Schedule 2: Recycling Operations For Hazardous Recyclable Material

(Subsection 2(1), subparagraph 2(2)(e)(iii), section 4, subparagraphs 8(j)(i) and (viii) and 9(f)(iv), paragraphs 9(n) and (o), subparagraph 16(e)(iv) and paragraphs 16(m) and (n))

Recycling Operations For Hazardous Recyclable Material
Item Column 1
Recycling Code
Column 2
Operation
1. R1 Use as a fuel in an energy recovery system, where the net heating value of the material is at least 12 780 kJ/kg.
2. R2 Recovery or regeneration of substances that have been used as solvents.
3. R3 Recovery of organic substances that have not been used as solvents.
4. R4 Recovery of metals and metal compounds.
5. R5 Recovery of inorganic materials other than metals or metal compounds.
6. R6 Regeneration of acids or bases.
7. R7 Recovery of components used for pollution abatement.
8. R8 Recovery of components from catalysts.
9. R9 Re-refining or re-use of used oil, other than by operation R1.
10. R10 Land treatment resulting in agricultural or ecological improvement.
11. R11 Use of residual materials obtained by any of operations R1 to R10 or R14.
12. R12 Exchange of a recyclable material for another recyclable material prior to recycling by any of operations R1 to R11 or R14.
13. R13 Accumulation prior to recycling by any of operations R1 to R11 orR14.
14. R14 Recovery or regeneration of a substance or use or re-use of a recyclable material, other than by any of operations R1 to R10.
15. R15 Testing of a new technology to recycle a hazardous recyclable material.
16. R16 Interim storage prior to any of operations R1 to R11 or R14.

Page details

Date modified: