2022-2023 Annual Summary of Inspection Activities

On-site Inspections

On-site inspections are conducted at the place where the designated project is being carried out; or where a record or anything relating to the designated project is located, such as the office or other premises of the proponent or of a third party.

On-site Inspections

Project Name

Number of Inspections

Start Date
(MM/DD/YYYY)

End Date
(MM/DD/YYYY)

Blackwater Gold Project

1

11/16/2022

11/17/2022

Hardrock Gold Mine Project

1

11/01/2023

11/01/2023

Springbank Off-Stream Reservoir Project

1

11/01/2022

11/04/2022

Site C Clean Energy Project

2

06/14/2022

06/16/2022

10/12/2022

10/13/2022

Woodfibre LNG Project

2

06/13/2022

06/13/2022

10/11/2022

10/11/2022

Côté Gold Mine Project

1

09/27/2022

09/27/2022

Kemess Underground

1

07/03/2022

07/08/2022

LNG Canada Export Terminal Project

2

04/18/2022

04/22/2022

12/06/2022

12/06/2022

Rainy River Project

1

05/09/2022

05/13/2022

Milton Logistics Hub Project

2

06/02/2022

06/03/2022

10/11/2022

10/13/2022

Brucejack Gold Mine Project

1

06/20/2022

06/24/2022

Magino Gold Project

1

11/02/2022

11/02/2022

Total

16

-

-

Off-site Inspections

Off-site inspections are conducted in the office of the designated person under the Canadian Environmental Assessment Act, 2012 or the Impact Assessment Act and can include reviewing reports submitted by a proponent.

Off-site Inspections

Project Name

Number of Inspections

Date of Inspections
(MM/DD/YYYY)

Contrecoeur Port Terminal Expansion Project

1

03/31/2023

Akasaba West Copper-Gold Mine Project

2

05/27/2022

06/15/2023

Black Point Quarry Project

1

07/05/2022

Blackwater Gold Project

1

09/22/2022

Brucejack Gold Mine Project

1

03/20/2023

Côté Gold Mine Project

2

06/30/2022

01/19/2023

Howse Property Iron Mine Project

1

06/30/2022

Hardrock Gold Mine Project

1

12/31/2022

Kemess Underground Project

1

03/29/2023

LNG Canada Export Terminal Project

3

04/07/2022

06/09/2022

06/29/2022

Magino Gold Project

1

08/05/2022

Milton Logistics Hub Project

1

03/31/2022

Rainy River Project

1

03/31/2022

Springbank Off-Stream Reservoir Project

3

04/25/2022

06/06/2022

10/31/2022

Site C Clean Energy Project

4

01/09/2023

02/13/2023

03/17/2023

03/31/2023

Woodfibre LNG Project

1

03/31/2023

Whabouchi Mining Project

1

06/28/2022

Valentine Gold Project

1

09/02/2022

Total

27

-

Page details

Date modified: