The Government of Canada is investing $10,469,172 and the Government of Manitoba is investing up to $2,697,399 through the COVID-19 Resilience Stream of the Investing in Canada Infrastructure Program to support 32 ventilation projects in schools, health facilities, treatment facilities, and emergency services buildings.
Project Information:
Location |
Project Name |
Project Details |
Federal Funding |
Provincial Funding |
---|---|---|---|---|
Town of Arborg |
Arborg and the District Health Centre - Heating, Ventilation and Air Conditioning (HVAC) System Upgrade |
This project consists of upgrading the HVAC systems cooling capacity to provide suitable environmental conditions. |
$336,000 |
$84,000 |
City of Brandon |
Dinsdale Personal Care Home - HVAC Upgrade and Replace Air Handling Unit |
This project consists of upgrading the HVAC system and replacing the air handling unit to improve ventilation. |
$91,034 |
$22,758 |
City of Brandon |
Addictions Foundation of Manitoba Brandon - Resident Suite HVAC Upgrade |
This project consists of upgrading the HVAC system to increase air filtration and meet current healthcare codes. |
$176,000 |
$44,000 |
Town of Churchill |
Churchill Health Centre - HVAC Improvements |
This project consists of upgrading the HVAC system to increase air filtration and meet current healthcare code requirements. |
$262,400 |
$65,600 |
Rural Municipality of La Broquerie |
Arborgate School - Boiler Replacement and Ventilation Upgrades |
This project consists of a boiler replacement and the installation of a heat recovery ventilator (HRV) with the goal of increasing outdoor air intake. |
$560,000 |
$140,000 |
Municipality of Louise |
Thomas Greenway Middle Years School - Steam Boiler System Replacement and Ventilation System Upgrade |
This project consists of replacing cabinet unit heaters, the installation of a roof top unit (RTU), the installation of an air-handling unit (AHU) and a heating system upgrade. |
$343,440 |
$85,860 |
Municipality of Minitonas-Bowsman |
Bowsman School - Unit Ventilator Replacement |
This project includes the replacement of classroom unit ventilators and the installation of a central dual core, reversing the flow of the HRV. |
$560,000 |
$140,000 |
Municipality of North Cypress-Langford |
Ecole la Source - Boiler Replacement and Ventilation Upgrades |
This project includes the replacement of the school boiler heating system, the main AHU and the gym AHU. |
$280,000 |
$70,000 |
Municipality of Rockwood |
Stonewall Collegiate - Steam Boiler System Replacement and Ventilation System Upgrades |
This project consists of the replacement of fan coil units and variable air volume boxes in classrooms, the installation of a central dual core energy recovery ventilator (ERV), the installation of a make-up air unit (MUA), the installation of a roof top unit (RTU) and the corresponding upgrade of the heating system. |
$695,760 |
$173,940 |
City of Selkirk |
Betel Personal Care Home - Air Handling Unit Replacements |
This project consists of upgrading the HVAC system to improve ventilation by increasing filtration and air changes. |
$236,000 |
$59,000 |
City of Thompson |
Thompson General Hospital (TGH) - OR Department Humidity Control Phase II |
This project consists of an upgrade to the HVAC system to provide adequate operating room humidity control, in order to reduce downtime. |
$800,000 |
$200,000 |
City of Thompson |
Thompson General Hospital (TGH) - Building Management System Controls Upgrade |
This project consists of the upgrade of an obsolete HVAC control system, in order to better provide optimal environmental conditions. |
$88,234 |
$102,165 |
City of Winnipeg |
Lions Manor Personal Care Home - Air Handling Unit Replacement #3 |
This project consists of upgrading the HVAC system to improve ventilation by increasing filtration and air changes. |
$16,240 |
$4,060 |
City of Winnipeg |
Lions Manor Personal Care Home - Air Handling Unit Replacement #4 |
This project consists of upgrading the HVAC system to improve ventilation by increasing filtration and air changes. |
$21,200 |
$5,300 |
City of Winnipeg |
Lions Manor Personal Care Home - Air Handling Unit Replacement #5 |
This project consists of upgrading the HVAC system to improve ventilation by increasing filtration and air changes. |
$30,400 |
$7,600 |
City of Winnipeg |
Golden Links Lodge Personal Care Home - Geothermal Well Upgrade |
This project consists of upgrading the Geothermal Well Pump to increase the systems cooling capacity to provide suitable environmental conditions. |
$48,800 |
$12,200 |
City of Winnipeg |
Lions Manor Personal Care Home - Air Handling Unit Replacement #2 |
This project consists of upgrading the HVAC system to improve ventilation by increasing filtration and air changes. |
$60,320 |
$15,080 |
City of Winnipeg |
Saul & Claribel Simkin Centre - Replace Kitchen Condensing Unit |
This project consists of replacing the kitchen’s Condensing Unit to increase the systems cooling capacity to provide suitable environmental conditions. |
$72,000 |
$18,000 |
City of Winnipeg |
Lions Manor Personal Care Home - Air Handling Unit Replacement #1 |
This project consists of upgrading the HVAC system to improve ventilation by increasing filtration and air changes. |
$78,320 |
$19,580 |
City of Winnipeg |
Cadham Provincial Laboratory - Cooling Upgrade |
This project consists of a cooling system upgrade to increase the overall cooling capacity, providing suitable environmental conditions. |
$80,000 |
$20,000 |
City of Winnipeg |
Actionmarguerite - Replace and Upsize Rooftop Air Handling System |
This project consists of upgrading the HVAC system to improve ventilation by increasing filtration and air changes. |
$104,000 |
$26,000 |
City of Winnipeg |
Bethania Personal Care Home - Main Air Handling Unit Mechanical Upgrade |
This project consists of upgrading the HVAC system to improve ventilation by increasing filtration and air changes. |
$109,024 |
$27,256 |
City of Winnipeg |
Grace General Hospital - Critical Building Management Control System Upgrade Phase 2 |
This project consists of upgrading the HVAC system to improve ventilation by increasing filtration and air changes. |
$112,000 |
$28,000 |
City of Winnipeg |
Fred Douglas Lodge Personal Care Home - East Side Heat and Air Conditioning Unit Replacement |
This project consists of upgrading to the buildings heating and cooling capacity to provide suitable environmental conditions. |
$200,000 |
$50,000 |
City of Winnipeg |
Ecole Precieux Sang - Boiler Replacement and Ventilation Upgrades |
This project includes replacing the school’s boiler heating system capacity and the classroom unit ventilators. |
$240,000 |
$60,000 |
City of Winnipeg |
Health Sciences Centre (HSC) - Cooling/ Condensing Unit Replacement Phase 1 |
This project consists of upgrading the cooling system to increase the overall capacity to provide suitable environmental conditions. |
$260,000 |
$65,000 |
City of Winnipeg |
St. Boniface Hospital - Install Redundant Operating Room Exhaust Fan |
This project includes supplying and installing supply and installation of redundant exhaust fans for site operating rooms to meet current healthcare code requirements. |
$328,000 |
$82,000 |
City of Winnipeg |
Health Sciences Centre (HSC) - HVAC Controls Upgrade Phase 1 |
This project consists of upgrading the HVAC control system to better provide optimal environmental conditions. |
$560,000 |
$140,000 |
City of Winnipeg |
Victoria General Hospital - HVAC Upgrade Phase 2 Operating Rooms |
This project includes installing an additional AHU for site operating rooms to meet current healthcare code requirements. |
$640,000 |
$160,000 |
City of Winnipeg |
Misericordia Hospital - Building Management System Controls Upgrade Phase 1 |
This project consists of upgrading the HVAC control system to better provide optimal environmental conditions. |
$680,000 |
$170,000 |
City of Winnipeg |
Health Sciences Centre (HSC) - HVAC Controls Upgrade Phase 2 |
This project consists of upgrading the HVAC control system to better provide optimal environmental conditions. |
$1,200,000 |
$300,000 |
City of Winnipeg |
Health Sciences Centre (HSC) - General Hospital HVAC Upgrade Phase 10 |
This project consists of upgrading the HVAC system to improve ventilation by increasing filtration and air changes. |
$1,200,000 |
$300,000 |