Backgrounder: Active and public transportation infrastructure upgrades underway for communities throughout Alberta
Backgrounder
The federal government is investing $36,301,698 through the Active Transportation Fund (ATF), the Rural Transit Solutions Fund (RTSF), and the Public Transit Infrastructure Stream of the Investing in Canada Infrastructure Program (ICIP-PTIS) to support over 50 communities with 48 projects across Alberta.
Project Information:
Location |
Project Name |
Project Details |
Funding Program |
Federal Funding |
Municipal Funding |
Other Funding |
---|---|---|---|---|---|---|
City of Airdrie |
Active Transportation Strategy Development |
The City’s first active transportation plan will establish principles and objectives, policy framework, service and design standards, goals for legacy infrastructure, and a 10-year implementation, phasing, and investment plan. |
ATF |
$50,000 |
$25,000 |
$0 |
Town of Banff; Town of Canmore; Hamlet of Lake Louise |
Purchase of vehicles and supporting infrastructure |
The Bow Valley Regional Transit Services Commission will purchase three accessible electric transit buses and a multi-dispenser charging station for an existing transit service run by Roam in Banff, Canmore and Lake Louise to address traffic issues and pollution and support resident mobility and employment access throughout the Bow Valley region. |
RTSF |
$3,938,000 |
$984,500 |
$0 |
Village of Beiseker; City of Chestermere; Town of Cochrane; Town of Crossfield; Town of Irricana; Rocky View County |
Expansion of wheelchair-accessible rural Community bus fleet in Rocky View County and Area |
The Rocky View Regional Handy Bus Society will purchase five new accessible buses to establish a more reliable and broader transit system in Crossfield, Chestermere, Cochrane, Rocky View County, Beiseker, Irricana, Redwood Meadows and potentially link the communities to Calgary. |
RTSF |
$475,000 |
$0 |
$118,750 (Rocky View Regional Handibus Society |
Municipal District of Big Lakes; Municipal District of Birch Hills County; Driftpile First Nation; Municipal District of Fairview No. 136; Municipal District of Grande Prairie No. 1 (County); Hamlet of Grouard; Municipal District of Lesser Slave River No. 124; Municipal District of Peace No. 135; Town of Peace River; Town of Slave Lake; Municipal District of Smoky River No. 130; Municipal District of Spirit River No. 133 |
Purchase of vehicles and supporting infrastructure to support transit |
Kapawe’no First Nation will acquire 12 zero-emission Vehicles (ZEVs), seven charging stations, five solar carports, and a transit hub for a diverse transit network benefiting the Indigenous communities of Kapawe’no First Nation, Grouard, Driftpile First Nation, Sucker Creek First Nation, and Sawridge First Nation. |
RTSF |
$3,827,734 |
$0 |
$25,000 |
The Municipal District of Red Deer County |
Rural Transportation Planning & Design Project for Red Deer County |
The County of Red Deer will review the current state of transportation options available to Red Deer County residents in the hamlets through surveys and community feedback. |
RTSF |
$50,000 |
$10,000 |
$0 |
Leduc County; |
Transit Needs Assessment and Feasibility Study |
The County of Leduc will conduct a transit needs assessment and feasibility study to better understand the transit requirements of the Nisku Business Park and rural areas of Leduc County. |
RTSF |
$50,000 |
$25,000 |
$0 |
Town of Canmore |
Installation of transit infrastructure for transit service in the Bow Valley Corridor and Town of Canmore |
Support new fixed-route bus infrastructure, including bus stops, to better serve the growing local and tourist population and, as well as reduce heavy traffic. |
RTSF |
$853,600 |
$213,400 |
$0 |
Town of Canmore |
Performance Study of Safety Characteristics of a Protected Intersection with Near-Side Signals |
The Town of Canmore will carry out a study of the protected intersection at Bow Valley Trail and Railway Avenue to examine its impacts on traffic safety in the Town and its transportation network. |
ATF |
$50,000 |
$0 |
$0 |
Town of Castor |
Purchase of an accessible vehicle to provide on-demand transportation service |
The Castor Halkirk Community Van Society will purchase a new wheelchair-accessible van to provide safe and reliable on-demand transportation service to the residents of Castor and Halkirk. |
RTSF |
$80,000 |
$0 |
$50,000 |
Town of Claresholm |
Connecting Claresholm: Expanding and Revitalizing Active Transportation Infrastructure to Promote Accessibility, Safety, and Inclusion |
The Town of Claresholm will construct new multi-use, accessible pathways and ramps that will connect to the Town’s existing active transportation routes. |
ATF |
$198,590 |
$132,393 |
$0 |
Municipal District of Clearwater County; Town of Rocky Mountain House |
The Tamarack Transit System |
The Clearwater Regional Housing Foundation will consult various community members and professionals to build an effective and efficient transit route. |
RTSF |
$50,000 |
$0 |
$0 |
Town of Coaldale |
2022 Walking & Biking Pathway Project |
Construction of a 3m wide asphalt multi-use pathway along the boundary of Parkside neighbourhood bordering 20th Avenue. Work also included installing a pedestrian crossing and signage along 20th Avenue at the entrance of Mountain Bike Park, and the development a 3m pathway south of the park. |
ATF |
$100,774 |
$67,183 |
$0 |
Town of Cochrane |
Policy development of multi-modal traffic bylaw with pathway and wayfinding design standards |
The Town of Cochrane will develop a policy that outlines best practices for multiple methods of transportation that shifts focus from vehicular to more active modes of transportation. |
ATF |
$50,000 |
$0 |
$0 |
Town of Cochrane |
Existing multi-use pathway paving upgrades and wayfinding in Cochrane, Alberta |
This project will upgrade 3.6km of paved multi-use pathway to an asphalt surface, as well as install wayfinding signage and pavement markers to further enable people to use active transportation. |
ATF |
$770,400 |
$513,600 |
$0 |
Town of Cochrane |
The Trail/Completing the Trail from Calgary to Canmore |
The Rotary Club of Cochrane will identify the needs and standards of the Trail, including benefits and an operations model. |
ATF |
$50,000 |
$0 |
$150,000 (Rotary Club of Cochrane Society) |
Town of Crossfield |
Active Transportation Plan |
The development of an active transportation plan to guide the enhancement of active transportation infrastructure. |
ATF |
$24,900 |
$0 |
$0 |
Town of Devon |
Purchase of an accessible vehicle to update the transit system |
Purchase of a new accessible community bus to improve the existing transit system's capacity to service seniors and those with reduced mobility in Town of Devon, Alberta. |
RTSF |
$112,000 |
$58,000 |
$0 |
Town of Didsbury |
Pedestrian Connectivity Master Plan |
The Town of Didsbury will develop a sustainable plan for a more connected, safe, and accessible pedestrian infrastructure network within Didsbury. |
ATF |
$50,000 |
$0 |
$0 |
Town of Drayton Valley |
Improving Community Connections: Active Transportation Enhancement Project |
There will be rehabilitation and widening of approximately 1,800m of multi-use asphalt pathways and install four sets of LED crosswalk signs along high-traffic routes to connect existing pathways and sidewalks. |
ATF |
$637,020 |
$424,680 |
$0 |
Town of Edson; Municipal District of Yellowhead County |
Public Transit Study |
The Town of Edson will conduct a study to identify transit options that would best meet the needs of residents. |
RTSF |
$45,000 |
$5,000 |
$5,000 |
Town of Gibbons |
Designing Gibbons Trails |
Development of a long-term strategy to improve the town’s active transportation network through engagement with the community and a report that outlines existing and future active transportation routes throughout the town. The goal is to improve trails and improve ways to connect parks, open spaces, and downtown areas. |
ATF |
$40,000 |
$15,000 |
$0 |
City of Grande Prairie |
Wayfinding Signage |
This project will provide signage in residential and commercial areas of Grande Prairie, connecting residents and visitors to the trail system from both arterial and non-arterial roads. |
ATF |
$60,000 |
$40,000 |
$0 |
Town of High River |
Active Transportation Plan |
The development of an active transportation plan and implementation plan based on High River’s Parks and Trails Open Spaces Master Plan. |
ATF |
$50,000 |
$0 |
$0 |
Municipality of Jasper |
Purchase infrastructure to launch a zero-emission transit system |
Purchase of zero-emission equipment and supporting infrastructure including a bus storage and maintenance facility supported by an engineering study to detail the facility requirements. This includes three battery electric buses, two electric bus chargers, 24 e-bikes, two e-bike solar charging stations and bike racks, e-bike engineering and public signage to launch a zero-emission transit system including a fixed-route bus and e-bike sharing service. The goals of the transportation system are to reduce vehicle congestion, prioritize environmental sustainability through zero-emission transit options, enhance the quality of life and transportation choices for residents and seasonal employees, and improve transportation experiences for visitors. |
RTSF |
$5,000,000 |
$3,054,200 |
$0 |
Municipality of Jasper |
Public Transit Solution Plan |
This project will support a long-term, comprehensive study on transit solutions for the municipality of Jasper. |
RTSF |
$50,000 |
$10,000 |
$0 |
Municipality of Jasper |
Promoting Active Transportation |
The Municipality of Jasper investigated developing a bicycle network to maximize the function of existing road right of way. The resulting feasibility study is now available on the municipality’s website. |
ATF |
$49,944 |
$0 |
$0 |
City of Lethbridge |
4 Avenue South and 7 Street South Bicycle Infrastructure Project |
The project will reconfigure and convert an 8-block section of 4 Avenue South from four to two lanes to install new protected bicycle lanes. |
ATF |
$1,200,000 |
$900,400 |
$794,854 |
City of Lethbridge |
Stafford Drive Pedestrian Overpass Project |
Through this planning project, the City of Lethbridge will engage stakeholders and evaluate design options to produce a tender-ready design for a safer multi-use overpass over Highway 3 and the CP railway. |
ATF |
$50,000 |
$250,000 |
$0 |
City of Lloydminster |
Bud Miller All Seasons Park Master Plan |
Development of a plan that will provide detailed information on possibilities for improving active transportation and increasing recreation opportunities. |
ATF |
$50,000 |
$100,000 |
$0 |
Town of Mayerthorpe |
Purchase of an accessible electric vehicle and install supporting infrastructure to expand bus services |
The Town will purchase a para-accessible minivan and install bus shelters, slow chargers, wheelchair accessibility sidewalk ramps and a new transit maintenance facility with supporting infrastructure to expand services and provide better day-to-day transit access. |
RTSF |
$570,359 |
$142,590 |
$0 |
City of Medicine Hat |
Transit Bus Replacements |
The project will replace end of life transit assets with new city buses. |
ICIP-PTIS |
$2,631,186 |
$5,428,814 |
$0 |
City of Medicine Hat |
Transit Scheduling System |
This project includes the one-time purchase of four years of consulting and scheduling services along with related data reporting tools for the purpose of improving the quality of existing public transit. |
ICIP-PTIS |
$38,400 |
$57,600 |
$0 |
City of Medicine Hat |
‘Moving Medicine Hat’ – Active Transportation Plan |
An active transportation plan will be developed that incorporates recommendations from public engagements and other established municipal plans. |
ATF |
$50,000 |
$75,000 |
$0 |
Village of Myrnam; Town of Two Hills; Municipal District of Two Hills No. 21 (County) |
Purchase of a vehicle to support demand-response transit system |
The Two Hills Family and Community Services Society will purchase a new vehicle to expand the on-demand response transit system for all community members of Two Hills. |
RTSF |
$80,000 |
$0 |
$20,000 |
Village of Myrnam; Town of Two Hills; Municipal District of Two Hills No. 21 (County), |
Two Hills and Area Community Assisted Transportation Project |
The Two Hills Family and Community Services Society will conduct a feasibility study to determine the viability of a Two Hills and surrounding area Community Assisted Transportation Program. |
RTSF |
$11,635 |
$0 |
$2,970 |
Town of Okotoks |
Active Transportation Strategy |
The Town of Okotoks will update and refine the existing active transportation strategy to generate a prioritized project list and an actionable strategy for implementation. |
ATF |
$50,000 |
$25,000 |
$0 |
Town of Olds |
Creating a Connected Community |
The Town of Olds will review existing plans to determine the best way to create a network of multi-use trails, including sidewalks, bicycle lanes, and safe crossings. |
ATF |
$50,000 |
$0 |
$0 |
City of Red Deer |
CPR Bridge Rehabilitation* |
The City of Red Deer will rehabilitate the CPR Pedestrian Bridge, a significant historical landmark which is used as a main active transportation corridor and forms part of the Trans Canada Trail. |
ATF |
$11,088,000 |
$7,892,000 |
$0 |
Municipal District of Rocky View County |
West Bragg Creek Paving Phase 2.2 |
The Bragg Creek Trails Association will pave the final 1.4km of the West Bragg Creek Trail segment going from Meadow View Road to Range Road 54. |
ATF |
$37,321 |
$121,369 (Rocky View Country) |
$87,082 |
Municipal District of Rocky View County |
West Bragg Creek Trail Paving Phase 3 |
The Bragg Creek Trails Association will pave 1.7km of the West Bragg Creek Trail along RR54 to complete the 10.1km regional pathway. |
ATF |
$190,131 |
$0 |
$126,754 |
Saddle Lake Cree Nation |
Pedestrian Network Master Plan and Implementation Strategy |
Saddle Lake Cree Nation will develop an active transportation plan that identifies priority projects and an implementation strategy, endorsed by Chief and Council. |
ATF |
$50,000 |
$0 |
$0 |
Town of Slave Lake |
Kapawe’no Adventure Trail |
The creation of two new trail loops with one connecting to the Community Cultural Center, a potential future transit hub. The project will encourage active transportation and recreational use within the community via a trail system for walking, cycling, skating, cross country skiing, hiking, and snowshoeing. |
ATF |
$500,000 |
$0 |
$5,000 |
Town of Stony Plain |
Trail link between the Town of Stony Plain and City of Spruce Grove |
The creation of an approximately 1.5km trail route that connects the Town of Stony Plain and City of Spruce Grove active transportation networks. |
ATF |
$918,360 |
$612,240 |
$0 |
Specialized Municipality of Strathcona County |
Strathcona County Footbridge - multi-use trail and amenities |
The Project will build a new multi-use trail that will connect to a pedestrian footbridge between the City of Edmonton and Strathcona County. The project will connect the two municipalities and improve access to the North Saskatchewan River Valley. |
ATF |
$690,000 |
$1,840,000 |
$0 |
Hamlet of Wabasca-Desmarais within Municipal District Opportunity No.17 |
Bigstone Cree Nation Active Transportation Plan |
Bigstone Cree Nation will develop an active transportation plan to provide residents with a safe and convenient space to travel by foot, by wheelchair (or other assistive devices), or by bicycle. The focus of the Bigstone Active Transportation Plan will be on the Ka’Asom’skaski and Nimiscikosihk Reserves (Wabasca 166A), located next to Wabasca-Desmarais, to provide connections between key destinations within these communities and to the adjacent hamlet. |
ATF |
$50,000 |
$0 |
$0 |
Town of Whitecourt |
Centennial Park Pathway Rehabilitation |
The Town of Whitecourt will repair 5.2km of trail, widen pathways, and install new signage along the Centennial Park Pathway System. |
ATF |
$1,183,344 |
$788,896 |
$0 |
Regional Municipality of Wood Buffalo |
Active Transportation Trail – Phase 2 |
This planning project is to prepare tender drawings for approximately 2000m of trail linking the Beacon Hill and Gregoire East Side Trails and develop a 3m paved trail. |
ATF |
$50,000 |
$95,000 |
$0 |
Regional Municipality of Wood Buffalo |
Prairie Creek Perimeter Trail – Design |
This design study will identify community needs through public engagement to develop a double fence (one for pedestrians and another for horses) along the edge of the Clearwater Horse Club and the neighborhood. |
ATF |
$50,000 |
$100,000 |
$0 |
*Federal funding is conditional on fulfilling all requirements related to consultation with Indigenous groups and environmental assessment obligations.