Calgary – 68 projects |
Improvements to suites at 15 sites, including to accessibility;
Rehabilitation of building exteriors at 23 sites;
Upgrades to fire alarm systems at two sites;
Replacements to interior plumbing at two sites;
Rehabilitations to building interiors at one site, including the replacement of fixtures and finishes in all resident units and/or common areas;
Rehabilitation to elevators and heating, ventilation, and air conditioning systems at seven sites; and
Enhancements to safety systems and roof replacement at nine sites.
|
$5,685,504 |
$1,421,378 |
Edmonton – 33 projects |
Improvements to suites at six sites, including to accessibility;
Rehabilitation of building exteriors at nine sites;
Upgrades to fire alarm systems at one site;
Upgrades to security systems including exterior lighting and the addition of video surveillance capabilities at two sites;
Replacements to interior plumbing at two sites;
Rehabilitations to building interiors at one site, including the replacement of fixtures and finishes in all resident units and/or common areas;
Rehabilitation to elevators and heating, ventilation, and air conditioning systems at seven sites; and
Enhancements to safety systems and roof replacement at four sites.
|
$5,342,720 |
$1,335,680 |
10 municipalities – 23 projects
Elk Point,
Hanna,
Hinton,
Irma,
Lac La Biche,
Biche,
Mallaig,
Plamondon,
Provost,
St. Paul,
St. Vincent |
Improvements to suites at 14 sites, including to accessibility;
Replacements to interior plumbing at one site;
Rehabilitation to an elevator at one site; and
Replacement of nurse call system at three sites.
|
$850,160 |
$212,540 |
15 municipalities – 29 projects
Berwyn,
Cereal,
Edson,
Falher,
Faust,
Fort Chipewyan,
Grimshaw,
Hanna,
Hardisty,
High Prairie,
Kinuso,
Manning,
Peace River,
St. Paul,
Wainwright |
Improvements to suites at five sites, including to accessibility;
Rehabilitation of building exteriors at three sites;
Upgrades to fire alarm systems at one site;
Replacements to interior plumbing at five sites;
Rehabilitations to building interiors at two sites, including the replacement of fixtures and finishes in all resident units and/or common areas; and
Replacement of roofs including shingles, eavestroughs, and downspouts at nine sites.
|
$791,320 |
$197,830 |
45 municipalities – 123 projects
Alix,
Anzac,
Barrhead,
Bentley,
Black Diamond,
Blackfalds,
Blairmore,
Bow Island,
Boyle,
Brooks,
Calgary,
Camrose,
Canmore,
Cardston,
Carmangay,
Crowsnest Pass,
Drumheller,
Eckville,
Edmonton,
Evansburg,
Fairview,
Fort Assiniboine,
Fort Saskatchewan,
High River,
Hythe,
Lacombe,
Lethbridge,
Lloydminster,
Medicine Hat,
Mirror,
New Sarepta,
Olds,
Red Deer,
Sherwood Park,
Spirit River,
Stettler,
Taber,
Thorhild,
Thorsby,
Three Hills,
Torrington,
Two Hills,
Vulcan,
Wanham,
Wembley |
Improvements to suites at 25 sites, including to accessibility;
Rehabilitation of building exteriors at 24 sites;
Upgrades to fire alarm systems at four sites;
Upgrades to security systems including exterior lighting and the addition of video surveillance capabilities at one site;
Replacements to interior plumbing at one site;
Rehabilitations to building interiors at 14 sites, including the replacement of fixtures and finishes in all resident units and/or common areas; and
Rehabilitation to heating, ventilation, and air conditioning systems at 11 sites;
Replacement of aging electrical panels and wires, and other electrical rehabilitation, at 13 sites;
Replacement of roofs including shingles, eavestroughs, and downspouts at 16 sites; and
Replacement of nurse call system at three sites.
|
$6,551,152 |
$1,637,789 |
42 municipalities – 86 projects
Acme,
Ashmont,
Athabasca,
Beaverlodge,
Big Valley,
Black Diamond,
Bon Accord,
Boyle,
Brooks,
Camrose,
Canmore,
Coaldale,
Cochrane,
Daysland,
Entwistle,
Evansburg,
Fort McMurray,
Grande Prairie,
High River,
Innisfail,
Lacombe,
Lethbridge,
Medicine Hat,
Morrin,
Okotoks,
Olds,
Red Deer,
Red Deer County,
Sherwood Park,
Spruce Grove,
St. Albert,
Stettler,
Stony Plain,
Strathmore,
Sundre,
Trochu,
Two Hills,
Wetaskiwin,
Whitecourt,
Wildwood,
Willingdon,
Winfield |
Improvements to suites at 24 sites, including to accessibility;
Rehabilitation of building exteriors at 15 sites;
Upgrades to fire alarm systems at four sites;
Upgrades to security systems including exterior lighting and the addition of video surveillance capabilities at one site;
Replacements to interior plumbing at nine sites;
Rehabilitations to building interiors at three sites, including the replacement of fixtures and finishes in all resident units and/or common areas; and
Rehabilitation to elevators and heating, ventilation, and air conditioning systems at 15 sites;
Enhancements to safety systems and roof replacement at three sites; and
Replacement of nurse call system at three sites.
|
$6,336,896 |
$1,584,224 |
Total Projects – 362 |
|
$25,557,752 |
$6,389,441 |
TOTAL FUNDING |
$31,947,193 |