Wood preservation facilities, general recommendations: chapter A, table 21


Table 21. Recommended Operating Practices for Kiln, Accelerated Fixation Chamber and Dripping Area (All Preservatives)

Routine checks

Objective: Define procedural practices that will enhance environmental and worker safety.

Operation Recommendations
Worker safety
  • Follow the personnel safety precautions for all procedures from Tables 6 and Table 8.
  • Procedure for operating practices should be available to workers.
Vent
  • Ensure that all vents are working properly prior to loading the charge.
Charges
  • Ensure that the charge is still stable (strapped).
Recycle systems
  • Ensure that drains or sumps are free of debris.

Drip free

Objective: Monitor the charges to ensure all drippage has stopped (48hr may not be sufficient in certain conditions)

Operation Recommendations
Condition control
  • Check time.
  • Minimum times have been established for some preservatives (ACQ, CA-B), while other times will be dependent on the preservative used, wood species and type of wood (posts, lumber, poles for example).
Drip free
  • Material can only be removed from contained area when all drippage has stopped.

Fixation/Stabilization

Objective: Monitor the fixation/stabilization during and after accelerated fixation/stabilization in the chamber/kiln or drip pad..

Operation Recommendations
Condition control
  • Check humidity.
  • Check temperature.
  • Check time.
Vent
  • Ensure that all vents are working properly in the accelerated fixation room.
Drip free
  • Conduct a fixation test for CCA.
Prior to yard storage
  • Preservative should be fixed (for CCA) or drip free.

Page details

Date modified: