Advanced search

Find pages with...
Then narrow your results by...

About 4,377 search results

Modelling & Simulation (M&S) and Uncertainly Qualification (UQ) for Safety Analysis of Nuclear Power Plants - Canadian Nuclear Safety Commission

http://www.nuclearsafety.gc.ca/eng/resources/research/technical-papers-and-articles/2016/modelling-simulation-uncertainly-qualification-for-safety-analysis-of-npp.cfm

Sep 15, 2016 ...Modelling & Simulation (M&S) and Uncertainly Qualification (UQ) for Safety Analysis of Nuclear Power Plants Xi’an Jiaotong University, Xi’an, China April 25–29, 2016 Prepared by: Wei Shen, Canadian Nuclear Safety Commission Abstract: A safety report demonstrates that the design of Nuclear Power Plants (NPPs) meets design and safety requirements through

Regulatory framework and insights from fire PSA of Canadian nuclear power plants - Canadian Nuclear Safety Commission

http://www.nuclearsafety.gc.ca/eng/resources/research/technical-papers-and-articles/2014/2014-regulatory-framework-and-insights.cfm

May 13, 2014 ...Regulatory framework and insights from fire PSA of Canadian nuclear power plants An abstract of the technical paper presented at: OECD/NEA International Workshop on Fire PRA Garching, Germany April 28–30, 2014 Prepared by: U. Menon Canadian Nuclear Safety Commission Ottawa, Ontario, Canada Abstract Recognizing that the Probabilistic Safety Assessment (PSA

Update on Canadian regulatory oversight of ageing management for nuclear power plants - Canadian Nuclear Safety Commission

http://www.nuclearsafety.gc.ca/eng/resources/research/technical-papers-and-articles/2009/aug09_d.cfm

Feb 3, 2014 ...Update on Canadian regulatory oversight of ageing management for nuclear power plants An abstract of the technical paper presented to: 20th International Conference Structural Mechanics in Reactor Technology (SMiRT) Espoo, Finland August 17–19, 2009 Prepared by: Ken Kirkhope, Andrei Blahoianu and Gerry Frappier Canadian Nuclear Safety Commission Ottawa

Bruce Power New Nuclear Power Plant Project Availability of $175,000 in Participant Funding

https://www.canada.ca/en/news/archive/2008/07/bruce-power-new-nuclear-power-plant-project-availability-175-000-participant-funding.html

Jul 17, 2008 ...Bruce Power New Nuclear Power Plant Project Availability of $175,000 in Participant Funding News Release OTTAWA, July 17, 2008 - The Canadian Environmental Assessment Agency (the Agency) is making available $175,000 under its Participant Funding Program to assist groups and individuals to take part in the environmental assessment of the proposed Bruce Power

International Atomic Energy Agency Emergency Preparedness Review Mission to Canada in June 2019

https://www.canada.ca/en/health-canada/services/health-concerns/emergencies-disasters/emergency-preparedness/nuclear-emergency-preparedness/international-atomic-energy-agency-emergency-preparedness-review-mission-canada-june-2019.html

Jun 20, 2019 ... missions to Member States by request. In February 2017, Canada requested that the IAEA carry out its first Canadian EPREV mission. Given that nuclear emergency preparedness and response is a shared responsibility in Canada, the scope of the EPREV mission included federal authorities, provinces with operating nuclear power plants (Ontario and New Brunswick

Joint Review Panel Established for the Proposed Bruce Power New Nuclear Power Plant Project

https://www.canada.ca/en/news/archive/2008/09/joint-review-panel-established-proposed-bruce-power-new-nuclear-power-plant-project.html

Sep 5, 2008 ...Joint Review Panel Established for the Proposed Bruce Power New Nuclear Power Plant Project News Release OTTAWA, September 5, 2008 – Three panel members were appointed today to a joint review panel (JRP) established to review the proposed Bruce Power New Nuclear Power Plant project located in the Municipality of Kincardine, Ontario. The appointment of Dr

Nuclear, oil and gas, and mining regulation

https://www.canada.ca/en/services/business/permits/federallyregulatedindustrysectors/nuclearoilgasminingregulation.html

Jul 31, 2018 ... of operating, future, and decommissioned uranium mines and mills. Regulation of nuclear power plants How nuclear power plants are regulated across each stage of their life cycle. Regulation of nuclear research reactors Regulated scientific research, non-destructive testing and the production of radioactive substances. Licensing of nuclear substances and radiation

Fukushima Accident Implications on Probabilistic Safety Assessment and on the Licensing of Nuclear Power Plants in Canada - Canadian Nuclear Safety Commission

http://www.nuclearsafety.gc.ca/eng/resources/research/technical-papers-and-articles/2014/2014-fukushima-accident-implications-probabilistic-safety-assessment-licensing-nuclear-power-plants-in-canada.cfm

Sep 22, 2015 ...Fukushima Accident Implications on Probabilistic Safety Assessment and on the Licensing of Nuclear Power Plants in Canada An abstract of the technical paper presented at: Probabilistic Safety Assessment & Management Conference Honolulu, Hawaii, U.S. June 22–27, 2014 Prepared by: Yolande Akl, Smain Yalaoui Canadian Nuclear Safety Commission (CNSC) Ottawa

RD-337: Design of New Nuclear Power Plants - Canadian Nuclear Safety Commission

http://www.nuclearsafety.gc.ca/eng/acts-and-regulations/regulatory-documents/published/html/rd337/

Feb 3, 2014 ...RD-337: Design of New Nuclear Power Plants Preface This regulatory document sets out the expectations of the Canadian Nuclear Safety Commission (CNSC) concerning the design of new water-cooled nuclear power plants (NPPs or plants). It establishes a set of comprehensive design expectations that are risk-informed and align with accepted international codes

Ontario Power Generation -Proposal to Construct and Operate New Nuclear Power Plant - Canadian Nuclear Safety Commission

http://www.nuclearsafety.gc.ca/eng/resources/environmental-assessments/completed/EA_07_05_29525.cfm

Feb 3, 2014 ...Ontario Power Generation -Proposal to Construct and Operate New Nuclear Power Plant Environmental assessment start date: May 17, 2007 Type: Review panel CEAR reference number:  07-05-29525 Proponent: Ontario Power Generation Location: Darlington Nuclear Site, Municipality of Clarington, Ontario Latest Updates May 8, 2012: Environmental Assessment Course

Report a problem or mistake on this page
Please select all that apply:

Thank you for your help!

You will not receive a reply. For enquiries, contact us.

Date modified: