Once complete, the South Fraser Perimeter Road will be a new 40-km, four-lane, 80 km/hr route along the south side of the Fraser River from Deltaport Way in southwest Delta to 176th St. (Highway 15) in Surrey, with connections to highways 1, 17, 91, 99 and TransLink’s Golden Ears Bridge connector road.
Opening Dec. 1 is the 10 km long eastern section of the SFPR, which runs from Highway 1 at 176th St. to 136th St. in Surrey.
On Dec. 1, the SFPR will officially be numbered Highway 17 and the existing Highway 17 from Tsawwassen ferry terminal to Highway 99 will be renumbered Highway 17A.
The SFPR has the largest environmental and agricultural mitigation and enhancement plan for a highway construction project of this size in B.C.
Learn More:
Media Contacts:
Rudy Husny
Press Secretary
Office of the Honourable Ed Fast
Minister of International Trade and Minister for the Asia-Pacific Gateway
613 992-7332
Media Relations
Transport Canada, Ottawa
613 993-0055
Kate Trotter
Government Communications and Public Engagement
Ministry of Transportation and Infrastructure
250 356-8241
Connect with the Province of B.C. at: www.gov.bc.ca/connect