Table of Contents
- 1. Introduction
- 2. Departmental context
- 3. Public Services and Procurement Canada Office of Evaluation
- 4. Key achievements in fiscal year 2020 to 2021
- 5. Annual evaluation planning exercise
- Appendix 1: Public Services and Procurement Canada Departmental Results Framework and Program inventory
- Appendix 2: Approach Used to Develop the Departmental Evaluation Plan for fiscal years starting in 2021 to 2022 and ending in 2025 to 2026
- Appendix 3: Planned evaluation projects from 2021 to 2022 until 2025 to 2026, per fiscal year
- Appendix 4: Programs excluded from the Departmental Evaluation Plan for fiscal years starting in 2021 to 2022 and ending in 2025 to 2026
List of tables
- Table 1: Fiscal year 2021 to 2022 gross budget expenditures forecast per core responsibility
- Table 2: Evaluation projects in fiscal year 2020 to 2021
- Table 3: Examples of types of advisory services provided in fiscal year 2020 to 2021
- Table 4: Types of mandatory evaluations from 2021 to 2022 until 2025 to 2026, according to the launch date
- Table 5: Number of discretionary evaluations per fiscal year, according to the launch date
- Table 6: Evaluation projects in fiscal year 2021 to 2022
- Table 7: Evaluation function transformation and planned innovation activities in fiscal year 2021 to 2022 and thereafter
- Table 8: Current planning and reporting activities
List of figures
Deputy head confirmation note
I approve the Departmental Evaluation Plan of Public Services and Procurement Canada for fiscal years starting in 2021 to 2022 and ending in 2025 to 2026 which I submit to the Treasury Board of Canada Secretariat as required by the Policy on Results (2016).
I confirm that this 5-year rolling Departmental Evaluation Plan:
- plans for evaluations of all ongoing programs of grants and contributions with 5-year average actual expenditures of $5 million or greater per year at least once every 5 years, in fulfillment of the requirements of subsection 42.1 of the Financial Administration Act
- meets the requirements of the Mandatory Procedures for Evaluation
- supports the requirements of the expenditure management system including, as applicable, Memoranda to Cabinet, Treasury Board submissions, and resource alignment reviews
I will ensure that this plan is updated annually, and I will provide information about its implementation to the Treasury Board of Canada Secretariat, as required.
Original signed by:
Bill Matthews
Deputy Minister
Public Services and Procurement Canada
List of acronyms and abbreviations
- CR
- Core responsibility
- DRF
- Departmental results framework
- EAC
- Evaluation Advisory Committee
- ECCC
- Environment and Climate Change Canada
- OE
- Office of Evaluation
- PCH
- Canadian Heritage
- PMERC
- Performance Measurement, Evaluation and Results Committee
- PSPC
- Public Services and Procurement Canada
- TB
- Treasury Board
- TBS
- Treasury Board of Canada Secretariat
1. Introduction
This document presents the Departmental Evaluation Plan (the plan) for PSPC for fiscal years starting in 2021 to 2022 and ending in 2025 to 2026. It was developed in compliance with the requirements of the TB’s Policy on Results and associated instruments. The plan is an information and management tool that enables the Head of Evaluation to plan the evaluations and resources for the next 5 years. Its purpose is to provide senior management with access to credible, neutral and timely information to support evidence-based decision making.
The plan is based on the results of consultations with department senior managers. It is approved by the Deputy Minister and then shared with the TBS.
2. Departmental context
PSPC plays an important role in the daily operations of the Government of Canada. As the central purchasing agent, real property manager, linguistic authority, treasurer, accountant, pay and pension administrator, and common service provider, it supports federal departments and agencies in the achievement of their mandated objectives. Its mission is to deliver high quality programs and services, ensure sound stewardship on behalf of Canadians, and meet the program needs of federal institutions.
The portfolio of PSPC includes the National Capital Commission as well as 3 Crown corporations (Canada Lands Company, Defence Construction Canada and Canada Post).
Mandate and priorities
PSPC fulfills its mandate through 5 CRs stated in the DRF:
- purchase of goods and services
- payments and accounting
- property and infrastructure
- government-wide support
- procurement OmbudsmanFootnote 1
The 5 CR and the program inventory are presented in a table in Appendix 1: Public Services and Procurement Canada Departmental Results Framework and Program inventory. The Office of the Procurement Ombudsman is an independent entity included in the DRF and was not considered in the development of the plan because it reports directly to Parliament through the Minister.
According to PSPC’s Departmental Plan for fiscal year 2021 to 2022, the gross budget expenditures forecast for the fiscal year total approximately $4.5 billion in programs, policies, initiatives and services.
Broad Public Services and Procurement Canada and Government of Canada priorities
- Protecting public health by supporting Canada’s response to the pandemic
- Ensuring a strong economic recovery by making key procurements for supporting defence and land needs
- Promoting a cleaner environment by supporting 0-emission objectives
- Ongoing commitment to inclusion and diversity
- Review of the Accommodation Strategy
- Transition to digital government
- Progress in the work to eliminate the backlog of public service payroll files
Core responsibility | Expenditures forecast |
---|---|
CR 1 Purchase of goods and services | $165,373,648 |
CR 2 Payments and accounting | $564,223,848 |
CR 3 Property and infrastructure | $3,244,445,160 |
CR 4 Government-wide support | $157,928,212 |
CR 5 Procurement Ombudsman | $4,211,647 |
Internal Services | $355,047,666 |
Total budget | $4,491,230,181 |
3. Public Services and Procurement Canada Office of Evaluation
According to the Policy on Results (2016), evaluation is defined within the Government of Canada as the systematic and neutral gathering and analysis of evidence in order to evaluate the rationale, merit or value of programs, initiatives, internal services, policies or priorities. Evaluation has a specific function and organizational governance structure.
3.1 Evaluation function: On the path to transformation and innovation
The mission of the OE is to conduct high-quality and timely evaluations to guide and support the decision-making process, improvements, innovation and accountability.
To fulfill its mandate, the OE has 4 priorities, while supporting the priorities of the department and those of the Government of Canada.
Priorities of the Office of Evaluation
- Impact
- Deliver high quality and timely evaluations meeting the information needs of senior management for evidence-based decision-making
- Innovation
- Implement innovative evaluation approaches based on risk and complexity in a neutral manner and with integrity
- Collaboration
- Establish effective collaboration and engagement with clients and stakeholders that reflect accountability and transparency
- Capacity
- Stabilize the evaluation team, foster professional development and knowledge transfer, and build evaluation tools and protocol
The OE applies the flexibility provided by the Policy on Results and offers various types of evaluations to meet the information needs of senior management. These evaluations take into account the lifecycle of a program, initiative or policy (design, implementation and others) and uses social science research methods that enable the neutral and systematic gathering and analysis of evidence.
In addition to conducting evaluations, the OE offers a variety of advisory services relating to evaluations, performance measurement, research and special studies intended to support the department in an effective and timely manner.
The OE also has resources dedicated to professional practices, the activities that strengthen the evaluation function. Apart from planning, reporting and internal liaison activities with federal institutions, the objective of the professional practices component is to develop tools to promote innovation and efficiency within the evaluation team.
3.2 Organizational structure and governance
The OE is part of the Evaluation and Integrated Risk Management Sector. In September 2020, following a reorganization, the sector joined the Office of the Chief Audit, Evaluation and Risk Executive to better meet the needs of the department.
The Chief Audit, Evaluation and Risk Executive assumes the role of Head of Evaluations at PSPC. His work is supported by the Director General of the Evaluation and Integrated Risk Management Sector , the Director of Evaluation, as well as the Evaluation Team.
The evaluation function is in turn supported by the following governance structure.
Figure 1: Office of the Chief Audit, Evaluation and Risk Executive Organization Chart

Text equivalent
Office of the Chief, Audit Evaluation and Risk Executive
- Audit
- Evaluation and Integrated Risk Management Sector
- Risk
- Evaluation
Evaluation Advisory Committee
The EAC was established in February 2021 following the recommendations of the neutral assessment of the PSPC evaluation function. This subcommittee supports the PMERC. It is chaired by the Associate Deputy Minister and its members include the Head of Evaluation, 4 Associate Deputy Ministers for programs and internal services as well a representative from 1 of the 5 regions. The mandate of the EAC is to support the evaluation function by providing strategic guidance, promoting the lessons learned from the evaluations, highlighting the evaluation function, and promoting evaluation within the department.
Performance Measurement, Evaluation and Results Committee
The PMERC is chaired by the Deputy Minister and consists of the members of senior management. It supervises the evaluation function within the department in compliance with the Policy on Results and provides recommendations to the Deputy Minister regarding planning, resources and coordination of the function as well as the use of evaluation information in the decision-making process.
4. Key achievements in fiscal year 2020 to 2021
PSPC has adapted well to the COVID-19 pandemic repercussions and remains on the path to transformation and innovation.
4.1 Background: Impact of the COVID-19 pandemic
In response to the COVID-19 pandemic in the spring of 2020, PSPC played a key role in helping secure personal protective equipment, tests, and vaccines for Canadians. The pandemic has had significant repercussions on the work performed by the OE, which had to adapt to a rapidly evolving environment, while maintaining its activities to provide useful and relevant information in a timely manner.
The repercussions of the pandemic on the OE included:
- a change in how the evaluation team works, having to adapt to the reality of telework
- a slowdown in activities and delays in the finalization of some deliverables as a result of changing priorities
- a redefinition of the scope and time frame for the evaluation of a pilot project that could not be completed as planned, due to the repercussions of COVID-19 on the initiative
4.2 Plan implementation: On the path to transformation and innovation
In fiscal year 2020 to 2021, through evaluation projects, advisory services and professional practices, the OE supported the decision-making process at the department by providing evidence in a timely manner. The OE also initiated a series of measures aimed at transforming and innovating evaluation practices at PSPC in order to increase its usefulness. These transformation efforts will continue in fiscal year 2021 to 2022.
Types of evaluation projects recognized in the Policy on Results
- Mandatory
- Evaluation of programs or initiatives that must be implemented at specific times in accordance with commitments made in TB submissions as well as evaluations of all ongoing programs of grants and contributions with 5-year average actual expenditures of $5 million or greater per year. In addition, at PSPC, evaluations that have started and been carried over from 1 year to the other.
- Discretionary
- Evaluation of programs, internal services, policies and priorities for which the evaluation schedule is based on an analysis of risks, needs and priorities.
In fiscal year 2020 to 2021, the evaluation team worked on 5 evaluation projects, including participation in 2 horizontal evaluations managed by other departments. These projects included 1 evaluation that was approved in fiscal year 2020 to 2021, 3 evaluations that began in fiscal year 2020 to 2021 (including 2 horizontal evaluations), and 1 evaluation that was postponed until fiscal year 2021 to 2022 (the evaluation scope is being revised).
Evaluation project | Branch | Launch date | Planned Deputy Minister approval date |
---|---|---|---|
Evaluation at Public Services and Procurement Canada | |||
Evaluation of the Risk-based Defence Procurement Pilot. Mandatory evaluation. | Procurement Branch and Defence Marine Procurement Branch | December 2019 | June 2020 |
Evaluation of PSPC’s Use of Selected Consulting Services. Mandatory evaluation. | Not applicable (n/a) | August 2020 | September 2021 |
Evaluation of Federal Accommodations and Special Purpose Space (initial evaluation scope: Pathfinder pilot project). Evaluation scope is being revised. Mandatory evaluation | Real Property Branch | January 2021, Revised in June 2021 | March 2022 |
Contribution to horizontal evaluations carried out by other departments | |||
Federal Leadership Towards Zero Plastic Waste in Canada Initiative. Mandatory evaluation/horizontal. Lead department: ECCC | Real Property Services | October 2020 | March 2022 |
Evaluation of the Action Plan for Official Languages Mandatory evaluation/horizontal. Lead department: PCH. | Translation bureau | November 2020 | May 2022 |
Innovation and collaboration
The innovative practices introduced in fiscal year 2020 to 2021 to ensure the usefulness and quality of the services offered include the following:
- the evaluation working group for the evaluations that began in fiscal year 2020 to 2021
- the evaluation working groups consist of key stakeholders associated with the program for the duration of the evaluation
- the objective of this collaborative approach is to ensure the evaluation project progresses in the right direction and that the evaluation team receives relevant and timely advice on an array of evaluation issues
- new evaluation approaches
- the OE is applying the flexibility offered by the Policy on Results and is developing new options to scope the evaluation
- the OE is proposing innovative approaches to ensure the usefulness of evaluation projects
- introduction of visual evaluation product
- in response to the requirement of the Policy on Results regarding evaluation summaries, the OE introduced infographics in fiscal year 2020 to 2021 as a new practice for presenting information in a visual and concise manner to make the information easier to understand
- in so doing, the evaluation team is looking to communicate information more quickly and increase the dissemination of evaluation products to various types of stakeholders
Advisory services
In addition to evaluation projects, the team reviewed and provided advice on a large number of TB submissions as well as on planning and performance documents (for example, Departmental Plan, Departmental Results Report, Integrated Planning Report). The team also contributed to the meaningful review of 22 Program Performance Information Profiles to ensure that the information on future and past evaluations is appropriately reflected and accurate.
The OE provided ad hoc advisory services for various department programs and initiatives during fiscal year 2020 to 2021. The details are provided in Table 3.
Programs or initiatives | Examples of types of advisory services provided |
---|---|
Career management and leadership services | Evaluability study |
Restarting of the departmental loading program | Support in developing the logic model |
Consulting services on socio-economic procurement experimentation pilot | Peer review of the final report |
Phase 2 of the Risk-Based Defence Procurement Pilot Project | Support in developing the logic model |
Professional practices
The professional practices component contributed to the efficiency and effectiveness of the evaluation function by providing support for the evaluators’ work.
During the year, various tools to support the function were developed, including an Evaluation 101 presentation intended to raise awareness and inform new evaluation team members, working group members, program managers, and officers about the evaluation function at PSPC and evaluation stakeholders’ duties and responsibilities. Employees in professional practices also worked on improving internal procedures and the information management system, such as the restructuring of GCdocs (information management solution adopted by PSPC) and the development of a follow-up sheet to provide progress reports on evaluation projects and other evaluation activities. These initiatives help to improve the team’s efficiency by improving coordination of work.
An annual recommendation follow-up activity was also conducted with program officials. The objective was to evaluate progress made in implementing Management Action Plans approved in response to the recommendations stemming from the evaluations. However, in order to reduce the administrative burden on programs due to changes in priorities following the repercussions of the COVID-19 pandemic, only 1 follow-up was carried out during the year.
With a view to raising awareness and increasing the visibility of the evaluation function within the department, the employees in professional practices worked closely with the communications team and colleagues in the Integrated Risk Management Directorate to help create an intranet site page for the Office of the Chief Audit, Evaluation and Risk Executive. This intranet page was launched in March 2021. It will continue to improve its intranet presence in the current fiscal year.
Lastly, the team worked with the evaluation community at the federal government level to improve the use of evaluation report data. In that regard, it provided support for the results team at the TBS as part of the pilot project for the Evaluation Report Information System. In addition, the Director General, Evaluation and Integrated Risk Management Sector, is a member of the Government of Canada’s Evaluation Steering Committee and the Director of Evaluation is a member of the Federal Community Strategic Council.
4.3 Evaluation function capacity and resources
The work involved in transforming the evaluation function also included a focus on enhancing its capacity. Considerable progress was made in fiscal year 2020 to 2021 to rebuild the team and promote professional development.
Various types of training have been provided to strengthen the internal capacity of the evaluation function.
Individual training sessions were held to help evaluators expand their current skills and acquire new knowledge of innovative methods and evaluation techniques. Training was also provided on the series of essential evaluation skills as well as training on data visualization and the creation of effective infographics to team members. The team also participated in discussion sessions on the lessons learned from COVID-19 regarding evaluation and performance measures offered by the Canadian Evaluation Society (CES). 9 employees are CES members and management will continue to support the membership of evaluators in the Society in fiscal year 2021 to 2022.
Various group training sessions were also held to introduce the team to department practices as well as the new work protocols resulting from the pandemic. The topics included information sessions on cybersecurity and the optimized use of GCdocs.
The OE also provided support for department mental health initiatives. In addition to encouraging the team to participate in various activities and presentations provided by the Office of the Ombudsman, the team also participated in sessions on resilience organized for employees by the Branch. A discussion space was also created in the form of informal weekly meetings where team members could get to know one another and discuss various topics other than work.
5. Annual evaluation planning exercise
Various steps were required during the conducting of this annual evaluation planning exercise. The approach and methodology overview, the planned evaluation projects, the planning of activities in support of the transformation of the evaluation function and the planning of current and reporting activities are described below.
5.1 Approach and methodology overview
In accordance with TB requirements, an annual planning exercise was conducted to identify evaluation projects that will be carried out during the next 5-year evaluation cycle. See Appendix 2: Approach Used to Develop the Departmental Evaluation Plan for fiscal years starting in 2021 to 2022 and ending in 2025 to 2026 of this document for the main steps involved in this exercise.
This year, with the integration of the OE within the Office of the Chief Audit, Evaluation and Risk Executive, the evaluation and audit functions continued to adopt a more strategic approach to harmonize the planning exercises to the extent possible. The objective was not only to promote better synergy between the 2 functions, but also to reduce the burden of this exercise on the stakeholders. To achieve this, the following activities in the plan were carried out in collaboration with Audit:
- planning and engagement of joint consultations with the department's senior management
- alignment of the evaluation and audit schedules with respect to governance and development of common presentations to some committees
- identification of joint projects
5.2 Planned evaluation projects
Given that PSPC is an operational department, the evaluation team benefited from the flexibility provided by the Policy on Results to prioritize evaluation projects that meet the information needs and priorities of the department’s senior management.
Consequently, for the period covering fiscal years starting in 2021 to 2022 and ending in 2025 to 2026, the plan includes a total of 24 evaluation projects.
Of these evaluation projects, 11 are mandatory, including 5 horizontal evaluations lead by other departments, and 13 are discretionary, including 1 joint project with the Audit Team.
Appendix 3: Planned evaluation projects from 2021 to 2022 until 2025 to 2026, per fiscal year shows the detailed schedule of the evaluations planned over the next 5 years.
Evaluation project | Reason for the evaluation | 2020 to 2021 | 2021 to 2022 | 2022 to 2023 | 2023 to 2024 | 2024 to 2025 | 2025 to 2026 |
---|---|---|---|---|---|---|---|
Evaluation of PSPC’s Use of Selected Consulting Services | Mandatory: carried over | Launch | n/a | n/a | n/a | n/a | n/a |
Federal Leadership Towards Zero Plastic Waste in Canada Initiative (Lead department: ECCC) | Mandatory: horizontal | Launch | n/a | n/a | n/a | n/a | n/a |
Evaluation of the Action Plan for Official Languages (Lead department: PCH) | Mandatory: horizontal | Launch | n/a | n/a | n/a | n/a | n/a |
Evaluation of Federal Accommodations and Special Purpose Space (initial evaluation scope: Pathfinder pilot project). Evaluation scope is being revised | Mandatory: carried over | Launch | n/a | n/a | n/a | n/a | n/a |
Evaluation Framework for Phase 2 of the Risk-based Defence Procurement Pilot | Mandatory: TB submission | n/a | Launch | n/a | n/a | n/a | n/a |
Canadian Drugs and Substances Strategy (including the Substance Use and Addictions Program, and Opioid Response) (Lead department: Health Canada) | Mandatory: horizontal | n/a | Launch | n/a | n/a | n/a | n/a |
Evaluation of the Accessible Government Built Environment Initiative | Mandatory: TB submission | n/a | n/a | Launch | n/a | n/a | n/a |
Federal Contaminated Sites – Phase 4 Federal Contaminated Sites Action Plan (Lead department: ECCC) | Mandatory: horizontal | n/a | n/a | Launch | n/a | n/a | n/a |
National Strategy to Combat Human Trafficking (Lead department: Public Safety) | Mandatory: horizontal | n/a | n/a | n/a | Launch | n/a | n/a |
Evaluation of the Electronic Procurement Solution | Mandatory: TB submission | n/a | n/a | n/a | Launch | n/a | n/a |
Evaluation of the Phase 2 of the Risk-based Defence Procurement | Mandatory: TB submission | n/a | n/a | n/a | Launch | n/a | n/a |
Table 4 Note
|
Number of discretionary evaluations | 2021 to 2022 | 2022 to 2023 | 2023 to 2024 | 2024 to 2025 | 2025 to 2026 |
---|---|---|---|---|---|
Discretionary evaluations | 2 | 1 | 1 | 5 | 4 |
It is important to note that evaluation projects could be added to the schedule, depending on availability of additional resources and/or on evolving priorities and information needs. These potential additional projects could include:
- an evaluation with a cross-cutting theme, which might include a post-pandemic human resources (HR) theme (including the issue of diversity and inclusion) or a greening and sustainability theme
- a study of the lessons learned from a cross-cutting theme which could include topics such as innovation in procurement (Science and Parliamentary Infrastructure Branch), the impact of information technologies on operations as well as best practices for informing business continuity plans or Phase 2 of the lessons learned from COVID-19Footnote 2
- a Real Property Services evaluation that could focus on the current context for the Government of Canada's real estate portfolio and the possibility of change given the new reality after COVID, which could impact real estate operations, including disposalsFootnote 3
- a specific evaluation and/or other products related to the evolution of work in a short term
Core responsibility | Title of the evaluation project | Date |
---|---|---|
Projects started in fiscal year 2020 to 2021 to be completed between fiscal years starting in 2021 to 2022 and ending in 2022 to 2023 (mandatory) | Deputy Minister’s approval date (planned) | |
CR1 | Evaluation of PSPC’s Use of Selected Consulting Services | September 2021 |
CR3 | Horizontal evaluation: Federal Leadership Towards Zero Plastic Waste in Canada Initiative (Lead department: ECCC) | March 2022 |
CR3 | Evaluation of the Federal Accommodation and Special Purposes Space. The evaluation scope in under discussion. | March 2022 |
CR4 | Horizontal evaluation: Evaluation of the Action Plan for Official Languages (Lead department: PCH) | May 2022 |
Projects to be launched in 2021 to 2022 | Planned launch date for the evaluation | |
CR1 | Evaluation Framework for Phase 2 of the Risk-based Defence Procurement Pilot | September 2021 |
CR4 | Evaluation of Shared Travel Services | September 2021 |
CR4 | Horizontal evaluation: Canadian Drugs and Substances Strategy (including the Substance Use and Addictions Program, and Opioid Response) (Lead department: Health Canada) | December 2021 |
CR1 | Phase 2 - Evaluation of PSPC’s Use of Selected Consulting Services | February 2022 |
The plan includes 14 of the 20 programs listed in the program inventory, excluding the Procurement Ombudsman, and covers approximatively 96% of departmental planned program spending or $3.6 billion of the $4.15 billion allocated to PSPC for 2021 to 2022 (this amount excludes external services and Procurement Ombudsman). See table 1: Fiscal year 2021 to 2022 gross budget expenditures forecast per core responsibility for more details.
6 programs, representing a total of 3.8% planned program spending, are excluded from the current evaluation plan. The details regarding these programs and the rationale for their exclusion are included in Appendix 4: Programs excluded from the Departmental Evaluation Plan for fiscal years starting in 2021 to 2022 and ending in 2025 to 2026 of this plan.
5.3 Planning of activities in support of the transformation of the evaluation function
The OE will continue to transform the evaluation function at PSPC in 2021 to 2022, by implementing innovative activities aimed at improving the quality of products and by offering relevant evaluation services in a timely manner. In addition to the innovative activities introduced in 2020 to 2021, Table 7 illustrates the innovative activities that will be introduced in 2021 to 2022.
Activities | Description |
---|---|
Real-time evaluations | Evaluations of shorter duration or in real time in order to meet the information needs of senior management. |
Scope of the innovative evaluations and methods | Consider evaluating priorities as well as themes at PSPC, such as the thematic evaluation of the PSPC use of selected consulting contracts for the use of professional services or evaluations that might include themes on post-pandemic, human resources or greening and sustainability. These evaluations will be focussed on information needs. Innovative evaluation methods will continue to be adopted to ensure the usefulness of evaluations. |
Quality assurance | Make sure that the quality assurance for evaluation products is risk-based and comply with evaluation standards and procedures. |
Concise reporting | Develop more concise reporting in order to increase the usefulness of products and meet the needs of various stakeholders in a timely manner. |
Lessons learned | Hold sessions on lessons learned internally once the evaluation projects are completed in order to share best practices and strengthen team capacities. |
Post-project survey | Incorporate the results from the post-project survey more effectively. As much as possible, also expand the scope beyond the evaluation projects to include advisory services. |
Integration of Indigenous perspectives in evaluations | Continue to develop a critical path to consider the Indigenous perspectives that will incorporate guiding principles, approaches, an inventory of questions, methods and evaluation tools appropriate to evaluation projects within an Indigenous context, as appropriate. |
Audit | Continue to improve the synergy with the audit function in order to adopt more effective practices and reduce overlap between, or the burden on, the programs. |
Networking | Creation of a community of practice at the government level for the operating departments in order to share best evaluation and management practices. |
5.4 Planning of current planning and reporting activities
In 2021 and 2022, the OE will continue to plan routine planning and reporting activities. Table 8 describes the main planning activities.
Activities | Description |
---|---|
Advisory services |
|
Departmental Evaluation Plan |
|
Tracking of the implementation of management recommendations and action plans stemming from the evaluations |
|
Internal liaison |
|
External liaison |
|
Appendix 1: Public Services and Procurement Canada Departmental Results Framework and Program inventory
Core responsibility | Purchase of goods and services | Payments and accounting | Property and infrastructure | Government-wide support | Procurement ombudsman (excluded from the evaluation universe) |
---|---|---|---|---|---|
Description | PSPC purchases goods and services on behalf of the Government of Canada. | PSPC collects revenues and issues payments, maintains the financial accounts of Canada, issues financial reports, and administers payroll and pension services for the Government of Canada. | PSPC provides federal employees and Parliamentarians with work space; builds, maintains and manages federal properties and other public works such as bridges and dams; and provides associated services to federal organizations. | PSPC provides administrative services and tools to federal organizations that help them deliver programs and services to Canadians. | The Office of the Ombudsman reviews the procurement practices of federal organizations as well as complaints from Canadian suppliers and provides independent dispute resolution services. |
Program Inventory |
|
|
|
|
|
Appendix 2: Approach used to develop the Departmental Evaluation Plan for fiscal years starting in 2021 to 2022 and ending in 2025 to 2026
The plan was completed between December 2020 and July 2021. The main steps of this exercise included:
1. Review of the evaluation universe
The planning process for this exercise consisted of determining the evaluation universe, in other words, all evaluable mandatory and potential units at PSPC. The DRF and the PSPC Programs Inventory served as a starting point in this exercise since they describe the CR of PSPC.
2. Environmental scan
An environmental scan was then conducted to identify the priorities, risks, and information needs of the government and the department. This analysis included a review of various documents, including the PSPC Minister’s mandate letter and supplementary mandate letter, the PSPC departmental plan, the department risk profile and related products, the program information profiles, the 2019 to 2023 PSPC Risk-based Audit Plan as well as the previous PSPC audits and evaluations.
3. Consultations
22 consultations were held with PSPC senior management in the various branches and regional directorates in order to gather information on their needs and priorities, as well as the risks. Consultations were held with TBS representatives to discuss their questions and priorities for PSPC to be given consideration during the development of this 5-year evaluation plan.
4. Prioritization of evaluation projects
Various factors were taken into consideration in order to justify eliminating, maintaining or adding an evaluation, as well as the evaluation schedule. In addition to taking into account the priorities and information needs and risks identified during the environmental scan and consultations, there was also a need to review the risks associated with the evaluations. Various risk factors were evaluated, including the type of funding, the complexity of the evaluation, the materiality, the required skills and expertise, the availability of program data, and the program budget.
5. Approval of the Departmental Evaluation Plan
The draft of the plan was submitted to the Departmental Audit committee for information purposes, to the EAC for discussion and endorsement, to the PMERC members for recommendation for approval and to the Deputy Minister for final approval. It was be shared with the TBS and to be published externally on canada.ca.
Appendix 3: Planned evaluation projects from 2021 to 2022 until 2025 to 2026, per fiscal year
No. | Evaluation project title | Branch office of primary interest | Core responsibility | Program inventory | Evaluation type and focus | Evaluation rationale | 2020 to 2021 | 2021 to 2022 | 2022 to 2023 | 2023 to 2024 | 2024 to 2025 | 2025 to 2026 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Evaluation of PSPC’s Use of Selected Consulting Services | Several Branches and Regions | Various | Various | Evaluation to assess the relevance and effectiveness of selected consulting contracts used within PSPC. | Mandatory: Carry-over |
Starttable 10 note 1 January to March |
July to September |
n/a | n/a | n/a | n/a |
2 | Evaluation Framework for Phase 2 of the Risk-based Defence Procurement Pilot |
Procurement Branch Defence and Marine Procurement Branch |
Purchase of goods and services |
Procurement leadership Procurement services |
Establishment of an evaluation framework ahead of the planned evaluation in fiscal year 2023 to 2024. The evaluation framework as well as the upcoming evaluation will be conducted in consultation with the Department of National Defence and the Treasury Board of Canada Secretariat. |
Mandatory: TB submission | n/a |
Start July to September End January to March |
n/a | n/a | n/a | n/a |
3 | Federal Leadership Towards Zero Plastic Waste in Canada Initiative |
Lead department: Environment and Climate Change Canada Real Property Branch |
Property and infrastructure | Real property services | The evaluation will notably examine the issues related to the relevance, effectiveness and efficiency of the Initiative. | Mandatory: horizontal |
Start October to December |
End January to March |
n/a | n/a | n/a | n/a |
4 | Evaluation of the Action Plan for Official Languages |
Lead department: Canadian Heritage Translation Bureau |
Government-wide support | Linguistic services |
To be determined The lead department has not yet determined the evaluation objective. |
Mandatory: horizontal |
Start October to December |
n/a |
End April to June |
n/a | n/a | n/a |
5 | Evaluation of Federal Accommodation and Special Purposes Space | Real Property Branch | Property and infrastructure | Federal accommodation and infrastructure |
The evaluation is related to one of the business lines of the Federal Accommodation and Infrastructure Program: Federal Accommodation and Special Purposes Space. The focus of the evaluation will be related to the future of work to adapt to the post-pandemic reality. PSPC meets the accommodation needs of 250,000 employees from 99 federal organizations through a portfolio of office facilities and common use assets. |
Mandatory: Carry-over |
Start October to December |
End January to March |
n/a | n/a | n/a | n/a |
6 | Evaluation of Shared Travel Services | Digital Services Branch | Government-wide support | Government-wide corporate services |
To be determined Pending information needs of the branch in consultation with Treasury Board of Canada Secretariat. |
Discretionary | n/a |
Start July to September |
End April to June |
n/a | n/a | n/a |
7 | Canadian Drugs and Substances Strategy (including the Substance Use and Addictions Program, and Opioid Response) |
Lead department: Health Canada Departmental Oversight Branch |
Government-wide support | Security and oversight services |
To be determined The lead department has not yet determined the evaluation objective. |
Mandatory: horizontal | n/a |
Start October to December |
End January to March |
n/a | n/a | n/a |
8 | Phase 2 Evaluation of PSPC’s Use of Selected Consulting Services | To be determined | Various | Various | To be determined following Phase I results. | Discretionary |
Start January to March |
End October to December |
n/a | n/a | n/a | n/a |
9 | Evaluation of the Accessible Government Built Environment Initiative | Real Property Branch | Property and infrastructure | Federal accommodation and infrastructure |
Impact evaluation to assess departmental achievement of assessments. PSPC provides technical expertise, innovative solutions and oversight to ensure that federal infrastructures are safe, healthy and remain in top condition. |
Mandatory: TB submission | n/a | n/a |
Start July to September |
End October to December |
n/a | n/a |
10 | Federal Contaminated Sites. Phase 4 Federal Contaminated Sites Action Plan |
Lead department: Environment and Climate Change Canada Real Property Services |
Property and infrastructure | Federal accommodation and infrastructure |
To be determined The lead department has not yet determined the evaluation objective. PSPC provides technical expertise, innovative solutions and oversight to ensure that federal infrastructures are safe, healthy and remain in top condition. |
Mandatory: horizontal | n/a | n/a |
Start January to March |
End July to September |
n/a | n/a |
11 | Potential joint audit and evaluation: Aging and Accessible Infrastructure, Safety and Security of Buildings | To be determined | To be determined | To be determined | To be determined | Discretionary | n/a | n/a |
Start April to June |
n/a |
End January to March |
n/a |
12 | National Strategy to Combat Human Trafficking |
Lead department: Public Safety Procurement Branch |
Purchase of goods and services |
Procurement leadership Procurement services |
To be determined. The lead department has not yet determined the evaluation objective. |
Mandatory: horizontal | n/a | n/a | n/a |
Start January to March |
End October to December |
n/a |
13 | Evaluation of the Phase 2 of the Risk-based Defence Procurement Pilot |
Procurement Branch Defence and Marine Procurement Branch |
Purchase of goods and services |
Procurement leadership Procurement services |
Evaluation will focus on the results of the phase 2 of the project. The evaluation will be conducted in consultation with the Department of National Defence, the Canadian Armed Forces and the Treasury Board of Canada Secretariat. |
Mandatory: TB submission | n/a | n/a | n/a |
Start January to March |
End October to December |
n/a |
14 | Evaluation of the Electronic Procurement Solution | Procurement Branch | Purchase of goods and services |
Procurement leadership Procurement services |
Design and delivery evaluation to help management adjust course or improve results. | Mandatory: TB submission | n/a | n/a | n/a |
Start January to March |
End October to December |
n/a |
15 | Evaluation of Major Capital Projects supporting the Long-term Vision and Plan | Science and Parliamentary Infrastructure Branch | Property and infrastructure | Parliament Hill and surroundings | Delivery evaluation undertaken during project implementation to help management adjust course or improve results. | Discretionary | n/a | n/a | n/a |
Start January to March |
End July to September |
n/a |
16 | Evaluation of Prompt Payment of Contractors | Procurement Branch | Purchase of goods and services |
Procurement leadership Procurement services |
Delivery evaluation will focus on the governance and efficiency of support to improve payment practices. | Discretionary | n/a | n/a | n/a | n/a |
Start April to June End January to March |
n/a |
17 | Evaluation of Federal Pay Administration | Pay Branches | Payments and accounting | Federal pay administration | To be determined | Discretionary | n/a | n/a | n/a | n/a |
Start April to June End January to March |
n/a |
18 | Evaluation of the Pension Administration | Receiver General and Pension Branch | Payments and accounting | Federal pension administration | Delivery evaluation with a focus on questions of relevance (including an examination of the governance model) and effectiveness (progress against intended outcomes), with the possibility to evaluate transformation efforts. | Discretionary | n/a | n/a | n/a | n/a |
Start July to September |
End July to September |
19 | Evaluation of GClingua (2025 to 2026) | Translation Bureau | Government-wide support | Linguistic services | Mid-term evaluation to help program managers adjust course or improve results. | Discretionary | n/a | n/a | n/a | n/a |
Start October to December |
End July to September |
20 | Evaluation of the Predictable Capital Funding Model |
Financial Administration Branch Real Property Branch |
Purchase of goods and services |
Procurement leadership Procurement services |
Mid-term evaluation to assess contributions of the accrual budgeting project toward the delivery of PSPC’s infrastructure programs supporting efforts to ensure a healthy asset portfolio. | Discretionary | n/a | n/a | n/a | n/a |
Start October to December |
End October to December |
21 | Evaluation of Cape Breton Operations | Region (Atlantic) |
Payments and accounting Property and infrastructure |
Cape Breton Operations: human resources legacy Benefits Cape Breton operations: portfolio management |
To be determined | Discretionary | n/a | n/a | n/a | n/a | n/a |
Start April to June End January to March |
22 | Evaluation of Payment in Lieu of Taxes Program | Real Property Branch | Payments and accounting | Payments instead of property taxes to local governments | To be determined | Discretionary | n/a | n/a | n/a | n/a | n/a |
Start April to June End January to March |
23 | Evaluation of Centres of Expertise for Technical Services | Real Property Branch | Property and infrastructure | Federal accommodation and infrastructure |
The Real Property Branch provides technical expertise, innovative solutions, and oversight to ensure federal infrastructure remains safe and in top condition. There are currently 9 national centres of expertise. The scope of this evaluation is yet to be determined. PSPC provides technical expertise, innovative solutions and oversight to ensure that federal infrastructures are safe, healthy and remain in top condition. |
Discretionary | n/a | n/a | n/a | n/a | n/a |
Start April to June End January to March |
24 | Evaluation of Socio-economic Procurement Support | Procurement Branch | Purchase of goods and services |
Procurement leadership Procurement services |
Formative Evaluation | Discretionary | n/a | n/a | n/a | n/a | n/a |
Start April to June End January to March |
Table 10 Notes
|
Appendix 4: Programs excluded from the Departmental Evaluation Plan for fiscal years starting in 2021 to 2022 and ending in 2025 to 2026
The following programs are excluded from the plan:
Payments and collection of revenues
2.75% of departmental planned program spending in fiscal year 2021 to 2022
- The purpose of this program is to ensure the integrity of the Treasury for Canadians as well as to develop and maintain the Receiver General’s treasury systems. The Receiver General program was evaluated in fiscal year 2015 to 2016. Consequently, the priority for evaluating this program is low, unless there is a major change in the program’s design.
Government-wide accounting and reports
0.4% of departmental planned program spending in fiscal year 2021 to 2022
- This program helps to ensure maintenance of the accounts of Canada and the Chart of Accounts at the federal administration level as well as the production of the Public Accounts of Canada, including the audited consolidated annual financial statements and the Monthly Statements of Financial Operations for the Government of Canada. The Receiver General program was evaluated in fiscal year 2015 to 2016. Consequently, the priority for evaluating this program is low, unless there is a major change in the program’s design.
Communication services
0.4% of departmental planned program spending in fiscal year 2021 to 2022
- This program sector supports the services providing information to Canadians and government institutions on Government of Canada programs and publications. The activities of this program have not changed much over the years and remain relatively stable. However, the evaluation requirements will be reviewed at the appropriate time, given the communication modernization project underway.
Document imaging services
0.09% of departmental planned program spending in fiscal year 2021 to 2022
- This program offers efficient and quality document imaging and data entry services based on a cost recovery principle to federal organizations, using internal production capacity and private sector contractors. An evaluation of the document imaging services was conducted in May 2015. No major changes to the program are planned. The priority for evaluating this program is therefore low.
Asset disposal
0.1% of departmental planned program spending in fiscal year 2021 to 2022
- The asset disposal program includes GCSurplus (GCSurplus.ca, GCMil, GCTransfer and GCRecycle) and the management of seized goods. With the last evaluation dating back to fiscal year 2006 to 2007, the priority for evaluating this program is low, unless there is a major change in the program’s design.
Canadian General Standards Board
0.05% of departmental planned program spending in fiscal year 2021 to 2022
- The Canadian General Standards Board is a centre of expertise within the Government of Canada that develops and updates national standards and provides certifications for personnel, products and organizations. Since the last official evaluation dates back to 2008, the program conducted a validated self-evaluation in fiscal year 2016 to 2017. The priority for evaluating this program is low, unless there is a major change in the program’s design.
Page details