Joint federal, territorial and community funding through the Investing in Canada Plan will support seven wastewater and solid waste projects in the Northwest Territories.
The Government of Canada is investing over $5.1 million in these projects through the Green Infrastructure Stream (GIS) of the Investing in Canada Infrastructure Program. The Government of the Northwest Territories, Northwest Territories’ communities and Indigenous recipients are providing more than $1.7 million towards these projects.
Project Information:
Ultimate Recipient |
Project Name |
Project Description |
Federal Funding |
Recipient Funding |
---|---|---|---|---|
Community Government of Behchokǫ̀ |
Behchokǫ̀ Landfill Upgrade and Expansion |
Construction of an additional landfill cell, a brand new landfill office, weigh scale, controlled gate, and fencing. |
$1,237,500 |
$412,500 |
Hamlet of Fort Resolution |
Fort Resolution Landfill Upgrades |
Road access improvements to reduce standing water on the access road, updates to facility signage and the installation of a 150m fence to capture solid waste from leaving the landfill site. |
$63,724 |
$21,241 |
Village of Fort Simpson |
Fort Simpson Wastewater Sludge Management and Solid Waste Landfill Improvements |
Construction of a lined wastewater sludge management site, a dedicated household hazardous waste area and a reconfiguration of the landfill to better control access through a transfer station concept. |
$750,000 |
$250,000 |
Town of Fort Smith |
Fort Smith Landfill Expansion |
Construction of new waste cells, a waste transfer station, and the development of a compost treatment facility to reduce landfill by approximately 50% by diverting organic waste and processing into useable soil. |
$1,056,125 |
$352,041 |
Government of Northwest Territories |
North Slave Regional Community Landfills Waste Diversion and Improvement Program |
Rehabilitation of five existing solid waste landfills in Behchokǫ̀, Gamèti, Fort Providence, Wekweètì, and Whatì by increasing volumetric capacity by 30,000-45,000 cubic metres (total across all sites). |
$1,113,750 |
$371,250 |
Town of Inuvik |
Inuvik Solid Waste Site Expansion |
Installation of an electrified fence to prevent bears from entering the solid waste site. |
$600,000 |
$200,000 |
Hamlet of Paulatuk |
Paulatuk Sewage Lagoon Upgrade |
Construction of a berm around the Paulatuk sewage lagoon. |