Changes to the Union Dues Structure for the Communications, Energy and Paperworkers Union of Canada (CEP) - Local 588G

Date:

To: Heads, Compensation and Labour Relations

This bulletin is to advise you of changes to be made to the membership dues structure for the Communications, Energy and Paperworkers Union of Canada (CEP) – Local 588G. Currently, CEP uses an hourly range structure which will be changed to an hourly rate specific structure effective .

The new membership rates are contained in the enclosed document. Although the new rates included in the chart go back to 2007, CEP does not intend to recover arrears prior to October 2009, therefore the change of rates is (as highlighted in the enclosure).

Please note that this new rate structure applies to employees in the Bindery Sub-Group of the Non-Supervisory Printing Services Group who are currently paying CEP membership dues and are covered by a collective agreement between the Treasury Board of Canada Secretariat and CEP.

Due to the large number of different rates, as well as the very low population of members (under 25), Public Works and Government Services of Canada (PWGSC) is not able to upload all these rates into the Regional Pay System (RPS). Consequently, no bulk change will be scheduled and the updates to the rates will have to be done manually by departments.

PWGSC will be issuing a broadcast message to advise compensation advisors.

Please note that every time there is a change in the hourly rate of pay, the compensation advisor will be responsible for manually adjusting the membership dues rates according to the chart provided.

Departmental Compensation and Labour Relations managers should direct any questions to their appropriate corporate officials who, if need be, can contact the Pay Administration Section.

Any employee enquiries regarding these membership dues changes are to be directed to CEP.

Carl Trottier
A/Executive Director
Strategic Compensation Management
Compensation and Labour Relations
Office of the Chief Human Resources Officer


Appendix "A"

Non-Supervisory Printing Services

Employees of the Bindery Sub-Group
Hourly Pay Rates and Monthly Union Dues (in dollars)
CEP Local 588G

Table Legend

  • $) Effective October 1, 2006
  • A) Effective October 1, 2007
  • B) Effective October 1, 2008
  • C) Effective October 1, 2009
  • D) Effective October 1, 2010

Newfoundland, PEI, NS, NB, Quebec, Ontario (other than Ottawa/Hull, Montreal and Toronto)

Bindery Operator 1 (BIN-1)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 14.03 = 52.64 14.54 = 54.55 15.10 = 56.65
A) October 1, 2007 14.35 = 53.84 14.87 = 55.79 15.45 = 57.97
B) October 1, 2008 14.57 = 54.66 15.09 = 56.61 15.68 = 58.83
C) October 1, 2009 14.79 = 55.49 15.32 = 57.48 15.92 = 59.73
D) October 1, 2010 15.01 = 56.31 15.55 = 58.34 16.16 = 60.63

Bindery Operator 2 (BIN-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 15.55 = 58.34 16.14 = 60.55 16.73 = 62.72
A) October 1, 2007 15.91 = 59.69 16.51 = 61.94 17.11 = 64.19
B) October 1, 2008 16.15 = 60.59 16.76 = 62.88 17.37 = 65.17
C) October 1, 2009 16.39 = 61.49 17.01 = 63.82 17.63 = 66.14
D) October 1, 2010 16.64 = 62.43 17.27 = 64.79 17.89 = 67.12

Bindery Operator 3 (BIN-3)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 17.96 = 67.38 18.60 = 69.78 19.31 = 72.45
A) October 1, 2007 18.37 = 68.92 19.03 = 71.40 19.75 = 74.10
B) October 1, 2008 18.65 = 69.97 19.32 = 72.49 20.05 = 75.22
C) October 1, 2009 18.93 = 71.02 19.61 = 73.57 20.35 = 76.35
D) October 1, 2010 19.21 = 72.07 19.90 = 74.66 20.66 = 77.51

Ottawa-Hull and Montreal

Bindery Operator 1 (BIN-1)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 15.03 = 56.39 15.61 = 58.57 16.21 = 60.82
A) October 1, 2007 15.38 = 57.70 15.97 = 59.91 16.58 = 62.21
B) October 1, 2008 15.61 = 58.57 16.21 = 60.82 16.83 = 63.14
C) October 1, 2009 15.84 = 59.43 16.45 = 61.72 17.08 = 64.08
D) October 1, 2010 16.08 = 60.33 16.70 = 62.66 17.34 = 65.06

Bindery Operator 2 (BIN-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 16.69 = 62.62 17.29 = 64.87 17.97 = 67.42
A) October 1, 2007 17.07 = 64.04 17.69 = 66.37 18.38 = 68.96
B) October 1, 2008 17.33 = 65.02 17.96 = 67.38 18.66 = 70.00
C) October 1, 2009 17.59 = 65.99 18.23 = 68.40 18.94 = 71.06
D) October 1, 2010 17.85 = 66.97 18.50 = 69.41 19.22 = 72.11

Bindery Operator 3 (BIN-3)
Effective Date Step 1 Step 2 Step 3
$ October 1, 2006 21.64 = 81.19 22.44 = 84.19 23.29 = 87.38
A) October 1, 2007 22.14 = 83.07 22.96 = 86.14 23.83 = 89.41
B) October 1, 2008 22.47 = 84.30 23.30 = 87.42 24.19 = 90.12
C) October 1, 2009 22.81 = 85.58 23.65 = 88.73 24.55 = 92.11
D) October 1, 2010 23.15 = 86.85 24.00 = 90.04 24.92 = 90.39

Bindery Operator 4 (BIN-4)
Effective Date Step 1 Step 2 Step 3
$ October 1, 2006 21.64 = 81.19 22.44 = 84.19 23.29 = 87.38
A) October 1, 2007 22.14 = 83.07 22.96 = 86.14 23.83 = 89.41
B) October 1, 2008 22.47 = 84.30 23.30 = 87.42 24.19 = 90.12
C) October 1, 2009 22.81 = 85.58 23.65 = 88.73 24.55 = 92.11
D) October 1, 2010 23.15 = 86.85 24.00 = 90.04 24.92 = 90.39

Toronto

Bindery Operator 1 (BIN-1)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 15.88 = 59.58 16.50 = 61.91 17.12 = 64.23
A) October 1, 2007 16.25 = 60.97 16.88 = 63.33 17.51 = 65.69
B) October 1, 2008 16.49 = 61.87 17.13 = 64.27 17.77 = 66.67
C) October 1, 2009 16.74 = 61.87 17.39 = 65.24 18.04 = 67.68
D) October 1, 2010 16.99 = 63.74 17.65 = 66.22 18.31 = 68.70

Bindery Operator 2 (BIN-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 17.48 = 65.58 18.08 = 67.83 18.81 = 70.57
A) October 1, 2007 17.88 = 67.08 18.50 = 69.41 19.24 = 72.19
B) October 1, 2008 18.15 = 68.10 18.78 = 70.46 19.53 = 73.27
C) October 1, 2009 18.42 = 69.11 19.06 = 71.51 19.82 = 74.36
D) October 1, 2010 18.70 = 70.16 19.35 = 72.60 20.12 = 75.49

Bindery Operator 3 (BIN-3)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 21.66 = 81.26 22.45 = 84.23 23.30 = 87.42
A) October 1, 2007 22.16 = 83.14 22.97 = 86.18 23.84 = 89.44
B) October 1, 2008 22.49 = 84.38 23.31 = 87.46 24.20 = 90.79
C) October 1, 2009 22.83 = 85.65 23.66 = 88.77 24.56 = 92.15
D) October 1, 2010 23.17 = 86.93 24.01 = 90.08 24.93 = 93.53

Winnipeg

Bindery Operator 1 (BIN-1)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 16.36 = 61.38 17.02 = 63.86 17.64 = 66.18
A) October 1, 2007 16.74 = 61.36 17.41 = 65.32 18.05 = 67.72
B) October 1, 2008 16.99 = 63.74 17.67 = 66.29 18.32 = 68.73
C) October 1, 2009 17.24 = 64.68 17.94 = 67.31 18.59 = 69.75
D) October 1, 2010 17.50 = 65.66 18.21 = 68.32 18.87 = 70.80

Bindery Operator 2 (BIN-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 17.95 = 66.22 18.59 = 69.75 19.30 = 72.41
A) October 1, 2007 18.36 = 68.88 19.02 = 71.36 19.74 = 74.06
B) October 1, 2008 18.64 = 69.93 19.31 = 72.45 20.04 = 75.18
C) October 1, 2009 18.92 = 70.98 19.60 = 73.54 20.34 = 76.31
D) October 1, 2010 19.20 = 72.04 19.89 = 74.62 20.65 = 77.48

Bindery Operator 3 (BIN-3)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 22.07 = 82.80 22.91 = 85.95 23.78 = 89.22
A) October 1, 2007 22.58 = 84.72 23.44 = 87.94 24.33 = 91.28
B) October 1, 2008 22.92 = 85.99 23.79 = 89.26 24.69 = 92.63
C) October 1, 2009 23.26 = 87.27 24.15 = 90.61 25.06 = 94.02
D) October 1, 2010 23.61 = 88.58 24.51 = 90.24 25.44 = 95.45

Regina

Bindery Operator 1 (BIN-1)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 18.42 = 69.11 19.10 = 71.66 19.83 = 74.40
A) October 1, 2007 18.84 = 70.68 19.54 = 73.31 20.29 = 76.12
B) October 1, 2008 19.12 = 71.73 19.83 = 72.71 20.59 = 77.25
C) October 1, 2009 19.41 = 72.82 20.13 = 75.52 20.90 = 78.41
D) October 1, 2010 19.70 = 73.91 20.43 = 76.65 21.21 = 79.58

Bindery Operator 2 (BIN-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 19.81 = 74.32 20.55 = 77.10 21.33 = 80.03
A) October 1, 2007 20.27 = 76.05 21.02 = 78.86 21.82 = 81.86
B) October 1, 2008 20.57 = 77.18 21.34 = 80.06 22.15 = 83.10
C) October 1, 2009 20.88 = 78.34 21.66 = 81.26 22.48 = 84.34
D) October 1, 2010 21.19 = 79.50 21.98 = 82.47 22.82 = 85.62

Saskatoon

Bindery Operator 1 (BIN-1)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 17.76 = 66.63 18.44 = 69.18 19.13 = 71.77
A) October 1, 2007 18.17 = 68.17 18.86 = 70.76 19.57 = 73.42
B) October 1, 2008 18.44 = 69.18 19.14 = 71.81 19.86 = 74.51
C) October 1, 2009 18.72 = 70.23 19.43 = 72.90 20.16 = 75.64
D) October 1, 2010 19.00 = 71.28 19.72 = 73.99 20.46 = 76.76
Bindery Operator 2 (BIN-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 19.21 = 72.07 19.93 = 74.77 20.67 = 77.55
A) October 1, 2007 19.65 = 73.72 20.39 = 76.50 21.15 = 79.35
B) October 1, 2008 19.94 = 74.81 20.70 = 77.66 21.47 = 80.55
C) October 1, 2009 20.24 = 75.94 21.01 = 78.83 21.79 = 81.75
D) October 1, 2010 20.54 = 77.06 21.33 = 80.03 22.12 = 82.99

Alberta

Bindery Operator 1 (BIN-1)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 17.92 = 67.23 18.56 = 69.63 19.28 = 72.34
A) October 1, 2007 18.33 = 68.77 18.99 = 71.25 19.72 = 73.99
B) October 1, 2008 18.60 = 69.78 19.27 = 72.30 20.02 = 75.11
C) October 1, 2009 18.88 = 70.83 19.56 = 73.39 20.32 = 76.24
D) October 1, 2010 19.16 = 71.88 19.85 = 74.47 20.62 = 77.36
Bindery Operator 2 (BIN-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 19.34 = 72.56 20.04 = 75.19 20.80 = 78.04
A) October 1, 2007 19.78 = 74.21 20.50 = 76.91 21.28 = 79.84
B) October 1, 2008 20.08 = 75.34 20.81 = 78.08 21.60 = 81.04
C) October 1, 2009 20.38 = 76.46 21.12 = 79.24 21.92 = 82.24
D) October 1, 2010 20.69 = 77.63 21.44 = 80.44 22.25 = 83.48
Bindery Operator 3 (BIN-3)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 21.76 = 81.64 22.57 = 84.68 23.42 = 87.87
A) October 1, 2007 22.26 = 83.52 23.09 = 86.63 23.96 = 89.89
B) October 1, 2008 22.59 = 84.75 23.44 = 87.94 24.32 = 91.24
C) October 1, 2009 22.93 = 86.03 23.79 = 89.26 24.68 = 92.60
D) October 1, 2010 23.27 = 87.31 24.15 = 90.61 25.05 = 93.98

British Columbia

Bindery Operator 1 (BIN-1)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 20.36 = 76.39 21.13 = 79.28 21.89 = 82.13
A) October 1, 2007 20.83 = 78.15 21.62 = 81.11 22.39 = 84.00
B) October 1, 2008 21.14 = 79.31 21.94 = 82.32 22.73 = 85.28
C) October 1, 2009 21.46 = 80.51 22.27 = 83.55 23.07 = 86.55
D) October 1, 2010 21.78 = 81.71 22.60 = 84.79 23.42 = 87.87
Bindery Operator 2 (BIN-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 21.67 = 81.30 22.46 = 84.27 23.32 = 87.49
A) October 1, 2007 22.17 = 83.18 22.98 = 86.22 23.86 = 89.52
B) October 1, 2008 22.50 = 84.42 23.32 = 87.49 24.22 = 90.87
C) October 1, 2009 22.84 = 85.69 23.67 = 88.81 24.58 = 92.22
D) October 1, 2010 23.18 = 86.97 24.03 = 90.16 24.95 = 93.61
Bindery Operator 3 (BIN-3)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006 27.82 = 104.00 28.83 = 108.00 29.91 = 112.00
A) October 1, 2007 28.46 = 107.00 29.49 = 111.00 30.60 = 113.75
B) October 1, 2008 28.89 = 108.00 29.93 = 112.00 31.06 = 113.75
C) October 1, 2009 29.32 = 110.00 30.38 = 113.75 31.53 = 113.75
D) October 1, 2010 29.76 = 112.00 30.84 = 113.75 32.00 = 113.75

Appendix "B"

Non-Supervisory Printing Services

Employees of the Offset Preparation and Production Sub-Groups
Hourly Pay Rates and Monthly Union Dues (in dollars)
CEP Local 588G

Table Legend

  • $) Effective October 1, 2006
  • A) Effective October 1, 2007
  • B) Effective October 1, 2008
  • C) Effective October 1, 2009
  • D) Effective October 1, 2010

Newfoundland


Offset Production (OFO-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

18.59 = $ 69.75

19.30 = $ 72.41

20.00 = $ 75.04

A) October 1, 2007

19.02 = $ 71.36

19.74 = $ 74.06

20.46 = $ 76.76

B) October 1, 2008

19.31 = $ 72.45

20.04 = $ 75.19

20.77 = $ 77.93

C) October 1, 2009

19.60 = $ 73.54

20.34 = $ 76.31

21.08 = $ 79.09

D) October 1, 2010

19.89 = $ 74.62

20.65 = $ 77.48

21.40 = $ 80.29

Offset Production (OFO-3)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

18.87 = $ 70.80

19.55 = $ 73.35

20.32 = $ 76.24

A) October 1, 2007

19.30 = $ 72.41

20.00 = $ 75.04

20.79 = $ 78.00

B) October 1, 2008

19.59 = $ 73.50

20.30 = $ 76.16

21.10 = $ 79.16

C) October 1, 2009

19.88 = $ 74.59

20.60 = $ 77.29

21.42 = $ 80.36

D) October 1, 2010

20.18 = $ 75.71

20.91 = $ 78.45

21.74 = $ 81.56

Provinces of Prince Edward Island, Nova Scotia and New Brunswick

Offset Production (OFO-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

19.09 = $ 71.62

19.81 = $ 74.32

20.55 = $ 77.10

$) October 1, 2006

19.53 = $ 73.27

20.27 = $ 76.05

21.02 = $ 78.86

B) October 1, 2008

19.82 = $ 74.36

20.57 = $ 77.18

21.34 = $ 80.06

C) October 1, 2009

20.12 = $ 75.49

20.88 = $ 78.34

21.66 = $ 81.26

D) October 1, 2010

20.42 = $ 76.61

21.19 = $ 79.50

21.98 = $ 82.47

Offset Production (OFO-3)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

19.35 = $ 72.60

20.05 = $ 75.22

20.82 = $ 78.11

A) October 1, 2007

19.80 = $ 74.29

20.51 = $ 76.95

21.30 = $ 79.91

B) October 1, 2008

20.10 = $ 75.41

20.82 = $ 78.11

21.62 = $ 81.11

C) October 1, 2009

20.40 = $ 76.54

21.13 = $ 79.28

21.94 = $ 82.32

D) October 1, 2010

20.71 = $ 77.70

21.45 = $ 80.48

22.27 = $ 83.55

Offset Production (OFO-4)
Effective Date Step 1 Step 2
$) October 1, 2006

20.21 = $ 75.82

20.96 = $ 78.64

A) October 1, 2007

20.67 = $ 77.55

21.44 = $ 80.44

B) October 1, 2008

20.98 = $ 78.71

21.76 = $ 81.64

C) October 1, 2009

21.29 = $ 79.88

22.09 = $ 82.88

D) October 1, 2010

21.61 = $ 81.08

22.42 = $ 84.12

Quebec and Ontario

Offset Preparation (OFE-1)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

19.31 = $ 72.45

20.02 = $ 75.11

20.77 = $ 77.92

A) October 1, 2007

19.75 = $ 74.10

20.48 = $ 76.84

21.25 = $ 79.73

B) October 1, 2008

20.05 = $ 75.22

20.79 = $ 78.00

21.57 = $ 80.93

C) October 1, 2009

20.35 = $ 76.35

21.10 = $ 79.16

21.89 = $ 82.13

D) October 1, 2010

20.66 = $ 77.51

21.42 = $ 80.36

22.22 = $ 83.37

Offset Preparation (OFE-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

21.56 = $ 80.89

22.35 = $ 83.85

23.19 = $ 87.00

A) October 1, 2007

22.06 = $ 82.77

22.86 = $ 85.75

23.72 = $ 88.99

B) October 1, 2008

22.39 = $ 84.00

23.20 = $ 87.04

24.08 = $ 90.34

C) October 1, 2009

22.73 = $ 85.28

23.55 = $ 88.36

24.44 = $ 91.69

D) October 1, 2010

23.07 = $ 86.55

23.90 = $ 89.67

24.81 = $ 93.08

Offset Preparation (OFE-3)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

26.20 = 98.30

27.18 = $ 101.97

28.20 = $ 105.80

A) October 1, 2007

26.80 = $ 100.55

27.81 = $ 104.33

28.85 = $ 108.24

B) October 1, 2008

27.20 = $ 102.05

28.23 = $ 105.91

29.28 = $ 109.85

C) October 1, 2009

27.61 = $ 103.59

28.65 = $ 107.49

29.72 = $ 111.50

D) October 1, 2010

28.02 = $ 105.13

29.08 = $ 109.10

30.17 = $ 113.75

Offset Preparation (OFE-4)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

25.16 = $ 94.40

26.11 = $ 97.96

27.08 = $ 101.60

A) October 1, 2007

25.74 = $ 96.57

26.71 = $ 100.21

27.70 = $ 103.93

B) October 1, 2008

26.13 = $ 98.04

27.11 = $ 101.71

28.12 = $ 105.50

C) October 1, 2009

26.52 = $ 99.50

27.52 = $ 103.25

28.54 = $ 107.08

D) October 1, 2010

 26.92 = $101.00

27.93 = $ 104.79

28.97 = $ 108.69

Offset Preparation (OFE-5A*)
Effective Date Step 1 Step 2 Step 3
* For pay purposes only refer to as OFE-15
$) October 1, 2006

25.16 = $ 94.40

26.11 = $ 97.96

27.08 = $ 101.60

A) October 1, 2007

25.74 = $ 96.57

26.71 = $ 100.21

27.70 = $ 103.93

B) October 1, 2008

26.13 = $ 98.04

27.11 = $ 101.71

28.12 = $ 105.50

C) October 1, 2009

26.52 = $ 99.50

27.52 = $ 103.25

28.54 = $ 107.08

D) October 1, 2010

26.92 = $101.00

27.93 = $ 104.79

28.97 = $ 108.69

Offset Preparation (OFE-5)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

26.78 = $ 100.47

27.82 = $ 104.38

28.83 = $ 108.17

A) October 1, 2007

27.40 = $ 102.80

28.46 = $ 106.78

29.49 = $ 110.64

B) October 1, 2008

27.81 = $ 104.34

28.89 = $ 108.39

29.93 = $ 112.29

C) October 1, 2009

28.23 = $ 105.91

29.32 = $ 110.00

30.38 = $ 113.75

D) October 1, 2010

28.65 = $ 107.49

29.76 = $ 111.65

30.84 = $ 113.75

Offset Preparation (OFE-6)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

26.78 = $ 100.47

27.82 = $ 104.38

28.83 = $ 108.17

A) October 1, 2007

27.40 = $ 102.80

28.46 = $ 106.78

29.49 = $ 110.64

B) October 1, 2008

27.81 = $ 104.34

28.89 = $ 108.39

29.93 = $ 112.29

C) October 1, 2009

28.23 = $ 105.91

29.32 = $ 110.00

30.38 = $ 113.75

D) October 1, 2010

28.65 = $ 107.49

29.76 = $ 111.65

30.84 = $ 113.75

Offset Preparation (OFE-7)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

29.81 = $ 111.84

30.92 = $ 113.75

32.08 = $ 113.75

A) October 1, 2007

30.50 = $ 113.75

31.63 = $ 113.75

32.82 = $ 113.75

B) October 1, 2008

30.96 = $ 113.75

32.10 = $ 113.75

33.31 = $ 113.75

C) October 1, 2009

31.42 = $ 113.75

32.58 = $ 113.75

33.81 = $ 113.75

D) October 1, 2010

31.89 = $ 113.75

33.07 = $ 113.75

34.32 = $ 113.75

Offset Production (OFO-1)
Effective Date Step 1 Step 2
$) October 1, 2006

16.57 = $ 62.17

17.17 = $ 64.42

A) October 1, 2007

16.95 = $ 63.59

17.56 = $ 65.88

B) October 1, 2008

17.20 = $ 64.53

17.82 = $ 66.86

C) October 1, 2009

17.46 = $ 65.51

18.09 = $ 67.87

D) October 1, 2010

17.72 = $ 66.48

18.36 = $ 68.88

Offset Production (OFO-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

16.83 = $ 63.14

17.49 = $ 65.62

18.09 = $ 67.87

A) October 1, 2007

17.22 = $ 64.61

17.89 = $ 67.12

18.51 = $ 69.45

B) October 1, 2008

17.48 = $ 65.58

18.16 = $ 68.13

18.79 = $ 70.50

C) October 1, 2009

17.74 = $ 66.56

18.43 = $ 69.15

19.07 = $ 71.55

D) October 1, 2010

18.01 = $ 67.57

18.71 = $ 70.20

19.36 = $ 72.64

Offset Production (OFO-3)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

19.35 = $ 72.60

20.05 = $ 75.22

20.82 = $ 78.11

A) October 1, 2007

19.80 = $ 74.29

20.51 = $ 76.95

21.30 = $ 79.91

B) October 1, 2008

20.10 = $ 75.41

20.82 = $ 78.11

21.62 = $ 81.11

C) October 1, 2009

20.40 = $ 76.54

21.13 = $ 79.28

21.94 = $ 82.32

D) October 1, 2010

20.71 = $ 77.70

21.45 = $ 80.48

22.27 = $ 83.55

Offset Production (OFO-4)
Effective Date Step 1 Step 2
$) October 1, 2006

20.21 = $ 75.82

20.96 = $ 78.64

A) October 1, 2007

20.67 = $ 77.55

21.44 = $ 80.44

B) October 1, 2008

20.98 = $ 78.71

21.76 = $ 81.64

C) October 1, 2009

21.29 = $ 79.88

22.09 = $ 82.88

D) October 1, 2010

21.61 = $ 81.08

22.42 = $ 84.12

Offset Production (OFO-5)
Effective Date Step 1 Step 2
$) October 1, 2006

20.59 = $ 77.25

21.37 = $ 80.18

A) October 1, 2007

21.06 = $ 79.01

21.86 = $ 82.01

B) October 1, 2008

21.38 = $ 80.21

22.19 = $ 83.25

C) October 1, 2009

21.70 = $ 81.41

22.52 = $ 84.49

D) October 1, 2010

22.03 = $ 82.65

22.86 = $ 85.77

Offset Production (OFO-6)
Effective Date Step 1 Step 2
$) October 1, 2006

21.04 = $ 78.94

21.82 = $ 81.86

A) October 1, 2007

21.52 = $ 80.74

22.32 = $ 83.74

B) October 1, 2008

21.84 = $ 81.94

22.65 = $ 84.98

C) October 1, 2009

22.17 = $ 83.18

22.99 = $ 86.25

D) October 1, 2010

22.50 = $ 84.42

23.33 = $ 87.53

Offset Production (OFO-7)
Feeder - Over 788 mm to 1378 mm (30" to 54") , inclusive
Effective Date Step 1 Step 2
$) October 1, 2006

21.36 = $ 80.14

22.19 = $ 83.25

A) October 1, 2007

21.85 = $ 81.98

22.70 = $ 85.17

B) October 1, 2008

22.18 = $ 83.22

23.04 = $ 86.44

C) October 1, 2009

22.51 = $ 84.45

23.39 = $ 87.76

D) October 1, 2010

22.85 = $ 85.73

23.74 = $ 89.07

Offset Production (OFO-8)
Pressman - Over 508 mm to 1032 mm (20" to 40") , inclusive (one-colour)
Effective Date Step 1 Step 2
$) October 1, 2006

23.84 = $ 89.44

24.73 = $ 92.78

A) October 1, 2007

24.39 = $ 91.51

25.30 = $ 94.92

B) October 1, 2008

24.76 = $ 92.90

25.68 = $ 96.35

C) October 1, 2009

25.13 = $ 94.28

26.07 = $ 97.81

D) October 1, 2010

25.51 = $ 95.71

26.46 = $ 99.27

Offset Production (OFO-9)
Pressman - Over 788 mm to 1032 mm (30" to 40") , inclusive (two-colour)
Effective Date Step 1 Step 2
$) October 1, 2006

26.55 = $ 99.61

27.58 = $ 103.48

A) October 1, 2007

27.16 = $ 101.90

28.21 = $ 105.84

B) October 1, 2008

27.57 = $ 103.44

28.63 = $ 107.42

C) October 1, 2009

27.98 = $ 104.98

29.06 = $ 109.03

D) October 1, 2010

28.40 = $ 106.55

29.50 = $ 110.68

Offset Production (OFO-10)
Pressman - Two unit perfector web
Effective Date Step 1 Step 2
$) October 1, 2006

27.68 = $ 103.85

28.72 = $ 107.75

A) October 1, 2007

28.32 = $ 106.25

29.38 = $ 110.23

B) October 1, 2008

28.74 = $ 107.83

29.82 = $ 111.81

C) October 1, 2009

29.17 = $ 109.44

30.27 = $ 113.56

D) October 1, 2010

29.61 = $ 111.09

30.72 = $ 113.75

Offset Production (OFO-11)
Second Pressman - Over 788 mm to 1032 mm (30" to 40") , inclusive (four-colour)
Effective Date Step 1 Step 2
$) October 1, 2006

27.74 = $ 104.07

28.81 = $ 108.09

A) October 1, 2007

28.38 = $ 106.48

29.47 = $ 110.57

B) October 1, 2008

28.81 = $ 108.09

29.91 = $ 112.22

C) October 1, 2009

29.24 = $ 109.70

30.36 = $ 113.75

D) October 1, 2010

29.68 = $ 111.35

30.82 = $ 113.75

Offset Production (OFO-12)
First Pressman - Over 788 mm to 1032 mm (30" to 40") , inclusive (four-colour)
Effective Date Step 1 Step 2
$) October 1, 2006

31.72 = $ 113.75

32.90 = $ 113.75

A) October 1, 2007

32.45 = $ 113.75

33.66 = $ 113.75

B) October 1, 2008

32.94 = $ 113.75

34.16 = $ 113.75

C) October 1, 2009

33.43 = $ 113.75

34.67 = $ 113.75

D) October 1, 2010

33.93 = $ 113.75

35.19 = $ 113.75

Offset Production (OFO-13)
Pressman - Over 1032 mm to 1378 mm (40" to 54") , inclusive (two-colour)
Effective Date Step 1 Step 2
$) October 1, 2006

27.41 = $ 102.84

28.43 = $ 106.66

A) October 1, 2007

28.04 = $ 105.20

29.08 = $ 109.10

B) October 1, 2008

28.46 = $ 106.78

29.52 = $ 110.75

C) October 1, 2009

28.89 = $ 108.39

29.96 = $ 112.40

D) October 1, 2010

29.32 = $ 110.00

30.41 = $ 113.75

Offset Production (OFO-14)
Feeder - Over 1378 mm to 1610 mm (54" to 63") , inclusive (four-colour) computer print control
Effective Date Step 1 Step 2
$) October 1, 2006

23.89 = $ 89.63

24.78 = $ 92.97

A) October 1, 2007

24.44 = $ 91.69

25.35 = $ 95.11

B) October 1, 2008

24.81 = $ 93.08

25.73 = $ 96.53

C) October 1, 2009

25.18 = $ 94.47

26.12 = $ 98.00

D) October 1, 2010

25.56 = $ 95.90

26.51 = $ 99.46

Offset Production (OFO-15)
Second Pressman - Over 1378 mm to 1610 mm (54" to 63") , inclusive (four-colour) computer print control
Effective Date Step 1 Step 2
$) October 1, 2006

30.27 = $ 113.75

31.41 = $ 113.75

A) October 1, 2007

30.97 = $ 113.75

32.13 = $ 113.75

B) October 1, 2008

31.43 = $ 113.75

32.61 = $ 113.75

C) October 1, 2009

31.90 = $ 113.75

33.10 = $ 113.75

D) October 1, 2010

32.38 = $ 113.75

33.60 = $ 113.75

Offset Production (OFO-16)
First Pressman - Over 1378 mm to 1610 mm (54" to 63") , inclusive (four-colour) computer print control
Effective Date Step 1 Step 2
$) October 1, 2006

32.43 = $ 113.75

33.64 = $113.75

A) October 1, 2007

33.18 = $ 113.75

34.41 = $ 113.75

B) October 1, 2008

33.68 = $ 113.75

34.93 = $ 113.75

C) October 1, 2009

34.19 = $ 113.75

35.45 = $ 113.75

D) October 1, 2010

34.70 = $ 113.75

35.98 = $ 113.75

Offset Production (OFO-17)
Feeder - Over 674 mm to 1032 mm (26" to 40") , inclusive (seven-colour) computer print control
Effective Date Step 1 Step 2
$) October 1, 2006

23.01 = $ 86.33

23.87 = $ 89.56

A) October 1, 2007

23.54 = $ 88.32

24.42 = $ 91.62

B) October 1, 2008

23.89 = $ 89.63

24.79 = $ 93.00

C) October 1, 2009

24.25 = $ 90.98

25.16 = $ 94.40

D) October 1, 2010

24.61 = $ 92.33

25.54 = $ 95.82

Offset Production (OFO-18)
Second Pressman - Over 674 mm to 1032 mm (26" to 40") , inclusive (seven-colour) computer print control
Effective Date Step 1 Step 2
$) October 1, 2006

30.14 = $ 113.08

31.25 = $ 113.75

A) October 1, 2007

30.83 = $ 113.75

31.97 = $ 113.75

B) October 1, 2008

31.29 = $ 113.75

32.45 = $ 113.75

C) October 1, 2009

31.76 = $ 113.75

32.94 = $ 113.75

D) October 1, 2010

32.24 = $ 113.75

33.43 = $ 113.75

Offset Production (OFO-19)
First Pressman - Over 674 mm to 1032 mm (26" to 40") , inclusive (seven-colour) computer print control
Effective Date Step 1 Step 2
$) October 1, 2006

34.10 = $ 113.75

35.38 = $ 113.75

A) October 1, 2007

34.88 = $ 113.75

36.19 = $ 113.75

B) October 1, 2008

35.40 = $ 113.75

36.73 = $ 113.75

C) October 1, 2009

35.93 = $ 113.75

37.28 = $ 113.75

D) October 1, 2010

36.47 = $ 113.75

37.84 = $ 113.75

Manitoba, Saskatchewan and Alberta

Offset Preparation (OFE-1)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

19.65 = $ 73.72

20.39 = $ 76.50

21.17 = $ 79.43

A) October 1, 2007

20.10 = $ 75.41

20.86 = $ 78.26

21.66 = $ 81.26

B) October 1, 2008

20.40 = $ 76.54

21.17 = $ 79.43

21.98 = $ 82.47

C) October 1, 2009

20.71 = $ 77.70

21.49 = $ 80.63

22.31 = $ 83.70

D) October 1, 2010

21.02 = $ 78.86

21.81 = $ 81.83

22.64 = $ 84.94

Offset Preparation (OFE-3)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

23.71 = $ 88.96

24.61 = $ 92.33

25.51 = $ 95.71

A) October 1, 2007

24.26 = $ 91.02

25.18 = $ 94.47

26.10 = $ 97.92

B) October 1, 2008

24.62 = $ 92.37

25.56 = $ 95.90

26.49 = $ 99.39

C) October 1, 2009

24.99 = $ 93.76

25.94 = $ 97.32

26.89 = $ 100.89

D) October 1, 2010

25.36 = $ 95.15

26.33 = $ 98.79

27.29 = $ 102.39

Offset Preparation (OFE-4)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

23.48 = $ 88.09

24.36 = $ 91.39

25.29 = $ 94.88

A) October 1, 2007

24.02 = $ 90.12

24.92 = $ 93.50

25.87 = $ 97.06

B) October 1, 2008

24.38 = $ 91.47

25.29 = $ 94.88

26.26 = $ 98.52

C) October 1, 2009

24.75 = $ 92.86

25.67 = $ 96.31

26.65 = $ 99.99

D) October 1, 2010

25.12 = $ 94.25

26.06 = $ 97.77

27.05 = $ 101.49

Offset Preparation (OFE-5*)
Effective Date Step 1 Step 2 Step 3

* For pay purposes only refer to as OFE-15

$) October 1, 2006

23.48 = $ 88.09

24.36 = $ 91.39

25.29 = $ 94.88

A) October 1, 2007

24.02 = $ 90.12

24.92 = $ 93.50

25.87 = $ 97.06

B) October 1, 2008

24.38 = $ 91.47

25.29 = $ 94.88

26.26 = $ 98.52

C) October 1, 2009

24.75 = $ 92.86

25.67 = $ 96.31

26.65 = $ 99.99

D) October 1, 2010

25.12 = $ 94.25

26.06 = $ 97.77

27.05 = $ 101.49

Offset Preparation (OFE-5)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

24.98 = $ 93.72

25.90 = $ 97.17

26.86 = $ 100.77

A) October 1, 2007

25.55 = $ 95.86

26.50 = $ 99.42

27.48 = $ 103.10

B) October 1, 2008

25.93 = $ 97.29

26.90 = $ 100.92

27.89 = $ 104.64

C) October 1, 2009

26.32 = $ 98.75

27.30 = $ 102.43

28.31 = $ 106.21

D) October 1, 2010

  26.71 = $ 100.21

27.71 = $ 103.96

28.73 = $ 107.79

Offset Preparation (OFE-6)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

24.98 = $ 93.72

25.90 = $ 97.17

26.86 = $ 100.77

A) October 1, 2007

25.55 = $ 95.86

26.50 = $ 99.42

27.48 = $ 103.10

B) October 1, 2008

25.93 = $ 97.29

26.90 = $ 100.92

27.89 = $ 104.64

C) October 1, 2009

26.32 = $ 98.75

27.30 = $ 102.43

28.31 = $ 106.21

D) October 1, 2010

  26.71 = $ 100.21

27.71 = $ 103.96

28.73 = $ 107.79

Offset Production (OFO-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

19.76 = $ 74.13

20.48 = $ 76.84

21.26 = $ 79.76

A) October 1, 2007

20.21 = $ 75.82

20.95 = $ 78.60

21.75 = $ 81.60

B) October 1, 2008

20.51 = $ 76.95

21.26 = $ 79.76

22.08 = $ 82.84

C) October 1, 2009

20.82 = $ 78.11

21.58 = $ 80.96

22.41 = $ 84.08

D) October 1, 2010

21.13 = $ 79.28

21.90 = $ 82.16

22.75 = $ 85.35

Offset Production (OFO-3)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

20.00 = $ 75.04

20.76 = $ 77.89

21.51 = $ 80.70

A) October 1, 2007

20.46 = $ 76.76

21.24 = $ 79.69

22.00 = $ 82.54

B) October 1, 2008

20.77 = $ 77.93

21.56 = $ 80.89

22.33 = $ 83.78

C) October 1, 2009

21.08 = $ 79.09

21.88 = $ 82.09

22.66 = $ 85.02

D) October 1, 2010

21.40 = $ 80.29

22.21 = $ 83.33

23.00 = $ 86.29

Offset Production (OFO-4)
Effective Date Step 1 Step 2
$) October 1, 2006

20.86 = $ 78.26

21.68 = $ 81.34

A) October 1, 2007

21.34 = $ 80.06

22.18 = $ 83.22

B) October 1, 2008

21.66 = $ 81.26

22.51 = $ 84.45

C) October 1, 2009

21.98 = $ 82.47

22.85 = $ 85.73

D) October 1, 2010

22.31 = $ 83.70

23.19 = $ 87.00

Offset Production (OFO-5)
Effective Date Step 1 Step 2
$) October 1, 2006

21.27 = $ 79.80

22.06 = $ 82.77

A) October 1, 2007

21.76 = $ 81.64

22.57 = $ 84.68

B) October 1, 2008

22.09 = $ 82.88

22.91 = $ 85.95

C) October 1, 2009

22.42 = $ 84.12

23.25 = $ 87.23

D) October 1, 2010

22.76 = $ 85.39

23.60 = $ 88.54

Offset Production (OFO-8)
Effective Date Step 1 Step 2
$) October 1, 2006

24.22 = $ 90.87

25.13 = $ 94.28

A) October 1, 2007

24.78 = $ 92.97

25.71 = $ 96.46

B) October 1, 2008

25.15 = $ 94.36

26.10 = $ 97.92

C) October 1, 2009

25.53 = $ 95.78

26.49 = $ 99.39

D) October 1, 2010

25.91 = $ 97.21

26.89 = $ 100.89

British Columbia

Offset Preparation (OFE-1)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

24.70 = $ 92.67

25.64 = $ 96.20

26.59 = $ 99.76

A) October 1, 2007

25.27 = $ 94.81

26.23 = $ 98.41

27.20 = $ 102.05

B) October 1, 2008

25.65 = $ 96.23

26.62 = $ 99.88

27.61 = $ 103.59

C) October 1, 2009

26.03 = $ 97.66

27.02 = $ 101.37

28.02 = $ 105.13

D) October 1, 2010

26.42 = $ 99.12

27.43 = $ 102.91

28.44 = $ 106.70

Offset Preparation (OFE-3)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

27.25 = $ 102.24

28.29 = $ 106.14

29.34 = $ 110.08

A) October 1, 2007

27.88 = $ 104.60

28.94 = $ 108.58

30.01 = $ 112.59

B) October 1, 2008

28.30 = $ 106.18

29.37 = $ 110.19

30.46 = $ 113.75

C) October 1, 2009

28.72 = $ 107.75

29.81 = $ 111.84

30.92 = $ 113.75

D) October 1, 2010

29.15 = $ 109.36

30.26 = $ 113.00

31.38 = $ 113.75

Offset Preparation (OFE-4)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

26.84 = $ 100.70

27.87 = $ 104.56

28.92 = $ 108.50

A) October 1, 2007

27.46 = $ 103.03

28.51 = $ 106.96

29.59 = $ 111.02

B) October 1, 2008

27.87 = $ 104.56

28.94 = $ 108.58

30.03 = $ 112.67

C) October 1, 2009

28.29 = $ 106.14

29.37 = $ 110.19

30.48 = $ 113.75

D) October 1, 2010

28.71 = $ 107.72

29.81 = $ 111.84

30.94 = $ 113.75

Offset Preparation (OFE-5)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

28.69 = $ 107.64

29.79 = $ 111.77

30.89 = $ 113.00

A) October 1, 2007

29.35 = $ 110.12

30.48 = $ 113.75

31.60 = $ 113.75

B) October 1, 2008

29.79 = $ 111.77

30.94 = $ 113.75

32.07 = $ 113.75

C) October 1, 2009

30.24 = $ 113.46

31.40 = $ 113.75

32.55 = $ 113.75

D) October 1, 2010

30.69 = $ 113.75

31.87 = $ 113.75

33.04 = $ 113.75

Offset Production (OFO-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

23.72 = $ 88.99

24.62 = $ 92.37

25.52 = $ 95.75

A) October 1, 2007

24.27 = $ 91.06

25.19 = $ 94.51

26.11 = $ 97.96

B) October 1, 2008

24.63 = $ 92.41

25.57 = $ 95.93

26.50 = $ 99.42

C) October 1, 2009

25.00 = $ 93.80

25.95 = $ 97.36

26.90 = $ 100.92

D) October 1, 2010

25.38 = $ 95.22

26.34 = $ 98.82

27.30 = $ 102.43

Offset Production (OFO-3)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

24.88 = $ 93.35

25.83 = $ 96.91

26.78 = $ 100.47

A) October 1, 2007

25.45 = $ 95.48

26.42 = $ 99.12

27.40 = $ 102.80

B) October 1, 2008

25.83 = $ 96.91

26.82 = $ 100.62

27.81 = $ 104.34

C) October 1, 2009

26.22 = $ 98.37

27.22 = $ 102.13

28.23 = $ 105.91

D) October 1, 2010

26.61 = $ 99.84

27.63 = $ 103.66

28.65 = $ 107.49

Offset Production (OFO-4)
Effective Date Step 1 Step 2
$) October 1, 2006

25.95 = $ 97.36

26.94 = $ 101.07

A) October 1, 2007

26.55 = $ 99.61

27.56 = $ 103.40

B) October 1, 2008

26.95 = $ 101.11

27.97 = $ 104.94

C) October 1, 2009

27.35 = $ 102.61

28.39 = $ 106.51

D) October 1, 2010

27.76 = $ 104.15

28.82 = $ 108.13

Offset Production (OFO-6)
Effective Date Step 1 Step 2
$) October 1, 2006

27.15 = $ 101.86

28.16 = $ 105.65

A) October 1, 2007

27.77 = $ 104.19

28.81 = $ 108.09

B) October 1, 2008

28.19 = $ 105.76

29.24 = $ 109.70

C) October 1, 2009

28.61 = $ 107.34

29.68 = $ 111.35

D) October 1, 2010

29.04 = $ 108.95

30.13 = $ 113.75

Appendix "C"

Non-Supervisory Printing Services

Employees of the Composition Sub-Group
Hourly Pay Rates and Monthly Union Dues (in dollars)
CEP Local 588G

Table Legend

  • $) Effective October 1, 2006
  • A) Effective October 1, 2007
  • B) Effective October 1, 2008
  • C) Effective October 1, 2009
  • D) Effective October 1, 2010

Ottawa-Hull AND Montreal

Composition (COM-1)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

16.69 = $ 62.62

17.29 = $ 64.87

17.97 = $ 67.42

A) October 1, 2007

17.07 = $ 64.04

17.69 = $ 73.87

18.38 = $ 68.96

B) October 1, 2008

17.33 = $ 65.02

17.96 = $ 67.38

18.66 = $ 70.01

C) October 1, 2009

17.59 = $ 65.99

18.23 = $ 68.40

18.94 = $ 71.06

D) October 1, 2010

17.85 = $ 66.97

18.50 = $ 69.41

19.22 = $ 72.11

Composition (COM-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

19.27 = $ 72.30

19.96 = $ 74.89

20.72 = $ 79.54

A) October 1, 2007

19.71 = $ 73.95

20.42 = $ 76.61

21.20 = $ 79.54

B) October 1, 2008

20.01 = $ 75.07

20.73 = $ 77.78

21.52 = $ 80.74

C) October 1, 2009

20.31 = $ 76.20

21.04 = $ 78.94

21.84 = $ 81.94

D) October 1, 2010

20.61 = $ 77.33

21.36 = $ 80.14

22.17 = $ 83.18

Composition (COM-3)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

21.45 =$ 80.48

22.28 = $ 83.59

23.11 = $ 86.70

A) October 1, 2007

21.94 = $ 82.32

22.79 = $ 85.50

23.64 = $ 88.69

B) October 1, 2008

22.27 = $ 83.55

23.13 = $ 86.78

23.99 = $ 90.01

C) October 1, 2009

22.60 = $ 84.79

23.48 = $ 80.90

24.35 = $ 91.35

D) October 1, 2010

22.94 = $ 86.07

23.83 = $ 89.41

24.72 = $ 92.75

Composition (COM-4)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

21.75 = $ 81.60

22.55 = $ 84.60

23.41 = $ 87.83

A) October 1, 2007

22.25 = $ 83.48

23.07 = $ 86.55

23.95 = $ 89.86

B) October 1, 2008

22.58 = $ 84.72

23.42 = $ 87.87

24.31 = $ 91.21

C) October 1, 2009

22.92 = $ 85.99

23.77 = $ 89.18

24.67 = $ 92.56

D) October 1, 2010

23.26 = $ 87.27

24.13 = $ 90.53

25.04 = $ 93.95

Composition (COM-5)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

23.06 = $ 86.52

23.91 = $ 89.71

24.82 = $ 93.12

A) October 1, 2007

23.59 = $ 88.51

24.46 = $ 91.77

25.39 = $ 95.26

B) October 1, 2008

23.94 = $ 89.82

24.83 = $ 93.16

25.77 = $ 96.68

C) October 1, 2009

24.30 = $ 91.17

25.20 = $ 94.55

26.16 = $ 98.15

D) October 1, 2010

24.66 = $ 92.52

25.58 = $ 95.97

26.55 = $ 99.61

Toronto

Composition (COM-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

20.11 = $ 75.45

20.86 = $ 78.26

21.68 = $ 81.34

A) October 1, 2007

20.57 = $ 77.18

21.34 = $ 80.06

22.18 = $ 83.22

B) October 1, 2008

20.88 = $ 78.34

21.66 = $ 81.26

22.51 = $ 84.45

C) October 1, 2009

21.19 = $ 79.50

21.98 = $ 82.47

22.85 = $ 85.73

D) October 1, 2010

21.51 = $ 80.70

22.31 = $ 83.70

23.19 = $ 87.00

Ontario (Other than Ottawa and Toronto)

Composition (COM-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

17.81 = $ 66.82

18.49 = $ 69.37

19.18 = $ 71.96

A) October 1, 2007

18.22 = $ 68.36

18.92 = $ 70.98

19.62 = $ 73.61

B) October 1, 2008

18.49 = $ 69.37

19.20 = $ 72.04

19.91 = $ 74.70

C) October 1, 2009

18.77 = $ 70.42

19.49 = $ 73.12

20.21 = $ 75.82

D) October 1, 2010

19.05 = $ 71.47

19.78 = $ 74.21

20.51 = $ 76.95

Appendix "D"

Non-Supervisory Printing Services

Employees of the Job Planning and Control Sub-Group
Hourly Pay Rates and Monthly Union Dues (in dollars)
CEP Local 588G

Table Legend

  • $) Effective October 1, 2006
  • A) Effective October 1, 2007
  • B) Effective October 1, 2008
  • C) Effective October 1, 2009
  • D) Effective October 1, 2010

Ottawa and Montreal

Job Planning and Control (PRC-1)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

19.31 = $ 72.45

20.02 = $ 75.11

20.77 = $ 77.93

A) October 1, 2007

19.75 = $ 74.10

20.48 = $ 76.84

21.25 = $ 79.73

B) October 1, 2008

20.05 = $ 75.22

20.79 = $ 78.00

21.57 = $ 80.93

C) October 1, 2009

20.35 = $ 76.35

21.10 = $ 79.16

21.89 = $ 82.13

D) October 1, 2010

20.66 = $ 77.51

21.42 = $ 80.36

22.22 = $ 83.37

Job Planning and Control (PRC-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

21.45 = $ 80.48

22.28 = $ 83.59

23.11 = $ 86.70

A) October 1, 2007

21.94 = $ 82.32

22.79 = $ 85.50

23.64 = $ 88.69

B) October 1, 2008

22.27 = $ 83.55

23.13 = $ 86.78

23.99 = $ 90.00

C) October 1, 2009

22.60 = $ 84.79

23.48 = $ 88.09

24.35 = $ 91.36

D) October 1, 2010

22.94 = $ 86.07

23.83 = $ 89.41

24.72 = $ 92.75

Job Planning and Control (PRC-3)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

23.87 = $ 89.56

24.76 = $ 92.90

25.69 = $ 96.38

A) October 1, 2007

24.42 = $ 91.62

25.33 = $ 95.03

26.28 = $ 98.60

B) October 1, 2008

24.79 = $ 93.00

25.71 = $ 96.46

26.67 = $ 100.06

C) October 1, 2009

25.16 = $ 94.40

26.10 = $ 97.92

27.07 = $ 101.56

D) October 1, 2010

25.54 = $ 95.82

26.49 = $ 99.39

27.48 = $ 103.10

Job Planning and Control (PRC-4)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

25.85 = $ 96.98

26.80 = $ 100.55

27.84= $ 104.45

A) October 1, 2007

26.44 = $ 99.20

27.42 = $ 102.88

28.48 = $ 106.85

B) October 1, 2008

26.84 = $ 100.70

27.83 = $ 104.41

28.91 = $ 108.47

C) October 1, 2009

27.24 = $ 102.20

28.25 = $ 105.99

29.34 = $ 110.08

D) October 1, 2010

27.65 = $ 103.74

28.67 = $ 107.57

29.78 = $ 111.73

Job Planning and Control (PRC-5)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

25.85 = $ 96.98

26.80 = $ 100.55

27.84 = $ 104.45

A) October 1, 2007

26.44 = $ 99.20

27.42 = $ 102.88

28.48 = $ 106.85

B) October 1, 2008

26.84 = $ 100.70

27.83 = $ 104.41

28.91 = $ 108.47

C) October 1, 2009

27.24 = $ 102.20

28.25 = $ 105.99

29.34 = $ 110.08

D) October 1, 2010

27.65 = $ 103.74

28.67 = $ 107.57

29.78 = $ 111.73

Job Planning and Control (PRC-6)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

27.64 = $ 103.70

28.68 = $ 107.60

29.76 = $ 111.65

A) October 1, 2007

28.28 = $ 106.10

29.34 = $ 110.08

30.44 = $ 113.75

B) October 1, 2008

28.70 = $ 107.68

29.78 = $ 111.75

30.90 = $ 113.75

C) October 1, 2009

29.13 = $ 109.29

30.23 = $ 113.42

31.36 = $ 113.75

D) October 1, 2010

29.57 = $ 110.94

30.68 = $ 113.75

31.83 = $ 113.75

Job Planning and Control (PRC-7)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

29.83 = $ 111.91

30.94 = $ 113.75

32.11 = $ 113.75

A) October 1, 2007

30.52 = $ 113.75

31.65 = $ 113.75

32.85 = $ 113.75

B) October 1, 2008

30.98 = $ 113.75

32.12 = $ 113.75

33.34 = $ 113.75

C) October 1, 2009

31.44 = $ 113.75

32.60 = $ 113.75

33.84 = $ 113.75

D) October 1, 2010

31.91 = $ 113.75

33.09 = $ 113.75

34.35 = $ 113.75

Atlantic

Job Planning and Control (PRC-1)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

17.56 = $ 65.88

18.22 = $ 68.36

18.90 = $ 70.91

A) October 1, 2007

17.96 = $ 67.38

18.64 = $ 69.93

19.33 = $ 72.52

B) October 1, 2008

18.23 = $ 68.40

18.92 = $ 70.98

19.62 = $ 73.61

C) October 1, 2009

18.50 = $ 69.41

19.20 = $ 72.04

19.91 = $ 74.70

D) October 1, 2010

18.78 = $ 70.46

19.49 = $ 73.12

20.21 = $ 75.82

Job Planning and Control (PRC-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

20.18 = $ 75.71

20.93 = $ 78.53

21.74 = $ 81.56

A) October 1, 2007

20.64 = $ 77.44

21.41 = $ 80.33

22.24 = $ 83.44

B) October 1, 2008

20.95 = $ 78.60

21.73 = $ 81.53

22.57 = $ 84.68

C) October 1, 2009

21.26 = $ 79.76

22.06 = $ 82.77

22.91 = $ 85.95

D) October 1, 2010

21.58 = $ 80.96

22.39 = $ 84.00

23.25 = $ 87.23

Job Planning and Control (PRC-6)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

25.96 = $ 97.40

26.95 = $ 101.11

27.95 = $ 104.86

A) October 1, 2007

26.56 = $ 99.65

27.57 = $ 103.44

28.59 = $ 107.27

B) October 1, 2008

26.96 = $ 101.15

27.98 = $ 104.98

29.02 = $ 108.88

C) October 1, 2009

27.36 = $ 102.65

28.40 = $ 106.55

29.46 = $ 110.53

D) October 1, 2010

27.77 = $ 104.19

28.83 = $ 108.17

29.90 = $ 112.18

Toronto

Job Planning and Control (PRC-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

22.45 = $ 84.22

23.30 = $ 87.42

24.17 = $ 90.68

A) October 1, 2007

22.97 = $ 86.18

23.84 = $ 89.44

24.73 = $ 92.78

B) October 1, 2008

23.31 = $ 87.46

24.20 = $ 90.79

25.10 = $ 94.17

C) October 1, 2009

23.66 = $ 88.77

24.56 = $ 92.14

25.48 = $ 95.60

D) October 1, 2010

24.01 = $ 90.08

24.93 = $ 93.53

25.86 = $ 97.02

Winnipeg

Job Planning and Control (PRC-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

21.80 = $ 81.79

22.63 = $ 84.90

23.47 = $ 88.06

A) October 1, 2007

22.30 = $ 83.67

23.15 = $ 86.85

24.01 = $ 90.08

B) October 1, 2008

22.63 = $ 84.90

23.50 = $ 88.17

24.37 = $ 91.43

C) October 1, 2009

22.97 = $ 86.18

23.85 = $ 89.48

24.74 = $ 92.82

D) October 1, 2010

23.31 = $ 87.46

24.21 = $ 90.83

25.11 = $ 94.21

Edmonton

Job Planning and Control (PRC-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

21.80 = $ 81.79

22.63 = $ 84.90

23.47 = $ 88.06

A) October 1, 2007

22.30 = $ 83.67

23.15 = $ 86.85

24.01 = $ 90.08

B) October 1, 2008

22.63 = $ 84.90

23.50 = $ 88.17

24.37 = $ 91.43

C) October 1, 2009

22.97 = $ 86.18

23.85 = $ 89.48

24.74 = $ 92.82

D) October 1, 2010

23.31 = $ 87.46

24.21 = $ 90.83

25.11 = $ 94.21

British Columbia

Job Planning and Control (PRC-1)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

24.85 = $ 93.23

25.77 = $ 96.68

26.73 = $ 100.29

A) October 1, 2007

25.42 = $ 95.37

26.36 = $ 98.90

27.34 = $ 102.58

B) October 1, 2008

25.80 = $ 96.80

26.76 = $ 100.40

27.75 = $ 104.11

C) October 1, 2009

26.19 = $ 98.26

27.16 = $ 101.90

28.17 = $ 105.69

D) October 1, 2010

26.58 = $ 99.72

27.57 = $ 103.44

28.59 = $ 107.27

Appendix "E"

Non-Supervisory Printing Services

Employees of the Machinery Maintaining Sub-Group
Hourly Pay Rates and Monthly Union Dues (in dollars)
CEP LOCAL 588G

Table Legend

  • $) Effective October 1, 2006
  • A) Effective October 1, 2007
  • B) Effective October 1, 2008
  • C) Effective October 1, 2009
  • D) Effective October 1, 2010

Ottawa-Hull

Machinery Maintaining (MAI-1)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

17.55 = $ 65.84

18.21 = $ 68.32

18.89 = $ 70.87

A) October 1, 2007

17.95 = $ 67.35

18.63 = $ 69.90

19.32 = $ 72.49

B) October 1, 2008

18.22 = $ 68.36

18.91 = $ 70.95

19.61 = $ 73.57

C) October 1, 2009

18.49 = $ 69.37

19.19 = $ 72.00

19.90 = $ 74.66

D) October 1, 2010

18.77 = $ 70.42

19.48 = $ 73.09

20.20 = $ 75.79

Machinery Maintaining (MAI-2)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

19.76 = $ 74.14

20.48 = $ 76.84

21.25 = $ 79.73

A) October 1, 2007

20.21 = $ 75.82

20.95 = $ 78.60

21.74 = $ 81.56

B) October 1, 2008

20.51 = $ 76.95

21.26 = $ 79.76

22.07 = $ 82.80

C) October 1, 2009

20.82 = $ 78.11

21.58 = $ 80.96

22.40 = $ 84.04

D) October 1, 2010

21.13 = $ 79.28

21.90 = $ 82.17

22.74 = $ 85.32

Machinery Maintaining (MAI-3)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

23.14 = $ 86.82

24.02 = $ 90.12

24.91 = $ 93.46

A) October 1, 2007

23.67 = $ 88.81

24.57 = $ 92.18

25.48 = $ 95.60

B) October 1, 2008

24.03 = $ 90.16

24.94 = $ 93.57

25.86 = $ 97.02

C) October 1, 2009

24.39 = $ 91.51

25.31 = $ 94.96

26.25 = $ 98.49

D) October 1, 2010

24.76 = $ 92.90

25.69 = $ 96.38

26.64 = $ 99.95

Machinery Maintaining (MAI-4)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

25.76 =$ 96.65

26.74 = $ 100.32

27.72 = $ 104.00

A) October 1, 2007

26.35 = $ 98.86

27.36 = $ 102.65

28.36 = $ 106.40

B) October 1, 2008

26.75 = $ 100.36

27.77 = $ 104.19

28.79 = $ 108.02

C) October 1, 2009

27.15 = $ 101.86

28.19 = $ 105.76

29.22 = $ 109.63

D) October 1, 2010

27.56 = $ 103.40

28.61 = $ 107.34

29.66 = $ 111.28

Machinery Maintaining (MAI-5)
Effective Date Step 1 Step 2 Step 3
$) October 1, 2006

28.46 = $ 106.78

29.54 = $ 110.83

30.67 = $ 115.07

A) October 1, 2007

29.11 = $ 109.22

30.22 = $ 113.38

31.38 = $ 113.75

B) October 1, 2008

29.55 = $ 110.87

30.67 = $ 115.07

31.85 = $ 113.75

C) October 1, 2009

29.99 = $ 112.52

31.13 = $ 116.79

32.33 = $ 113.75

D) October 1, 2010

30.44 = $ 113.75

31.60 = $ 113.75

32.81 = $ 113.75

Page details

Date modified: