Backgrounder: Improving local roads and bridges in Saskatchewan's rural municipalities
Backgrounder
Federal Gas Tax Fund allocated towards 309 projects in 2016
The federal Gas Tax Fund (GTF) provides Canadian municipalities with a permanent, predictable and indexed source of long-term funding. The Government of Canada will provide Saskatchewan with more than $59.1 million for community infrastructure through the federal GTF in 2016-17.
Based on project planning in 2016, federal GTF funding supported the following local roads and bridges projects in Saskatchewan's rural municipalities:
| Rural Municipality | Project Name | Estimated Total Cost |
Federal GTF Allocated to Project |
|---|---|---|---|
| Antelope Park No. 322 |
Reconstruct 4.8 km of Hjalte Road West |
$499,664 |
$62,596 |
| Argyle No. 1 |
Reconstruct 3.2 km of 5 Mile Road |
$200,000 |
$79,758 |
| Arlington No. 79 |
Reconstruct 9.7 km of Grid 613 |
$789,483 |
$113,417 |
| Arm River No. 252 |
Reconstruct 8 km of Girvin Grid |
$1,215,167 |
$73,555 |
| Auvergne No. 76 |
Clay Cap 3.2 km of Grid #628 |
$160,930 |
$20,725 |
| Auvergne No. 76 |
Pave Two Bridge Decks |
$30,000 |
$30,000 |
| Auvergne No. 76 |
Replace Bridge with Two Culverts |
$163,328 |
$80,000 |
| Baildon No. 131 |
Replace Skyline Bridge |
$620,000 |
$81,390 |
| Baildon No. 131 |
Replace Old Guard Bridge |
$622,373 |
$94,078 |
| Barrier Valley No. 397 |
Clay Cap 4.0 km of Road |
$80,920 |
$80,920 |
| Barrier Valley No. 397 |
Clay Cap 3.2 km of Algrove Lake Curve |
$50,000 |
$40,000 |
| Battle River No. 438 |
Repave 9.6 km of Old Highway 4 |
$297,393 |
$297,393 |
| Bayne No. 371 |
Project 301/303 Road Reconstruction |
$710,680 |
$169,916 |
| Bengough No. 40 |
Upgrade Access Road |
$9,296 |
$9,296 |
| Bengough No. 40 |
Rebuild 1.6 km of Class 5 Torkelson Grid Road |
$35,000 |
$35,000 |
| Benson No. 35 |
Reconstruct 29 km of Viewfield Grid |
$411,000 |
$144,746 |
| Big Arm No. 251 |
Replace Code Bridge |
$550,000 |
$59,080 |
| Big Quill No. 308 |
Rebuild 3.2 km of Gillis Road |
$265,000 |
$150,000 |
| Big Quill No. 308 |
Clay Cap and Rebuild Grade on Tower Road |
$65,000 |
$23,400 |
| Big Stick No. 141 |
Reconstruct Grid Road |
$273,776 |
$43,719 |
| Biggar No. 347 |
Construct a Highway Turning Lane |
$50,000 |
$50,000 |
| Birch Hills No. 460 |
Upgrade Bridge - Id 226-46A-06 E |
$25,000 |
$25,000 |
| Birch Hills No. 460 |
Replace Bridge with Culverts |
$100,000 |
$100,000 |
| Bjorkdale No. 426 |
Replace Two Bridges with New Culverts |
$200,000 |
$50,000 |
| Blaine Lake No. 434 |
Radnga Creek Upgrade |
$204,712 |
$124,712 |
| Bratt's Lake No. 129 |
Bridge Replacement with Large Dimension Culverts |
$120,000 |
$120,000 |
| Britannia No. 502 |
Pavement Overlay 13.2 km of 4 Mile Road and Dump Road |
$2,401,750 |
$174,783 |
| Brock No. 64 |
Clay Cap Range Road 2052 |
$800,000 |
$70,305 |
| Brokenshell No. 68 |
Replace 3 Bridges with Culverts |
$331,018 |
$90,983 |
| Buchanan No. 304 |
Bridge Upgrades |
$70,000 |
$50,000 |
| Buckland No. 491 |
Paddockwood Bridge Replacement |
$500,000 |
$500,000 |
| Cambria No. 6 |
Upgrade Grid 606 |
$390,000 |
$89,802 |
| Cana No. 214 |
Install Four Culverts 2-2014 |
$2,909 |
$2,909 |
| Cana No. 214 |
Install Two Culverts 5-2014 |
$2,599 |
$2,599 |
| Cana No. 214 |
Install Culvert 6-2014 |
$1,030 |
$1,030 |
| Cana No. 214 |
Install Four Culverts 1-2014 |
$17,338 |
$17,338 |
| Cana No. 214 |
Install Two Culverts 3-2014 |
$2,480 |
$2,480 |
| Cana No. 214 |
Reconstruct 0.8 km of Road |
$50,000 |
$50,000 |
| Cana No. 214 |
Install Three Culverts in Division Two |
$3,350 |
$3,350 |
| Cana No. 214 |
Reconstruct 0.8 km of Kennel Road |
$41,000 |
$41,000 |
| Cana No. 214 |
Replace Culvert at Kaposvar Dam |
$19,500 |
$19,500 |
| Cana No. 214 |
Install Culvert on Brewer Road |
$3,200 |
$3,200 |
| Cana No. 214 |
Install Four Culverts in Division Five |
$4,550 |
$4,550 |
| Cana No. 214 |
Install 10 Culverts in Division Six |
$11,900 |
$11,900 |
| Canaan No. 225 |
Upgrade 2.2 km of Covill Hill Road |
$225,551 |
$44,015 |
| Canwood No. 494 |
Revitalize 3.2 km Gravel Road |
$75,000 |
$75,000 |
| Caron No. 162 |
Replace Bridge with Two 2400 mm Culverts |
$154,125 |
$107,888 |
| Chaplin No. 164 |
Clay Cap 3.2 km of Range Road 3050 |
$50,000 |
$33,931 |
| Chaplin No. 164 |
Reconstruct 0.4 km of Range Road 3053 |
$15,500 |
$15,500 |
| Chester No. 125 |
Reconstruct 8 km of CTP Road |
$1,050,000 |
$110,184 |
| Colonsay No. 342 |
Upgrade CWB Terminal Road |
$86,354 |
$70,896 |
| Connaught No. 457 |
Upgrade Three Bridges and Replace One Culvert |
$1,000,000 |
$225,942 |
| Cote No. 271 |
Clay Capping 0.8 km of Road |
$80,000 |
$44,107 |
| Cote No. 271 |
Install Culvert in Division 4 (by Runnymede) |
$17,500 |
$17,500 |
| Cote No. 271 |
Install Culvert in Division 5 |
$12,000 |
$12,000 |
| Cote No. 271 |
Replace Bridge at Division 6 2015 |
$260,000 |
$138,388 |
| Coteau No. 255 |
Replace Pavement on 4.0 km of Road |
$25,000 |
$23,856 |
| Coteau No. 255 |
Rebuild Flood Damaged Roads |
$449,714 |
$66,664 |
| Coulee No. 136 |
Replace Two Bridges and Culvert with Six Culverts |
$450,000 |
$182,191 |
| Cupar No. 218 |
Clay Cap 3.2 km Hospital Road |
$62,000 |
$62,000 |
| Cymri No. 36 |
Pave 6.85 km of Grid No. 702 |
$3,222,912 |
$154,790 |
| District of Lakeland No. 521 |
Lakeshore Drive - Carwin Park Redesign |
$291,000 |
$152,197 |
| Duck Lake No. 463 |
Lake Road Project |
$6,500 |
$6,500 |
| Duck Lake No. 463 |
Lily Plain Road Upgrade |
$145,000 |
$118,592 |
| Dufferin No. 190 |
1.6 km of Grid Road 642 CTP Improvement |
$203,000 |
$101,500 |
| Eagle Creek No. 376 |
Replace Culvert SK-784 |
$50,000 |
$50,000 |
| Edenwold No. 158 |
Enhance Emerald Park Walkways |
$440,586 |
$440,586 |
| Eldon No. 471 |
Repave 12.8 km of Grid 684 |
$5,539,646 |
$221,845 |
| Elfros No. 307 |
Road Recap |
$90,000 |
$43,359 |
| Emerald No. 277 |
Reconstruct and Recap 1.6 km of Suttil Road |
$325,535 |
$66,022 |
| Enfield No. 194 |
Old Ducks Unlimited Project Culvert Replacement |
$46,000 |
$38,989 |
| Enfield No. 194 |
Reconstruct 2 km of Boot Hill Road |
$100,000 |
$79,758 |
| Enniskillen No. 3 |
Incorporation of Gravelock |
$522,000 |
$105,2260 |
| Enterprise No. 142 |
Reconstruct 12 km of Truck Route and Richmound Grid Roads |
$186,750 |
$41,356 |
| Estevan No. 5 |
Reconstruct 3.2 km of Primary Grid #703 |
$483,000 |
$336,461 |
| Eye Hill No. 382 |
Denzil Grid Reconstruction |
$5,337,600 |
$291,025 |
| Fertile Valley No. 285 |
Reconstruct 1.6 km of Road E 31-29-8 W3 |
$174,039 |
$30,456 |
| Fertile Valley No. 285 |
Reconstruct 0.5 km of Road ESE 35-28-09 W3 |
$210,470 |
$58,050 |
| Flett's Springs No. 429 |
Reconstruct 8.0 km of Road |
$220,000 |
$220,000 |
| Flett's Springs No. 429 |
Replace Bridges with Culverts |
$165,000 |
$165,000 |
| Foam Lake No. 276 |
Replace Cement Bridge with Four Culverts |
$623,820 |
$162,140 |
| Fox Valley No. 171 |
Pave Street |
$16,475 |
$16,475 |
| Francis No. 127 |
Replace Bridge |
$190,000 |
$190,000 |
| Frenchman Butte No. 501 |
Reconstruct 3 km of Oil Road |
$1,400,000 |
$424,785 |
| Garden River No. 490 |
Replace Bridge with 2 Span Wood Bridge (Weirdale Grid) |
$173,000 |
$44,750 |
| Garry No. 245 |
Reconstruct 1.6 km of road |
$30,000 |
$30,000 |
| Garry No. 245 |
Replace Two Culverts and Raise Grade |
$50,000 |
$50,000 |
| Glen Mcpherson No. 46 |
Replace Three Culverts and Culvert Extension |
$63,339 |
$28,360 |
| Glenside No. 377 |
Reconstruct 3.2 km of Road |
$15,000 |
$15,000 |
| Golden West No. 95 |
Reconstruct 5.6 km of Road |
$677,327 |
$103,538 |
| Grandview No. 349 |
Upgrade Skog Road |
$9,713 |
$9,713 |
| Grant No. 372 |
Clay Cap 9.6 km Smuts Grid 767 |
$425,000 |
$125,545 |
| Grass Lake No. 381 |
Reconstruction of Salvador Grid Road |
$1,950,000 |
$109,003 |
| Grassy Creek No. 78 |
Resurface 1.6 km of 722 Road |
$185,000 |
$83,894 |
| Gravelbourg No. 104 |
Reconstruct 2 km of Grid Road 718 |
$55,782 |
$55,782 |
| Gravelbourg No. 104 |
Neubekker Bridge Resurfacing |
$36,000 |
$34,610 |
| Grayson No. 184 |
Reconstruct 4.8 km of Road |
$195,000 |
$141,201 |
| Great Bend No. 405 |
Construct Low-Level Crossing |
$45,000 |
$45,000 |
| Griffin No. 66 |
Install Culvert at NE 34-7-10-W2 |
$1,500 |
$1,500 |
| Gull Lake No. 139 |
Pave 4.49 km Green Terminal Road |
$3,500,000 |
$59,375 |
| Happy Valley No. 10 |
Short Line Railway Funding |
$750,000 |
$108,497 |
| Happyland No. 231 |
Reconstruct 6.4 km of Road |
$1,000,000 |
$83,893 |
| Harris No. 316 |
Upgrade Clayton Bridge |
$130,000 |
$12,723 |
| Hart Butte No. 11 |
Rebuild 4.82 km of Road |
$736,265 |
$77,986 |
| Hazelwood No. 94 |
Reconstruct 4.8 km of Road |
$300,000 |
$72,668 |
| Hillsborough No. 132 |
Culvert Installation and Grid Road Reconstruction |
$10,285 |
$9,361 |
| Hillsborough No. 132 |
Install Culvert on Road and Replace Smaller Culverts |
$16,130 |
$15,836 |
| Hillsborough No. 132 |
Replace Small Culverts with Large Culverts |
$12,996 |
$12,776 |
| Hoodoo No. 401 |
Repave 3.2 km of Grid 777 |
$200,000 |
$104,276 |
| Hoodoo No. 401 |
Replace Wakaw Lake Culvert on Bonne Madonne Grid |
$104,276 |
$104,276 |
| Hudson Bay No. 394 |
Municipal Culvert Installation Division 2 |
$90,900 |
$90,900 |
| Hudson Bay No. 394 |
Municipal Culvert Installation Divisions 3 and 4 |
$28,000 |
$28,000 |
| Hudson Bay No. 394 |
Municipal Culvert Installation Division 5 |
$45,500 |
$45,500 |
| Hudson Bay No. 394 |
Municipal Culvert Installation Division 6 |
$35,650 |
$35,650 |
| Humboldt No. 370 |
Reconstruct 2.5 km of Road |
$479,784 |
$340,807 |
| Huron No. 223 |
Reconstruct 1.6 km of Road |
$223,571 |
$107,974 |
| Indian Head No. 156 |
Rebuild 7.8 km of Grid 619 |
$792,229 |
$112,252 |
| Insinger No. 275 |
Construction of 8.1 km of CTP Road |
$1,276,998 |
$96,005 |
| Invermay No. 305 |
Clay Capping Chain of Lakes Mile-Grid 617 |
$60,245 |
$51,381 |
| Kellross No. 247 |
Clay Cap NW-20-25-14-W2 Grid Road |
$11,800 |
$11,800 |
| Kellross No. 247 |
Clay Cap 4.8 km of 639 South |
$300,000 |
$108,321 |
| Kelvington No. 366 |
Replace DesRoches Bridge with Culverts |
$75,000 |
$75,000 |
| Kelvington No. 366 |
Replace Mitton Bridge with Culverts |
$75,000 |
$72,405 |
| Key West No. 70 |
Road Re-construction |
$150,000 |
$112,856 |
| Keys No. 303 |
Upgrade ENE 21-31-2- W2 Bridge |
$1,051,725 |
$123,182 |
| King George No. 256 |
Reconstruct 2 km of Gravel Pit Road |
$30,065 |
$30,065 |
| Kingsley No. 124 |
Clay Cap 4.9 km of Grid 605 South |
$277,463 |
$124,363 |
| Kinistino No. 459 |
Upgrade Bridge at E 17-47-21-W2 |
$735,000 |
$130,000 |
| Lac Pelletier No. 107 |
Lac Pelletier Trail Reconstruction |
$30,000 |
$30,000 |
| Lacadena No. 228 |
Dryland Road Relocation |
$74,857 |
$74,857 |
| Laird No. 404 |
Upgrade and Clay Cap 1.6 km Carmen Grid |
$84,801 |
$84,801 |
| Lajord No. 128 |
Construction, Clay Cap & Gravel 3.2 km of Road |
$103,175 |
$87,425 |
| Lake Johnston No. 102 |
Reconstruct 2.5 km of Mitchellton Road |
$82,000 |
$48,435 |
| Lake Lenore No. 399 |
Road Rehabilitation |
$45,000 |
$45,000 |
| Lake Lenore No. 399 |
Replace Bridge with Culverts |
$60,000 |
$60,000 |
| Lake Of The Rivers No. 72 |
Reconstruct 1.6 km of Road RR2293 |
$50,000 |
$50,000 |
| Lake Of The Rivers No. 72 |
Reconstruct 6.44 km of Road RR2291 to RR2283 |
$60,000 |
$39,211 |
| Lakeside No. 338 |
Reconstruct 11.2 km of Quill Plains Grid |
$193,380 |
$114,320 |
| Lakeview No. 337 |
Clay Cap .9 km of Hendon Grid |
$125,510 |
$62,755 |
| Last Mountain Valley No. 250 |
Rebuild 1.6 km and Clay Cap 3.2 km of Road |
$210,625 |
$98,793 |
| Lawtonia No. 135 |
Clay Cap 3.2 km of Flowing Well Road |
$308,000 |
$128,204 |
| Leroy No. 339 |
Replace Bridge with Culverts over Lanigan Creek |
$309,430 |
$65,484 |
| Lipton No. 217 |
Reconstruct 11.2 km of Strasbourg Grid |
$861,000 |
$231,493 |
| Livingston No. 331 |
Bridge Installation |
$170,000 |
$67,647 |
| Livingston No. 331 |
Rebuild 1.6 km of Fort Livingston Road |
$40,000 |
$40,000 |
| Lomond No. 37 |
Replace Bridge Over Long Creek |
$975,000 |
$89,802 |
| Lone Tree No. 18 |
Upgrade 10 km of Road |
$110,000 |
$106,871 |
| Longlaketon No. 219 |
Pavement Reversion to Gravel |
$465,000 |
$413,068 |
| Loon Lake No. 561 |
Replace Old Bridge with a New Bridge on Range Road 3211 |
$181,650 |
$106,000 |
| Loon Lake No. 561 |
Replace Cement Culvert with Box Culvert on Range Road 3202 |
$27,175 |
$25,884 |
| Loon Lake No. 561 |
Replace Culvert at Low Level Crossing |
$72,788 |
$69,365 |
| Loon Lake No. 561 |
Replace Culvert on Range Road 3200 |
$28,423 |
$12,916 |
| Lost River No. 313 |
Cygnet Lake Road Clay Capping |
$71,000 |
$35,356 |
| Lost River No. 313 |
Upgrade Roads with Rip Rap |
$123,739 |
$61,739 |
| Manitou Lake No. 442 |
Rebuild and Widen 6.4 km of Road 454 |
$195,000 |
$62,139 |
| Mankota No. 45 |
Clay Cap 4 km of Summercove Road |
$190,000 |
$132,773 |
| Maple Bush No. 224 |
Replace 3 Culverts-Main Farm Access TWP RD 224 |
$50,000 |
$49,332 |
| Maple Creek No. 111 |
Upgrade 7.2 km of Galloway Road |
$450,000 |
$357,308 |
| Marquis No. 191 |
Bridge Replacement |
$491,500 |
$199,177 |
| Marriott No. 317 |
Replace Cleland Dam Culvert |
$15,608 |
$15,608 |
| Maryfield No. 91 |
Thunder Road Bridge Replacement |
$120,000 |
$94,233 |
| McCraney No. 282 |
Road Reconstruction |
$145,000 |
$97,331 |
| Meadow Lake No. 588 |
Replace 317-60-19N Bridge with a New Bridge |
$175,427 |
$175,427 |
| Medstead No. 497 |
Clay Capping Roads |
$327,000 |
$29,138 |
| Meeting Lake No. 466 |
Replace Four Culverts |
$20,000 |
$20,000 |
| Meota No. 468 |
Rebuild and Resurface Birch Road |
$259,600 |
$259,600 |
| Milton No. 292 |
Reconstruct 4.02 km Marengo West Road |
$403,433 |
$92,165 |
| Monet No. 257 |
Upgrade Road Beds |
$149,694 |
$139,729 |
| Montrose No. 315 |
Chip Seal 5.6 km of O'Malley Road |
$140,000 |
$140,000 |
| Moose Creek No. 33 |
Clay Cap 6.7 km of Dam Road |
$683,125 |
$109,889 |
| Moose Mountain No. 63 |
Clay Cap 4.8 km of Road |
$220,000 |
$141,792 |
| Moose Range No. 486 |
Replace Classen/Thesen Bridge with Culverts |
$50,000 |
$40,000 |
| Moose Range No. 486 |
Construct Forbes/Wlaz Low Level Crossing |
$60,000 |
$50,000 |
| Moose Range No. 486 |
Upgrade Schmitt Bridge |
$80,000 |
$30,000 |
| Moose Range No. 486 |
Replace Stacey (East) Bridge With Two Culverts |
$130,000 |
$36,150 |
| Moose Range No. 486 |
Replace Stagman (East) Culvert with Two Culverts |
$100,000 |
$100,000 |
| Moose Range No. 486 |
Upgrade Codette Grid Bridge |
$80,000 |
$30,000 |
| Moosomin No. 121 |
Reconstruct and Pave 3.2 km of Road |
$645,838 |
$148,882 |
| Morris No. 312 |
Clay Cap 6.5 km of 205/206 Road |
$485,000 |
$92,346 |
| Morse No. 165 |
Clay Cap 8.4 km of Road 612 |
$635,000 |
$118,455 |
| Mountain View No. 318 |
Reconstruct 0.8 km of Valley Centre Road |
$55,852 |
$49,184 |
| Mountain View No. 318 |
Reconstruct 0.8 km of Winona Road |
$53,775 |
$49,184 |
| North Qu'Appelle No. 187 |
Resurface 3.2 km of Road with Asphalt |
$113,000 |
$93,000 |
| Norton No. 69 |
Replace Bridge with 2 Culverts |
$53,035 |
$53,035 |
| Oakdale No. 320 |
Upgrade 13.05 km of Hopedale Road |
$4,453,075 |
$76,213 |
| Orkney No. 244 |
Replace Springside Bridge with Three Culverts |
$593,000 |
$426,255 |
| Paddockwood No. 520 |
Hanson Hill Heavy Haul Road Upgrade |
$721,000 |
$191,989 |
| Paynton No. 470 |
Upgrade 1.5 km of Grid 674 |
$105,672 |
$46,418 |
| Pense No. 160 |
Clay Cap 3.2 km of TWP 174 Road |
$220,000 |
$139,133 |
| Perdue No. 346 |
Reconstruct Road-E of SE 22-10-36 W3 |
$38,650 |
$38,650 |
| Perdue No. 346 |
Reconstruct Road-S of SE 04-34-10 W3 |
$39,825 |
$39,825 |
| Piapot No. 110 |
Rebuild and Widen 4.8 km of Kealey Springs Road |
$225,000 |
$114,717 |
| Pinto Creek No. 75 |
Upgrade Bridge at E22-08-08 W3M |
$30,000 |
$30,000 |
| Pittville No. 169 |
Reconstruction of Verlo Hill Road |
$254,934 |
$67,984 |
| Pittville No. 169 |
Upgrade 3.2 km of Class 4 Road |
$329,709 |
$60,262 |
| Pleasant Valley No. 288 |
Upgrade 3.2 km of Wilson Road |
$130,000 |
$101,913 |
| Pleasantdale No. 398 |
3L South-Upgrade |
$95,000 |
$75,000 |
| Pleasantdale No. 398 |
Thompson North |
$90,000 |
$30,000 |
| Pleasantdale No. 398 |
Hardy Pit Road South |
$120,000 |
$30,000 |
| Ponass Lake No. 367 |
Fosston Grid Construction |
$291,245 |
$155,676 |
| Poplar Valley No. 12 |
Purchase Rail Line |
$750,000 |
$154,941 |
| Porcupine No. 395 |
Replace Grisdale and Zubrowski Bridges |
$1,268,265 |
$242,228 |
| Prairie Rose No. 309 |
Reconstruct 5.3 km of Esk South Road |
$1,158,820 |
$76,509 |
| Prairiedale No. 321 |
Reconstruct 1.6 km of Municipal Road - Phase I |
$128,121 |
$74,736 |
| Preeceville No. 334 |
Clay Cap 6.4 km of CTP Corridor |
$120,000 |
$120,000 |
| Preeceville No. 334 |
Clay Cap 3.2 km of CTP Corridor Self Tender |
$70,000 |
$70,000 |
| Prince Albert No. 461 |
Reconstruct 4.0 km of Gerrond Road |
$603,271 |
$603,271 |
| Prince Albert No. 461 |
Reconstruct 3.0 km of RusStan Road |
$345,000 |
$137,423 |
| Prince Albert No. 461 |
Reconstruct 1.6 km of RusStan Road |
$235,000 |
$235,000 |
| Redberry No. 435 |
Clay Cap 3.2 km of Grid 781 |
$423,335 |
$109,889 |
| Redburn No. 130 |
Upgrade Thule Bridge |
$362,000 |
$123,791 |
| Reford No. 379 |
Clay Cap 0.8 km of Road |
$20,000 |
$20,000 |
| Reno No. 51 |
Replace Cattle Underpass with Culverts |
$4,701 |
$4,701 |
| Reno No. 51 |
GWR Crossing Improvements |
$8,807 |
$8,807 |
| Reno No. 51 |
Install Culverts at Cypress Lake Road |
$12,059 |
$12,059 |
| Reno No. 51 |
Upgrade Schmidt Bridge |
$32,295 |
$32,295 |
| Riverside No. 168 |
Reconstruct 4 km of Road |
$173,000 |
$144,746 |
| Rocanville No. 151 |
Upgrade 8 km of Road |
$225,000 |
$30,274 |
| Rodgers No. 133 |
Replace Culverts and Build Up Road at 6 Locations |
$46,056 |
$29,835 |
| Rosedale No. 283 |
Replace Bridge with Culverts |
$200,000 |
$152,131 |
| Rosemount No. 378 |
Upgrade 3.2 km of Randy's Road |
$70,000 |
$58,489 |
| Rosthern No. 403 |
Replace Friesens Bridge with Culverts |
$323,210 |
$323,210 |
| Round Hill No. 467 |
Clay Cap 1.6 km of Primary Weight Corridor |
$318,364 |
$124,535 |
| Round Valley No. 410 |
Reconstruct 6.4 km of Primary Grid 787 |
$883,500 |
$184,645 |
| Rudy No. 284 |
Reconstruct 4.7 km on Highway 219 Connector |
$583,678 |
$108,401 |
| Sarnia No. 221 |
Reconstruct 4.8 km of Penzance Grid |
$400,000 |
$78,576 |
| Saskatchewan Landing No. 167 |
Culvert Replacement |
$30,556 |
$30,556 |
| Saskatchewan Landing No. 167 |
Reconstruct 8 km of Propane Grid |
$53,000 |
$53,000 |
| Saskatchewan Landing No. 167 |
Reconstruct 1.6 km of Site #1 Road |
$15,778 |
$15,778 |
| Sasman No. 336 |
Reconstruct 4.83 km of Super Grid |
$436,538 |
$92,787 |
| Sasman No. 336 |
Reconstruct 3.22 km of Primary Grid |
$504,075 |
$231,168 |
| Sasman No. 336 |
Replace Bridge with Three Culverts |
$120,606 |
$74,634 |
| Scott No. 98 |
Upgrade Bridge at N 36-11-17-W2 |
$46,000 |
$4,998 |
| Scott No. 98 |
Upgrade Bridge at E 22-10-16-W2 |
$79,900 |
$41,483 |
| Scott No. 98 |
Upgrade Bridge at E 17-12-16-W2 |
$37,700 |
$5,509 |
| Sherwood No. 159 |
Reconstruct 4.82 km of Inland Drive |
$6,600,000 |
$274,427 |
| Sliding Hills No. 273 |
Clay Cap 3.2 km Mazeppa Grid |
$200,000 |
$138,280 |
| Snipe Lake No. 259 |
Reconstruct 4.8 km of Grid 752 |
$949,414 |
$133,521 |
| Souris Valley No. 7 |
Replace Long Creek Bridge |
$730,000 |
$70,896 |
| South Qu'Appelle No. 157 |
Reconstruct 6.2 km of Road |
$448,000 |
$328,339 |
| South Qu'Appelle No. 157 |
Clay Cap 4 km Blair's Grid Phase 2 |
$135,000 |
$135,000 |
| Spalding No. 368 |
Clay Cap 4.8 km of Grid 640 |
$300,000 |
$186,693 |
| Spiritwood No. 496 |
Replace Witchekan Bridge with Culverts |
$250,000 |
$10,000 |
| Spiritwood No. 496 |
Reconstruct Zuk Road |
$75,000 |
$75,000 |
| Spiritwood No. 496 |
Replace Golf Course Bridge |
$105,000 |
$105,000 |
| Spiritwood No. 496 |
Rehabilitate Hunt Farm Bridge |
$32,000 |
$32,000 |
| Spiritwood No. 496 |
Rehabilitate Town of Spiritwood Bridge |
$76,000 |
$76,000 |
| St. Andrews No. 287 |
Upgrade 1.6 km of Cosway Road |
$41,375 |
$41,375 |
| St. Andrews No. 287 |
Upgrade Bridge at SE 33-30-15-W3 |
$25,777 |
$24,550 |
| St. Andrews No. 287 |
Upgrade Green Road SE 33-30-15 W3 |
$7,730 |
$7,730 |
| St. Andrews No. 287 |
Upgrade Cosway Westside E 17-28-15-W3 |
$82,130 |
$82,130 |
| St. Louis No. 431 |
Upgrade 2.5 km CTP Road |
$400,000 |
$254,286 |
| St. Philips No. 301 |
Replace Three Culverts |
$40,000 |
$40,000 |
| Stanley No. 215 |
Clay Cap Grid 618 |
$800,000 |
$170,000 |
| Stanley No. 215 |
Upgrade 21 km of Old Highway 10 |
$355,335 |
$180,819 |
| Star City No. 428 |
Upgrade 0.8 km of Provincial Grid 681 |
$85,000 |
$85,000 |
| Star City No. 428 |
Upgrade 1.6 km of Provincial Grid 681 |
$170,000 |
$119,173 |
| Storthoaks No. 31 |
Replace Bridge with 3 Culverts |
$250,000 |
$89,802 |
| Surprise Valley No. 9 |
Construct 3.2 km of Road |
$160,000 |
$74,145 |
| Sutton No. 103 |
Upgrade Dry Lake Road |
$185,083 |
$70,896 |
| Swift Current No. 137 |
Clay Cap 7.2 km of Sand Road |
$933,376 |
$600,253 |
| Tecumseh No. 65 |
Reconstruct 1.4 km of Road |
$200,000 |
$79,758 |
| Terrell No. 101 |
Reconstruct 4.8 km of Eisen Road |
$68,000 |
$60,582 |
| Three Lakes No. 400 |
Construct St. Benedict Lagoon Road |
$30,360 |
$30,360 |
| Tisdale No. 427 |
Replace Bridge with Culvert and Upgrade Bridge |
$338,233 |
$270,586 |
| Torch River No. 488 |
Upgrade Madryga Bridge |
$120,400 |
$25,710 |
| Torch River No. 488 |
Replace Bridge with Large Diameter Culverts |
$255,000 |
$77,000 |
| Touchwood No. 248 |
Upgrade Mission Lake Road |
$125,000 |
$78,872 |
| Tramping Lake No. 380 |
Reconstruct 6.5 km of Road |
$450,000 |
$121,114 |
| Tullymet No. 216 |
Rebuild 4.82 km of Goodeve Grid |
$150,000 |
$64,988 |
| Turtle River No. 469 |
Rebuild Range Road 3195 |
$470,000 |
$106,444 |
| Usborne No. 310 |
Resurface 22 km PG 668 HH - Phase 2 |
$4,500,000 |
$161,584 |
| Val Marie No. 17 |
Reconstruct 2.6 km of Rosefield Grid |
$215,137 |
$143,428 |
| Vanscoy No. 345 |
Haul Road Reconstruction |
$1,200,000 |
$1,200,000 |
| Victory No. 226 |
Clay Cap 3.2 km of Park Road |
$224,898 |
$80,862 |
| Viscount No. 341 |
Upgrade Langston Road |
$27,000 |
$20,000 |
| Viscount No. 341 |
Upgrade St. John's Cemetery Road |
$40,000 |
$35,000 |
| Viscount No. 341 |
Upgrade Buffalo Fence North Road |
$30,000 |
$25,000 |
| Viscount No. 341 |
Upgrade Glenfield Road |
$81,000 |
$70,980 |
| Walpole No. 92 |
Clay Cap 4.8 km of Ryerson Road |
$180,450 |
$99,845 |
| Waverley No. 44 |
Replace Two Bridges with Culverts |
$60,000 |
$50,000 |
| Wawken No. 93 |
Clay Cap 2.4 km of Scammel Road and Install Culverts |
$181,978 |
$165,129 |
| Webb No. 138 |
Reconstruct 4.8 km of Range Road 3170 |
$240,000 |
$157,448 |
| Wellington No. 97 |
Replace Two Culverts |
$23,200 |
$23,200 |
| Weyburn No. 67 |
Widen 22nd Ave SE Turn off |
$29,004 |
$29,004 |
| Weyburn No. 67 |
Upgrade Golf Course Bridge |
$183,000 |
$183,000 |
| Whiska Creek No. 106 |
Reconstruct 1.6 km of Division 2 Haul Route Road |
$65,000 |
$65,000 |
| Whiska Creek No. 106 |
Replace Culvert Project 'A' and 'B' |
$140,438 |
$123,758 |
| Whiska Creek No. 106 |
Replace Culvert Project 'C' |
$66,020 |
$66,020 |
| Willner No. 253 |
Reconstruct 8 km of Girvin Grid #749 |
$1,408,250 |
$72,373 |
| Willow Bunch No. 42 |
Upgrade Pavement on Park Access Road |
$45,500 |
$25,000 |
| Willow Creek No. 458 |
Replace Bridge with Culvert-ESE 21-48-16 W2 |
$22,000 |
$20,927 |
| Willow Creek No. 458 |
Replace Bridge with Culvert-ENE 13-48-17 W2 |
$22,000 |
$20,332 |
| Willow Creek No. 458 |
Replace Bridge with Two Culverts-ENE 26-48-17 W2 |
$23,000 |
$21,755 |
| Willow Creek No. 458 |
Replace Little Bridge Creek Bridge with Two Culverts |
$30,000 |
$28,800 |
| Willow Creek No. 458 |
Upgrade Sandhill Creek Road |
$50,000 |
$45,000 |
| Willow Creek No. 458 |
Construct McFarlane Low Level Crossing |
$19,000 |
$18,000 |
| Willow Creek No. 458 |
Upgrade Bohaychuk Road |
$12,000 |
$11,500 |
| Willow Creek No. 458 |
Upgrade Swanson Road |
$20,000 |
$18,500 |
| Willow Creek No. 458 |
Replace McKenzie Bridge with 2 Culverts |
$45,000 |
$42,800 |
| Willow Creek No. 458 |
Replace Metcalfe Bridge with Culvert |
$35,000 |
$33,000 |
| Winslow No. 319 |
Reconstruct 6.5 km of Main Farm Access |
$1,192,179 |
$95,710 |
| Wise Creek No. 77 |
Replace Culvert and Rebuild Road Grade |
$12,000 |
$12,000 |
| Wise Creek No. 77 |
Reconstruct Thin Membrane Pavement |
$210,240 |
$38,000 |
| Wolseley No. 155 |
Replace Culvert at Rose Lane Road |
$100,000 |
$80,427 |
| Wolseley No. 155 |
Rebuild 1.6 km of McMain Road |
$60,000 |
$39,210 |
| Wood Creek No. 281 |
Upgrade 4.9 km of Simpson Grid |
$410,780 |
$60,557 |
| Wreford No. 280 |
Install Culvert at SSW 4-29-24 |
$5,521 |
$5,521 |
| Wreford No. 280 |
Replace Culverts on Two Adjoining Roads |
$21,985 |
$21,985 |
For more information on the federal Gas Tax Fund, please visit: http://www.infrastructure.gc.ca/plan/gtf-fte-eng.html