Water activities in oil sands monitoring work plans 2014 to 2015
Table 3: water implemenation plan activities
Acronyms
- ESRD
-
Environment and Sustainable Resource Development
- EC
-
Environment Canada
-
WBEA
-
Wood Buffalo Environmental Association
- LICA
-
Lakeland Industry and Community Association
- ABMI
-
Alberta Biodiversity Monitoring Institute
- BAM
-
The Boreal Avian Modelling Project - University of Alberta
- DU
-
Ducks Unlimited Canada
- EMCLA
-
Ecological Monitoring Committee for the Lower Athabasca
Commitment for 2014 to 2015 | Proposed responsible organization | Approved budget |
---|---|---|
Mainstream water quality | ||
Mainstream water quality monitoring | EC | $3,342,550 |
Continue and increase comparability studies and laboratory round-robin | ESRD | |
Collection and analysis of Athabasca LTRN (5 sites - M0, M2, M9) (ESRD in-kind) | ESRD | |
Collection and analysis of Athabasca MTRN (M8) (ESRD in-kind) | ||
Collection and analysis of Athabasca LTRN enhancements (initiate WQ at M1; M2 additional transect samples) | ESRD | |
Tributary water quality | ||
Event-based sampling and analysis spring freshet (Steepbank, Ells, Firebag, Muskeg, MacKay) daily | ||
Tributary Monitoring Program (Steepbank, Ells, Firebag, Muskeg, MacKay) sampling and analysis (Reconcile with Athabasca River Contaminant Loading done by ESRD) | EC | $1,212,440 |
Athabasca River Contaminant Loading - Tributaries (Steepbank, Ells, Firebag, Muskeg, MacKay, Clearwater) monthly sampling and analysis (Reconcile with EC Tributary Program) | ESRD | $727,500 |
Muskeg River water quality monthly sampling and analysis | ESRD | $727,500 |
Water quality | ||
Mainstem water quality - Collection and analysis of samples at 4 mainstem sites (ATR-DC, ATR-SR, ATR-MR, ATR-DD); establish continuity of data; management, QA/QC, reporting | ||
Tributary water quality - Monthly water quality sampling, analysis and reporting 5 sites (MU-1, PO-1, MA-2, CH-1, CL-3); Seasonal water quality sampling, analysis and reporting at 17 sites; Fall water quality sampling, analysis and reporting at 33 sites | Hatfield | $990,177 |
Expanded Geography Water Quality | EC | |
Oil sands contaminants | ||
Chemical / Biological Contaminant Source Attribution | EC | $283,400 |
Surface water/groundwater | ||
Surface groundwater interactions (Steepbank, Ells, Firebag, Muskeg) | EC | $357,000 |
Geophysical shallow groundwater assesments in the Mackay River catchment - links to Representatives Sub-basin Studies and establishes the extent of groundwater/surface water connectivity | EC | $190,000 |
Continue monitoring of existing North Athabasca Oil Sands Area network (ESRD to continue to Fund $300k) | ESRD | |
South Athabasca Oil Sands Area Groundwater Network | ||
Climate and hydrology (RAMP) monitoringFootnote1 | ||
Field activities | Hatfield | $1,825,258 |
Management, QA/QC, reporting | Hatfield | $399,426 |
Hydrometric monitoring | EC-WSC | $642,250 |
WCS hydrometric network; audit of RAMP stations to verify data comparability | EC-WSC | |
ESRD hydrometric and meteorological work | ESRD | |
Regional Hydrology and Hydrological/Hydraulic Modelling | EC | $602,950 |
Regional hydrology and hydrological/hydraulic modelling | ||
Hydro-climatology |
||
Hydrological/Hydraulic modelling | ||
River ice dynamics | ||
Sediments/Dynamics/Transport | ||
Monitoring sediment dynamics/Transport/Chemistry - tributaries | EC | $277,875 |
Sediment monitoring at M3 | EC-WSC | $100,000 |
Paleo-coring - Regional lakes | EC | $476,340 |
River sediment Quality sampling and analysis (RAMP) - captured in the Aquatic Ecosystem health |
Commitment for 2014 to 2015 | Proposed responsible organization | Approved budget |
---|---|---|
Mainstem benthos | ||
Sample collection and interpretation of data and chemical analysis | EC |
$755,500 |
Lower Athabasca River zoobenthos methods comparison | ||
Sample collection and interpretation of data | ||
Tributary benthos | ||
CABIN sample collection (fall) and interpretation of data and chemical analysis | EC | $731,750 |
Analysis of data in order to standardize methods | ESRD/EC |
$189,633 |
Extended Geography - Deltaic Ecosystem Health |
EC | $593,750 |
Biological water quality and sediment sampling and associated analysis in Peace Athabasca Delta and Slave Delta.(linkage to Biodiversity contaminants) | ||
ESRD/Hatfield Benthos and Sediment | Hatfield | $795,281 |
Benthos (Ekman) and sediment sampling, analysis and reporting at 4 mainstem sites; benthos (Hess and Ekman) and sediment sampling, analysis and reporting at 38 sites |
Commitment for 2014 to 2015 | Proposed responsible organization | Approved budget |
---|---|---|
Snow and atmospheric deposition | ||
Atmospheric Deposition Program; snow chemistry |
EC/ESRD | $907,000 |
Sampling, analysis- co-sampling QA/QC | ESRD | |
Snow modelling | ESRD |
Commitment for 2014 to 2015 | Proposed responsible organization | Approved budget |
---|---|---|
Wild fish health | ||
Wild fish - Mainstem and tributaries |
EC |
$724,000 |
Monitor fish populations | ||
Spring Athabasca fish inventory | Hatfield |
$69,385 |
Spring clearwater fish inventory |
Hatfield |
$30,868 |
Summer Athabasca fish inventory |
Hatfield |
$69,385 |
Summer clearwater fish inventory |
Hatfield |
$30,868 |
Fall Athabasca fish inventory |
Hatfield |
$79,569 |
Fall clearwater fish inventory |
Hatfield |
$30,868 |
Regional lakes fish tissue - Mercury |
Hatfield |
$17,497 |
Tributary Fish Assemblage Program |
Hatfield |
$129,195 |
Athabasca River Trout-Perch Sentinel Program | ||
Athabasca River fish tissue |
Hatfield |
$25,732 |
Delta fish assemblage monitoring |
Hatfield |
$63,399 |
Management, QA/QC, reporting |
Hatfield |
$158,476 |
Community-based monitoring - Fish |
EC | $211,681 |
Terteriary watershed sampling (includes streams and lakes) 10 watersheds / year |
ESRD | $48,500 |
Fish/invertebrate toxicology; mussel toxicology; invertebrate, naphthenic acid toxicology; invertebrate toxicology |
Commitment for 2014 to 2015 | Proposed responsible organization | Approved budget |
---|---|---|
Acid-Sensitive Lakes | ||
Align work under RAMP with results from assessment and lake surveys (to be completed by end of 2015) | Hatfield | $105,775 |
Acid Sensitive Lakes Program - metals analysis | ||
Acid Sensitive Lake Monitoring Program | $59,000 |
Commitment for 2014 to 2015 | Proposed responsible organization | Approved budget |
---|---|---|
Representative Sub-basin Studies/process integration/modelling (Ells/Steepbank/Muskeg); data QA/QC with standardized protocols | EC/ESRD |
$91,000 |
Development of a monitoring proposal for wetlands and implementation of initial identified activities | EC/ESRD |
$200,000 |
Development of a monitoring proposal for deep groundwater work and implementation of initial identified activities | EC/ESRD | $200,000 |
Commitment for 2014 to 2015 | Proposed responsible organization | Approved budget |
---|---|---|
Administration of contracts to Hatfield for aquatic monitoring Special note: Directors and Co-Chairs agreed to support WBEA for managing the aquatic monitoring contract to Hatfield. |
$150,000 | |
Sub-sub-total
|
$18,950,000
|