Available studies and reports: Eastern Bridge in the National Capital Region

If you wish to obtain a copy of any of the reports listed below, please contact Real Property. The report will be emailed to you or instructions will be provided on how to retrieve an electronic version of the document.

As these documents were developed for internal purposes, they may not all currently exist in both official languages. A translation of unilingual documents can be provided upon request. The timeframe to receive a translation will vary depending on the size and technical complexity of the document.

Some sections of the reports may have been redacted as they contain information that is notably personal, commercially sensitive or related to security.

Reports available upon request

6th Crossing Geotechnical Investigation – Geotechnical Data Reports

These reports summarize the findings of an investigation conducted along the Montée Paiement-Aviation Parkway, Lower Duck Island and McLaurin Bay corridors in the Ottawa River area to evaluate the subsurface soil and bedrock conditions. The investigation was limited to within the Ottawa River, and did not extend to the land approaches or islands. Distinct reports were prepared for each option. Available in both English and French.

  • 6th Crossing Geotechnical Investigation – Kettle Island Alignment – Geotechnical Data Report (GDR)
  • 6th Crossing Geotechnical Investigation – Lower Duck Island Alignment – Geotechnical Data Report (GDR)
  • 6th Crossing Geotechnical Investigation – McLaurin Bay Alignment – Geotechnical Data Report (GDR)
6th Crossing Geotechnical Investigation – Geotechnical Design Memorandums

These documents present engineering guidelines on the geotechnical design aspects of the project. They include construction considerations, which could influence planning and design decisions. They also analyse and interpret the information gathered during the geotechnical investigation, and give recommendations for the proposed crossing. Distinct reports were prepared for each option. Available in both English and French.

  • 6th Crossing Geotechnical Investigation – Kettle Island Alignment – Geotechnical Design Memorandum (GDM)
  • 6th Crossing Geotechnical Investigation – Lower Duck Island Alignment – Geotechnical Design Memorandum (GDM)
  • 6th Crossing Geotechnical Investigation – McLaurin Bay Alignment – Geotechnical Design Memorandum (GDM)
2020 Sixth Interprovincial Main Crossing Conceptual Design Report

This report presents the findings for a refresh of the 2013 Functional Designs for an additional interprovincial bridge. A functional design is a long-term planning tool that enables the scoping of property acquisition and right-of-way needs, facilitates the identification of utility conflicts, highlights connections to and conflicts with existing transportation infrastructure and establishes a basis for refining high-level cost estimates. As the project proceeds, the functional design will evolve using post-pandemic data. Available in both English and French.

2020 Sixth Crossing Conceptual Design Study Geotechnical Desktop Study Update

This report presents the refresh of the 2013 findings of our additional desktop research, and provides comments and recommendations that may affect the conceptual design and construction of an additional bridge in the National Capital Region (NCR). Available in both English and French.

2020 Update of Hydrotechnical Assessment of Function Designs for Alternative Corridors Technical Memorandum

This report provides a refresh summary of the previously completed Hydrotechnical Assessment of Function Designs for Alternative Corridors (November 2012), commissioned by the National Capital Commission (NCC). It considers changes in the regulatory regime and in the approach to the previous hydrotechnical assessment. Available in both English and French.

2020 Sixth Interprovincial Bridge Crossing Study Refresh – Assessment and Evaluation Refresh Report

This report refreshed the analysis of the short-listed corridors for an additional bridge in the NCR. It incorporated the 2020 refreshed studies conducted by the NCC. Available in both English and French.

Documents available online

2020 refresh of the 2013 technical study

The NCC has completed the refresh of the study (PDF) on 3 potential corridors previously identified as having the most potential.

2025 Executive summary of the regional transportation context and technical studies

This document provides an overview of the most relevant planning studies (PDF) and highlights how this information can be applied to the Eastern Bridge project.

2025 Summary of technical studies

The studies were refreshed from 2019 to 2024 with updated data from the:

This document provides an overview of past technical studies (PDF) and highlights relevant conclusions for the Eastern Bridge project.

Report: Public participation round 1

This report: Public participation round 1 summarizes the feedback from the public, advisory groups and other stakeholders from the first round of participation in summer 2025.


Past research also shows that the need for an interprovincial link east of the NCR has been recognized since 1915. This research includes: