| Armstrong |
Culvert installation on Princess, Queen and King Streets |
$37,000 |
| Aubrey |
Granular lifts on Griffith Road, Tree Nursery Road, and Wall Street |
$6,138 |
| Aubrey |
Ditching Griffith Road from Highway 594 to the C.P. Railway crossing |
$11,000 |
| Bears Passage |
Double and single surface treatment on Cheeko Drive |
$9,680 |
| Bears Passage |
Culvert replacement on Cheeko Drive and Japada Trail |
$2,277 |
| Beaver Bay |
Calcium chloride application on Beaver Bay Road |
$698 |
| Britton |
Granular lifts on School Road, Eylofson Road, Franklin Road, Henderson Loop Road, Saunders Road, and McLean Lake Road |
$28,676 |
| Crescent Point |
Gravelling on Crescent Point Road |
$1,996 |
| Dance |
Granular lift on Dance Hall Road, Dance Loop, Armstrong Road |
$3,871 |
| Dawson Rd/Goldie |
Gravel resurfacing on Ellis Road |
$15,794 |
| Dawson Rd/Goldie |
Calcium chloride application on Ellis Road, Grand Truck and Finmark Road |
$25,765 |
| Devon |
Gravel resurfacing on Road #2 |
$265 |
| Eton |
Granular Lifts and crushed gravel. Calcium chloride placed on fresh gravel. Replace culverts at km 3.3 and km 4.2. |
$59,700 |
| Eton |
Granular lifts on Griffith Road, Mackie Road, Neely Road, and Salton East Road. Gravel on Parker Road, Pollard Road, Richardson Road, Salton East Road, Stephenson Road, Stenberg Road, Latimer Road, Corner Road, and Griffith Road. |
$53,000 |
| Forbes |
Spot gravel, pit run, granular resurfacing, driveway mix |
$25,000 |
| Forbes |
Culvert replacements on Centre, Tiito, Jaaska, and Flett Roads |
$22,247 |
| Ghost Lake |
Granular lift on Ghost Lake Road |
$14,144 |
| Gordon Lake |
Calcium chloride on main road to campsite area |
$17,172 |
| Gorham |
Gravel grade raise on Hilldale Road south of Olmala Road |
$2,001 |
| Hardwick |
Gravel resurfacing on Arrow Dam Road, McKluskey Road and Cameron Road |
$27,115 |
| Hicks Lake |
Calcium chloride on Hicks Lake Road |
$6,274 |
| Inglis Lake |
Surface treat approximately 500 meters of main road |
$9,000 |
| Ingolf |
Double surface treatment on entire main road |
$70,870 |
| Inwood |
Brushing Haukanen Narrows and Pine Point |
$21,531 |
| Jacques |
Gravel lift on Tapio Lake Road |
$35,073 |
| Jacques |
1.4 km of double surface treatment on Howcum Lake Road |
$45,000 |
| Jacques |
Replace 3 culverts on Tapio Road |
$10,000 |
| Kabigon Bay |
Gravel resurfacing on Kabaigon Bay Road |
$2,597 |
| Kendall Inlet |
Surface treatment of approximately 550 metres on main and branch roads |
$21,200 |
| Kingsford |
Granular lift on Kingsford/Dance, WA Smith, Stone and Cann Roads |
$18,363 |
| Kingsford |
Brushing on Cann Road |
$7,852 |
| Kingsford |
Culvert replacement at Kingsford/Dance Road, entrance of Cann Road |
$4,006 |
| Laclu |
Brush Ostersund and a few side roads |
$10,835 |
| Lybster |
Ditching on Old Silver Mountain Road |
$40,000 |
| Lybster |
Screened road gravel on Old Silver Mountain Road and Old Mill Road |
$40,000 |
| Lyon |
Gravel application on Valley Road East |
$14,000 |
| Mabella |
Calcium chloride on Mabella Road |
$1,565 |
| Marion Lake |
Calcium chloride on Marion Lake Road |
$5,218 |
| Marks |
Ditching on Connelly Road, Cronk Road and Old School Road |
$33,513 |
| Marks |
Culvert installation on Cronk Road and Earl Road |
$15,000 |
| McCallum Point |
Surface treatment on main road sections |
$15,980 |
| McIntosh |
Single surface treatment on McIntosh Road and Canyon Lake Road |
$37,950 |
| McKenzie Portage |
Double surface treatment on main and side roads |
$33,478 |
| Melgund |
Granular lifts on Tailings from Broda on Melgund 2, Melgund 3 Road and Melgund 8 Road |
$30,000 |
| Melgund |
Install gabion baskets at culvert locations km 0.6 and km 0.8 to widen Melgund 4 Road |
$19,000 |
| Minaki |
Surface treatment of 300 m on 2 locations in village |
$9,534 |
| Mine Centre |
Culvert replacement on Government Road East |
$552 |
| Miscampbell |
Granular lift and calcium chloride on Hayes, Best, Kliner, McFee, Frog Creek Roads |
$19,151 |
| Miscampbell |
Ditching on Hayes, Best, Kliner and McFee Roads |
$7,980 |
| Mountain Bay |
Calcium chloride on Mountain Bay Road |
$6,270 |
| Munro Point |
Calcium chloride on Munro Point Road |
$931 |
| Mutrie |
Surface treating on Old Main Line Road |
$46,000 |
| Nelles |
Granular lift on Johnson, Pope, Jason, Forrester Roads |
$11,822 |
| Nelles |
Granular lift on Gouliquer, Lauzon, Forrester, Vargyas Roads |
$6,188 |
| Nelles |
Ditching on Vargyas and Nelles Dilke Roads |
$6,651 |
| Northern Lights Lake |
Supply load haul and gravel resurfacing on Northern Lights Lake Road |
$30,000 |
| Northern Lights Lake |
Calcium chloride on Northern Lights Lake Road |
$26,587 |
| Obonga Lake |
Calcium chloride on Obonga Lake Road |
$19,061 |
| Pellatt #2 |
Double surface treatment on several main and side roads |
$69,916 |
| Pickerel Lake |
Surface treatment on main road |
$13,922 |
| Pine Ridge |
Gravel resurfacing on Pine Ridge Road |
$5,934 |
| Polly Lake |
Spray injection patcher on Polly Lake Road |
$3,088 |
| Portage Bay |
Calcium chloride on Portage Bay Road |
$4,261 |
| Pratt |
Granular lift on Blue Road #7, Jack's Road, Pratt Road #2 |
$8,609 |
| Pratt |
Ditching on Jack's Road, Storkson Road |
$7,656 |
| Pratt |
Culvert replacement on Blue Road #7 |
$690 |
| Red Pine Ridge |
Surface treatment at one location on main road |
$6,673 |
| Redditt |
Surface treatment at four locations in village |
$17,479 |
| Reef Point |
Rocky Islet Road, single surface treatment |
$7,500 |
| Reef Point |
Brushing on Reef Point, Hopkins Bay, Bay Road E, Rocky Islet Road |
$24,556 |
| Reef Point |
Ditching on Reef Point Road |
$892 |
| Rossmere Bay |
Gravel resurfacing on Rossmere Bay |
$4,036 |
| Rowell |
Ganular lift on Amesdale Road |
$26,000 |
| Rowell |
Replace culverts on Amesdale Road |
$4,000 |
| Rugby |
Granular lifts and top coat on Houde Road and Bobie Brook Drive |
$23,000 |
| Rush Bay |
Dig outs on main roads |
$22,978 |
| Savant Lake |
Patch surface treatment |
$4,000 |
| Savant Lake |
School crossings and 20 km/h signs |
$1,000 |
| Savant Lake |
Ditching on main roads |
$6,000 |
| Shebandowan |
Patch surface treatment |
$2,925 |
| Shebandowan |
Calcium chloride on Rudolph Road |
$544 |
| Sherwood lake |
Gravelling main road |
$7,095 |
| Sibley |
Twin culvert installations on Pass Lake Crossroad (1.4 km west of Portage Drive and 2.8 km west of Portage Drive) |
$29,903 |
| Sibley |
Ronquist and Moonlight Bay (road name signs) |
$256 |
| Southwatten |
Rocky Inlet Road – single surface treatment |
$4,041 |
| Southworth |
Granular lifts and gravel laying on Melgund Lake Road, Brown Bay Road and Metis Road |
$42,000 |
| Southworth |
Replace culvert on Brown Bay Road at Battle Creek |
$20,000 |
| Spohn |
Granular lifts on Budreau, Sunset Beach, Fishery, Kreger Roads |
$15,056 |
| Spohn |
Culvert replacement on Fishery, Kreger Roads |
$6,606 |
| Stirling |
Gravel resurfacing on Black Sturgeon Lake Road |
$30,000 |
| Stirling |
Brushing on Stewart Lake Road |
$3,450 |
| Stirling |
Culvert installation at two sites along Stewart Lake Road |
$18,617 |
| Stirling |
Load restriction signs |
$220 |
| Stirling |
Ditching along Stewart Lake Road |
$2,135 |
| Storm bay |
Frost heave dig out on main and side roads |
$8,132 |
| Strange |
Ditching on North Side Road from bridge |
$10,000 |
| Sunny Slopes |
Calcium chloride on Sunnyslopes Road |
$807 |
| Sutherland |
Granular lift on Sutherland Roads #2, 3, 4 |
$8,016 |
| Sutherland |
Brushing on Sutherland Roads #1, 2, 3, 4, 5, Birch Road, Mill Road |
$13,334 |
| Upsala |
Various culvert installations |
$45,545 |
| Van Horne |
Granular lifts on Wilson Road, Brough Drive, Barrett Road, Hutchison Road, Ross-Lapointe Road and Sfreddo Road |
$39,000 |
| Van Horne |
Brushing on Barrett Road |
$3,000 |
| Wabigoon Redverse West |
Granular lifts on Upper Falls Road, Leutschaft Road, Quibel Road and Blue Lake Loop Road. |
$25,000 |
| Wabigoon Redverse West |
Calcium chloride on Blue Lake Loop Road and Quibel Road to cover fresh gravel |
$7,500 |
| Wabigoon Southeast |
Granular lifts on Toews Road and Wood Shed Road |
$5,000 |
| Wabigoon Southeast |
Build a turnaround at the end of Wood Shed Road |
$2,300 |
| Wainwright |
Granular lifts on Morton Road, Tanner Road, Coates Road and Glengoland Far North Road |
$39,000 |
| War Eagle |
Surface treatment on main road section |
$1,980 |
| Ware |
Double surface treatment on Silver Falls Road from km 1.6 to km 5.4 |
$130,042 |
| Zealand #1 |
Granular lifts on The Cliff's Road, Main Street and Shady Lane |
$24,000 |
| Zealand #1 |
Single surface treating on last 1.0 km of East Thunder Lake Road |
$15,000 |
| Zealand #3 |
Granular lifts on McArthur Road, Hoey Loop Road, Lyle Road, Pronger Lake Road and Keatley Road |
$17,500 |
| Zealand #3 |
Brushing Ghost Lake Road and Pronger Lake Road |
$4,900 |