Notice of Defect Handbook: table 1
Table 1: Summary of Notice of Defect Reporting Steps by Applicable Regulations
Notice of Defect Reporting Steps | On-Road Vehicle and Engine Emission Regulations | Off-Road Compression-Ignition Engine Emission Regulations | Off-Road Small Spark- Ignition Engine Emission Regulations | Marine Spark-Ignition Engine, Vessel and Off-Road Recreational Vehicle Emission Regulations |
---|---|---|---|---|
Step 1: Notice of Defect “on becoming aware” Please refer to section 3.3 of this document. |
Notice of defect containing the information described in subsection 45(1). | Notice of defect containing the information described in subsection 25(1). | Notice of defect containing the information described in subsection 26(1). | Notice of defect containing the information described in subsection 43(1). |
Step 2: Initial Report Within 60 days after a notice of defect has been given |
An initial report containing the information described in subsection 45(2). | An initial report containing the information described in subsection 25(2). | An initial report containing the information described in subsection 26(2). | An initial report containing the information described in subsection 43(2). |
Step 3: Follow-up Reports |
Quarterly reports containing the information specified in subsection 45(3) within 45 days after the end of each calendar quarterFootnotea for a period of two years. | Quarterly reports containing the information specified in subsection 25(3) within 45 days after the end of each calendar quarterFootnotea for a period of two years. | A report containing the information specified in subsection 26(3) not later than 24 months after giving notice of defect. |
|
Note: The Passenger Automobile and Light Truck Greenhouse Gas Emission Regulations and the Heavy-duty Vehicle and Engine Greenhouse Gas Emission Regulations refer to information set out in subsection 45(1) of the On-Road Vehicle and Engine Emisison Regulations.
Page details
- Date modified: