Backgrounder: The governments of Canada and Saskatchewan invest in 21 infrastructure projects to build stronger communities across Saskatchewan
Backgrounder
The Government of Canada is investing more than $20 million through the Rural and Northern Infrastructure Stream of the Investing in Canada Infrastructure Program to support 21 projects across Saskatchewan. The Government of Saskatchewan is contributing more than $21 million. Recipients are contributing more than $23 million and are responsible for any additional costs.
Project information:
Location |
Project Name |
Project Details |
Federal Funding |
Provincial Funding |
Recipient Funding |
---|---|---|---|---|---|
Rural Municipality of Antler No. 61 |
RM of Antler No. 61 - Dalrymple Bridge |
Replacement of the existing 6.1 metre treated timber bridge with new culverts. |
$66,680 | $133,320 | $200,000 |
Town of Balgonie |
Town of Balgonie – Aquatic Centre |
Construction of a 430 square metre outdoor swimming pool featuring a regulation-compliant circulation and water treatment system, and a high-efficiency heating system. The new pool will also have a zero-depth beach entry that will improve access for residents of all ages and abilities. |
$1,170,113 | $974,997 | $780,173 |
Rural Municipality of Caledonia No. 99 |
RM of Caledonia No.99 - McCrystal Concrete Arch* |
Replacement of the existing 18.3 metre re-enforced concrete arch bridge with a new bridge. |
$166,700 | $333,300 | $500,000 |
Resort Village of Cochin |
Resort Village of Cochin – Breakwater Rehabilitation* |
Revitalization and rehabilitation of the existing breakwater which is in an advanced state of disrepair. |
$441,215 | $367,642 | $294,180 |
Village of Grayson |
Village of Grayson - Skating Rink Roof Revitalization |
Removal of the existing metal sheet roof of a 30,000 square foot community skating rink and re-installation of a new 29-gauge low rib roof sheet metal on both sides of the arena. |
$57,400 | $47,829 | $38,271 |
Rural Municipality of Hudson Bay No. 394 |
RM of Hudson Bay No. 394, Twp 454A, Rg 2042 Bridge Replacement* |
Replacement of the existing 12.2 metre precast concrete on timber bridge with a new bridge. |
$166,700 | $333,300 | $500,000 |
Rural Municipality of Keys No. 303 |
RM of Keys No. 303, Gazdewich Bridge* |
Replacement of the existing 12.2 metre precast concrete on timber bridge with new larger diameter culverts. |
$83,350 | $166,650 | $250,000 |
Rural Municipality of Keys No. 303 |
RM of Keys No. 303, Red Bin Road Bridge* |
Replacement of the existing 12.2 metre treated timber bridge with new larger diameter culverts. |
$83,350 | $166,650 | $250,000 |
Rural Municipality of Lacadena No. 228 |
RM of Lacadena No. 228, Grid 647 Bridge Replacement* |
Replacement of the existing 12.2 metre treated timber bridge with a new bridge. |
$166,700 | $333,300 | $500,000 |
City of Lloydminster |
City of Lloydminster - New Event Arena |
Construction of a new event facility with three regulation-sized rinks that will be a destination for ice sports and other large community events. This new modern event facility will feature accessible and inclusive amenities. |
$16,463,508 | $16,665,000 | $16,871,492 |
Rural Municipality of Lumsden No. 189 |
RM of Lumsden No. 189- Grid 734 - Cement Bridge* |
Replacement of the existing 21.4 metre reinforced concrete beam bridge with a new bridge. |
$166,700 | $333,300 | $500,000 |
Rural Municipality of Lumsden No. 189 |
RM of Lumsden No. 189 - Shirley Andrew Low Level Crossing* |
Replacement of the existing low level crossing culverts with new low level crossing culverts. |
$50,010 | $99,990 | $150,000 |
Rural Municipality of Lumsden No. 189 |
RM of Lumsden No. 189 - Fish Farm - Low Level Crossing* |
Replacement of the existing low level crossing culverts with new low level crossing culverts. |
$50,010 | $99,990 | $150,000 |
Rural Municipality of Mervin No. 499 |
RM of Mervin No.499 - Bridge at Township Road 502* |
Replacement of the existing 18.3 metre concrete and steel bridge with a new bridge. |
$166,700 | $333,300 | $500,000 |
Town of Mossbank |
Town of Mossbank - Park Trails |
Installation of benches and rest areas into the trail as well as disc golf recruit baskets positioned at various points along the trail. |
$60,000 | $49,995 | $40,005 |
Rural Municipality of Orkney No. 244 |
RM of Orkney No.244 - Township Road 275* |
Replacement of the existing 18.3 metre treated timber bridge with a new bridge. |
$166,700 | $333,300 | $500,000 |
Rural Municipality of Orkney No. 244 |
RM of Orkney No.244 - Jedburgh Grid Bridge* |
Replacement of the existing 12.2 metre treated timber bridge with new culverts. |
$57,512 | $114,989 | $172,499 |
Rural Municipality of Poplar Valley No. 12 |
RM of Poplar Valley No. 12, Wolfe Bridge Replacement |
Replacement of the existing 12.2 metre treated timber bridge with a new culvert. |
$50,010 | $99,990 | $150,000 |
Rural Municipality of Porcupine No. 395 |
RM of Porcupine No. 395 - Copeau (Reed) Bridge* |
Replacement of the existing 12.2 metre treated timber bridge with a new bridge. |
$166,700 | $333,300 | $500,000 |
Rural Municipality of Preeceville No. 334 |
RM of Preeceville No. 334 - Ebel Bridge* |
Replacement of the existing 18.3 metre treated timber bridge with a new bridge. |
$166,700 | $333,300 | $500,000 |
Rural Municipality of Torch River No. 488 |
RM of Torch River No. 488 - Construction Of Bridge, South Of Garrick* |
Replacement of the existing 30.4 metre treated timber bridge with a new bridge. |
$166,700 | $333,300 | $500,000 |
Total: |
$20,133,458 | $21,986,742 | $23,846,620 |
*Federal funding is conditional on fulfilling all requirements related to consultation with Indigenous groups.
Page details