Backgrounder: Canada and Ontario invest over $35 million in 35 recreational infrastructure projects
Backgrounder
Joint federal, provincial, and recipient funding through the Investing in Canada infrastructure plan will support 35 community, cultural, and recreation infrastructure projects across Ontario.
The Government of Canada is investing over $19.1 million in these projects through the Community, Culture, and Recreation Stream of the Investing in Canada plan. The Government of Ontario is providing over $15.9 million, while recipients are investing over $13 million in their respective projects.
Project Information:
Project Name |
Recipient |
Project Details |
Federal Funding |
Provincial Funding |
Recipient Funding |
---|---|---|---|---|---|
The Centennial Grounds Sports and Culture Revitalization |
Township of St. Joseph |
Construction of a new screened room for cultural events, washroom and shower facilities, as well as shade structures to support multiday cultural and sporting events. The construction will involve the resurfacing of the parking lot; new top soil and grass for ground fields and other landscaping; electrical, and lighting upgrades to improve outdoor sport facilities. |
$114,385 |
$95,311 |
$76,266 |
Tillsonburg Community Centre Rehabilitation Project |
Town of Tillsonburg |
Replacement of the pool area’s tile floors, deck and line, pool roof, pool mechanicals, and lighting, expanding the pool change room for family and gender neutral accessibility, as well as the installation of a new ramp entry into the pool, and the construction of a new 3,600 sq. ft. outdoor splash pad. |
$1,999,801 |
$1,666,334 |
$1,333,367 |
Rehabilitation and Improvements to the Hearst Claude-Larose Recreation Centre |
Town of Hearst |
Rehabilitation of the arena and pool’s equipment and infrastructure will improve service, cut energy costs, prolong the equipment’s and infrastructure's life expectancy, enhance accessibility for users and improve the safety features of the facility for workers and users. |
$1,881,792 |
$1,568,003 |
$1,254,685 |
Community Centre- Upgrading and Expansion of current Facility |
Township of Hornepayne |
Upgrading the hockey arena, curling club and youth space, and expanding the community centre to add a seniors’ socialization space with a community kitchen, a public library, fitness facility and a multi-use gym and meeting space. This will transform the existing community arena into a community centre and hub. |
$1,872,895 |
$1,560,590 |
$1,248,753 |
City of Sarnia Strangway Centre Gymnasium Extension |
City of Sarnia |
Expansion of the Stangway Centre will involve the hiring of architect and engineering services, a public consultation to determine design elements, and selection of the construction firm. The expansion will increase access to recreation and leisure options for seniors and adults over the age of 20. |
$1,428,300 |
$1,190,131 |
$952,319 |
Dressing Rooms Expansion/Enhancement Project |
County of Norfolk |
Updates to the existing facilities to meet Hockey Canada’s new guideline requirements to improve hockey player development, dressing rooms will be upgraded to make them fully accessible, with the addition of gender-neutral change rooms. Delhi, Langton, Port Dover and Waterford arenas will be upgraded. |
$1,320,000 |
$1,099,890 |
$880,110 |
Sarnia-Lambton YMCA Recreation Facility Rehabilitation |
YMCA of Southwestern Ontario, Sarnia-Lambton YMCA (Jerry McCaw Family Centre) |
Replacement of all facility windows, exterior doors, balance of flat roof, heat exchangers, heat pumps and building an automation system, emergency generators, and pool filters. The rehabilitation will result in operational costs savings to be reallocated towards programming for the community, including First Nations members and Newcomers. |
$1,108,188 |
$923,398 |
$738,885 |
Renovations to the Glencoe Memorial Arena & Glencoe Curling Club |
Municipality of Southwest Middlesex |
Replace refrigerated concrete floors in both facilities; upgrade electrical panel, condenser fan and soft starters; convert to glycol-cooled compressor heads; upgrade ammonia detection & ventilation system and hot water system. |
$1,082,554 |
$902,038 |
$721,793 |
Erin Community Centre Rehabilitation and Renovation |
Town of Erin |
Installation of a fixed emergency generator, health and safety upgrades to the electrical, HVAC and refrigeration systems, roof structure replacement, and a new alarm system, and accessibility improvements to the elevator, washroom, and signage. |
$1,056,000 |
$879,912 |
$704,088 |
Historic West Elgin Town Hall Rehabilitation |
Municipality of West Elgin |
Renovations and upgrades to the Historic Town Hall will include a new asphalt roof, windows, doors, and masonry, improvements to the interior beams, fire rating, stairs and the HVAC system, as well as accessibility upgrades for a barrier-free entrance and the addition of universally accessible washrooms. |
$1,006,500 |
$838,666 |
$671,084 |
Curtis Street Square |
City of St. Thomas |
Creation of a public plaza and meeting area, with enhanced parking area, green space and a pedestrian connection between the St. Thomas Public Library, a new child care centre and the historic L&PS Rail Corridor Tourism Centre and trail system. Additionally an outside courtyard will be developed at the library to enhance the overall experience. |
$798,000 |
$672,000 |
$571,200 |
Renovation of Jackson Pool |
City of Sarnia |
Renovation of Jackson Pool with the construction of a new pool. Accessibility for all members of the public will be improved with the renovations to the change areas, splash area, washrooms, entrance and seating. |
$770,700 |
$642,186 |
$513,864 |
McIntyre Headframe Restoration |
City of Timmins |
Restoration will include the selection of bidding contractors, detailed engineering designs and drawings, the replacement of the corroded structural steel and wood frame, and the repair of loose cladding and wall anchor backets on the exterior of the headframe. |
$656,958 |
$547,410 |
$438,026 |
Moonbeam Community Hub |
Township of Moonbeam |
Construction and rehabilitation work to create a community hub. This involves the installation of a pavilion/roof on the outdoor skating rink, new skating rink boards, the installation of bleachers and new lights, the rehabilitation of the tennis court and the resurfacing of 6 kilometres of paved natura trails with asphalt. |
$479,780 |
$399,777 |
$319,893 |
Keterson Park Multi-Use Community Facility |
Municipality of West Perth |
Construction of new multi-use facility will involve the removal of existing structures such as barns, the storage shed and pavilion, the relocation of existing batting cages, site remediation and new site servicing. This will help create a new accessible pathway to pavilion and all baseball diamonds. |
$461,129 |
$348,963 |
$437,500 |
Family YMCA of St. Thomas-Elgin Recreation Facility Rehabilitation |
YMCA of Southwestern Ontario, Family YMCA of St. Thomas-Elgin |
Rehabilitation of the facility will involve the replacement of the roof over the gymnasium, and the replacement of the balance of roof and the PoolPak pool dehumidification unit, the construction of an additional storage facility, and retrofitting the doors to improve building accessibility. |
$437,960 |
$364,930 |
$292,010 |
Renovation and Rehabilitation of the Iroquois Falls Recreation Complex |
Town of Iroquois Falls |
Renovation of the complex involves upgrading pool boilers and the condenser cooling tower; enhancing the building envelope, rehabilitating the pool’s ceiling and insulation, upgrading lighting in the ladies gym to LED in addition to the replacement of plumbing and plumbing fixtures. The arena scoreboard and the multi-use service tractor will also be replaced |
$311,259 |
$259,357 |
$207,532 |
Eastwood Park Upgrades |
Municipality of Central Elgin |
Upgrades will include a new accessible pathway system to connect four different streets with the park and provide access to the proposed amenities in the park. Further upgrades will include a new multi-use court, pickleball courts, green gym equipment, playground equipment and a large shade structure. |
$286,000 |
$238,310 |
$190,690.50 |
Renovate and Rehabilitate Recreation at Assiginack Fairgrounds |
Township of Assiginack |
Renovations involve upgrading the baseball diamond lighting, sliding hill, and outdoor track, building a basketball court, jumping pits and a new storage building, converting part of the arena to a multi-purpose fitness room, installing soccer nets, as well as purchasing and installing exercise equipment for the fitness room. |
$266,281 |
$219,682 |
$179,740 |
YMCA of Timmins Renovation: Strengthening Impact in and for our community |
City ofTimmins |
Renovations to the Timmins Family YMCA include exterior renovations to solve the crumbling façade and lack of insulation, and will also include improvements to the building’s overall accessibility. Insulation and new cladding will be added to the outside of the building. Two exterior cement stairways will also be fixed. |
$225,000 |
$187,481 |
$150,019 |
Rehabilitation of the (Earlton) Pool Building Facility |
Township of Armstrong |
Replacement of plumbing and drains, upgrading the boiler to a gas heating unit paired with a rooftop solar array, raising the foundation of the facility, improvements to the entrance to connect to access routes of the parking area, and the creation of fully accessible washrooms, change rooms, and reception area. |
$189,200 |
$157,651 |
$126,149 |
PERC Park Pavilion & Trail |
Township of Perth East |
Creation of a community gathering place which includes the design of a 50’ x 80’ pavilion, a building with universal accessible washroom, storage room, kitchenette, interior and exterior lighting will be added, and the existing trail extended |
$174,384 |
$145,305 |
$116,271 |
Roof Replacement Norwich Community Centre/Arena |
Township of Norwich |
Replacement of the existing steel roof of the Norwich community centre and arena. This will include the stripping and disposal of the current steel roof structure and the construction and installation of a new standing seam steel roof finished with a combination steel and single ply membrane. |
$165,000 |
$165,000 |
$330,000 |
AODA Shelving for Libraries |
Norfolk County Public Library Board |
Rehabilitation work to address and enhance the functionality of shelves in Library branches. This will include redesigning the shelving layout and purchase of shelves that meet requirements under the Accessibility for Ontarians with Disabilities Act. Three branches are involved; Waterford, Port Rowan and Simcoe. |
$151,200 |
$125,987 |
$100,813 |
Camlachie Community Centre/Camlachie Library/Plympton-Wyoming Museum Improvements |
Town of Plympton-Wyoming |
Improvements involve upgrades to the washrooms including installing an access ramp, replacing the existing roof on the Camlachie Community Centre, installing and expanding an accessible parking area and walkways for the Library and Museum building. Overall accessibility to the building will be improved. |
$142,908 |
$119,078 |
$95,284 |
Ski Resort Terrain Development for Increased Accessibility |
Kamiskotia Snow Resort |
Expansion of the snow making system infrastructure to enhance capacity and efficiency while utilizing new modern technologies, and constructing a downhill mountain bike trail system and operation to create additional off-season sustainability and continue to grow activities. |
$130,200 |
$108,489 |
$86,811 |
Embro Matheson Park Revitalization |
Township of Zorra |
Replacement of the baseball lighting system with an electrical distribution panel, lighting controls, underground electrical servicing and light posts with LED heads. The historic Embro Highland Games and Embro Fair field stone monument will also be restored. |
$115,000 |
$95,824 |
$76,676 |
Downie Optimist Hall Renovations |
Township of Perth South |
Renovations will involve removing carpeted walls, repairing ceilings and walls, replacing the kitchen, adding gender neutral and accessible washrooms, installing new lighting, and expanding the parking lot to include accessible spots. |
$109,691 |
$91,400 |
$73,137 |
Rehabilitation of the Val Rita-Harty Community Centre |
Township of Val Rita-Harty |
Rehabilitation of the centre includes converting two former classrooms into a single community space and adding an electronic key system. This will allow for increased access to the community centre and social programming. |
$98,620 |
$82,175 |
$65,755 |
Lighthouse Festival Theatre Greenroom Quality Improvement |
Town of Port Dover |
Improvements will involve engaging with the Six Nations of The Grand River community on designing and consulting on potential public art elements, finalize a greenroom design, remove and replace existing doors, walls, and ceiling, install new plumbing and washroom fixtures, and reconfiguring the backstage to accommodate two new gender-neutral washrooms. |
$85,404 |
$71,163 |
$56,943* |
Dutton Dunwich Community Pool Rehabilitation |
Municipality of Dutton Dunwich |
Rehabilitation of the pool includes cutting the existing deck into slabs and removing them, trenching the pool deck for new plumbing lines, backfilling the new lines with sand and gravel, pouring concrete deck, sawing concrete for stress cracking, increasing visibility from guard office to pool area by adding windows, and replacing the existing entrances as well as providing more access options. |
$62,793 |
$52,322 |
$41,867 |
Lynn Valley Trail (LVT) Rehabilitation |
Norfolk County |
Improve 10km of trail from Port Dover to Simcoe. Replacement of six existing wooden bridge ramps with an updated design to improve accessibility, resurfacing 6.75 kilometres with limestone screening to fill in the low and wet areas and restore the 2 metre tail width, and paving of 1.15 kilometres of the trail on the Port Dover in-town section to improve accessibility for all trail users. |
$58,420 |
$48,678 |
$38,952 |
Opasatika Community Hub Renovation Project |
Township of Opasatika |
Renovation of the hub will include demolishing the existing playground structure and replacing it with a new one, installing a new accessibility lift, updating and preparing landscaping, and installing safe exercise flooring. Work will benefit all community residents, notably, under-served segments of the community. |
$52,925 |
$44,099 |
$35,287 |
Renovation of Storage Spaces at Beachville District Museum |
Beachville District Historical Society Museum |
Renovations will involve the restoration of museum’s stone and dirt basement to give the converted house additional structural integrity, humidity control and usable storage space. The aging collection storage space will also be renovated to ensure safer storage of artifacts and to address environmental hazards. |
$39,000 |
$29,250 |
$29,250 |
Community Centre Rehabilitation |
Township of Hudson |
Rehabilitation of the centre includes removing and replacing existing shingles, flashing, eaves, and damaged roofing, and removing and replacing existing floor tiles with durable commercial grade flooring. Replacing both the existing roof and floor of the centre will allow both residents and visitors of the region to have access to a safe recreational facility. |
$35,000 |
$29,164 |
$23,336 |
Page details
- Date modified: