2020-2021 Annual Summary of Inspection Activities

On-site inspections

On-site inspections are conducted at the place where the designated project is being carried out; or where a record or anything relating to the designated project is located, such as the office or other premises of the proponent or of a third party.

On-site inspections

Project Name

Number of Inspections

Date of Inspection
(MM/DD/YYYY)

Kemess Underground Project

1

9/14/2020 – 9/16/2020

Rainy River

1

3/3/2020 – 3/4/2020

LNG Canada

1

2/4/2020 – 2/5/2020

Site C Clean Energy Project

1

8/11/2020 – 8/14/2020

Total

4

-

Off-site inspections

Off-site inspections are conducted in the office of the designated person under the Impact Assessment Act and can include reviewing reports submitted by a proponent.

Off-site inspections

Project

Number of Inspections

Date of Inspection
(MM/DD/YYYY)

Akasaba West Copper-Gold Mine Project

1

9/29/2020

Black Point Quarry Project

1

6/20/2020

Brucejack Gold Mine Project

2

11/13/2020
3/31/2021

Côté Gold Mine Project

1

7/23/2020

Hardrock Gold Mine

1

12/3/2020

Howse Property Iron Mine Project

1

6/28/2020

Kemess Underground Project

1

5/15/2020

LNG Canada Export Terminal Project

9

5/14/2020
6/9/2020
6/16/2020
6/20/2020
6/30/2020
9/30/2020
10/18/2020
10/29/2020
11/15/2020

Magino Gold Project

5

11/19/2020
12/2/2020
1/8/2021
1/25/2021
1/29/2021

Whabouchi Mining Project

2

10/31/2020
3/24/2021

Marine Terminal Project on the North Shore of the Saguenay

3

6/11/2020
6/15/2020
12/15/2020

Site C Clean Energy Project

1

5/8/2020

Woodfibre LNG Project

2

4/17/2020
3/31/2021

Total

30

-

Page details

Date modified: