Performance results for the internal audit function

Performance results for the internal audit function as of June 30, 2025

Table 1: Attributes
Compliance attributes Key compliance attribute Results
  • Do internal auditors in departments have the training required to do the job effectively? Are multidisciplinary teams in place to address diverse risks?
Percentage of staff with an internal audit or accounting designation (Certified Internal Auditor [CIA], Chartered Professional Accountant [CPA]). Staff members may hold multiple designations or certifications and may be counted in all three statistics. As a result, the percentages should not be considered parts of a whole. 39%
Percentage of staff with an internal audit or accounting designation (CIA, CPA) in progress. 46%
Percentage of staff holding other designations (CGAP, CISA, CFE, etc.) 21%
  • Is internal audit work performed in conformance with the international standards for the profession of internal audit, as required by Treasury Board policy?
Date of last comprehensive briefing to the Departmental Audit Committee on the internal processes, tools, and information considered necessary to evaluate conformance with the IIA Code of Ethics and the Standards, as well as the results of the quality assurance and improvement program (QAIP). November 3, 2024 for both the Public Health Agency of Canada (PHAC) and Health Canada (HC)
Date of last external assessment. June 2021
  • Are the Risk-based Audit Plans (RBAPs) submitted to audit committees and approved by deputy heads implemented as planned, with resulting reports published? Is management acting on audit recommendations for improvements to departmental processes?

RBAPs and related information:

  • name and status of audits for the current fiscal year of the RBAP
  • date the audit report was approved
  • date the audit report was published
  • original planned date for completion of all Management Response Action Plan (MRAP) items
  • status of MRAP items
See Table 2: 2024-2025 Status of Audit Projects as of June 30, 2025.

Is internal audit credible and adding value in support of the mandate and strategic objectives of the organization?

Yes. 100% of PHAC and HC's senior management provided a "Good" or "Excellent" rating of the internal audit function's ability to provide valuable insights to effectively support organizational objectives, along with its role in driving improvements to governance and risk management.

The internal audit function leveraged the annual RBAP refresh consultations with senior management during the 2024-2025 fiscal year to gather their perspectives on the value internal audit provides to both organizations.

Table 2: 2024-2025 Status of Audit Projects as of June 30, 2025
Audit project Organization Audit status Date report approved Date report published Date planned for original MRAP completion Implementation status
Audit of Drug Shortage Reporting, monitoring and Compliance Activities HC Published – MRAP not fully implemented May 27, 2024 September 23, 2024 June 30, 2025 50%
Audit of the Security of National Emergency Strategic Stockpile (NESS) Warehouse Facilities PHAC Published – MRAP fully implemented December 7, 2022 March 27, 2023 August 31, 2023 100%
Audit of Surveillance Activities PHAC Published – MRAP not fully implemented July 16, 2020 September 18, 2020 November 30, 2021 94%
Audit of the Management of Intellectual Property PHAC Published – MRAP not fully implemented April 10, 2024 August 8, 2024 June 30, 2025 20%
Audit of the Safe Voluntary Isolation Sites Program PHAC Published – MRAP not fully implemented October 24, 2024 February 27, 2025 March 31, 2025 TBD
Audit of Conflict of Interest at PHAC PHAC Published – MRAP not fully implemented June 26, 2024 October 22, 2024 March 31, 2025 75%
Audit of Cybersecurity at the National Microbiology Laboratory PHAC Approved – Not published ( Publication was withheld due to identified cyber security vulnerabilities.) September 27, 2024 N/A January 1, 2026 41%
Audit of Occupational Health and Safety HC and PHAC Published - MRAP not fully implemented January 20, 2025 TBD September 30, 2026 18%
Audit of Cyber Security at HC and PHAC HC and PHAC Published – MRAP fully implemented

PHAC: Dec 16, 2023
HC: Dec 13, 2023

April 16, 2024 September 30, 2024 100%
Audit of Monitoring of Internal Control over Financial Management (previous name: Audit of Key Internal Controls) HC and PHAC Published – MRAP not applicable

PHAC: Oct 11, 2024
HC: Nov 20, 2024

PHAC: February 11, 2025
HC: Mar 20, 2025

N/A (There were no recommendations issued for this engagement.) N/A
Horizontal Audit of Information Management at HC and PHAC HC and PHAC In progress TBD TBD TBD TBD
Audit of Project Management HC In progress TBD TBD TBD TBD
Audit of Inspection Activities HC In progress TBD TBD TBD TBD
Audit of Grants and Contributions HC In progress TBD TBD TBD TBD
Audit of SGBA Plus Implementation (previous name: Audit of Sex and Gender-based Analysis Plus [SGBA+] at PHAC) PHAC Approved - Not published June 23, 2025 TBD TBD TBD
Audit of Overtime Management at PHAC and HC (engagement initially involved only PHAC, but now includes PHAC and HC) HC and PHAC In progress TBD TBD TBD TBD
Audit of Project Management PHAC In progress TBD TBD TBD TBD
Audit of Governance and Strategic Planning of IT HC and PHAC In progress TBD TBD TBD TBD
Audit of Regional Operations PHAC In progress TBD TBD TBD TBD
Audit of IT Procurement and Contracting HC and PHAC In progress TBD TBD TBD TBD

Performance results for the internal audit function of March 31, 2025

Table 1: 2024-2025 Status of Audit Projects as of March 31, 2025
Audit project Organization Audit status Date report approved Date report published Date planned for original MRAP completion Implementation status
Audit of Drug Shortage Reporting, monitoring and Compliance Activities HC Published – MRAP not fully implemented May 27, 2024 September 23, 2024 June 30, 2025 25%
Audit of the Security of National Emergency Strategic Stockpile (NESS) Warehouse Facilities PHAC Published – MRAP fully implemented December 7, 2022 March 27, 2023 August 31, 2023 100%
Audit of Surveillance Activities PHAC Published – MRAP not fully implemented July 16, 2020 September 18, 2020 November 30, 2021 94%
Audit of the Management of Intellectual Property PHAC Published – MRAP not fully implemented April 10, 2024 August 8, 2024 June 30, 2025 20%
Audit of the Safe Voluntary Isolation Sites Program PHAC Published – MRAP not fully implemented October 24, 2024 February 27, 2025 March 31, 2025 TBD
Audit of Conflict of Interest at PHAC PHAC Published – MRAP not fully implemented June 26, 2024 October 22, 2024 March 31, 2025 25%
Audit of Cybersecurity at the National Microbiology Laboratory PHAC Approved – Not published (Publication was withheld due to identified cyber security vulnerabilities.) September 27, 2024 N/A
(Publication was withheld due to identified cyber security vulnerabilities.)
January 1, 2026 TBD
Audit of the Occupational Health and Safety Program HC and PHAC Approved – Not published January 20, 2025 TBD September 30, 2026 TBD
Audit of Cyber Security at HC and PHAC HC and PHAC Published – MRAP fully implemented

PHAC: Dec 16, 2023
HC: Dec 13, 2023

April 16, 2024 September 30, 2024 100%
Audit of Information Management at HC and PHAC HC and PHAC In progress TBD TBD TBD TBD
Audit of Monitoring of Internal Control over Financial Management (previous name: Audit of Key Internal Controls) HC and PHAC Published – MRAP not fully implemented

PHAC: Oct 11, 2024
HC: Nov 20, 2024

PHAC: February 11, 2025
HC: Mar 20, 2025

N/A (There were no recommendations issued for this engagement.) N/A
Audit of Project Management HC In progress TBD TBD TBD TBD
Audit of Inspection Activities HC In progress TBD TBD TBD TBD
Audit of Grants and Contributions HC In progress TBD TBD TBD TBD
Audit of Sex and Gender-based Analysis Plus (SGBA+) at PHAC PHAC In progress TBD TBD TBD TBD
Audit of Overtime Management HC and PHAC In progress TBD TBD TBD TBD
Audit of Project Management PHAC In progress TBD TBD TBD TBD
Audit of Governance and Strategic Planning of IT HC and PHAC In progress TBD TBD TBD TBD

Performance results for the internal audit function as of June 30, 2024

Compliance attributes Key compliance attribute Results
1. Do internal auditors in departments have the training required to do the job effectively? Are multidisciplinary teams in place to address diverse risks?

Percentage of staff with an internal audit or accounting designation (Certified Internal Auditor [CIA], Chartered Professional Accountant [CPA]).

Staff members may hold multiple designations or certifications and may be counted in all three statistics. As a result, the percentages should not be considered parts of a whole.

42%

Percentage of staff with an internal audit or accounting designation (CIA, CPA) in progress.

Staff members may hold multiple designations or certifications and may be counted in all three statistics. As a result, the percentages should not be considered parts of a whole.

42%

Percentage of staff holding other designations (CGAP, CISA, CFE, etc.)

Staff members may hold multiple designations or certifications and may be counted in all three statistics. As a result, the percentages should not be considered parts of a whole.

19%
2. Is internal audit work performed in conformance with the international standards for the profession of internal audit as required by Treasury Board policy? Date of last comprehensive briefing to the Departmental Audit Committee on the internal processes, tools, and information considered necessary to evaluate conformance with the IIA Code of Ethics and the Standards, as well as the results of the quality assurance and improvement program (QAIP).

October 6, 2023 for PHAC

November 21, 2023 for HC

Date of last external assessment. June 2021
3. Are the Risk-based Audit Plans (RBAPs) submitted to audit committees and approved by deputy heads implemented as planned with resulting reports published? Is management acting on audit recommendations for improvements to departmental processes?

RBAPs and related information:

  • name and status of audit for the current fiscal year of the RBAP
  • date the audit report was approved
  • date the audit report was published
  • original planned date for completion of all management response and action plan (MRAP) items
  • status of MRAP items.

See Status of FY 2023-24 Projects
table.

4. Is internal audit credible and adding value in support of the mandate and strategic objectives of the organization?

Yes. By combining robust audit methods with strategic advisory services, the internal audit function remains a vital resource for senior management as denoted by the high demands for advisory projects. In addition, senior management increasingly seeks the internal audit function's involvement in executive committees, which internal audit carries out in an advisory capacity to ensure its independence and objectivity. This highlights internal audit's ability to provide valuable insights to effectively support organizational objectives, along with its role in driving improvements to governance and risk management.

The Chief Audit Executive continues to have regular and ongoing conversations with senior management to ensure the internal audit function is providing value to the organization.

Status of FY 2023-24 Projects
Audit Project Organization Audit status Date report approved Date report published Date planned for original MRAP completion Implementation status
Audit of Integrated Risk Management HC Published – MRAP fully implemented January 30, 2023 May 26, 2023 December 31, 2023 100%
Audit of Drug Shortage Reporting, monitoring and Compliance Activities HC Approved – Not published May 27, 2024 TBD June 30, 2025 TBD
Audit of Project Management HC In progress TBD TBD TBD TBD
Audit of the Security of National Emergency Strategic Stockpile (NESS) Warehouse Facilities PHAC Published – MRAP not fully implemented December 7, 2022 March 27, 2023 August 31, 2023 80%
Audit of Enterprise Risk Management PHAC Published – MRAP fully implemented June 21, 2023 October 19, 2023 December 31, 2023 100%
Audit of the Management of Intellectual Property PHAC Published – MRAP not fully implemented April 10, 2024 August 2, 2024 June 30, 2025 TBD
Audit of the Safe Voluntary Isolation Sites Program PHAC In progress TBD TBD TBD TBD
Audit of Conflict of Interest at PHAC PHAC Approved – Not published June 26, 2024 TBD TBD TBD
Audit of Overtime Management PHAC In progress TBD TBD TBD TBD
Audit of Monitoring of Internal Control over Financial Management (previous name: Audit of Key Internal Controls) PHAC In progress TBD TBD TBD TBD
Audit of Cybersecurity at National Microbiology Lab PHAC In progress TBD TBD TBD TBD
Audit of Sex and Gender-based Analysis Plus (SGBA+) at PHAC PHAC In progress TBD TBD TBD TBD
Audit of the Occupational Health and Safety Program HC and PHAC In progress TBD TBD TBD TBD
Audit of Cyber Security at HC and PHAC HC and PHAC Published – MRAP not fully implemented PHAC: Dec 16, 2023
HC: Dec 13, 2023
April 16, 2024 September 30, 2024 TBD
Audit of Information Management at HC and PHAC HC and PHAC In progress TBD TBD TBD TBD
Audit of Business Continuity Plans for Critical Services HC and PHAC Published – MRAP fully implemented PHAC: October 26, 2022
HC: September 28, 2022
February 16, 2023 April 30, 2023 100%

Performance results for the internal audit function as of June 30, 2023

Compliance attributes Key compliance attribute Results
Do internal auditors in departments have the training required to do the job effectively? Are multidisciplinary teams in place to address diverse risks? Percentage of staff with an internal audit or accounting designation (Certified Internal Auditor [CIA], Chartered Professional Accountant [CPA]). 21%
Percentage of staff with an internal audit or accounting designation (CIA, CPA) in progress. 33%
Percentage of staff holding other designations (CGAP, CISA, CFE, etc.) 18%
Is internal audit work performed in conformance with the international standards for the profession of internal audit, as required by Treasury Board policy? Date of last comprehensive briefing to the Departmental Audit Committee on the internal processes, tools, and information considered necessary to evaluate conformance with the IIA Code of Ethics and the Standards, as well as the results of the quality assurance and improvement program (QAIP).

October 3, 2022 for PHAC

November 22, 2022 for HC

Date of last external assessment. May 2021
Are the RBAPs submitted to audit committees and approved by deputy heads implemented as planned, with resulting reports published? Is management acting on audit recommendations for improvements to departmental processes?

RBAPs and related information:

  • name and status of audit for the current fiscal year of the RBAP
  • date the audit report was approved
  • date the audit report was published
  • original planned date for completion of all management action plan (MAP) items
  • status of MAP items.
See 2022-23 Status of Audit Projects table below.
Is internal audit credible and adding value in support of the mandate and strategic objectives of the organization? Average overall usefulness rating from senior management (ADM-level or equivalent) of areas audited. Consolidated Results - Client Satisfaction = 93%
Status of FY 2022-23 Projects
Audit Project Organization Audit status Date report approved Date report published Date planned for original MAP completion Implementation status
Audit of Investment Planning of Capital Assets at Health Canada HC Approved April 9, 2022 August 3, 2022 March 31, 2022 100%
Audit of Integrated Risk Management HC Approved January 30, 2023 May 26, 2023 December 31, 2023 56%
Review of the Fraud Risk Assessment Process HC Approved March 23, 2023 N/A N/A N/A
Readiness Assessment of the Critical Drug Reserve Program HC Approved N/A N/A N/A N/A
Federal Workplace Testing Program Readiness Assessment HC In-progress N/A N/A N/A N/A
Audit of Drug Shortage Reporting, Monitoring and Compliance Activities HC In-progress TBD TBD TBD TBD
Pest Management Regulatory Agency Transformation - Governance HC Approved N/A N/A N/A N/A
Pest Management Regulatory Agency Transformation - Risk Management HC In-progress N/A N/A N/A N/A
Audit of Management Controls and Governance around Border Reopening PHAC Approved June 30, 2022 October 25, 2022 June 30, 2022 100%
Audit of the Security of National Emergency Strategic Stockpile Warehouse Facilities PHAC Approved December 7, 2022 March 27, 2023 August 31, 2023 77%
Audit of Enterprise Risk Management PHAC Approved June 21, 2023 TBD December 31, 2023 85%
Review of the Fraud Risk Assessment Process PHAC Approved April 5, 2023 N/A N/A N/A
Audit of the Management of Intellectual Property PHAC In-progress TBD TBD TBD TBD
Audit of the Safe Voluntary Isolation Sites Program PHAC In-progress TBD TBD TBD TBD
Audit of Conflict of Interest at PHAC PHAC In-progress TBD TBD TBD TBD
Audit of the Business Continuity Plans for Critical Services HC and PHAC Approved PHAC: October 26, 2022
HC: September 28, 2022
February 16, 2023 April 30, 2023 31%
Readiness Assessment for Rapid Tests (HC and PHAC) HC and PHAC Approved N/A N/A N/A N/A

Performance results for the internal audit function as of June 30, 2022

Compliance attributes Key compliance attribute Results
Do internal auditors in departments have the training required to do the job effectively? Are multidisciplinary teams in place to address diverse risks? Percentage of staff with an internal audit or accounting designation of Certified Internal Auditor (CIA) or Chartered Professional Accountant (CPA). 33%
Percentage of staff with an internal audit or accounting designation (CIA, CPA) in progress. 42%
Percentage of staff holding other designations (CGAP, CISA, CFE, etc.) 25%
Is internal audit work performed in compliance with the international standards for the internal audit profession, as required by Treasury Board policy? Date of last comprehensive briefing to the Departmental Audit Committee on the internal processes, tools, and information considered necessary to evaluate compliance with the IIA Code of Ethics and the Standards, as well as the results of the quality assurance and improvement program (QAIP). May 28, 2021 for HC
June 15, 2021 for PHAC
Date of last external assessment. May 2021
Are the RBAPs submitted to audit committees and approved by deputy heads implemented as planned, with resulting reports published? Is management acting on audit recommendations for improvements to departmental processes? RBAPs and related information:
  • name and status of audit for the current fiscal year of the RBAP
  • date the audit report was approved
  • date the audit report was published
  • original planned date for completion of all management action plan (MAP) items
  • status of MAP items
See 2021-22 Status of Audit Projects table below.
Is internal audit credible and adding value in support of the mandate and strategic objectives of the organization? Average overall usefulness rating from senior management (ADM-level or equivalent) of areas audited. Consolidated Results - Client Satisfaction = 88%
Status of FY 2021-22 Projects
Audit Project Organization Audit status Date report approved Date report published Date planned for original MAP completion Implementation status
Readiness Assessment for the Wellness Together Canada Initiative HC Approved September 17, 2021 N/A N/A N/A
Audit of Investment Planning HC Approved April 9, 2022 In progress March 31, 2022 TBD
Audit of Integrated Risk Management HC In progress TBD TBD TBD TBD
Audit of the Development of VaccineConnect PHAC Approved January 4, 2022 April 5, 2022 December 31, 2021 100%
Audit of Management Controls and Governance around Border Reopening PHAC Completed – Not yet approved TBD TBD TBD TBD
Audit of COVID-19 National Emergency Strategic Stockpile (NESS) Warehouse Facilities PHAC In progress TBD TBD TBD TBD
Management of Intellectual Property - NML PHAC In progress TBD TBD TBD TBD
Audit of Integrated Risk Management PHAC In progress TBD TBD TBD TBD
Audit of Cybersecurity at NMLB PHAC In progress TBD TBD TBD TBD
Audit of Staffing Service Delivery HC and PHAC Approved April 26, 2021 August 18, 2021 March 31, 2021 100%
Audit of IT Asset Management HC and PHAC Approved February 7, 2022 June 24, 2022 March 31, 2023 10%
Audit of the Business Continuity Plans for Staff Delivering Critical Services HC and PHAC Completed – Not yet approved TBD TBD TBD TBD
Audit of Cybersecurity at PHAC and HC HC and PHAC In progress TBD TBD TBD TBD
Status of FY 2022-23 Projects
Audit Project Organization Audit status Date report approved Date report published Date planned for original MAP completion Implementation statusFootnote *
Readiness Assessment of the Critical Drug Reserve Program HC In progress TBD N/A N/A N/A
Consulting Engagement for PMRA Transformation PHAC In progress TBD N/A N/A N/A
Readiness Assessment for Rapid Tests (HC and PHAC) HC and PHAC In Progress TBD N/A N/A N/A

Performance results for the internal audit function as of June 30, 2021

Compliance attributes Key compliance attribute Results
Do internal auditors in departments have the training required to do the job effectively? Are multidisciplinary teams in place to address diverse risks? Percentage of staff with an internal audit or accounting designation (Certified Internal Auditor [CIA], Chartered Professional Accountant [CPA]). 41%
Percentage of staff with an internal audit or accounting designation (CIA, CPA) in progress. 44%
Percentage of staff holding other designations (CGAP, CISA, CFE, etc.) 29%
Is internal audit work performed in conformance with the international standards for the profession of internal audit as required by Treasury Board policy? Date of last comprehensive briefing to the Departmental Audit Committee on the internal processes, tools, and information considered necessary to evaluate conformance with the IIA Code of Ethics and the Standards, as well as the results of the quality assurance and improvement program (QAIP). May 28, 2021 for HC
June 15, 2021 for PHAC
Date of last external assessment. May 2021
Are the RBAPs submitted to audit committees and approved by deputy heads implemented as planned with resulting reports published? Is management acting on audit recommendations for improvements to departmental processes? RBAPs and related information:
  • name / status of audit for the current fiscal year of the RBAP
  • date the audit report was approved
  • date the audit report was published
  • original planned date for completion of all management action plan (MAP) items
  • status of MAP items
See Status of FY 2020-21 Projects table below.
Is internal audit credible and adding value in support of the mandate and strategic objectives of the organization? Average overall usefulness rating from senior management (ADM-level or equivalent) of areas audited. Consolidated Results - Client Satisfaction = 89%

Status of FY 2020-21 projects

Audit project Organization Audit status Date report approved Date report published Date planned for original MAP completion Implementation status
Audit of Controlled Substances HC Approved - published January 14, 2021 May 20, 2021 December 31, 2020 25%
Joint Audit and Evaluation on the Medical Devices Program HC Approved - published Nov. 23, 2020 March 31, 2021 December 31, 2022 0%
Audit of Inspection Activities HC Approved - published May 10, 2020 August 6, 2020 June 30, 2021 75%
Audit of IT Systems Development HC and PHAC Approved - published May 10, 2020 May 13, 2020 May 31, 2021 75%
Audit of the Multi-Sectoral Partnership Program PHAC Approved - published April 29, 2020 July 31, 2020 April 1, 2021 0%
Audit of Surveillance Activities PHAC Approved - published July 16, 202 September 17, 2020 November 30, 2021 0%
Audit of IT Asset Management HC and PHAC In Progress TBD TBD TBD TBD
Audit of Investment Planning HC In Progress TBD TBD TBD TBD
Consulting Engagement for Antimicrobial Resistance HC In Progress TBD TBD TBD TBD
Readiness Assessment for the Wellness Together Canada Initiative HC In Progress TBD TBD TBD TBD
Readiness Assessment of Contracts Phase I - Consulting Engagement HC Completed N/A N/A N/A N/A
Readiness Assessment of Contracts Phase II - Consulting Engagement HC In Progress N/A N/A N/A N/A
PHAC Data Strategy - Program Under Development Audit (Cycles 1 & 2) PHAC Completed N/A N/A N/A N/A
Review of the Framework for Science and Research Excellence Implementation HC On hold N/A N/A N/A N/A
Consulting Engagement for Compensation Support Services HC Completed N/A N/A N/A N/A
Consulting Engagement of National Microbiology Laboratory Staffing Practices PHAC Completed N/A N/A N/A N/A

Updated: June 30, 2020

Compliance attributes Key compliance attribute Results
Do internal auditors in departments have the training required to do the job effectively? Are multidisciplinary teams in place to address diverse risks? Percentage of staff with an internal audit or accounting designation (Certified Internal Auditor [CIA], Chartered Professional Accountant [CPA]). 27%
Percentage of staff with an internal audit or accounting designation (CIA, CPA) in progress. 50%
Percentage of staff holding other designations (CGAP, CISA, CFE, etc.) 27%
Is internal audit work performed in conformance with the international standards for the profession of internal audit as required by Treasury Board policy? Date of last comprehensive briefing to the Departmental Audit Committee on the internal processes, tools, and information considered necessary to evaluate conformance with the IIA Code of Ethics and the Standards, as well as the results of the quality assurance and improvement program (QAIP).

June 16, 2020 for HC

July 6, 2020 for PHAC

Date of last external assessment. June 2016
Are the RBAPs submitted to audit committees and approved by deputy heads implemented as planned with resulting reports published? Is management acting on audit recommendations for improvements to departmental processes?

RBAPs and related information:

  • name / status of audit for the current fiscal year of the RBAP
  • date the audit report was approved
  • date the audit report was published
  • original planned date for completion of all management action plan (MAP) items
  • status of MAP items
See Status of FY 2019-20 Projects and Status of FY 2020-21 Projects table below.
Is internal audit credible and adding value in support of the mandate and strategic objectives of the organization? Average overall usefulness rating from senior management (ADM-level or equivalent) of areas audited. Consolidated Results - Client Satisfaction = 90%

Status of FY 2019-20 projects

Audit Project Organization Audit status Date report approved Date report published Date planned for original MAP completion Implementation statusFootnote *
Audit of the Determination of Recoverable Amounts for Grants and Contributions PHAC Approved - published September 13, 2019 January 14, 2020 December 31, 2019 40%
Audit of the Multi-Sectoral Partnerships (MSP) Program to Promote Healthy Living and Prevent Chronic Disease PHAC Approved - to be published April 29, 2020 In progress July 2021 TBD
Audit of Surveillance PHAC In progress TBD TBD TBD TBD
HR's monitoring of staffing practices at the National Microbiology Lab (Consulting Engagement) PHAC Approved April 26, 2020 N/A N/A N/A
Data Strategy Program Under Development Audit (audits performed in three-month cycles throughout the program's lifecycle) PHAC In progress TBD TBD TBD TBD
Audit of Inspection Activities HC Approved - to be published May 10, 2020 In progress June 2021 TBD
Audit of Controlled Substances HC In progress TBD TBD TBD TBD
Program Implementation of the Cannabis Act (Consulting Engagement) HC In progress TBD N/A N/A N/A
Audit of the Management of Grants and Contributions - Phase II HC Approved - published November 9, 2019 March 17, 2020 December 2020 TBD
Joint Audit and Evaluation of the Medical Devices Program HC In progress TBD TBD TBD TBD
Governance Review (Consulting Engagement) HC Approved March 13, 2020 N/A N/A N/A
Audit of IT Asset Management HC and PHAC In Progress TBD TBD TBD TBD
Audit of Procurement and Contracting HC and PHAC Approved - published October 21, 2019 February 28, 2020 September 30, 2020 16%
Audit of the Management of Privacy Practices HC and PHAC Approved - published December 2, 2019 April 3, 2020 December 2020 TBD
Audit of Information Technology Systems Development HC and PHAC Approved - to be published May 7, 2020 In progress May 2021 TBD

Status of FY 2020-21 projects

Audit Project Organization Audit status Date report approved Date report published Date planned for original MAP completion Implementation statusFootnote *
Audit of the Management of Scientific Research HC and PHAC In progress TBD TBD TBD TBD
Audit of Staffing Service Delivery HC and PHAC In progress TBD TBD TBD TBD
Compensation Support Services (Consulting Engagement) HC In progress TBD N/A N/A N/A
Antimicrobial Resistance Readiness Review (Consulting Engagement) PHAC In progress TBD TBD TBD TBD

Updated: June 30, 2019

Compliance attributes Key compliance attribute Results
Do internal auditors in departments have the training required to do the job effectively? Are multidisciplinary teams in place to address diverse risks? Percentage of staff with an internal audit or accounting designation (Certified Internal Auditor [CIA], Chartered Professional Accountant [CPA]). 31%
Percentage of staff with an internal audit or accounting designation (CIA, CPA) in progress. 62%
Percentage of staff holding other designations (CGAP, CISA, CFE, etc.) 27%
Is internal audit work performed in conformance with the international standards for the profession of internal audit as required by Treasury Board policy? Date of last comprehensive briefing to the Departmental Audit Committee on the internal processes, tools, and information considered necessary to evaluate conformance with the IIA Code of Ethics and the Standards, as well as the results of the quality assurance and improvement program (QAIP). July 2019
Date of last external assessment. June 2016
Are the RBAPs submitted to audit committees and approved by deputy heads implemented as planned with resulting reports published? Is management acting on audit recommendations for improvements to departmental processes? RBAPs and related information:
  • name / status of audit for the current fiscal year of the RBAP
  • date the audit report was approved
  • date the audit report was published
  • original planned date for completion of all management action plan (MAP) items
  • status of MAP items
See Status of FY 2018-19 Projects and Status of FY 2019-20 Projects tables below.
Is internal audit credible and adding value in support of the mandate and strategic objectives of the organization? Average overall usefulness rating from senior management (ADM-level or equivalent) of areas audited. Consolidated Results - Client Satisfaction = 89%

Status of FY 2018-19 projects

Internal audit title Department Audit status Date report approved Date report published Date planned for original MAP completion Implementation status
Consulting Engagement - Review of the Global Public Health Intelligence Network PHAC Approved -not to be published June 5, 2018 N/A N/A N/A
Consulting Engagement - Review of the Joint External Evaluation Process PHAC Approved -not to be published June 5, 2018 N/A N/A N/A
Audit of Biologics and Radiopharmaceuticals HC Approved- published Sept. 25, 2018 Nov. 16, 2018 March 31, 2019 100%
Audit of the Biosecurity Program PHAC Approved- published March 28, 2019 May 17, 2019 April 1, 2020 40%
Consulting Engagement - Review of the Opioid Crisis Response HC Approved - not to be published Feb. 28, 2019 N/A N/A N/A
Audit of Contracting and Procurement HC and PHAC In progress - - - -
Audit of Grants and Contributions Phase II HC In progress - - - -
Status of FY 2019-20 Projects
Internal audit title Department Audit status Date report approved Date report published Date planned for original MAP completion Implementation status
Acquisition Cards PHAC and HC Approved- published March 29, 2019 May 17, 2019 Dec. 31, 2018 100%
Determination of Recoverable Amounts PHAC In progress - - - -
Multi-sectoral Partnerships PHAC In progress - - - -
Surveillance Activities PHAC In progress - - - -
Inspection Activities HC In progress - - - -
Controlled Substances HC In progress - - - -
Medical Devices Program HC In progress - - - -
Program for Implementation of the Cannabis Act (Consulting Engagement) HC In progress - - - -
Management of Privacy Practices PHAC and HC In progress - - - -
IT Systems Development PHAC and HC In Progress - - - -
Shared Services Partnership Agreement PHAC and HC In Progress - - - -
Asset Management PHAC and HC In Progress - - - -

Updated: September 30, 2018

Compliance attributes Key compliance attribute Results
Do internal auditors in departments have the training required to do the job effectively? Are multidisciplinary teams in place to address diverse risks? Percentage of staff with an internal audit or accounting designation (Certified Internal Auditor [CIA], Chartered Professional Accountant [CPA]). 27%
Percentage of staff with an internal audit or accounting designation (CIA, CPA) in progress 64%
Percentage of staff holding other designations (CGAP, CISA, CFE, etc.) 45%
Is internal audit work performed in conformance with the international standards for the profession of internal audit as required by Treasury Board policy? Date of last comprehensive briefing to the Departmental Audit Committee on the internal processes, tools, and information considered necessary to evaluate conformance with the IIA Code of Ethics and the Standards, as well as the results of the quality assurance and improvement program (QAIP). June 2018
Date of last external assessment June 2016
Are the RBAPs submitted to audit committees and approved by deputy heads implemented as planned with resulting reports published? Is management acting on audit recommendations for improvements to departmental processes? RBAPs and related information
  • name / status of audit for the current fiscal year of the RBAP
  • date the audit report was approved
  • date the audit report was published
  • original planned date for completion of all management action plan (MAP) items
  • status of MAP items
See Status of FY 2018-19 Projects table below.
Is internal audit credible and adding value in support of the mandate and strategic objectives of the organization? Average overall usefulness rating from senior management (ADM-level or equivalent) of areas audited. Consolidated Results - Client Satisfaction = 86%
Status of FY 2018-19 Projects
Internal audit title Department Audit status Date report approved Date report published Date planned for original MAP completion Implementation status
Consulting Engagement - Review of the Global Public Health Intelligence Network PHAC Approved - not to be published June 5, 2018 N/A N/A N/A
Consulting Engagement - Review of the Joint External Evaluation Process PHAC Approved - not to be published June 5, 2018 N/A N/A N/A
Audit of Biologics and Radiopharmaceuticals HC Approved - not yet published August 29, 2018 - - -
Fraud Risk Assessment HC and PHAC In progress - - - -
Consulting Engagement - Review of the Opioid Crisis Response HC In progress - - - -
Audit of the Biosecurity Program PHAC In progress - - - -
Audit of Contracting and Procurement HC and PHAC In progress - - - -
Audit of Grants and Contributions Phase II HC In progress - - - -

Updated: June 30, 2018

Compliance attributes Key compliance attribute Results
Do internal auditors in departments have the training required to do the job effectively? Are multidisciplinary teams in place to address diverse risks? Percentage of staff with an internal audit or accounting designation [Certified Internal Auditor (CIA), Chartered Professional Accountant (CPA)] 40%
Percentage of staff with an internal audit or accounting designation (CIA, CPA) in progress 45%
Percentage of staff holding other designations (CGAP, CISA, CFE, etc.) 50%
Is internal audit work performed in conformance with the international standards for the profession of internal audit as required by Treasury Board policy? Date of last comprehensive briefing to the Departmental Audit Committee on the internal processes, tools, and information considered necessary to evaluate conformance with the IIA Code of Ethics and the Standards, as well as the results of the quality assurance and improvement program (QAIP) June 2018
Date of last external assessment June 2016
Are the RBAPs submitted to audit committees and approved by deputy heads implemented as planned with resulting reports published? Is management acting on audit recommendations for improvements to departmental processes? RBAPs and related information
  • name / status of audit for the current fiscal year of the RBAP
  • date the audit report was approved
  • date the audit report was published
  • original planned date for completion of all management action plan (MAP) items
  • status of MAP items
See Status of FY 2018-19 Projects table below.
Is internal audit credible and adding value in support of the mandate and strategic objectives of the organization? Average overall usefulness rating from senior management (ADM-level or equivalent) of areas audited. Consolidated Results - Client Satisfaction = 86%
Status of FY 2018-19 Projects
Internal audit title Department Audit status Date report approved Date report published Date planned for original MAP completion Implementation status
Consulting Engagement - Review of the Global Public Health Intelligence Network PHAC Approved - not to be published June 5, 2018 N/A N/A N/A
Consulting Engagement - Review of the Joint External Evaluation Process PHAC Approved - not to be published June 5, 2018 N/A N/A N/A
Audit of Biologics and Radiopharmaceuticals HC In progress - - - -
Fraud Risk Assessment HC and PHAC In progress - - - -
Consulting Engagement - Review of the Opioid Crisis Response HC In progress - - - -
Audit of the Biosecurity Program PHAC In progress - - - -
Audit of Contracting and Procurement HC and PHAC In progress - - - -
Audit of Grants and Contributions Phase II HC In progress - - - -