Enhanced Fujita scale damage indicators and degrees of damage, chapter 7


Masonry Apartments or Motels (MAM)

Typical Construction:

Table 7. Degree of Damage (DOD) for Expected (EXP), Lower Bound (LB) and Upper Bound (UB)
DOD Damage Description EXP LB UB
1 Threshold of visible damage 105 85 130
2 Loss of roof covering (up to 20%) 130 110 165
3 Uplift of lightweight metal roof decking 155 130 185
4 Uplift of concrete roof decking 195 165 230
5 Collapse of top storey walls 215 185 240
6 Collapse of top two floors of three or more storeys 250 210 290
7 Total destruction of a large section of building 290 255 330

*All wind speeds in km/h

Page details

Date modified: