Action Plan for the Victorin’s Gentian (Gentianopsis virgata ssp. victorinii) in Canada – 2014

Cover Photo: Victorin’s Gentian

2014


Recommended citation:

Environment Canada. 2014. Action Plan for the Victorin’s Gentian (Gentianopsis virgata ssp. victorinii) in Canada.
Species at Risk Act Action Plan Series. Environment Canada, Ottawa. iv + 11 pp.

For copies of the action plan, or for additional information on species at risk (SAR), including Committee of the Status of Wildlife in Canada (COSEWIC) Status Reports, residence descriptions, recovery strategies, plans and other related recovery documents, please visit the Species at Risk Public Registry.

Cover illustration: © Audrey Lachance, Bureau d’écologie appliquée

Également disponible en français sous le titre :
« Plan d’action pour le gentiane de Victorin (Gentianopsis virgata ssp. victorinii) au Canada »

© Her Majesty the Queen in Right of Canada, represented by the Minister of the Environment, 2014. All rights reserved.
ISBN 978-1-100-25273-5
Catalogue no. CW69-21/8-2015E-PDF

Content (excluding the illustrations) may be used without permission, with appropriate credit to the source.


The federal, provincial, and territorial government signatories under the Accord for the Protection of Species at Risk (1996) agreed to establish complementary legislation and programs that provide for effective protection of species at risk throughout Canada. Under the Species at Risk Act (S.C. 2002, c.29) (SARA), the federal competent ministers are responsible for the preparation of action plans for species listed as Extirpated, Endangered, and Threatened for which recovery has been deemed feasible. They are also required to report on progress five years after the publication of the final document on the SAR Public Registry.

Under SARA, one or more action plan(s) provides the detailed recovery planning that supports the strategic direction set out in the recovery strategy for the species. The plan outlines what needs to be done to achieve the population and distribution objectives (previously referred to as recovery goals and objectives) identified in the recovery strategy, including the measures to be taken to address the threats and monitor the recovery of the species, as well as the proposed measures to protect critical habitat that has been identified for the species. The action plan also includes an evaluation of the socio-economic costs of the action plan and the benefits to be derived from its implementation. The action plan is considered one in a series of documents that are linked and should be taken into consideration together. Those being the COSEWIC status report, the recovery strategy, and one or more action plans.

The Minister of the Environment and the Minister responsible for Parks Canada Agency are the competent ministers under SARA for the Victorin’s Gentian and have prepared this action plan to implement the recovery strategy, as per section 47 of SARA. To this extent possible, it has been prepared in cooperation with the government of Quebec (Ministère du Développement durable, de l’Environnement et de la Lutte aux Changements Climatiques - MDDELCC).

Success in the recovery of this species depends on the commitment and cooperation of many different constituencies that will be involved in implementing the directions and actions set out in this action plan and will not be achieved by Environment Canada, Parks Canada Agency, or any other jurisdiction, alone. All Canadians are invited to join in supporting and implementing this action plan for the benefit of the Victorin’s Gentian and Canadian society as a whole.

Implementation of this action plan is subject to the appropriations, priorities and budgetary constraints of the participating jurisdictions and organizations.

Vincent Carignan (Environment Canada, Canadian Wildlife Service – Quebec region) wrote this action plan based on a draft version produced by Hélène Gilbert (consulting botanist, Bureau d’écologie appliquée). The following people helped to improve the content: Charles Latour [1], Alain Branchaud and Karine Picard (Environment Canada, Canadian Wildlife Service – Quebec region); the Saint Lawrence Freshwater Estuary Threatened Flora Recovery Team [Patricia Désilets (MDDELCC), Pierre Morisset (consultant), Hélène Gilbert, Nicole Lavoie and Michèle Dupont-Hébert (Fondation québécoise pour la protection du patrimoine naturel), Patrice Laliberté and Hubert Pelletier (Nature Conservancy of Canada – Quebec Region), Frédéric Coursol (Montréal’s Botanical Garden) and Sylvain Paradis [2] (Parks Canada Agency), as well as Norman Dignard (Fondation québécoise pour la protection du patrimoine naturel).

This action plan compliments the Recovery Strategy for the Victorin’s Gentian (Gentianopsis virgata ssp. victorinii) in Canada (Environment Canada, 2012). The proposed recovery measures aim to implement all the broad strategies and approaches to recovery set out in the recovery strategy for all the populations and suitable habitat for the species in Canada.

The critical habitat for Victorin’s Gentian is identified in the recovery strategy. It consists of all suitable habitat in the mid-littoral zone up to the adjacent shore, thereby including the upper littoral zone of the 14 priority target occurrences. Because we still do not know to what extent these parts of the critical habitat contribute to meeting the long-term population and distribution objectives, a schedule of studies has been proposed to fill the knowledge gaps on population viability and dynamics. This action plan considers this aspect in the development of necessary recovery measures and therefore does not identify any additional critical habitat for the time being.

Critical habitat identified to date is located on both federal and non-federal land. Proposed measures to protect critical habitat are presented in section 1.4.

A schedule that establishes the implementation priorities for the recovery measures addresses the following general strategies for the Victorin’s Gentian’s recovery in Canada:

  1. Conservation of the species, its suitable habitat and the adjacent riparian area;
  2. surveys and monitoring;
  3. research; and
  4. communication and outreach.

A socio-economic cost-benefit evaluation for implementing this action plan is presented. Low to Moderate socio- economic impacts and limited additional constraints to land use are expected. The direct cost of implementing this action plan is estimated at $950,000 for 2014–2019.

Victorin’s Gentian (Gentianopsis virgata ssp. victorinii) is an herbaceous species endemic to Quebec that grows mainly along the upper shoreline of the freshwater or slightly brackish marshes of the St. Lawrence River. The species was assessed as Threatened by the Committee on the Status of Endangered Wildlife in Canada (COSEWIC) in 2004, and has been listed as such in Schedule 1 of the Species at Risk Act (SARA) since 2005. In Quebec, the species has been listed as Threatened under the Act respecting threatened or vulnerable species since 2001.

The population of Victorin’s Gentian is estimated to contain between 1700 and 6000 individuals. To date, 45 occurrences of the species have been documented along the St. Lawrence River between Deschambault and Lotbinière to the west and Saint-Roch-des-Aulnaies and Île-aux-Oies to the east. The Centre de données sur le patrimoine naturel du Québec (CDPNQ) contains up-to-date population data.

Habitat loss, through shoreline filling and infrastructure development for example, is the greatest threat facing Victorin’s Gentian. Human trampling, invasive plants, mowing and flower picking, as well as overabundant animal populations also threaten its occurrences.

The objective of the action plan for the Victorin’s Gentian are to implement the Recovery Strategy for the Victorin’s Gentian (Gentianopsis virgata ssp. victorinii) in Canada (Environment Canada 2012) whose population and distribution objectives are: 1. In the short-term, maintain and, if possible, increase the population size and area of occupancy of Victorin’s Gentian within each of the 14 occurrences identified as priority targets; and 2. In the long-term, maintain and, if possible, increase the population size and area of occupancy of Victorin’s Gentian throughout its range in Canada.

This action plan complements the Plan de conservation du gentianopsis élancé variété de Victorin (Gentianopsis procera subsp. macounii var. victorinii) (Jolicoeur and Couillard 2007) published by the government of Quebec. The conservation plan includes 17 [3] occurrences identified as priority targets for conservation of the species.

The recovery strategy provides more details on the strategic direction and approaches for the recovery of the species, as well as on the species and the factors threatening it.

Table 1A. Implementation Schedule
Broad Strategy:
Conservation of the species, its suitable habitat as well as the adjacent riparian zone
N0 Approach Recovery Measures Priority [4] Threats or
Concerns Addressed [5]
Schedule
[4]“Priority” reflects the extent to which the action contributes directly to recovery of the species or is an essential precursor to an action that contributes to the recovery of the species.

[5]Threats and limiting factors: 1) shoreline filling and infrastructure development; 2) anthropogenic trampling; 3) invasive plants; 4) mowing and flower picking; 5) overabundant animal populations; 6) changing water salinity brought on by climate change; 7) ice scouring; 8) pollution; 9) erosion; 10) oil spills; 11) dumping of debris on the shore; and 12) gaps in knowledge.
1 Apply legal and stewardship measures within the occurrences as well as in the adjacent shoreline in order to reduce the effects of the main threats Continue efforts to acquire, provide legal protection for and/or reach conservation agreements on priority occurrences and adjacent areas High All except
5 – 6 – 7
2014-2019
2 Apply legal and stewardship measures within the occurrences as well as in the adjacent shoreline in order to reduce the effects of the main threats Eliminate practices inconsistent with maintaining the species and its habitat High All except
5 – 6 – 7
2014-2019
3 Apply legal and stewardship measures within the occurrences as well as in the adjacent shoreline in order to reduce the effects of the main threats Take into account the presence of the species and its suitable habitat when conducting environmental assessments of projects (including repairing retaining walls), or before adopting mitigation or compensatory measures High All except
5 – 6 – 7
2014-2019
4 Apply legal and stewardship measures within the occurrences as well as in the adjacent shoreline in order to reduce the effects of the main threats Assess the forests adjacent to priority occurrences in order to conserve them as buffer zones for shoreline conservation High 1.9 2014-2019
5 Apply legal and stewardship measures within the occurrences as well as in the adjacent shoreline in order to reduce the effects of the main threats Assess the quality indices of riparian strips for all priority occurrences to target priority intervention sites Medium 12 2014-2019
6 Maintain or implement management approaches aiming at increasing the abundance of the species and the area of occupancy of its suitable habitat Determine whether the 14 priority occurrences can be managed to make them sufficiently productive to maintain or increase the species’ overall population and area of occupancy Medium 12 2014-2019
7 Maintain or implement management approaches aiming at increasing the abundance of the species and the area of occupancy of its suitable habitat Explore approaches for increasing populations Medium 12 2014-2019
8 Maintain or implement management approaches aiming at increasing the abundance of the species and the area of occupancy of its suitable habitat Restore habitat where technically feasible Low All except 6 2014-2019
Table 1B. Implementation Schedule
Broad Strategy:
Surveys and monitoring
N0 Approach Recovery Measures Priority [4] Threats or
Concerns Addressed [5]
Schedule
[4]“Priority” reflects the extent to which the action contributes directly to recovery of the species or is an essential precursor to an action that contributes to the recovery of the species.

[5]Threats and limiting factors: 1) shoreline filling and infrastructure development; 2) anthropogenic trampling; 3) invasive plants; 4) mowing and flower picking; 5) overabundant animal populations; 6) changing water salinity brought on by climate change; 7) ice scouring; 8) pollution; 9) erosion; 10) oil spills; 11) dumping of debris on the shore; and 12) gaps in knowledge.
9 Establish a monitoring program for this species with highly fluctuating local populations Standardize the approach to collect, describe and compile information on occurrences Medium 12 2014
10 Establish a monitoring program for this species with highly fluctuating local populations Determine how often surveys have to be conducted to understand the population dynamics of the species (interannual variations in abundance, trends and hardiness) Medium 12 2014
11 Establish a monitoring program for this species with highly fluctuating local populations Expand the monitoring of occurrences initiated in 2008 to other occurrences Medium 12 2014-2019
12 Establish a monitoring program for this species with highly fluctuating local populations Regularly check whether the species is present or absent in suitable habitat that is not currently colonized Medium 12 2014-2019
13 Establish a monitoring program for this species with highly fluctuating local populations Clarify the status of the population in Boischatel Low 12 2015
Table 1C. Implementation Schedule
Broad Strategy:
Research
N0 Approach Recovery Measures Priority [4] Threats or
Concerns Addressed [5]
Schedule
[4]“Priority” reflects the extent to which the action contributes directly to recovery of the species or is an essential precursor to an action that contributes to the recovery of the species.

[5]Threats and limiting factors: 1) shoreline filling and infrastructure development; 2) anthropogenic trampling; 3) invasive plants; 4) mowing and flower picking; 5) overabundant animal populations; 6) changing water salinity brought on by climate change; 7) ice scouring; 8) pollution; 9) erosion; 10) oil spills; 11) dumping of debris on the shore; and 12) gaps in knowledge.
14 Clarify certain demographic parameters of Victorin’s Gentian (vitality, viability of occurrences and threat responses) Develop and implement a research program aiming at understanding the vital cycle and ecological needs Medium/High All 2014-2019
15 Clarify certain demographic parameters of Victorin’s Gentian (vitality, viability of occurrences and threat responses) Determine whether the species is a seed bank and, if so, determine its longevity Medium 12 2014-2019
16 Clarify certain demographic parameters of Victorin’s Gentian (vitality, viability of occurrences and threat responses) Develop and implement a research program to provide a better understanding of the impact of major threats to the survival of the species Medium All 2014-2019
17 Clarify certain demographic parameters of Victorin’s Gentian (vitality, viability of occurrences and threat responses) Determine the minimum size for a viable population Medium 12 2014-2015
Table 1D. Implementation Schedule
Broad Strategy:
Communication and outreach
N0 Approach Recovery Measures Priority [4] Threats or
Concerns Addressed [5]
Schedule
[4]“Priority” reflects the extent to which the action contributes directly to recovery of the species or is an essential precursor to an action that contributes to the recovery of the species.

[5]Threats and limiting factors: 1) shoreline filling and infrastructure development; 2) anthropogenic trampling; 3) invasive plants; 4) mowing and flower picking; 5) overabundant animal populations; 6) changing water salinity brought on by climate change; 7) ice scouring; 8) pollution; 9) erosion; 10) oil spills; 11) dumping of debris on the shore; and 12) gaps in knowledge.
18 Develop and implement a communications strategy with partner organizations, special interest groups, landowners and the general public Encourage exchanges between stakeholders (scientists, recovery groups and implementation groups, NGOs, levels of government, the general public, and private landowners) through yearly meetings, presentations to partners, information sessions for citizens, etc. High 12 2014-2019
19 Develop and implement a communications strategy with partner organizations, special interest groups, landowners and the general public Encourage support from the general public and land-management decision-makers (municipalities, regional county municipalities (RCMs), regional conferences of elected officials, etc.) and focusing on promoting compliance with laws, regulations and policies High 12 2014-2019
20 Develop and implement a communications strategy with partner organizations, special interest groups, landowners and the general public Continue outreach to shoreline property owners and other users with tools such as brochures, non-technical articles, websites, maps/signs, shoreline quality indices, landowners’ notebooks, annual information sessions, etc. Medium 12 2014-2019

The critical habitat for Victorin’s Gentian is identified in the recovery strategy (Environment Canada 2012). It corresponds to all suitable habitat within each of the 14 priority occurrences (critical habitat units) within the boundaries delineated on one side by the shore (high-water mark) and on the other side by the upper limit of the lower littoral zone. It is not currently known to what extent these critical habitat units contribute to attaining the long-term population and distribution objectives. It may be difficult to increase the population of Victorin’s Gentian and its area of occupancy within the 14 priority occurrences sufficiently to maintain them at these levels, notably because of the availability of the habitat. The schedule of studies in the recovery strategy outlines the activities required to fill this knowledge gap and determine whether additional critical habitat units are required to meet the long-term population and distribution objectives. This action plan incorporates this aspect in the development of recovery measures and therefore does not identify any additional critical habitat for the time being.

Examples of activities likely to result in destruction of critical habitat for Victorin’s Gentian may be found section 7.2 of the recovery strategy (Environment Canada, 2012).

Critical habitat for the Victorin's Gentian has been identified on federal and non-federal lands.

Critical habitat for one occurrence of Victorin’s Gentian is on land owned by Parks Canada at Grosse Île and the Irish Memorial National Historic Site. Under the provisions of subsection 58(5) of SARA, the competent minister shall, within 180 days following the posting of the final version of the recovery strategy that identifies critical habitat on the Species at Risk Public Registry, and after consulting with every other competent minister, make an order for any portion of critical habitat that is not legally protected by provisions in or measures under SARA or any other Act of Parliament. If the minister does not make the order, the minister shall include in the Species at Risk Public Registry a statement setting out how the critical habitat or portions of it are legally protected.

With regard to those portions of critical habitat on non-federal lands, Environment Canada intends to collaborate with the government of Quebec to determine if provincial legislation and regulations will be considered to provide protection for critical habitat for this species under SARA.

Being respectful of jurisdictional role, Environment Canada’s approach is to first look to the laws of the province and, where necessary, move on to assess if provisions in or measures under SARA or any other Act of Parliament can protect those portions of critical habitat.

If it is deemed that the critical habitat is not protected in whole or in part, the progress towards achieving its protection will be included in the Species at Risk Public Registry by way of reports as per section 63 of SARA.

The implementation of stewardship measures is an important complementary strategy for preserving this species’ critical habitat. Environment Canada will collaborate with the government of Quebec, non-governmental organizations and individuals to facilitate the implementation of conservation measures.

This section assesses the potential socio-economic costs associated with implementing the action plan, as well as the benefits it could provide.

The Action Plan for Victorin’s Gentian in Canada describes the recovery measures required to meet the population and distribution objectives set out in the recovery strategy for this species. Table 2 presents the breakdown of anticipated direct costs based on the four general recovery strategies; it is a compilation of the estimated costs for each activity in Table 1. These costs were determined by consulting with the main stakeholders involved in species conservation. The direct costs are estimated for the period from 2014 to 2019 [6].

Table 2. Estimate of the direct costs related to implementing the 2014–2019 action plan for the Victorin’s Gentian.
Broad Strategy Priority Government (Federal & Provincial) Other Stakeholders
$ 950,000
Conservation of the species, its suitable habitat and the adjacent riparian area High $425,000 $335,000
Surveys and monitoring High $50,000 $40,000
Research High $20,000 $15,000
Communication and outreach High $40,000 $35,000
$535,000 $415,000

The indirect costs are the potential costs associated with the action plan’s implementation that could have an impact on the various stakeholders affected by the management of the Victorin’s Gentian in Canada, particularly private landowners.

Critical habitat is largely on non-federal land, which could affect the landowners’ behaviour. For example, in order to limit the threat connected with filling and infrastructure development, governments, municipalities and landowners must restrict shoreline development or any other activities in the critical habitat of Victorin’s Gentian. Outdoor enthusiasts and all-terrain vehicle users will have to change their hiking and riding routes in the intertidal zone so as not to disturb the habitat of Victorin’s Gentian. Finally, citizens must stop picking this plant.

To maintain biodiversity, the ecosystems where the species live must be healthy and intact. These conditions are important in providing various ecological services. While these values are difficult to quantify, studies conducted throughout the world have demonstrated their important economic contribution (Barbier and Heal 2006; Almack and Wilson 2010). A meta-analysis by Balmford et al. (2002) shows that the cost-benefits ratio of effective conservation programs in wild natural environments is 100:1. As for the individual importance of a species, it depends on several factors, including the year, location and services taken into consideration (Isbell et al. 2011). The great contribution of biodiversity to ecological services that guarantee the current and future economic and ecological health of Canada would therefore justify applying the precautionary principle in order to maintain and reestablish species at risk.

Victorin’s Gentian is not considered to have any direct economic value (in terms of marketing). However, Victorin’s Gentian has intrinsic value and is an important part of Canada’s natural heritage. According to the Canada Gazette (2007), Canadians want to conserve species for future generations even if they will never personally see or use these species. Furthermore, the aesthetic appeal of Victorin’s Gentian makes it a symbol of estuarine conservation and protection of threatened or vulnerable species (COSEWIC 2004). The species is also of scientific interest to botanists because it raises the entire range of issues relating to the origin and diversification of the endemic flora of the estuarine shores of the St. Lawrence River (COSEWIC 2004).

The ecosystem in which Victorin’s Gentian lives provides many ecosystem services [7]. Wetlands are recognized as important in the life cycle of many species of insects, fish, amphibians, molluscs, reptiles, small furbearing mammals, and birds (Environment Canada 2010). In addition, these areas play a role in nutrient cycling and water purification, and can reduce erosion by slowing the current (Environment Canada 2010). Considering that the St. Lawrence River is the main water source for a large number of municipalities in Quebec, the water treatment role played by marshes along the river becomes even more critical. Also, the marshes provide spawning grounds for many species of fish and habitat for waterfowl. They therefore promote recreational activities such as hunting, fishing and wildlife and plant observation (Environment Canada 2010).

The implementation of all recovery measures proposed in this action plan would result in direct costs of almost $ 950,000 for the 2014–2019 period. Low to Moderate socio-economic impacts are expected. They should generate few additional land use constraints beyond those stipulated under the current legislative and regulatory framework. Implementing this action plan would also contribute specifically to the Federal Sustainable Development Strategy (Environment Canada 2010). Finally, the plan contributes to the efforts of organizations involved in sustainable land management in the upper estuary of the St. Lawrence River.

The performance indicators presented in the associated recovery strategy provide a way to define and measure progress in achieving the population and distribution objectives.

Pursuant to section 55 of SARA, a report on the implementation of the action plan will be produced by assessing progress in implementing the broad strategies.

Pursuant to section 55 of SARA, a report on the ecological and socio-economic impacts of the action plan will be produced by assessing the results of monitoring the species’ recovery and its long-term viability and by evaluating the action plan’s implementation.

A strategic environmental assessment (SEA) is conducted on all SARA recovery planning documents in accordance with the Cabinet Directive on the Environmental Assessment of Policy, Plan and Program Proposals. The purpose of a SEA is to incorporate environmental considerations into the development of public policies, plans and program proposals to support environmentally sound decision making and to evaluate whether the outcomes of a recovery planning document could affect any component of the environment or achievement of any of the Federal Sustainable Development Strategy’s goals and targets.

Recovery planning is intended to benefit species at risk and biodiversity in general. However, it is recognized that implementation of action plans may inadvertently lead to environmental effects beyond the intended benefits. The planning process based on national guidelines directly incorporates consideration of all the environmental effects, with a particular focus on possible impacts upon non-target species or habitats. The results of the SEA are incorporated directly into the action plan itself, but are also summarized below in this statement.

This action plan contributes directly to achieving the goals and targets of the Federal Sustainable Development Strategy for Canada. More specifically, it will help restore populations of wildlife to healthy levels and maintain productive and resilient ecosystems with the capacity to recover and adapt (goals 5 and 6 of the strategy).

The possibility that the action plan might inadvertently produce negative effects for the environment and other species was considered. However, since the recommended recovery measures are limited to non-intrusive activities such as monitoring occurrences and public outreach, we concluded that this plan will not produce any significant adverse effects.

Victorin’s Gentian is dependent on the upper and middle shoreline. Protection of critical Victorin’s Gentian habitat will have beneficial effects on many wildlife species that occupy this habitat, including nesting waterfowl and other plant species endemic to the freshwater estuary of the St. Lawrence River that live in association with Victorin’s Gentian, many of which are in precarious situations, such as Provancher’s Fleabane (Erigeron philadelphicus ssp. provancheri) (threatened species under the LEMV), Victorin’s Water Hemlock (species of concern listed in Schedule 1 of SARA and a threatened species under the Act respecting threatened or vulnerable species) and the Pipewort Parker (threatened species under the Act respecting threatened or vulnerable species). In addition, a dozen or so other species likely to be designated as threatened or vulnerable in Quebec live in association with Victorin’s Gentian. Actions for the protection of priority Victorin’s Gentian occurrences and outreach initiatives targeting the public and shoreline communities will directly contribute to the conservation of populations of these other rare species that occupy the St. Lawrence River freshwater estuary.


[1] Formerly of Environment Canada, Canadian Wildlife Service – Quebec region.

[2] Retired.

[3] During the recent update of the provincial conservation plan, some occurrences were merged due to their proximity. The 14 occurrences of the federal recovery strategy correspond exactly to the 17 provincial priority occurrences.

[4] “Priority” reflects the extent to which the action contributes directly to recovery of the species or is an essential precursor to an action that contributes to the recovery of the species.

[5] Threats and limiting factors: 1) shoreline filling and infrastructure development; 2) anthropogenic trampling; 3) invasive plants; 4) mowing and flower picking; 5) overabundant animal populations; 6) changing water salinity brought on by climate change; 7) ice scouring; 8) pollution; 9) erosion; 10) oil spills; 11) dumping of debris on the shore; and 12) gaps in knowledge.

[6] Section 55 of SARA requires that the progress toward achieving the action plan objectives be assessed and that a report on the action plan’s implementation and ecological and socio-economic impacts be prepared five years after the plan comes into effect.

[7] The internationally accepted definition of ecosystem services is that of the Millennium Ecosystem Assessment (MEA) from the Secretariat of the Convention on Biological Diversity (SCBD). Ecosystem services are the benefits people obtain from ecosystems. These services are the result of ecological functions. The MEA identifies the four main types of ecosystem services as provisional, regulative, supporting and cultural (MEA 2005).