with privacy legislation and related policy instruments
- the policy, transparency and proactive publications team develops directives, leads PSPC’s approach on transparency and openness, provides advice and is responsible for proactive publications
- the governance and outreach team develops procedures and statistical reports, delivers training, promotes awareness and is responsible for ATIP annual reports
Below these divisions there is another level for ATIP liaison officers, who coordinate the retrieval, review and submission of information held by their branch or region in response to ATIP requests.
The Access to Information Act and the Privacy Act allow for the provision of services by a government institution to another government institution that is presided over by the same minister. In the 2023 to 2024 reporting period, PSPC had a service agreement for the provision of corporate services to the Office of the Procurement Ombudsman (OPO) which included Access to Information services under section 96 of the Access to Information Act and section 73.1 of the Privacy Act. The ATIP Directorate was responsible for addressing potential concerns regarding OPO’s independence and perception of conflict of interest, including file segregation and limited access to OPO files. OPO was responsible for reviewing and confirming the application of exemptions and exceptions on release packages and provide informal final approval prior to public release.
Proactive publication
Part 2 of the Access to Information Act requires federal institutions to proactively publish specific records produced by government institutions. The Policy, Planning and Communications Branch (PPCB) is responsible for the proactive publication process and works in collaboration with branches and regions within PSPC.
PPCB collaborates with the Finance Branch, the Human Resources Branch, the Procurement Branch and the Digital Services Branch to publish travel expenses, hospitality expenses, reports tabled in parliament, reclassification of positions, contracts over $10,000, grants and contributions over $25,000, and expense reports. The ATIP Directorate is also responsible for proactively publishing briefing materials prepared for the arrival of newly-appointed minister and deputy minister and for parliamentary committee appearances, question period notes, and briefing note titles.
Delegation of authority
Pursuant to section 95(1) of the Access to Information Act, the minister of Public Services and Procurement Canada has delegated the power, duties and functions of the administration of the act down to ATIP manager level. Certain administrative functions are also delegated to ATIP managers, team leaders and senior analysts to accelerate the processing of requests.
The most recent PSPC delegation instrument was signed on October 23, 2023, with a separate matrix for ATIP delegation. An excerpt of the delegation of authorities approved by the minister, pertaining to delegation under the Access to Information Act, is attached as Annex A: Delegation of authorities chart for the Access to Information Act and its regulations.
Performance for 2023 to 2024
In this section
- Requests received and closed
- Pages reviewed
- Completion times
- Factors influencing performance
- Outstanding requests
- Sources of requests
- Informal requests
- Exemptions
- Exclusions
- Consultations
- Extensions
- Disposition
- Complaints
Requests received and closed

Text version
Chart summary: Requests received and closed
- 2019 to 2020: 628 requests received, 827 requests closed
- 2020 to 2021: 800 requests received, 602 requests closed
- 2021 to 2022: 563 requests received, 519 requests closed
- 2022 to 2023: 419 requests received, 447 requests closed
- 2023 to 2024: 537 requests received, 617 requests closed
The department received a total of 537 requests pursuant to the Access to Information Act in the 2023 to 2024 reporting period, which represents an increase of 28.16% from the previous year. The majority of access to information requests received by the department during 2023 to 2024 were related to contracts, real property projects, as well as briefing material and management correspondence on various subjects.
Pages reviewed

Text version
| Fiscal year | Pages reviewed for requests under the Access to Information Act |
|---|---|
| 2019 to 2020 | 466,000 |
| 2020 to 2021 | 272,000 |
| 2021 to 2022 | 118,000 |
| 2022 to 2023 | 102,000 |
| 2023 to 2024 | 232,000 |
In 2023 to 2024, PSPC reviewed 232,236 pages for requests received under the Access to Information Act.
Completion times

Text version
| Completion time | Access to information requests |
|---|---|
| Within 30 days | 28.85% |
| 31 to 60 days | 10.05% |
| 61 to 120 days | 11.51% |
| 121 days or more | 49.59% |
PSPC’s overall compliance rate for the 2023 to 2024 reporting period was 42.63% for requests under the Access to Information Act. This compliance rate represents all files that were closed either within the initial 30 days or within an extension period obtained for reasons of volume or consultations.
The percentage of requests closed within the initial 30 days was 28.85%. Given the nature of PSPC’s mandate as a service provider to other federal organizations, the department must often perform consultations in order to seek input from other institutions and complete all required actions on a file. Consequently, a large number of PSPC’s access to information files require extensions beyond the 30-day legislative period.
Factors influencing performance
The compliance rate of 42.63% is the result of the following factors:
- complexity and volume of new requests
- consultations with other parties as PSPC is a service provider to other federal organizations
- analysis and review of proposed responses to parliamentary questions, motions for the production of documents, and documentation prepared for parliament appearances and/or for incoming ministers
- significant increase in number of active complaints with the Office of the Information Commissioner of Canada (OIC) coupled with 5 new applications filed with the Federal Court of Canada against PSPC pursuant to section 44 of the Access to Information Act taxing ATIP Directorate resources
- time and effort required for multiple recruitment initiatives and for the mentoring of employees participating in the Development Program as the ATIP Directorate experienced staff shortages and turnover for most of the 2023 to 2024 fiscal year
- closing of outstanding requests accumulated since the outset of the COVID-19 pandemic hindering the ability of the directorate to process incoming requests within legislated timelines
- technical issues due to the outdated request processing system causing multiple challenges to PSPC
Outstanding requests
Active requests

Text version
| Fiscal year | Access to information active requests within legislated timelines | Access to information active requests beyond legislated timelines |
|---|---|---|
| 2016 to 2017 | 0 | 11 |
| 2017 to 2018 | 0 | 11 |
| 2018 to 2019 | 0 | 18 |
| 2019 to 2020 | 0 | 23 |
| 2020 to 2021 | 0 | 61 |
| 2021 to 2022 | 3 | 60 |
| 2022 to 2023 | 3 | 37 |
| 2023 to 2024 | 184 | 32 |
At the end of the 2023 to 2024 reporting period, PSPC had a total of 443 active requests pursuant to the Access to Information Act that were outstanding from previous reporting periods. The majority of these active requests (85.78%) were received in the last 4 fiscal years, a third of which was due to the interruption of activities during the COVID-19 pandemic.
Sources of requests

Text version
Chart summary: Sources of requests
- Media: 36 requests (6.70%)
- Academia: 9 requests (1.68%)
- Business: 150 requests (27.93%)
- Organization: 8 requests (1.49%)
- Public: 168 requests (31.28%)
- Declined to identify: 166 requests (30.91%)
During the 2023 to 2024 reporting period, PSPC received the majority (90.12%) of its requests under the Access to Information Act from 3 sources:
- members of the public (31.28%)
- individuals who declined to identify (30.91%)
- private sector businesses (27.93%)
Of note, the number of requests from individuals who declined to identify was more than 3 times the number of requests of the 2022 to 2023 reporting period, while the number of requests from academia and organization was significantly reduced.
Informal requests
Every month, PSPC publishes summaries of closed access to information requests pertaining to records that do not contain personal or third-party information on the open government portal. Through this portal, Canadian citizens or permanent residents can submit informal requests for a copy of previously released information without having to pay the application fee.
In reporting period 2023 to 2024, PSPC received 354 informal requests, which is a decrease from the 513 informal requests received during the previous reporting period.
Exemptions
Of 617 access to information requests that were closed in 2023 to 2024, the department invoked exemptions allowed under the Access to Information Act on 342 requests (55.43%) while all information was disclosed in 111 requests (18%). The remaining 164 (26.58%) requests were either abandoned, transferred, neither confirmed nor denied, or those for which no records existed.
The majority of exemptions invoked by PSPC fell under 4 sections of the Access to Information Act:
- subsection 19(1), which protects personal information, was used in 271 files (79.24%)
- paragraph 20(1)(b), which protects confidential financial, commercial, scientific or technical information belonging to a third party, was used in 215 files (62.87%)
- paragraph 20(1)(c), which protects information the disclosure of which could reasonably be expected to result in material financial loss or gain to, or could reasonably be expected to prejudice the competitive position of, a third party, was used in 166 files (48.54%)
- subsection 21(1)(a)(b)(c)(d), which protects information about the operations of Government, was used in 138 files (40.35%)
Of note, more than one exemption can be applied to a specific request.
Exclusions
The Access to Information Act excludes or does not apply to certain types of information, specifically records that are already available to the public (section 68) and confidence of the King’s Privy Council for Canada (section 69).
In the 2023 to 2024 reporting period, PSPC applied 119 exclusions: 2 citing section 68, and 117 citing section 69.
Consultations
PSPC responded to 242 consultations from other government institutions and organizations for records relating to the department’s activities, which totalled 29,709 pages. A total of 56.20% of these consultation requests were completed within 60 days.
Extensions
Section 9 of the Access to Information Act permits the statutory time limits to be extended if consultations are necessary, if the request is for a large volume of records, and if processing within the original time limit would unreasonably interfere with the operations of the department.
PSPC invoked a total of 229 extensions during the 2023 to 2024 reporting period. Extensions were required in 88 instances to complete consultations with third-party, in 58 instances to complete consultations with other government institutions, and in 17 instances to complete consultations with legal services. In addition, extensions were required in 66 instances due to a high volume of requests and a large volume of pages to review, the treatment of which would have otherwise interfered with operations.
Disposition

Text version
Chart summary: Request disposition
- All disclosed: 111 requests (18%)
- Disclosed in part: 327 requests (53%)
- All exempted/all excluded, neither confirmed nor denied: 16 requests (2.59%)
- Abandoned: 87 requests (14.10%)
- Transferred, no records existed: 76 requests (12.32%)
Of all requests closed during the 2023 to 2024 reporting period, a total of 71% were either disclosed in part (53%) or fully disclosed (18%). The balance of requests were abandoned (14.10%), transferred to another federal institution or requests for which no responsive records existed (12.32%). A small number of requests were all exempted, all excluded, or neither confirmed nor denied (2.59%).
Complaints
Active complaints

Text version
| Fiscal year | Access to information active complaints |
|---|---|
| 2018 to 2019 | 1 |
| 2019 to 2020 | 2 |
| 2020 to 2021 | 17 |
| 2021 to 2022 | 31 |
| 2022 to 2023 | 17 |
| 2023 to 2024 | 48 |
At the end of the 2023 to 2024 reporting period, PSPC had a total of 116 active complaints with the OIC that were outstanding from previous reporting periods.
Complaints received and closed
During the 2023 to 2024 reporting period, PSPC was notified of 64 new complaints received by the OIC, and submitted formal representations for 44 active complaints received in the current or previous reporting period. Most of these complaints were related to delays or refusal of access.
The ATIP Directorate closed 13 complaint investigations for which it received a final report. Of these, 10 were deemed well-founded, 2 were deemed not well-founded, and 1 was settled or resolved to the satisfaction of the requester.
Training and awareness
Through the delivery of training and various activities, PSPC strengthened institution-wide awareness with the Access to Information Act and departmental obligations.
During the 2023 to 2024 reporting period, the ATIP Directorate continued to offer virtual training sessions and added hybrid sessions to support the hybrid workplace transition. These delivery formats gave the ATIP Directorate the ability to reach more participants throughout the country. They also encouraged active engagement and collaboration, either virtually or in person, while promoting ATIP trainings and tools on a larger scale within the department.
PSPC delivered 54 virtual training sessions and 9 hybrid sessions of the “Access to Information and Privacy Fundamentals” course to 1,122 employees, representing an increase in the number of participants from the 2022 to 2023 reporting period.
In addition to the training sessions delivered, the ATIP Directorate participated in the following activities:
- 2 virtual kiosks organized by PSPC Human Resources Onboarding and Orientation team offered to 71 new PSPC employees
- 2 virtual kiosks for PSPC’s Security Awareness Week offered to 194 participants
- 1 virtual kiosk for PSPC’s Learning Network, promoting ATIP training and resources, offered to 62 participants
- 3 “ATIP at a Glance” information sessions, promoting ATIP training and resources, offered to 93 participants in the context of all-staff meetings from various PSPC branches
Through these events, the ATIP Directorate informed participants of their obligations under the Access to Information Act, including those relating to proactive publication, and the department’s efforts to make the government more accessible to everyone.
Policies, guidelines and procedures
During the 2023 to 2024 reporting period, PSPC continued to develop internal guidance documents, procedures and tools to ensure consistent practices in request processing. These documents covered multiple operational actions, such as request intake, data validation, and request processing system management. PSPC also provided onboarding material for new employees. Current practices were reviewed to ensure standardized monitoring and to facilitate compliance with requirements.
To improve the administration of the ATIP program, the ATIP Directorate:
- held weekly management meetings to discuss emerging and ongoing operational and policy issues
- held bi-weekly mentoring sessions for employees of the Operations team, selecting specific subjects and sharing experiences
PSPC’s proactive publication processes and procedures continued to be effective in respecting legislated requirements and timelines. While slight adjustments to processes were made, no new policies, guidelines, or procedures were implemented during the 2023 to 2024 reporting period.
Proactive publication under part 2 of the Access to Information Act
Part 2 of the Access to Information Act requires federal institutions to proactively publish specific records they produce that would be of interest to the public.
To fulfill proactive publication requirements, PSPC maintained collaboration with branches and regions while monitoring, coordinating and supporting the implementation of efficient and consistent proactive publication processes and practices.
PSPC produced the following 57 proactive publications during the 2023 to 2024 fiscal year:
- 8 packages of briefing materials prepared by the department for the minister and/or deputy minister's appearance before a parliamentary committee pursuant to subsections 74(d) and 88(c)
- 2 packages of question period notes prepared by the department for the minister used on the last sitting days of the House of Commons in June and December of 2023 pursuant to subsection 74(c)
- 1 package of briefing materials prepared by the department for new or incoming ministers pursuant to subsection 74(a)
- 12 lists of memoranda titles prepared by the department for the minister or deputy minister in the previous month pursuant to subsections 74(b) and 88(b)
- 12 reports of travel expenses incurred by the minister, ministerial advisers and staff, senior officers or employees pursuant to sections 75 and 82
- 9 reports of hospitality expenses incurred by the minister, ministerial advisers and staff, senior officers or employees pursuant to sections 76 and 83
- 4 reports of contracts over $10,000 pursuant to sections 77 and 86
- 1 report of expenses incurred by the minister’s office paid out of the Consolidated Revenue Fund pursuant to section 78
- 1 report of position reclassifications pursuant to section 85
- 7 reports tabled in parliament pursuant to section 84
PSPC’s overall compliance rate for proactive publication in the 2023 to 2024 reporting period was 96.5%. There was a delay in the publication of a list of memoranda titles due to the 2023 strike, and of a report of position reclassifications due to a process error which has since been identified and corrected.
PSPC also published the summaries of completed access to information requests on the open government portal on a monthly basis.
| Legislative requirement | Section | Publication timeline | Institutional requirement |
|---|---|---|---|
| Travel expenses | 82 | Within 30 days after the end of the month of reimbursement | Government travel expenses |
| Hospitality expenses | 83 | Within 30 days after the end of the month of reimbursement | Government hospitality expenses |
| Reports tabled in Parliament | 84 | Within 30 days after tabling | Reports tabled in Parliament |
| Legislative requirement | Section | Publication timeline | Institutional requirement |
|---|---|---|---|
| Contracts over $10,000 | 86 | Q1-3: Within 30 days after the quarter Q4: Within 60 days after the quarter |
Government contracts over $10,000 |
| Grants & Contributions over $25,000 | 87 | Within 30 days after the quarter | Grants and contributions |
| Packages of briefing materials prepared for new or incoming deputy heads or equivalent | 88(a) | Within 120 days after appointment | Not applicable |
| Titles and reference numbers of memoranda prepared for a deputy head or equivalent, that is received by their office | 88(b) | Within 30 days after the end of the month received | Briefing note titles and numbers |
| Packages of briefing materials prepared for a deputy head or equivalent’s appearance before a committee of Parliament | 88(c) | Within 120 days after appearance | Briefing materials |
| Legislative requirement | Section | Publication timeline | Institutional requirement |
|---|---|---|---|
| Reclassification of positions | 85 | Within 30 days after the quarter | Government position reclassifications |
| Legislative requirement | Section | Publication timeline | Institutional requirement |
|---|---|---|---|
| Packages of briefing materials prepared by a government institution for new or incoming ministers | 74(a) | Within 120 days after appointment | Briefing materials |
| Titles and reference numbers of memoranda prepared by a government institution for the minister, that is received by their office | 74(b) | Within 30 days after the end of the month received | Briefing note titles and numbers |
| Package of question period notes prepared by a government institution for the minister and in use on the last sitting day of the House of Commons in June and December | 74(c) | Within 30 days after last sitting day of the House of Common in June and December | Question period notes |
| Packages of briefing materials prepared by a government institution for a minister’s appearance before a committee of Parliament | 74(d) | Within 120 days after appearance | Briefing materials |
| Travel expenses | 75 | Within 30 days after the end of the month of reimbursement | Government travel expenses |
| Hospitality expenses | 76 | Within 30 days after the end of the month of reimbursement | Government hospitality expenses |
| Contracts over $10,000 | 77 | Q1-3: Within 30 days after the quarter
Q4: Within 60 days after the quarter |
Government contracts over $10,000 |
| Ministers’ offices expenses
Note: This consolidated report is currently published by TBS on behalf of all institutions |
78 | Within 120 days after the fiscal year | Expenditures of ministers' offices |
Initiatives and projects to improve access to information
In this section
Development Program
As in previous years, significant employee shortages continued to affect PSPC’s ATIP operations throughout reporting period 2023 to 2024. To alleviate shortages of experienced employees, the ATIP Directorate used its developmental program to foster the professional development of individuals with limited or no ATIP experience, allowing their progression from entry level ATIP trainee (PM-01) to senior ATIP officer (PM-04). PSPC adjusted the curriculum to supplement available governmental and private training, and provided additional professional development through mentorship. The training included hands-on experience processing request pursuant to the Access to Information Act and the Privacy Act. The Development Program is a long-term recruitment initiative also intended to increase employee retention.
During reporting period 2023 to 2024, PSPC welcomed 2 ATIP Trainees (PM-01) to the program, promoted 1 participant from ATIP Trainee (PM-01) to Junior ATIP Officer (PM-02), and 2 participants from Junior ATIP Officer (PM-02) to ATIP Officer (PM-03) as they had acquired the necessary skills.
Backlog strategy
During the 2023 to 2024 reporting period, PSPC implemented its strategy to eliminate the backlog of access to information requests accumulated from the challenges experienced during the COVID-19 pandemic. This strategy is intended to unfold in phases with the goal of reducing request completion beyond legislated timelines by 75% in the coming years. The phases will be flexible and adjusted in accordance with operational needs.
In Phase 1, PSPC monitored and supported the processing of requests within legislated timelines. ATIP Trainees were hired and assigned to closing requests with a small volume of pages, freeing other employees for the completion of larger files, and enabling the ATIP Trainees to further develop their knowledge and skills. The initial goals of recruiting and onboarding Trainees and closing low-volume files were completed in the 2023 to 2024 reporting period.
Phases 2 and 3 were undertaken and progressed satisfactorily during the 2023 to 2024 reporting period. Concurrently with Phase 1, PSPC began the completion of requests beyond legislated timelines of less than 5,000 pages and complex filesfootnote 1. Additional resources were dedicated to assess and process requests beyond legislated timelines of more than 5,000 pages.
Through the various phases of this initiative, the ATIP Directorate reduced the initial backlog by 45%, reaching further than the halfway point of the established goal of reducing the backlog by 75%.
In Phase 4, PSPC will dedicate resources to the completion of requests beyond legislated timelines of more than 10,000 pages. In this final phase, PSPC will review the best practices established throughout the implementation of the strategy and develop the necessary tools and procedures for employees to maintain these best practices.
Technological improvements
PSPC continued to collaborate with stakeholders to advance the replacement of the current outdated request processing system and major milestones were achieved during the reporting period. This is an ongoing and government-wide project initiated by the Treasury Board of Canada Secretariat (TBS) involving all ATIP programs throughout the Government of Canada.
PSPC collaborated with Shared Services Canada in the Government of Canada Secret Infrastructure (GCSI) Expansion project to deploy classified information from the current local system to the GCSI. This involved the analysis of current information holdings and the destruction of information resources of business value past their retention date.
Transparency
PSPC’s approach towards transparency and openness prioritizes departmental efforts to go beyond proactive publication and make information of public interest readily available to Canadians. As the departmental coordinator on transparency, the ATIP Directorate continued the advancement of department-wide responses to motions for the production of papers emanating from parliament and the quarterly usage reports (QUR) initiative. QURs compile and maintain records on the provision of services to the federal government under contracts resulting from standing offers or supply arrangements. They are provided to the department by suppliers on a quarterly basis, and published on the open government portal as well as the PSPC transparency webpage.
In addition, the department routinely publishes a significant volume of information on the official source for Government of Canada procurement, canadabuys, which increases the availability of frequently requested information.
Summary of key issues and actions taken on complaints
Most complaints PSPC received during the 2023 to 2024 reporting period were related to delays or refusal of access. Depending on the nature of the complaint, PSPC contacted the OIC investigator to clarify the reasons behind the complaint, contacted the relevant office of primary interest (OPI) within PSPC to request new searches and disclosed additional records when applicable, and reviewed applied exemptions and exclusions to confirm their applicability.
To ensure effective collaboration and to resolve issues as quickly as possible, PSPC’s ATIP coordinator attended monthly meetings with representatives of the OIC to address outstanding complaints, ensure prompt resolution and discuss key issues to seek to avoid similar complaints in the future.
Additionally, in reporting period 2023 to 2024, PSPC refined its tiered response process. This process’ objective is to increase the efficiency of responses to orders issued pursuant to Section 37 of the Access to Information Act emanating from the Information Commissioner’s initial reports. It is based on an analysis of the severity and possible impacts of the order to adjust response letter at the appropriate level. This tiered process helped ensure PSPC’s compliance with the orders, notably through the use of newly-developed tools and resources to support all involved stakeholders in the fulfillment of legal requirements.
Appeal to the Federal Court of Canada
There were 5 new applications filed with the Federal Court of Canada against PSPC pursuant to section 44 of the Access to Information Act during the 2023 to 2024 reporting period.
In November 2022, PSPC filed a notice of application to review the Information Commissioner’s order to release records to a requester. The case was heard during the 2023 to 2024 reporting period and the decision is expected in the next fiscal year.
Fees
The Service Fees Act requires a responsible authority to report annually to parliament on the fees collected by the institution. With respect to fees collected under the Access to Information Act, the information below is reported in accordance with the requirements of section 20 of the Service Fees Act.
The Access to Information Act requires a fee payable: the $5 application fee is the only fee charged for an access to information request. Based on requests received during 2023 to 2024, PSPC collected $2,325 in application fees. In accordance with the changes to the Access to Information Act that came into force on June 21, 2019, PSPC waives all fees prescribed by the Act and Regulations, other than the $5 application fee set out in paragraph 7(1)(a) of the Regulations. PSPC also waived or refunded a total of $335 in application fees. The total operating cost of the ATIP program at PSPC for fiscal year 2023 to 2024 was $5,208,896.
Monitoring compliance
During the 2023 to 2024 reporting period, the ATIP Directorate produced weekly summary reports of new access to information requests received and requests soon to be disclosed. Weekly “snapshot” reports containing statistics on the number of requests received and processed were also provided to senior management, in addition to briefing materials. These reports were intended to further support monitoring of incoming and outgoing requests and increase compliance within the department.
In addition to these practices, the ATIP Directorate had a number of measures in place to monitor the time taken to process requests, to limit inter-institutional consultations, and to review frequently requested types of information. Furthermore, the implementation of the backlog strategy included an analysis of the volume and the complexity of requests beyond legislative timelines which was reported to senior management.
During the 2023 to 2024 reporting period, ATIP Officers regularly communicated with OPIs to monitor the time taken to process requests, ensuring that the ATIP Directorate assessed required extensions in a timely manner. Additionally, managers reviewed and monitored the status of access to information requests using the request processing system and conducted weekly meetings with staff to review active tasks and establish priorities.
Given the nature of PSPC’s mandate as a service provider to other federal organizations, the department is often required to perform consultations with other institutions. To appropriately limit inter-institutional consultation, PSPC carefully analyzed the content of the documents it intended to disclose and only sent documents that held information which could cause harm to stakeholders. ATIP Officers regularly communicated with other institutions, when consultations were required, to obtain status updates. Through these actions, compliance with requirements was monitored by ATIP Officers and overseen by managers.
Proactive publication
PSPC has established leading processes and practices to adhere to proactive publication legislated timelines. In reporting period 2023 to 2024, PSPC’s ATIP Directorate coordinated the proactive publication process ensuring continuous departmental engagement with contributors. In addition, the ATIP Directorate monitored the accuracy of published information under part 2 of the Access to Information Act through the use of monitoring tools. These include internal trackers, weekly briefings, and bi-weekly departmental tracker updates submitted to senior management on a regular basis. Furthermore, senior management throughout the department regularly monitored compliance to ensure the accuracy and completeness of proactively published information.
Annex A: Delegation of authorities chart for the Access to Information Act and its regulations
| Position titles | Access to Information Act | Access to Information regulations |
|---|---|---|
| Minister | Full | Full |
| Deputy minister | Full | Full |
| Associate Deputy minister | Full | Full |
| Position titles | Access to Information Act | Access to Information regulations |
|---|---|---|
| Senior departmental manager | Full | Full |
| Director general | Full | Full |
| Senior director | Full | Full |
| Director | Full | Full |
| Manager | Restrictedtable 10 note 1 | Full |
| Supervisor | Restrictedtable 10 note 2 | Restrictedtable 10 note 3 |
| Officer | Restrictedtable 10 note 4 | Not applicable |
Table 10 Notes
|
||
Delegation of authority
Access to Information Act and Privacy Act
I, the Minister of the Department of Public Works and Government Services, pursuant to section 95 of the Access to Information Act and section 73 of the Privacy Act, hereby designate the persons holding the positions set out in the Access to Information and Privacy Delegation of Authority matrix, or the persons occupying on an acting basis those positions, to exercise the power, duties and functions of the Minister responsible for Public Services and Procurement Canada, under the provisions of the acts and related regulations set out in the schedule opposite each position. This designation supersedes all previous delegations of authority.
The Honourable Jean-Yves Duclos
Minister Public Services and Procurement
Signed October 23, 2023
Annex B: Statistical report on the Access to Information Act
In this section
- Section 1: Requests under the Access to Information Act
- Section 2: Informal requests
- Section 3: Applications to the information commissioner on declining to act on requests
- Section 4: Requests closed during the reporting period
- Section 5: Extensions
- Section 6: Fees
- Section 7: Consultations received from other institutions and organizations
- Section 8: Completion time of consultations on Cabinet confidences
- Section 9: Investigations and reports of finding
- Section 10: Court action
- Section 11: Resources related to the Access to Information Act
Name of institution: Public Services and Procurement Canada
Reporting period: April 1, 2023 to March 31, 2024
Section 1: Requests under the Access to Information Act
| Type | Number of requests |
|---|---|
| Received during reporting period | 537 |
Outstanding from previous reporting periods:
|
523 |
| Total | 1060 |
| Closed during reporting period | 617 |
Carried over to next reporting period:
|
443 |
| Source | Number of requests |
|---|---|
| Media | 36 |
| Academia | 9 |
| Business (private sector) | 150 |
| Organization | 8 |
| Public | 168 |
| Decline to identify | 166 |
| Total | 537 |
| Channels | Number of requests |
|---|---|
| Online | 483 |
| 38 | |
| 16 | |
| In person | 0 |
| Phone | 0 |
| Fax | 0 |
| Total | 537 |
Section 2: Informal requests
| Type | Number of requests |
|---|---|
| Received during reporting period | 354 |
Outstanding from previous reporting periods:
|
118 |
| Total | 472 |
| Closed during reporting period | 351 |
| Carried over to next reporting period | 121 |
| Channels | Number of requests |
|---|---|
| Online | 195 |
| 153 | |
| 6 | |
| In person | 0 |
| Phone | 0 |
| Fax | 0 |
| Total | 354 |
| Completion time | Number of informal requests |
|---|---|
| 1 to 15 days | 35 |
| 16 to 30 days | 46 |
| 31 to 60 days | 49 |
| 61 to 120 days | 72 |
| 121 to 180 days | 12 |
| 181 to 365 days | 87 |
| More than 365 days | 50 |
| Total | 351 |
| Volume of pages released | Number of requests | Pages released |
|---|---|---|
| Less than 100 | 0 | 0 |
| 100 to 500 | 0 | 0 |
| 501 to 1,000 | 0 | 0 |
| 1,001 to 5,000 | 0 | 0 |
| More than 5,000 | 0 | 0 |
| Volume of pages re-released | Number of requests | Pages re-released |
|---|---|---|
| Less than 100 | 254 | 4,148 |
| 100 to 500 | 68 | 18,004 |
| 501 to 1,000 | 18 | 12,730 |
| 1,001 to 5,00 | 11 | 18,158 |
| More than 5,000 | 0 | 0 |
Section 3: Applications to the information commissioner on declining to act on requests
| Type | Number of requests |
|---|---|
| Outstanding from previous reporting period | 0 |
| Sent during reporting period | 0 |
| Total | 0 |
| Approved by the information commissioner during reporting period | 0 |
| Declined by the information commissioner during reporting period | 0 |
| Withdrawn during reporting period | 0 |
| Carried over to next reporting period | 0 |
Section 4: Requests closed during the reporting period
| Disposition of requests | 1 to 15 days | 16 to 30 days | 31 to 60 days | 61 to 120 days | 121 to 180 days | 181 to 365 days | More than 365 days | Total |
|---|---|---|---|---|---|---|---|---|
| All disclosed | 3 | 41 | 28 | 14 | 10 | 9 | 6 | 111 |
| Disclosed in part | 1 | 29 | 18 | 42 | 44 | 62 | 131 | 327 |
| All exempted | 0 | 0 | 0 | 1 | 0 | 1 | 5 | 7 |
| All excluded | 1 | 0 | 1 | 4 | 1 | 0 | 1 | 8 |
| No records exist | 11 | 39 | 7 | 5 | 0 | 0 | 4 | 66 |
| Request transferred | 8 | 1 | 0 | 0 | 1 | 0 | 0 | 10 |
| Request abandoned | 33 | 10 | 8 | 5 | 2 | 1 | 28 | 87 |
| Neither confirmed nor denied | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 1 |
| Decline to act with the approval of the information commissioner | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Total | 57 | 121 | 62 | 71 | 58 | 73 | 175 | 617 |
Use these filters to narrow down the results in the 4.2 Exemptions applied table below.
| Section | Number of requests |
|---|---|
| 13(1)(a) | 14 |
| 13(1)(b) | 0 |
| 13(1)(c) | 1 |
| 13(1)(d) | 0 |
| 13(1)(e) | 0 |
| 14 | 1 |
| 14(a) | 4 |
| 14(b) | 3 |
| 15(1) | 18 |
| 15(1)—International affairs | 3 |
| 15(1)—Defence of Canada | 5 |
| 15(1)—Subversive activities | 0 |
| 16(1)(a)(i) | 0 |
| 16(1)(a)(ii) | 0 |
| 16(1)(a)(iii) | 0 |
| 16(1)(b) | 1 |
| 16(1)(c) | 1 |
| 16(1)(d) | 0 |
| 16(2) | 17 |
| 16(2)(a) | 0 |
| 16(2)(b) | 0 |
| 16(2)(c) | 49 |
| 16(3) | 0 |
| 16.1(1)(a) | 0 |
| 16.1(1)(b) | 0 |
| 16.1(1)(c) | 0 |
| 16.1(1)(d) | 0 |
| 16.2(1) | 0 |
| 16.3 | 0 |
| 16.4(1)(a) | 0 |
| 16.4(1)(b) | 0 |
| 16.5 | 0 |
| 16.6 | 0 |
| 17 | 1 |
| 18(a) | 1 |
| 18(b) | 39 |
| 18(c) | 0 |
| 18(d) | 12 |
| 18.1(1)(a) | 0 |
| 18.1(1)(b) | 1 |
| 18.1(1)(c) | 0 |
| 18.1(1)(d) | 0 |
| 19(1) | 271 |
| 20(1)(a) | 2 |
| 20(1)(b) | 215 |
| 20(1)(b.1) | 0 |
| 20(1)(c) | 166 |
| 20(1)(d) | 36 |
| 20.1 | 0 |
| 20.2 | 0 |
| 20.4 | 0 |
| 21(1)(a) | 48 |
| 21(1)(b) | 61 |
| 21(1)(c) | 25 |
| 21(1)(d) | 4 |
| 22 | 2 |
| 22.1(1) | 1 |
| 23 | 41 |
| 23.1 | 0 |
| 24(1) | 47 |
| 26 | 1 |
| Section | Number of requests |
|---|---|
| 68(a) | 2 |
| 68(b) | 0 |
| 68(c) | 0 |
| 68.1 | 0 |
| 68.2(a) | 0 |
| 68.2(b) | 0 |
| 69(1) | 3 |
| 69(1)(a) | 7 |
| 69(1)(b) | 2 |
| 69(1)(c) | 0 |
| 69(1)(d) | 7 |
| 69(1)(e) | 5 |
| 69(1)(f) | 0 |
| 69(1)(g) re (a) | 42 |
| 69(1)(g) re (b) | 0 |
| 69(1)(g) re (c) | 23 |
| 69(1)(g) re (d) | 11 |
| 69(1)(g) re (e) | 16 |
| 69(1)(g) re (f) | 1 |
| 69.1(1) | 0 |
| Paper | E-record | Dataset | Video | Audio | Other |
|---|---|---|---|---|---|
| 3 | 435 | 0 | 0 | 0 | 0 |
4.5 Complexity
| Number of pages processed | Number of pages disclosed | Number of requests |
|---|---|---|
| 232,236 | 187,271 | 541 |
| Disposition | Less than 100 pages processed | 101 to 500 pages processed | 501 to 1,000 pages processed | 1,001 to 5,000 pages processed | More than 5,000 pages processed | |||||
|---|---|---|---|---|---|---|---|---|---|---|
| Number of requests | Pages processed | Number of requests | Pages processed | Number of requests | Pages processed | Number of requests | Pages processed | Number of requests | Pages processed | |
| All disclosed | 88 | 1,895 | 14 | 3,421 | 3 | 2,629 | 4 | 12,010 | 2 | 63,649 |
| Disclosed in part | 152 | 5,432 | 118 | 28,692 | 22 | 16,045 | 31 | 61,840 | 4 | 25,810 |
| All exempted | 4 | 50 | 1 | 170 | 0 | 0 | 2 | 2,678 | 0 | 0 |
| All excluded | 6 | 72 | 2 | 598 | 0 | 0 | 0 | 0 | 0 | 0 |
| Request abandoned | 82 | 0 | 2 | 646 | 0 | 0 | 3 | 6,599 | 0 | 0 |
| Neither confirmed nor denied | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Declined to act with the approval of the information commissioner | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Total | 333 | 7,449 | 137 | 33,527 | 25 | 18,674 | 40 | 83,127 | 6 | 89,459 |
| Number of minutes processed | Number of minutes disclosed | Number of requests |
|---|---|---|
| 0 | 0 | 0 |
| Disposition | Less than 60 minutes processed | 60 to 120 minutes processed | More than 120 minutes processed | |||
|---|---|---|---|---|---|---|
| Number of requests | Minutes processed | Number of requests | Minutes processed | Number of requests | Minutes processed | |
| All disclosed | 0 | 0 | 0 | 0 | 0 | 0 |
| Disclosed in part | 0 | 0 | 0 | 0 | 0 | 0 |
| All exempted | 0 | 0 | 0 | 0 | 0 | 0 |
| All excluded | 0 | 0 | 0 | 0 | 0 | 0 |
| Request abandoned | 0 | 0 | 0 | 0 | 0 | 0 |
| Neither confirmed nor denied | 0 | 0 | 0 | 0 | 0 | 0 |
| Declined to act with the approval of the information commissioner | 0 | 0 | 0 | 0 | 0 | 0 |
| Total | 0 | 0 | 0 | 0 | 0 | 0 |
| Number of minutes processed | Number of minutes disclosed | Number of requests |
|---|---|---|
| 0 | 0 | 0 |
| Disposition | Less than 60 minutes processed | 60 to 120 minutes processed | More than 120 minutes processed | |||
|---|---|---|---|---|---|---|
| Number of requests | Minutes processed | Number of requests | Minutes processed | Number of requests | Minutes processed | |
| All disclosed | 0 | 0 | 0 | 0 | 0 | 0 |
| Disclosed in part | 0 | 0 | 0 | 0 | 0 | 0 |
| All exempted | 0 | 0 | 0 | 0 | 0 | 0 |
| All excluded | 0 | 0 | 0 | 0 | 0 | 0 |
| Request abandoned | 0 | 0 | 0 | 0 | 0 | 0 |
| Neither confirmed nor denied | 0 | 0 | 0 | 0 | 0 | 0 |
| Declined to act with the approval of the information commissioner | 0 | 0 | 0 | 0 | 0 | 0 |
| Total | 0 | 0 | 0 | 0 | 0 | 0 |
| Disposition | Consultation required | Legal advice sought | Other | Total |
|---|---|---|---|---|
| All disclosed | 10 | 0 | 14 | 24 |
| Disclosed in part | 174 | 3 | 28 | 205 |
| All exempted | 4 | 0 | 0 | 4 |
| All excluded | 1 | 0 | 1 | 2 |
| Request abandoned | 14 | 2 | 10 | 26 |
| Neither confirmed nor denied | 0 | 0 | 0 | 0 |
| Declined to act with the approval of the information commissioner | 0 | 0 | 0 | 0 |
| Total | 203 | 5 | 53 | 261 |
4.6 Closed requests
| Type | Requests closed within legislated timelines |
|---|---|
| Number of requests closed within legislated timelines | 263 |
| Percentage of requests closed within legislated timelines (%) | 42.62560778 |
4.7 Deemed refusals
| Principal reason | Number of requests closed past the legislated timelines |
|---|---|
| Interference with operations / workload | 199 |
| External consultation | 23 |
| Internal consultation | 3 |
| Other | 129 |
| Total | 354 |
| Number of days past legislated timelines | Number of requests past legislated timeline where no extension was taken | Number of requests past legislated timeline where an extension was taken | Total |
|---|---|---|---|
| 1 to 15 days | 14 | 3 | 17 |
| 16 to 30 days | 15 | 2 | 17 |
| 31 to 60 days | 19 | 2 | 21 |
| 61 to 120 days | 47 | 1 | 48 |
| 121 to 180 days | 33 | 8 | 41 |
| 181 to 365 days | 46 | 4 | 50 |
| More than 365 days | 95 | 65 | 160 |
| Total | 269 | 85 | 354 |
| Translation requests | Accepted | Refused | Total |
|---|---|---|---|
| English to French | 0 | 0 | 0 |
| French to English | 0 | 0 | 0 |
| Total | 0 | 0 | 0 |
Section 5: Extensions
| Disposition of requests where an extension was taken | 9(1)(a) Interference with operations/ workload |
9(1)(b) Consultation Section 69 |
9(1)(b) Consultation Other |
9(1)(c) Third-party notice |
|---|---|---|---|---|
| All disclosed | 8 | 0 | 1 | 7 |
| Disclosed in part | 40 | 12 | 45 | 67 |
| All exempted | 0 | 0 | 0 | 0 |
| All excluded | 1 | 1 | 1 | 0 |
| Request abandoned | 16 | 4 | 10 | 14 |
| No records exist | 1 | 0 | 1 | 0 |
| Declined to act with the approval of the information commissioner | 0 | 0 | 0 | 0 |
| Total | 66 | 17 | 58 | 88 |
| Length of extensions | 9(1)(a) Interference with operations/ workload |
9(1)(b) Consultation Section 69 |
9(1)(b) Consultation Other |
9(1)(c) Third-party notice |
|---|---|---|---|---|
| 30 days or less | 23 | 0 | 5 | 1 |
| 31 to 60 days | 10 | 2 | 10 | 52 |
| 61 to 120 days | 9 | 5 | 23 | 22 |
| 121 to 180 days | 6 | 9 | 8 | 6 |
| 181 to 365 days | 12 | 0 | 10 | 7 |
| 365 days or more | 6 | 1 | 2 | 0 |
| Total | 66 | 17 | 58 | 88 |
Section 6: Fees
| Fee type | Fee collected | Fee waived | Fee refunded | |||
|---|---|---|---|---|---|---|
| Number of requests | Amount | Number of requests | Amount | Number of requests | Amount | |
| Application | 465 | $2,325.00 | 48 | $240.00 | 19 | $95.00 |
| Other fees | 0 | $0.00 | 0 | $0.00 | 0 | $0.00 |
| Total | 465 | $2,325.00 | 48 | $240.00 | 19 | $95.00 |
Section 7: Consultations received from other institutions and organizations
| Consultations | Other Government of Canada institutions | Number of pages to review | Other organizations | Number of pages to review |
|---|---|---|---|---|
| Received during reporting period | 199 | 18,204 | 8 | 2,571 |
| Outstanding from the previous reporting period | 66 | 11,577 | 4 | 117 |
| Total | 265 | 29,781 | 12 | 2,688 |
| Closed during the reporting period | 232 | 27,043 | 10 | 2,666 |
| Carried over within negotiated timelines | 25 | 2,313 | 1 | 18 |
| Carried over beyond negotiated timelines | 8 | 425 | 1 | 4 |
| Recommendation | 1 to 15 days | 16 to 30 days | 31 to 60 days | 61 to 120 days | 121 to 180 days | 181 to 365 days | More than 365 days | Total |
|---|---|---|---|---|---|---|---|---|
| Disclose entirely | 9 | 10 | 28 | 34 | 4 | 3 | 4 | 92 |
| Disclose in part | 0 | 1 | 15 | 17 | 7 | 5 | 4 | 49 |
| Exempt entirely | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Exclude entirely | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Consult other institution | 1 | 5 | 15 | 14 | 0 | 0 | 0 | 35 |
| Other | 25 | 8 | 13 | 4 | 1 | 2 | 3 | 56 |
| Total | 35 | 24 | 71 | 69 | 12 | 10 | 11 | 232 |
| Recommendation | 1 to 15 days | 16 to 30 days | 31 to 60 days | 61 to 120 days | 121 to 180 days | 181 to 365 days | More than 365 days | Total |
|---|---|---|---|---|---|---|---|---|
| Disclose entirely | 0 | 0 | 1 | 2 | 0 | 1 | 0 | 4 |
| Disclose in part | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 |
| Exempt entirely | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Exclude entirely | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Consult other institution | 1 | 1 | 1 | 0 | 0 | 0 | 0 | 3 |
| Other | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 2 |
| Total | 1 | 3 | 2 | 2 | 0 | 1 | 1 | 10 |
Section 8: Completion time of consultations on Cabinet confidences
| Number of days | Fewer than 100 pages processed | 101 to 500 pages processed | 501 to 1,000 pages processed | 1,001 to 5,000 pages processed | More than 5,000 pages processed | |||||
|---|---|---|---|---|---|---|---|---|---|---|
| Number of requests | Pages disclosed | Number of requests | Pages disclosed | Number of requests | Pages disclosed | Number of requests | Pages disclosed | Number of requests | Pages disclosed | |
| 1 to 15 | 5 | 19 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 16 to 30 | 11 | 204 | 0 | 0 | 1 | 10 | 0 | 0 | 0 | 0 |
| 31 to 60 | 10 | 192 | 2 | 178 | 0 | 0 | 0 | 0 | 0 | 0 |
| 61 to 120 | 7 | 138 | 1 | 135 | 0 | 0 | 0 | 0 | 0 | 0 |
| 121 to 180 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 181 to 365 | 0 | 0 | 1 | 272 | 0 | 0 | 0 | 0 | 0 | 0 |
| More than 365 | 1 | 7 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Total | 34 | 560 | 4 | 585 | 1 | 10 | 0 | 0 | 0 | 0 |
| Number of days | Fewer than 100 pages processed | 100 to 500 pages processed | 501 to 1,000 pages processed | 1,001 to 5,000 pages processed | More than 5,000 pages processed | |||||
|---|---|---|---|---|---|---|---|---|---|---|
| Number of requests | Pages disclosed | Number of requests | Pages disclosed | Number of requests | Pages disclosed | Number of requests | Pages disclosed | Number of requests | Pages disclosed | |
| 1 to 15 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 16 to 30 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 31 to 60 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 61 to 120 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 121 to 180 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 181 to 365 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| More than 365 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Total | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Section 9: Investigations and reports of finding
| Section 32: Notice of intention to investigate | Subsection 30(5): Ceased to investigate | Section 35: Formal representations |
|---|---|---|
| 64 | 44 | 33 |
| Section | Received | Containing recommendations issued by the information commissioner | Containing orders issued by the information commissioner |
|---|---|---|---|
| 37(1): Initial reports | 9 | 0 | 9 |
| 37(2): Final reports | 13 | 0 | 6 |
Section 10: Court action
| Complainant (1) | Institution (2) | Third party (3) | Privacy commissioner (4) | Total |
|---|---|---|---|---|
| 0 | 0 | 0 | 0 | 0 |
| Section 44 under paragraph 28(1)(b) |
|---|
| 5 |
Section 11: Resources related to the Access to Information Act
| Expenditures | Amount |
|---|---|
| Salaries | $4,061,859 |
| Overtime | $1,645 |
Goods and services:
|
$1,145,392 |
| Total | $5,208,896 |
| Resources | Person years dedicated to access to information activities |
|---|---|
| Full-time employees | 40.814 |
| Part-time and casual employees | 2.130 |
| Regional staff | 0.000 |
| Consultants and agency personnel | 4.658 |
| Students | 0.000 |
| Total | 47.602 |
Annex C: Supplemental statistical report on the Access to Information Act and the Privacy Act
In this section
- Section 1: Open requests and complaints under the Access to Information Act
- Section 2: Open requests and complaints under the Privacy Act
- Section 3: Social insurance number
- Section 4: Universal access under the Privacy Act
Name of institution: Public Services and Procurement Canada
Reporting period: April 1, 2023 to March 31, 2024
Section 1: Open requests and complaints under the Access to Information Act
| Fiscal year open requests were received | Open requests that are within legislated timelines as of March 31, 2024 | Open requests that are beyond legislated timelines as of March 31, 2024 | Total |
|---|---|---|---|
| Received in 2023 to 2024 | 184 | 32 | 216 |
| Received in 2022 to 2023 | 3 | 37 | 40 |
| Received in 2021 to 2022 | 3 | 60 | 63 |
| Received in 2020 to 2021 | 0 | 61 | 61 |
| Received in 2019 to 2020 | 0 | 23 | 23 |
| Received in 2018 to 2019 | 0 | 18 | 18 |
| Received in 2017 to 2018 | 0 | 11 | 11 |
| Received in 2016 to 2017 | 0 | 11 | 11 |
| Received in 2015 to 2016 | 0 | 0 | 0 |
| Received in 2014 to 2015 or earlier | 0 | 0 | 0 |
| Total | 190 | 253 | 443 |
| Fiscal year open complaints were received by institution | Number of open complaints |
|---|---|
| Received in 2023 to 2024 | 48 |
| Received in 2022 to 2023 | 17 |
| Received in 2021 to 2022 | 31 |
| Received in 2020 to 2021 | 17 |
| Received in 2019 to 2020 | 2 |
| Received in 2018 to 2019 | 1 |
| Received in 2017 to 2018 | 0 |
| Received in 2016 to 2017 | 0 |
| Received in 2015 to 2016 | 0 |
| Received in 2014 to 2015 or earlier | 0 |
| Total | 116 |
Section 2: Open requests and complaints under the Privacy Act
| Fiscal year open requests were received | Open requests that are within legislated timelines as of March 31, 2024 | Open requests that are beyond legislated timelines as of March 31, 2024 | Total |
|---|---|---|---|
| Received in 2023 to 2024 | 35 | 0 | 35 |
| Received in 2022 to 2023 | 0 | 1 | 1 |
| Received in 2021 to 2022 | 0 | 1 | 1 |
| Received in 2020 to 2021 | 0 | 2 | 2 |
| Received in 2019 to 2020 | 0 | 1 | 1 |
| Received in 2018 to 2019 | 0 | 0 | 0 |
| Received in 2017 to 2018 | 0 | 0 | 0 |
| Received in 2016 to 2017 | 0 | 0 | 0 |
| Received in 2015 to 2016 | 0 | 0 | 0 |
| Received in 2014 to 2015 or earlier | 0 | 0 | 0 |
| Total | 35 | 5 | 40 |
| Fiscal year open complaints were received by institution | Number of open complaints |
|---|---|
| Received in 2023 to 2024 | 6 |
| Received in 2022 to 2023 | 2 |
| Received in 2021 to 2022 | 3 |
| Received in 2020 to 2021 | 5 |
| Received in 2019 to 2020 | 2 |
| Received in 2018 to 2019 | 0 |
| Received in 2017 to 2018 | 0 |
| Received in 2016 to 2017 | 0 |
| Received in 2015 to 2016 | 0 |
| Received in 2014 to 2015 or earlier | 0 |
| Total | 18 |
Section 3: Social insurance number
| Question | Answer |
|---|---|
| Has your institution begun a new collection or new consistent use of the SIN in 2023 to 2024? | No |
Section 4: Universal access under the Privacy Act
| Question | Answer |
|---|---|
| How many requests were received from confirmed foreign nationals outside of Canada in 2023 to 2024? | 0 |