Backgrounder: Improving local roads and bridges in Saskatchewan's urban municipalities

Backgrounder

Federal Gas Tax Fund allocated towards 120 projects in 2016

The federal Gas Tax Fund (GTF) provides Canadian municipalities with a permanent, predictable and indexed source of long-term funding. The Government of Canada will be providing Saskatchewan with more than $59.1 million for community infrastructure through the federal GTF in 2016-17.

Based on project planning in 2016, federal GTF funding supported the following local roads and bridges projects in Saskatchewan's urban municipalities:

Municipality Project Name Estimated
Total Cost
Federal GTF Allocated to Project

Allan, Town of

Allan Pavement Project

$111,000

$55,106

Aquadeo, Resort Village of

Upgrade Roads including Main Access Road

$104,528

$24,814

Arcola, Town of

Service Road Extension - North Hwy #13

$50,000

$34,778

Asquith, Town of

Reconstruct East Avenue Roadway and Drainage

$107,005

$107,005

Assiniboia, Town of

Repave Two Streets

$641,000

$320,000

Aylsham, Village of

Reconstruct South Ave Curve

$10,000

$10,000

Balcarres, Town of

Pave Streets

$145,000

$70,000

Bangor, Village of

Replace Sidewalk

$5,500

$5,448

Big Shell, Resort Village of

Rebuild Gull and Grouse Roads

$3,000

$3,000

Bird's Point, Resort Village of

Construct Morgan Ave

$38,000

$30,426

Bjorkdale, Village of

Chip Seal Streets

$130,000

$58,785

Blaine Lake, Town of

Upgrade Streets

$123,465

$88,332

Bracken, Village of

Upgrade Railway Ave

$6,000

$6,000

Brownlee, Village of

Install Sidewalk Entry into Senior Citizens Hall

$4,000

$4,000

Bulyea, Village of

Resurface of Main Street (2 blocks Ashley St)

$100,000

$30,131

Burstall, Town of

Construct Road Approach

$11,613

$11,613

Cadillac, Village of

Rebuild Centre Street

$36,000

$32,124

Candle Lake, Resort Village of

Trail Rehabilitation

$13,700

$13,700

Chitek Lake, Resort Village of

Construct Country Cabin Lane Walkway

$9,428

$9,428

Choiceland, Town of

Rebuild One Block of Railway Avenue Sidewalk

$19,800

$19,800

Christopher Lake, Village of

Pave 11 Village Intersections

$90,000

$87,921

Clavet, Village of

Rebuild 2nd Ave E Phase I

$72,141

$21,925

Cochin, Resort Village of

Repave 3 Streets

$100,000

$46,224

Creighton, Northern Town of

Replace 420 m of Sidewalk on Creighton Ave

$183,587

$183,587

Denare Beach, Northern Village of

Pave and/or Sand Seal Roads

$294,122

$294,122

Denare Beach, Northern Village of

Road Development to New Industrial Area

$65,000

$65,000

Dundurn, Town of

Upgrade and Chip Seal Main Arterial Streets

$179,300

$179,300

Eastend, Town of

Pave Streets and Install Asphalt Curbs

$230,893

$122,367

Eatonia, Town of

Replace Sidewalks

$254,390

$150,063

Edam, Village of

Resurface Main Street from 1st to 2nd Ave

$15,914

$15,914

Eyebrow, Village of

Replace Sidewalks

$12,000

$7,800

Fenwood, Village of

Install a Culvert on Queen St North

$4,000

$4,000

Fleming, Town of

Upgrade Lane to an All Weather Road

$25,000

$24,518

Foam Lake, Town of

Pave Saskatchewan Avenue

$135,000

$125,000

Fort San, Resort Village of

Walking Trail Upgrade

$40,000

$40,000

Fort San, Resort Village of

Culvert Upgrades

$35,000

$35,000

Fosston, Village of

Sand Seal 800m Railway Ave

$30,000

$16,247

Gainsborough, Village of

John Street Paving

$52,000

$41,332

Gerald, Village of

Repaving Streets

$304,100

$33,676

Glenside, Village of

Rebuild Islay Street

$3,536

$3,369

Goodsoil, Village of

Build Up Road to Village Specifications

$10,543

$8,494

Goodsoil, Village of

Build Rear Alley Behind New Development on 2nd Street SW

$7,467

$7,467

Goodsoil, Village of

Rebuild and Upgrade Roads Washed Out

$38,176

$15,961

Goodwater, Village of

Replace Bridge on Jewel Creek

$620,000

$7,385

Grand Coulee, Village of

Upgrade Railway Avenue

$100,000

$100,000

Grandview Beach, Resort Village of

Apply Reclaimed Asphalt to Streets

$48,000

$7,385

Green Lake, Northern Village of

Construct Road to Access 11 Properties

$60,000

$18,477

Gull Lake, Town of

Repave Third Street

$302,795

$58,944

Hafford, Town of

Upgrade and Resurface Streets

$70,500

$70,500

Hanley, Town of

Sidewalk Replacement Phase 2

$48,000

$24,000

Hazenmore, Village of

Replace 84 m of Sidewalks on Main Street

$15,000

$14,770

Humboldt, City of

Roadway Rehabilitation 2015

$593,000

$322,510

Ile A La Crosse, Northern Village of

Road Pavement Resurfacing

$600,000

$244,158

Imperial, Town of

Sand Seal Streets

$45,139

$33,095

Kamsack, Town of

Renew Town Roads

$540,875

$479,105

Kannata Valley, Resort Village of

Reconstruct 40 m of Lakeshore Drive

$30,800

$17,359

Kelvington, Town of

Paving of Railway Ave-Main St W to Hwy No. 38

$185,862

$100,000

Kelvington, Town of

Replace Sidewalks-2nd and 3rd Ave (2014)

$30,673

$30,673

Kindersley, Town of

Upgrade 9th Street West-7th to 9th Avenue West

$305,000

$305,000

Kindersley, Town of

Upgrade C Street East-12th to 14th Avenue East

$185,000

$185,000

Kinistino, Town of

Resurfacing of Town Roads

$428,300

$219,482

Krydor, Village of

Construct Walking Paths and Sidewalks

$3,000

$3,000

La Loche, Northern Village of

Street Improvements

$1,107,346

$910,623

La Loche, Northern Village of

Build and Upgrade Streets and Sidewalks

$1,034,583

$771,289

La Ronge, Northern Town of

Upgrade Streets

$2,975,600

$853,267

Lafleche, Town of

Replace 305 m of Sidewalk

$71,600

$71,600

Langenburg, Town of

Reconstruct 257 m of Avenue A

$183,760

$183,760

Lanigan, Town of

Reconstruct and Pave Hoover Street

$873,300

$410,606

Lemberg, Town of

Upgrade Chickney Avenue

$30,000

$30,000

Leoville, Village of

Resurface Main Street

$147,000

$108,116

Leroy, Town of

Construct Willow Subdivision roads/curb and gutter

$300,000

$191,046

Lloydminster, City of

2015 Street Improvement Program

$2,500,000

$556,027

Loreburn, Village of

Replace Sidewalks

$7,500

$5,000

Lumsden, Town of

Street Pavement-Base Repairs with Hot Mix Overlay

$180,000

$16,055

Lumsden, Town of

Sidewalk/Walking Trails Removal and Installation

$140,000

$57,994

Luseland, Town of

Construct Road, Curbs and Gutters-New Subdivision

$478,135

$167,196

Macklin, Town of

Paving Project Phase II

$1,830,000

$417,991

Macoun, Village of

Upgrade Appleton and Robinson Avenues

$79,500

$72,668

Mankota, Village of

Resurface 2nd Street

$10,000

$10,000

Marcelin, Village of

Rebuild Streets

$72,607

$37,650

Maryfield, Village of

Pavement Recap

$334,716

$107,821

Melville, City of

Pave Toronto Street Subdivision Road

$150,000

$130,000

Meota, Village of

Sand Seal 1.6 km of Road-1st St W and 2nd Ave W

$64,980

$64,980

Mervin, Village of

Reconstruct 1.5 km of Road

$15,000

$15,000

Midale, Town of

Repave Main Street

$300,000

$134,093

Milden, Village of

Upgrade Center Street

$32,000

$24,000

Minton, Village of

Upgrade First Avenue

$40,000

$31,480

Mossbank, Town of

Repave Three Streets

$300,000

$118,364

Osler, Town of

Reconstruct Three Streets

$2,276,728

$331,762

Pangman, Village of

Replace 85 m Sidewalks on Mergens Street

$25,000

$25,000

Paradise Hill, Village of

Pave 880 m of Second Street

$115,000

$115,000

Parkside, Village of

Replace Sidewalks on Main Street

$18,000

$18,000

Pelican Pointe, Resort Village of

Road Erosion and Restoration

$15,000

$4,431

Pennant, Village of

Pave 0.3 km of Road

$131,609

$35,448

Quill Lake, Village of

Reconstruct Saskatchewan Ave

$48,578

$48,578

Quinton, Village of

Resurface Municipal Streets

$100,000

$48,621

Raymore, Town of

Upgrade Two Service Roads

$30,000

$30,000

Redvers, Town of

Upgrade Redvers Perimeter Road

$75,000

$75,000

Regina, City of

Street and Bridge Infrastructure Renewal

$121,760,000

$43,551,947

Ridgedale, Village of

Replace Culvert on Third Avenue

$982

$982

Ridgedale, Village of

Centennial Hall Culvert Replacement

$1,010

$1,010

Rose Valley, Town of

Upgrade Centre Street and Second Street South

$43,145

$39,000

Saskatchewan Beach, Resort Village of

Paving Main Roads

$366,178

$107,846

Shaunavon, Town of

Repave Roads-2015

$200,000

$200,000

Shaunavon, Town of

Repave 1500 m Roads

$200,000

$200,000

South Lake, Resort Village of

Pave 1100 m Lakeside Drive

$42,500

$20,930

Spy Hill, Village of

Repave Streets

$200,000

$60,262

St. Gregor, Village of

Upgrade Road and Install Two Culverts

$30,014

$22,814

St. Louis, Village of

Resurface Streets 2015

$40,000

$38,255

St. Louis, Village of

Resurface Streets 2016

$30,000

$26,132

Thode, Resort Village of

Resurface 2 km of Main Road

$94,082

$46,378

Vibank, Village of

Construct Sidewalks

$8,800

$8,800

Vonda, Town of

Rebuild Buffer Avenue

$50,000

$50,000

Wakaw, Town of

Reconstruct Elevator Road

$65,000

$65,000

Waldheim, Town of

Seal Coat Streets

$130,200

$130,200

Wee Too Beach, Resort Village of

Apply Reclaimed Asphalt to Streets

$42,000

$10,339

White City, Town of

Reconstruct Gregory Ave East

$1,000,000

$722,330

White City, Town of

Expand Pathways and Lighting

$186,172

$186,172

Windthorst, Village of

Access Road Upgrade-Railway Avenue West

$20,000

$13,200

Yellow Grass, Town of

Street Repaving

$1,700,000

$129,976

For more information on the federal Gas Tax Fund, please visit: http://www.infrastructure.gc.ca/plan/gtf-fte-eng.html

 


Search for related information by keyword

Page details

2024-08-22