RE-ORG project overview: Prince Albert Historical Society

The Prince Albert Historical Society took part in the RE-ORG: Canada (Prairies and North) training program in 2018–19. The reorganization covered three rooms and two collections in the Historical Museum: the object collection of approximately 10,000 objects was stored in 95.41 m2 (1027 ft2), and the archival collection of approximately 10,000 items spanned two rooms encompassing 76.65 m2 (825 ft2). All storage areas in the museum were affected. Prior to participating in RE-ORG: Canada, the Prince Albert Historical Society had started a reorganization project and received $25,000 in funding, in 2017, from the Museums Assistance Program (MAP) for collections management to purchase storage shelving, rolling shelving and a protective display case.

Project leads: Michelle Taylor and Donna Nutter

Main storage challenges

Photograph of a cluttered storage room.
© Prince Albert Historical Society
Figure 1. Before RE-ORG: objects piled on top of each other in storage.
Photograph of a crowded storage room The scene highlights objects and tools.
© Prince Albert Historical Society
Figure 2. Before RE-ORG: a vast storage area.
Panoramic photograph of an archive space with wooden shelves filled with materials, filing cabinets and desks.
© Prince Albert Historical Society
Figure 3. Before RE-ORG: view of the main archives area, showing the collections affected by the RE-ORG project inside shelved boxes and filing cabinets.
A panoramic photograph of an archive room with shelves filled with books, files and boxes.
© Prince Albert Historical Society
Figure 4. Before RE-ORG: view of the second archives room. The whole area was reorganized, but only the left side of the picture and computer areas were part of the RE-ORG project.

Project details

Within a year, the Prince Albert Historical Society was able to make the following storage improvements:

Photograph of an archival room featuring multiple white shelving units filled with various boxes.
© Prince Albert Historical Society
Figure 5. After RE-ORG: view of the second archives room, showing the compact shelving units installed using the 2017 MAP funding.
Photograph of an archive room with metal shelves and filing cabinets filled with labeled boxes and files.
© Prince Albert Historical Society
Figure 6. After RE-ORG: view of the second archives room, showing the wall where the computer station was once located. Floor and vertical space usage was maximized by configuring storage units back to back.
Photograph of a storage room with metal shelves containing various objects, plates and sports equipment.
© Prince Albert Historical Society
Figure 7. After RE-ORG: an aisle in the object storage room. Durable shelving was installed, all objects are visible and easily retrievable, and all are grouped by category.
Photograph of a narrow storage aisle with metal shelves on both sides, filled with various containers.
© Prince Albert Historical Society
Figure 8. After RE-ORG: an aisle in the object storage room. Durable shelving was installed, all objects are visible and easily retrievable, and all are grouped by category.

The project took 44 weeks to complete with up to 12 team members involved throughout the 4 phases (Table 1).

Table 1: timeline and breakdown of project phases
RE-ORG phase Number of weeks to complete Number of team members
1. Getting started 3 3
2. Storage condition report 3 3
3. Storage action plan 4 4
4. Storage reorganization implementation 34 12

The RE-ORG project cost $30,756 to complete, with most of the financial resources being applied to storage furniture. The Prince Albert Historical Society was also successful in securing $10,000 in MAP funding specifically for the RE-ORG project.

Table 2: budget breakdown
Budget item Amount (CAN$)
Staff time 2,688 (and hundreds of volunteer hours)
Tools, supplies and materials 2,377
Storage furniture 25,691
External services (such as contractors) 0
Total project cost 30,756

Based on the RE-ORG Self-Evaluation Tool for Collections in Storage (PDF Version), the Historical Museum made improvement in all four components of RE-ORG: “management,” “building and space,” “collection” and “furniture and small equipment.”

According to the results in Table 3 and Table 4, the “building and space” component experienced the largest improvement in the archives, with a 58% increase. In the object storage room, the “collection” component experienced the largest improvement, with a 52% increase.

Table 3: self-evaluation results for the archives
RE-ORG component Score (before) Score (after)
Management (maximum of 42 points) 24 30
Building and space (maximum of 54 points) 26 41
Collection (maximum of 51 points) 33 39
Furniture and small equipment (maximum of 33 points) 22 32
Bar chart showing percentage distribution across four categories.
© Government of Canada, Canadian Conservation Institute
Figure 9. Graph illustrating the percentage of improvement to the scores for the RE-ORG self-evaluation tool, calculated by comparing the scores before and after the storage reorganization project.
Description
Description of Figure 9
RE-ORG component Percentage of improvement
Management 25%
Building and space 58%
Collection 18%
Furniture and small equipment 45%
Table 4: self-evaluation results for the object storage room
RE-ORG component Score (before) Score (after)
Management (maximum of 42 points) 19 27
Building and space (maximum of 54 points) 35 47
Collection (maximum of 51 points) 27 41
Furniture and small equipment (maximum of 33 points) 19 28
Bar chart showing percentage distribution of resources across four categories.
© Government of Canada, Canadian Conservation Institute
Figure 10. Graph illustrating the percentage of improvement to the scores for the RE-ORG self-evaluation tool, calculated by comparing the scores before and after the storage reorganization project.
Description
Description of Figure 10
RE-ORG component Percentage of improvement
Management 42%
Building and space 34%
Collection 52%
Furniture and small equipment 47%

Lessons learned

Based on the experience of the Prince Albert Historical Society, the following factors should be considered in future RE-ORG projects:

Additional resources