2024-2025 Annual Summary of Inspection Activities

On-site Inspections

On-site inspections are conducted at the place where the designated project is being carried out; or where a record or anything relating to the designated project is located, such as the office or other premises of the proponent or of a third party.

On Site Inspections

Project

Number of Inspections

Start Date (MM/DD/YYYY)

End Date (MM/DD/YYYY)

Akasaba

1

11/05/2024

11/07/2024

Agrandissement Terminal Contrecoeur

2

05/29/2024

05/29/2024

09/17/2024

09/17/2024

Blackwater Gold Project

1

09/10/2024

09/10/2024

Cedar LNG

1

03/27/2025

03/27/2025

Côté Gold Mine

1

09/12/2024

09/12/2024

Hardrock Mine/Greenstone

1

11/13/2024

11/14/2024

LNG Canada

1

03/26/2025

03/27/2025

Lynn Lake Gold

1

08/13/2024

08/14/2024

Milton Logistics Hub

1

12/18/2024

12/18/2024

Murray River Coal

1

11/05/2024

11/05/2024

RBT2

1

06/25/2024

06/25/2024

Site C

1

11/06/2024

11/07/2024

Springbank Off-Stream Reservoir

1

12/05/2024

12/05/2024

Valentine Gold Project

1

10/02/2024

10/02/2024

Woodfibre LNG

1

12/05/2024

12/05/2024

Off-site Inspections

Off-site inspections are conducted in the office of the designated person under the Canadian Environmental Assessment Act, 2012 or the Impact Assessment Act and can include reviewing reports submitted by a proponent.

Off Site Inspections

Project

Number Of Inspections

Date Received

Agrandissement Terminal Contrecoeur

1

05/16/2024

Akasaba

1

10/09/2024

Brucejack

1

08/16/2024

Cedar LNG

1

12/03/2024

Hardrock/Greenstone

4

04/19/2024

04/22/2024

05/08/2024

11/01/2024

James Bay Lithium Mine Project

1

05/22/2024

Lynn Lake

2

02/12/2025

03/21/2025

Marathon

1

05/31/2024

Milton Logistics

3

05/16/2024

06/20/2024

01/13/2025

Mine Rose

1

06/28/2024

Rainy River

1

05/08/2024

Road Barens River

1

10/09/2024

RBT2

1

05/22/2024

Site C

1

05/23/2024

Valentine Gold

3

06/26/2024

06/09/2024

07/16/2024