Consultations on the CEPA New Substances Notification Regulations and New Substances Program - Final Report of the Multistakeholder Consultations
Table of Contents
- 1. Introduction
- 2. Background and Context of Multistakeholder Consultations on the NSN Regulations and NS Program
- 3. Themes and Issues
- Appendix 1: Table Members
- Appendix 2: Procedural Guidelines Adopted by the Table Members
- Appendix 3: Background and Supporting Documents
- Appendix 4: List of Acronyms and Definitions
- Appendix 5: Description of the "New Substances" Industry Sector in Canada
- Appendix 6: Proposed Requirements for Non-GLP Studies
- Appendix 7: Additional Information on the Assessment of Degradation Products
- Appendix 8: Test Criteria for the Sunrise Approach - from the Public Advocacy Group Representatives Discussion Paper, August 2000
- List of Tables
- List of Figures
- National Library of Canada cataloguing in publication data
Download the report in Adobe PDF format (701 KB).
Pursuant to
The New Substances Notification Regulations
of the
Canadian Environmental Protection Act, 1999
December 2001 -- EPS M-464
Page details
- Date modified: